Year Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62 10,217.53 0.00 0.00 10,217.53 2019 6 1 2 3,584.65 449.36 349.77 10,070.02 0.00 0.00 10,070.02 2019 6 1 3 3,584.65 449.37 349.34 10,069.79 0.00 0.00 10,069.79 2019 6 1 4 3,584.65 449.38 349.76 10,081.04 0.00 0.00 10,081.04 2019 6 1 5 3,584.65 449.37 349.75 10,067.47 0.00 0.00 10,067.47 2019 6 1 6 3,584.65 449.40 349.13 10,058.17 0.00 0.00 10,058.17 2019 6 1 7 3,584.65 449.35 349.79 10,089.08 0.00 0.00 10,089.08 2019 6 1 8 3,584.65 449.21 349.86 10,311.76 0.00 0.00 10,311.76 2019 6 1 9 3,584.65 449.15 349.29 10,330.71 0.00 0.00 10,330.71 2019 6 1 10 3,584.65 449.15 347.48 10,362.90 0.00 0.00 10,362.90 2019 6 1 11 3,584.65 449.18 349.64 10,284.13 0.00 0.00 10,284.13 2019 6 1 12 3,584.86 449.24 349.88 10,438.82 0.00 0.00 10,438.82 2019 6 1 13 3,584.86 449.24 349.87 10,474.27 0.00 0.00 10,474.27 2019 6 1 14 3,584.86 449.42 349.08 10,300.50 0.00 0.00 10,300.50 2019 6 1 15 3,584.86 449.55 349.97 10,125.72 0.00 0.00 10,125.72 2019 6 1 16 3,584.86 449.36 349.82 10,263.40 0.00 0.00 10,263.40 2019 6 1 17 3,584.86 449.36 349.86 10,303.06 0.00 0.00 10,303.06 2019 6 1 18 3,584.86 449.34 349.89 10,315.38 0.00 0.00 10,315.38 2019 6 1 19 3,584.86 449.48 349.80 10,117.86 0.00 0.00 10,117.86 2019 6 1 20 3,584.86 449.48 349.56 10,071.93 0.00 0.00 10,071.93 2019 6 1 21 3,584.86 449.49 349.85 10,080.23 0.00 0.00 10,080.23 2019 6 1 22 3,584.86 449.48 349.85 10,067.59 0.00 0.00 10,067.59 2019 6 1 23 3,584.86 449.49 349.85 10,080.59 0.00 0.00 10,080.59 2019 6 1 24 3,585.06 449.70 347.30 9,988.00 0.00 0.00 9,988.00 2019 6 2 1 3,585.06 449.72 341.32 10,026.69 0.00 0.00 10,026.69 2019 6 2 2 3,585.06 449.71 347.81 10,017.78 0.00 0.00 10,017.78 2019 6 2 3 3,585.06 449.71 347.81 10,027.21 0.00 0.00 10,027.21 2019 6 2 4 3,585.06 449.70 347.81 10,025.25 0.00 0.00 10,025.25 2019 6 2 5 3,585.06 449.71 347.81 10,027.94 0.00 0.00 10,027.94 2019 6 2 6 3,585.06 449.72 346.21 10,004.92 0.00 0.00 10,004.92 2019 6 2 7 3,585.06 449.71 347.77 10,021.68 0.00 0.00 10,021.68 2019 6 2 8 3,585.06 449.71 347.82 10,025.53 0.00 0.00 10,025.53 2019 6 2 9 3,585.06 449.71 347.78 10,024.51 0.00 0.00 10,024.51 2019 6 2 10 3,585.06 449.71 347.84 10,014.73 0.00 0.00 10,014.73 2019 6 2 11 3,585.06 449.71 347.93 10,008.07 0.00 0.00 10,008.07 2019 6 2 12 3,585.29 449.94 347.80 10,027.02 0.00 0.00 10,027.02 2019 6 2 13 3,585.29 449.96 347.71 10,018.34 0.00 0.00 10,018.34 2019 6 2 14 3,585.29 449.95 347.76 10,020.68 0.00 0.00 10,020.68 2019 6 2 15 3,585.29 449.95 347.78 10,013.43 0.00 0.00 10,013.43 2019 6 2 16 3,585.29 449.95 347.85 10,023.02 0.00 0.00 10,023.02 2019 6 2 17 3,585.29 449.95 347.82 9,999.29 0.00 0.00 9,999.29 2019 6 2 18 3,585.29 449.94 347.87 10,009.90 0.00 0.00 10,009.90 2019 6 2 19 3,585.29 449.97 347.33 9,997.38 0.00 0.00 9,997.38 2019 6 2 20 3,585.29 449.89 352.38 10,134.36 0.00 0.00 10,134.36

Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

Year Month Day Hour Elevation Head Generation

Power

Release Spillway Bypass

Total

Release

(ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs)

2019 6 1 1 3,584.65 449.30 351.62 10,217.53 0.00 0.00 10,217.53

2019 6 1 2 3,584.65 449.36 349.77 10,070.02 0.00 0.00 10,070.02

2019 6 1 3 3,584.65 449.37 349.34 10,069.79 0.00 0.00 10,069.79

2019 6 1 4 3,584.65 449.38 349.76 10,081.04 0.00 0.00 10,081.04

2019 6 1 5 3,584.65 449.37 349.75 10,067.47 0.00 0.00 10,067.47

2019 6 1 6 3,584.65 449.40 349.13 10,058.17 0.00 0.00 10,058.17

2019 6 1 7 3,584.65 449.35 349.79 10,089.08 0.00 0.00 10,089.08

2019 6 1 8 3,584.65 449.21 349.86 10,311.76 0.00 0.00 10,311.76

2019 6 1 9 3,584.65 449.15 349.29 10,330.71 0.00 0.00 10,330.71

2019 6 1 10 3,584.65 449.15 347.48 10,362.90 0.00 0.00 10,362.90

2019 6 1 11 3,584.65 449.18 349.64 10,284.13 0.00 0.00 10,284.13

2019 6 1 12 3,584.86 449.24 349.88 10,438.82 0.00 0.00 10,438.82

2019 6 1 13 3,584.86 449.24 349.87 10,474.27 0.00 0.00 10,474.27

2019 6 1 14 3,584.86 449.42 349.08 10,300.50 0.00 0.00 10,300.50

2019 6 1 15 3,584.86 449.55 349.97 10,125.72 0.00 0.00 10,125.72

2019 6 1 16 3,584.86 449.36 349.82 10,263.40 0.00 0.00 10,263.40

2019 6 1 17 3,584.86 449.36 349.86 10,303.06 0.00 0.00 10,303.06

2019 6 1 18 3,584.86 449.34 349.89 10,315.38 0.00 0.00 10,315.38

2019 6 1 19 3,584.86 449.48 349.80 10,117.86 0.00 0.00 10,117.86

2019 6 1 20 3,584.86 449.48 349.56 10,071.93 0.00 0.00 10,071.93

2019 6 1 21 3,584.86 449.49 349.85 10,080.23 0.00 0.00 10,080.23

2019 6 1 22 3,584.86 449.48 349.85 10,067.59 0.00 0.00 10,067.59

2019 6 1 23 3,584.86 449.49 349.85 10,080.59 0.00 0.00 10,080.59

2019 6 1 24 3,585.06 449.70 347.30 9,988.00 0.00 0.00 9,988.00

2019 6 2 1 3,585.06 449.72 341.32 10,026.69 0.00 0.00 10,026.69

2019 6 2 2 3,585.06 449.71 347.81 10,017.78 0.00 0.00 10,017.78

2019 6 2 3 3,585.06 449.71 347.81 10,027.21 0.00 0.00 10,027.21

2019 6 2 4 3,585.06 449.70 347.81 10,025.25 0.00 0.00 10,025.25

2019 6 2 5 3,585.06 449.71 347.81 10,027.94 0.00 0.00 10,027.94

2019 6 2 6 3,585.06 449.72 346.21 10,004.92 0.00 0.00 10,004.92

2019 6 2 7 3,585.06 449.71 347.77 10,021.68 0.00 0.00 10,021.68

2019 6 2 8 3,585.06 449.71 347.82 10,025.53 0.00 0.00 10,025.53

2019 6 2 9 3,585.06 449.71 347.78 10,024.51 0.00 0.00 10,024.51

2019 6 2 10 3,585.06 449.71 347.84 10,014.73 0.00 0.00 10,014.73

2019 6 2 11 3,585.06 449.71 347.93 10,008.07 0.00 0.00 10,008.07

2019 6 2 12 3,585.29 449.94 347.80 10,027.02 0.00 0.00 10,027.02

2019 6 2 13 3,585.29 449.96 347.71 10,018.34 0.00 0.00 10,018.34

2019 6 2 14 3,585.29 449.95 347.76 10,020.68 0.00 0.00 10,020.68

2019 6 2 15 3,585.29 449.95 347.78 10,013.43 0.00 0.00 10,013.43

2019 6 2 16 3,585.29 449.95 347.85 10,023.02 0.00 0.00 10,023.02

2019 6 2 17 3,585.29 449.95 347.82 9,999.29 0.00 0.00 9,999.29

2019 6 2 18 3,585.29 449.94 347.87 10,009.90 0.00 0.00 10,009.90

2019 6 2 19 3,585.29 449.97 347.33 9,997.38 0.00 0.00 9,997.38

2019 6 2 20 3,585.29 449.89 352.38 10,134.36 0.00 0.00 10,134.36

Page 2: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

2019 6 2 21 3,585.29 449.97 346.83 9,991.91 0.00 0.00 9,991.91

2019 6 2 22 3,585.29 449.95 346.43 10,008.71 0.00 0.00 10,008.71

2019 6 2 23 3,585.29 449.94 347.79 10,008.96 0.00 0.00 10,008.96

2019 6 2 24 3,585.53 450.19 345.72 9,950.76 0.00 0.00 9,950.76

2019 6 3 1 3,585.53 450.50 318.42 9,238.88 0.00 0.00 9,238.88

2019 6 3 2 3,585.53 450.35 336.86 9,606.79 0.00 0.00 9,606.79

2019 6 3 3 3,585.53 450.51 321.93 9,145.19 0.00 0.00 9,145.19

2019 6 3 4 3,585.53 450.52 322.75 9,180.93 0.00 0.00 9,180.93

2019 6 3 5 3,585.53 450.00 358.25 10,250.23 0.00 0.00 10,250.23

2019 6 3 6 3,585.53 448.93 434.28 12,328.54 0.00 0.00 12,328.54

2019 6 3 7 3,585.53 447.74 551.53 15,777.11 0.00 0.00 15,777.11

2019 6 3 8 3,585.53 447.89 537.39 15,320.61 0.00 0.00 15,320.61

2019 6 3 9 3,585.53 447.77 546.38 15,580.30 0.00 0.00 15,580.30

2019 6 3 10 3,585.53 447.58 566.06 16,160.40 0.00 0.00 16,160.40

2019 6 3 11 3,585.53 447.64 570.03 16,313.25 0.00 0.00 16,313.25

2019 6 3 12 3,585.79 447.73 570.29 16,385.07 0.00 0.00 16,385.07

2019 6 3 13 3,585.79 447.77 587.60 16,836.05 0.00 0.00 16,836.05

2019 6 3 14 3,585.79 447.62 587.09 16,879.14 0.00 0.00 16,879.14

2019 6 3 15 3,585.79 447.62 587.65 17,002.24 0.00 0.00 17,002.24

2019 6 3 16 3,585.79 447.59 587.94 17,078.81 0.00 0.00 17,078.81

2019 6 3 17 3,585.79 447.62 587.21 17,037.94 0.00 0.00 17,037.94

2019 6 3 18 3,585.79 447.91 566.06 16,295.28 0.00 0.00 16,295.28

2019 6 3 19 3,585.79 447.91 573.62 16,353.93 0.00 0.00 16,353.93

2019 6 3 20 3,585.79 447.91 569.47 16,254.59 0.00 0.00 16,254.59

2019 6 3 21 3,585.79 448.08 552.05 15,821.08 0.00 0.00 15,821.08

2019 6 3 22 3,585.79 448.49 511.04 14,582.03 0.00 0.00 14,582.03

2019 6 3 23 3,585.79 449.44 426.18 12,187.09 0.00 0.00 12,187.09

2019 6 3 24 3,585.94 450.66 341.95 9,795.49 0.00 0.00 9,795.49

2019 6 4 1 3,585.94 450.95 315.51 9,171.27 0.00 0.00 9,171.27

2019 6 4 2 3,585.94 450.99 322.77 9,158.24 0.00 0.00 9,158.24

2019 6 4 3 3,585.94 450.98 322.77 9,170.38 0.00 0.00 9,170.38

2019 6 4 4 3,585.94 450.98 322.83 9,170.03 0.00 0.00 9,170.03

2019 6 4 5 3,585.94 450.89 324.93 9,233.10 0.00 0.00 9,233.10

2019 6 4 6 3,585.94 450.39 374.30 10,695.70 0.00 0.00 10,695.70

2019 6 4 7 3,585.94 449.77 394.60 11,181.94 0.00 0.00 11,181.94

2019 6 4 8 3,585.94 449.00 475.80 13,615.57 0.00 0.00 13,615.57

2019 6 4 9 3,585.94 448.66 494.00 14,206.66 0.00 0.00 14,206.66

2019 6 4 10 3,585.94 448.53 503.13 14,524.37 0.00 0.00 14,524.37

2019 6 4 11 3,585.94 448.19 541.15 15,587.71 0.00 0.00 15,587.71

2019 6 4 12 3,586.15 448.57 541.66 15,613.34 0.00 0.00 15,613.34

2019 6 4 13 3,586.15 448.55 537.16 15,523.04 0.00 0.00 15,523.04

2019 6 4 14 3,586.15 448.30 558.07 15,906.47 0.00 0.00 15,906.47

2019 6 4 15 3,586.15 448.05 587.52 16,863.18 0.00 0.00 16,863.18

2019 6 4 16 3,586.15 448.03 588.80 16,855.96 0.00 0.00 16,855.96

2019 6 4 17 3,586.15 448.03 588.75 16,834.91 0.00 0.00 16,834.91

2019 6 4 18 3,586.15 447.91 592.15 16,905.52 0.00 0.00 16,905.52

2019 6 4 19 3,586.15 447.99 599.36 17,050.72 0.00 0.00 17,050.72

Page 3: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

2019 6 4 20 3,586.15 448.06 589.13 16,684.23 0.00 0.00 16,684.23

2019 6 4 21 3,586.15 448.08 588.38 16,760.12 0.00 0.00 16,760.12

2019 6 4 22 3,586.15 448.24 579.24 16,558.67 0.00 0.00 16,558.67

2019 6 4 23 3,586.15 449.08 492.44 14,089.35 0.00 0.00 14,089.35

2019 6 4 24 3,586.42 450.22 409.57 11,711.17 0.00 0.00 11,711.17

2019 6 5 1 3,586.42 451.27 326.22 9,385.49 0.00 0.00 9,385.49

2019 6 5 2 3,586.42 451.37 324.99 9,216.39 0.00 0.00 9,216.39

2019 6 5 3 3,586.42 451.39 324.98 9,199.30 0.00 0.00 9,199.30

2019 6 5 4 3,586.42 451.35 324.11 9,252.82 0.00 0.00 9,252.82

2019 6 5 5 3,586.42 450.84 359.58 10,290.14 0.00 0.00 10,290.14

2019 6 5 6 3,586.42 449.60 456.75 12,977.38 0.00 0.00 12,977.38

2019 6 5 7 3,586.42 449.02 518.06 14,665.06 0.00 0.00 14,665.06

2019 6 5 8 3,586.42 449.40 484.95 13,814.62 0.00 0.00 13,814.62

2019 6 5 9 3,586.42 449.25 489.90 13,936.00 0.00 0.00 13,936.00

2019 6 5 10 3,586.42 448.75 541.32 15,366.01 0.00 0.00 15,366.01

2019 6 5 11 3,586.42 448.75 540.66 15,425.17 0.00 0.00 15,425.17

2019 6 5 12 3,586.69 449.04 540.84 15,357.17 0.00 0.00 15,357.17

2019 6 5 13 3,586.69 448.99 542.77 15,424.47 0.00 0.00 15,424.47

2019 6 5 14 3,586.69 448.62 586.76 16,725.80 0.00 0.00 16,725.80

2019 6 5 15 3,586.69 448.56 592.62 16,953.75 0.00 0.00 16,953.75

2019 6 5 16 3,586.69 448.55 592.81 16,939.97 0.00 0.00 16,939.97

2019 6 5 17 3,586.69 448.56 592.71 16,937.79 0.00 0.00 16,937.79

2019 6 5 18 3,586.69 448.53 592.58 16,923.71 0.00 0.00 16,923.71

2019 6 5 19 3,586.69 448.58 592.68 16,862.21 0.00 0.00 16,862.21

2019 6 5 20 3,586.69 448.57 592.68 16,841.71 0.00 0.00 16,841.71

2019 6 5 21 3,586.69 448.60 592.26 16,835.57 0.00 0.00 16,835.57

2019 6 5 22 3,586.69 448.85 574.89 16,409.45 0.00 0.00 16,409.45

2019 6 5 23 3,586.69 449.59 489.92 14,202.26 0.00 0.00 14,202.26

2019 6 5 24 3,586.97 451.07 378.97 11,295.71 0.00 0.00 11,295.71

2019 6 6 1 3,586.97 451.31 340.06 10,483.63 0.00 0.00 10,483.63

2019 6 6 2 3,586.97 451.62 339.84 9,908.96 0.00 0.00 9,908.96

2019 6 6 3 3,586.97 451.69 335.76 9,688.37 0.00 0.00 9,688.37

2019 6 6 4 3,586.97 451.60 339.76 9,872.48 0.00 0.00 9,872.48

2019 6 6 5 3,586.97 451.28 357.40 10,678.24 0.00 0.00 10,678.24

2019 6 6 6 3,586.97 450.47 416.33 12,260.79 0.00 0.00 12,260.79

2019 6 6 7 3,586.97 450.10 449.45 13,228.59 0.00 0.00 13,228.59

2019 6 6 8 3,586.97 449.97 474.75 13,594.95 0.00 0.00 13,594.95

2019 6 6 9 3,586.97 449.82 486.41 14,060.18 0.00 0.00 14,060.18

2019 6 6 10 3,586.97 449.51 523.86 14,842.42 0.00 0.00 14,842.42

2019 6 6 11 3,586.97 449.42 525.91 14,991.85 0.00 0.00 14,991.85

2019 6 6 12 3,587.36 449.92 525.16 15,026.80 0.00 0.00 15,026.80

2019 6 6 13 3,587.36 449.72 549.33 15,727.01 0.00 0.00 15,727.01

2019 6 6 14 3,587.36 449.76 543.18 15,600.71 0.00 0.00 15,600.71

2019 6 6 15 3,587.36 449.57 560.58 15,947.29 0.00 0.00 15,947.29

2019 6 6 16 3,587.36 449.17 600.90 17,041.89 0.00 0.00 17,041.89

2019 6 6 17 3,587.36 449.24 600.69 17,071.69 0.00 0.00 17,071.69

2019 6 6 18 3,587.36 449.63 557.66 15,698.76 0.00 0.00 15,698.76

Page 4: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

2019 6 6 19 3,587.36 449.67 551.80 15,752.29 0.00 0.00 15,752.29

2019 6 6 20 3,587.36 449.58 569.48 16,229.16 0.00 0.00 16,229.16

2019 6 6 21 3,587.36 449.26 598.54 16,991.21 0.00 0.00 16,991.21

2019 6 6 22 3,587.36 449.77 548.98 15,700.47 0.00 0.00 15,700.47

2019 6 6 23 3,587.36 450.58 462.20 13,349.26 0.00 0.00 13,349.26

2019 6 6 24 3,587.59 451.85 377.96 11,030.65 0.00 0.00 11,030.65

2019 6 7 1 3,587.59 452.33 324.69 9,839.66 0.00 0.00 9,839.66

2019 6 7 2 3,587.59 452.28 325.83 9,713.44 0.00 0.00 9,713.44

2019 6 7 3 3,587.59 452.39 325.87 9,590.86 0.00 0.00 9,590.86

2019 6 7 4 3,587.59 452.46 327.39 9,478.47 0.00 0.00 9,478.47

2019 6 7 5 3,587.59 451.53 376.64 10,823.26 0.00 0.00 10,823.26

2019 6 7 6 3,587.59 450.81 439.58 12,678.70 0.00 0.00 12,678.70

2019 6 7 7 3,587.59 450.15 515.81 14,801.66 0.00 0.00 14,801.66

2019 6 7 8 3,587.59 450.09 526.70 15,146.18 0.00 0.00 15,146.18

2019 6 7 9 3,587.59 450.11 527.05 15,122.18 0.00 0.00 15,122.18

2019 6 7 10 3,587.59 450.00 535.17 15,412.12 0.00 0.00 15,412.12

2019 6 7 11 3,587.59 449.95 536.63 15,359.58 0.00 0.00 15,359.58

2019 6 7 12 3,587.98 450.18 553.61 15,718.65 0.00 0.00 15,718.65

2019 6 7 13 3,587.98 450.27 553.32 15,763.16 0.00 0.00 15,763.16

2019 6 7 14 3,587.98 449.95 586.33 16,638.07 0.00 0.00 16,638.07

2019 6 7 15 3,587.98 449.87 594.20 16,848.98 0.00 0.00 16,848.98

2019 6 7 16 3,587.98 449.87 593.72 16,825.57 0.00 0.00 16,825.57

2019 6 7 17 3,587.98 449.86 594.54 16,849.74 0.00 0.00 16,849.74

2019 6 7 18 3,587.98 449.85 594.60 16,874.83 0.00 0.00 16,874.83

2019 6 7 19 3,587.98 449.85 594.54 16,863.26 0.00 0.00 16,863.26

2019 6 7 20 3,587.98 449.86 594.54 16,857.42 0.00 0.00 16,857.42

2019 6 7 21 3,587.98 449.95 592.60 16,800.21 0.00 0.00 16,800.21

2019 6 7 22 3,587.98 450.11 575.94 16,364.26 0.00 0.00 16,364.26

2019 6 7 23 3,587.98 451.15 479.72 13,719.00 0.00 0.00 13,719.00

2019 6 7 24 3,588.29 452.48 377.99 10,777.23 0.00 0.00 10,777.23

2019 6 8 1 3,588.29 452.97 350.08 10,111.51 0.00 0.00 10,111.51

2019 6 8 2 3,588.29 453.01 351.57 10,036.21 0.00 0.00 10,036.21

2019 6 8 3 3,588.29 453.02 351.56 10,051.40 0.00 0.00 10,051.40

2019 6 8 4 3,588.29 453.02 351.66 10,052.23 0.00 0.00 10,052.23

2019 6 8 5 3,588.29 453.03 351.67 10,049.26 0.00 0.00 10,049.26

2019 6 8 6 3,588.29 453.02 351.62 10,032.78 0.00 0.00 10,032.78

2019 6 8 7 3,588.29 453.02 351.71 10,047.99 0.00 0.00 10,047.99

2019 6 8 8 3,588.29 453.03 350.82 10,026.30 0.00 0.00 10,026.30

2019 6 8 9 3,588.29 453.03 351.65 10,036.10 0.00 0.00 10,036.10

2019 6 8 10 3,588.29 453.02 351.65 10,044.46 0.00 0.00 10,044.46

2019 6 8 11 3,588.29 453.03 351.65 10,044.69 0.00 0.00 10,044.69

2019 6 8 12 3,588.74 453.49 351.61 10,044.87 0.00 0.00 10,044.87

2019 6 8 13 3,588.74 453.48 351.64 10,042.68 0.00 0.00 10,042.68

2019 6 8 14 3,588.74 453.48 351.58 10,038.35 0.00 0.00 10,038.35

2019 6 8 15 3,588.74 453.48 351.63 10,031.17 0.00 0.00 10,031.17

2019 6 8 16 3,588.74 453.49 351.67 10,031.74 0.00 0.00 10,031.74

2019 6 8 17 3,588.74 453.48 351.68 10,028.66 0.00 0.00 10,028.66

Page 5: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

2019 6 8 18 3,588.74 453.47 351.61 10,041.01 0.00 0.00 10,041.01

2019 6 8 19 3,588.74 453.49 351.68 10,039.53 0.00 0.00 10,039.53

2019 6 8 20 3,588.74 453.48 351.65 10,038.10 0.00 0.00 10,038.10

2019 6 8 21 3,588.74 453.48 351.71 10,040.56 0.00 0.00 10,040.56

2019 6 8 22 3,588.74 453.48 351.96 10,027.72 0.00 0.00 10,027.72

2019 6 8 23 3,588.74 453.49 352.67 10,068.75 0.00 0.00 10,068.75

2019 6 8 24 3,589.18 453.94 351.25 10,022.86 0.00 0.00 10,022.86

2019 6 9 1 3,589.18 453.92 345.87 10,135.54 0.00 0.00 10,135.54

2019 6 9 2 3,589.18 453.96 350.79 10,006.20 0.00 0.00 10,006.20

2019 6 9 3 3,589.18 453.95 350.79 10,016.55 0.00 0.00 10,016.55

2019 6 9 4 3,589.18 453.98 350.71 10,016.98 0.00 0.00 10,016.98

2019 6 9 5 3,589.18 453.98 350.78 10,002.71 0.00 0.00 10,002.71

2019 6 9 6 3,589.18 453.96 350.79 10,015.42 0.00 0.00 10,015.42

2019 6 9 7 3,589.18 454.00 349.81 9,982.65 0.00 0.00 9,982.65

2019 6 9 8 3,589.18 453.96 350.82 9,956.21 0.00 0.00 9,956.21

2019 6 9 9 3,589.18 453.97 350.78 10,000.19 0.00 0.00 10,000.19

2019 6 9 10 3,589.18 453.98 350.80 9,998.40 0.00 0.00 9,998.40

2019 6 9 11 3,589.18 453.97 350.83 9,999.75 0.00 0.00 9,999.75

2019 6 9 12 3,589.75 454.53 350.81 9,991.25 0.00 0.00 9,991.25

2019 6 9 13 3,589.75 454.53 350.69 10,008.73 0.00 0.00 10,008.73

2019 6 9 14 3,589.75 454.54 350.83 10,010.25 0.00 0.00 10,010.25

2019 6 9 15 3,589.75 454.54 350.72 10,007.46 0.00 0.00 10,007.46

2019 6 9 16 3,589.75 454.53 350.70 10,010.74 0.00 0.00 10,010.74

2019 6 9 17 3,589.75 454.55 350.77 10,005.86 0.00 0.00 10,005.86

2019 6 9 18 3,589.75 454.55 350.73 9,924.08 0.00 0.00 9,924.08

2019 6 9 19 3,589.75 454.53 348.41 10,021.03 0.00 0.00 10,021.03

2019 6 9 20 3,589.75 454.55 350.79 10,003.14 0.00 0.00 10,003.14

2019 6 9 21 3,589.75 454.55 350.82 10,003.18 0.00 0.00 10,003.18

2019 6 9 22 3,589.75 454.45 365.50 10,350.43 0.00 0.00 10,350.43

2019 6 9 23 3,589.75 454.53 350.78 9,986.25 0.00 0.00 9,986.25

2019 6 9 24 3,590.27 455.02 349.62 9,968.89 0.00 0.00 9,968.89

2019 6 10 1 3,590.27 455.31 324.91 9,198.16 0.00 0.00 9,198.16

2019 6 10 2 3,590.27 455.33 324.35 9,180.11 0.00 0.00 9,180.11

2019 6 10 3 3,590.27 455.35 323.44 9,091.88 0.00 0.00 9,091.88

2019 6 10 4 3,590.27 455.32 324.96 9,144.98 0.00 0.00 9,144.98

2019 6 10 5 3,590.27 454.80 364.00 10,318.57 0.00 0.00 10,318.57

2019 6 10 6 3,590.27 453.82 432.99 12,125.10 0.00 0.00 12,125.10

2019 6 10 7 3,590.27 452.86 520.17 14,700.41 0.00 0.00 14,700.41

2019 6 10 8 3,590.27 452.63 549.29 15,470.02 0.00 0.00 15,470.02

2019 6 10 9 3,590.27 452.66 542.07 15,298.12 0.00 0.00 15,298.12

2019 6 10 10 3,590.27 452.44 566.09 15,914.88 0.00 0.00 15,914.88

2019 6 10 11 3,590.27 452.39 573.34 16,217.31 0.00 0.00 16,217.31

2019 6 10 12 3,590.87 452.87 590.54 16,665.20 0.00 0.00 16,665.20

2019 6 10 13 3,590.87 452.89 585.16 16,573.69 0.00 0.00 16,573.69

2019 6 10 14 3,590.87 452.85 591.48 16,683.66 0.00 0.00 16,683.66

2019 6 10 15 3,590.87 452.84 591.83 16,690.84 0.00 0.00 16,690.84

2019 6 10 16 3,590.87 452.91 589.87 16,661.03 0.00 0.00 16,661.03

Page 6: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

2019 6 10 17 3,590.87 453.25 549.03 15,562.26 0.00 0.00 15,562.26

2019 6 10 18 3,590.87 452.91 586.62 16,551.59 0.00 0.00 16,551.59

2019 6 10 19 3,590.87 452.86 591.17 16,661.57 0.00 0.00 16,661.57

2019 6 10 20 3,590.87 452.86 591.78 16,675.52 0.00 0.00 16,675.52

2019 6 10 21 3,590.87 452.92 588.43 16,602.83 0.00 0.00 16,602.83

2019 6 10 22 3,590.87 453.61 509.06 14,389.94 0.00 0.00 14,389.94

2019 6 10 23 3,590.87 454.57 422.22 11,925.22 0.00 0.00 11,925.22

2019 6 10 24 3,591.44 456.20 338.28 9,548.26 0.00 0.00 9,548.26

2019 6 11 1 3,591.44 456.39 324.01 9,133.97 0.00 0.00 9,133.97

2019 6 11 2 3,591.44 456.43 326.26 9,151.46 0.00 0.00 9,151.46

2019 6 11 3 3,591.44 456.44 325.96 9,143.30 0.00 0.00 9,143.30

2019 6 11 4 3,591.44 456.39 324.30 9,178.07 0.00 0.00 9,178.07

2019 6 11 5 3,591.44 455.94 357.66 10,119.75 0.00 0.00 10,119.75

2019 6 11 6 3,591.44 455.11 425.59 12,055.93 0.00 0.00 12,055.93

2019 6 11 7 3,591.44 454.75 463.27 13,066.38 0.00 0.00 13,066.38

2019 6 11 8 3,591.44 454.46 491.20 13,799.82 0.00 0.00 13,799.82

2019 6 11 9 3,591.44 454.52 483.89 13,628.57 0.00 0.00 13,628.57

2019 6 11 10 3,591.44 454.31 500.49 14,058.87 0.00 0.00 14,058.87

2019 6 11 11 3,592.01 454.67 512.91 14,375.11 0.00 0.00 14,375.11

2019 6 11 12 3,592.01 454.27 556.67 15,615.56 0.00 0.00 15,615.56

2019 6 11 13 3,592.01 454.19 555.84 15,733.33 0.00 0.00 15,733.33

2019 6 11 14 3,592.01 453.98 593.63 16,705.05 0.00 0.00 16,705.05

2019 6 11 15 3,592.01 453.98 594.65 16,721.04 0.00 0.00 16,721.04

2019 6 11 16 3,592.01 454.02 593.86 16,715.84 0.00 0.00 16,715.84

2019 6 11 17 3,592.01 454.16 568.68 16,040.92 0.00 0.00 16,040.92

2019 6 11 18 3,592.01 453.99 593.76 16,694.24 0.00 0.00 16,694.24

2019 6 11 19 3,592.01 453.98 594.27 16,695.80 0.00 0.00 16,695.80

2019 6 11 20 3,592.01 453.95 595.26 16,713.06 0.00 0.00 16,713.06

2019 6 11 21 3,592.01 453.96 602.54 16,932.54 0.00 0.00 16,932.54

2019 6 11 22 3,592.01 454.10 586.43 16,496.76 0.00 0.00 16,496.76

2019 6 11 23 3,592.01 454.98 501.94 14,170.46 0.00 0.00 14,170.46

2019 6 11 24 3,592.71 456.57 413.94 11,669.26 0.00 0.00 11,669.26

2019 6 12 1 3,592.71 457.63 332.53 9,387.56 0.00 0.00 9,387.56

2019 6 12 2 3,592.71 457.71 328.71 9,190.77 0.00 0.00 9,190.77

2019 6 12 3 3,592.71 457.74 328.80 9,213.66 0.00 0.00 9,213.66

2019 6 12 4 3,592.71 457.67 325.39 9,260.82 0.00 0.00 9,260.82

2019 6 12 5 3,592.71 457.18 369.09 10,398.69 0.00 0.00 10,398.69

2019 6 12 6 3,592.71 456.15 443.56 12,379.25 0.00 0.00 12,379.25

2019 6 12 7 3,592.71 455.56 502.86 14,095.23 0.00 0.00 14,095.23

2019 6 12 8 3,592.71 455.28 533.54 14,931.18 0.00 0.00 14,931.18

2019 6 12 9 3,592.71 455.65 498.58 13,991.76 0.00 0.00 13,991.76

2019 6 12 10 3,592.71 455.40 517.74 14,473.61 0.00 0.00 14,473.61

2019 6 12 11 3,592.71 455.00 551.56 15,458.46 0.00 0.00 15,458.46

2019 6 12 12 3,592.71 454.94 569.18 16,019.96 0.00 0.00 16,019.96

2019 6 12 13 3,593.38 455.32 598.29 16,766.24 0.00 0.00 16,766.24

2019 6 12 14 3,593.38 455.30 600.78 16,839.39 0.00 0.00 16,839.39

2019 6 12 15 3,593.38 455.30 600.64 16,829.30 0.00 0.00 16,829.30

Page 7: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

2019 6 12 16 3,593.38 455.38 598.17 16,777.43 0.00 0.00 16,777.43

2019 6 12 17 3,593.38 455.68 560.32 15,781.58 0.00 0.00 15,781.58

2019 6 12 18 3,593.38 455.32 598.10 16,758.46 0.00 0.00 16,758.46

2019 6 12 19 3,593.38 455.30 600.69 16,842.93 0.00 0.00 16,842.93

2019 6 12 20 3,593.38 455.30 600.64 16,821.16 0.00 0.00 16,821.16

2019 6 12 21 3,593.38 455.37 599.43 16,804.46 0.00 0.00 16,804.46

2019 6 12 22 3,593.38 455.82 558.52 15,760.23 0.00 0.00 15,760.23

2019 6 12 23 3,593.38 456.48 490.34 13,807.44 0.00 0.00 13,807.44

2019 6 12 24 3,593.93 457.77 411.53 11,570.53 0.00 0.00 11,570.53

2019 6 13 1 3,593.93 458.82 323.09 9,255.01 0.00 0.00 9,255.01

2019 6 13 2 3,593.93 458.90 328.20 9,203.31 0.00 0.00 9,203.31

2019 6 13 3 3,593.93 458.92 329.86 9,202.79 0.00 0.00 9,202.79

2019 6 13 4 3,593.93 458.84 331.09 9,250.32 0.00 0.00 9,250.32

2019 6 13 5 3,593.93 458.29 370.07 10,394.54 0.00 0.00 10,394.54

2019 6 13 6 3,593.93 457.46 440.51 12,087.24 0.00 0.00 12,087.24

2019 6 13 7 3,593.93 457.61 420.14 11,657.67 0.00 0.00 11,657.67

2019 6 13 8 3,593.93 457.33 454.54 12,789.09 0.00 0.00 12,789.09

2019 6 13 9 3,593.93 456.61 519.99 14,466.52 0.00 0.00 14,466.52

2019 6 13 10 3,593.93 456.45 534.91 14,911.25 0.00 0.00 14,911.25

2019 6 13 11 3,593.93 456.37 541.71 14,833.56 0.00 0.00 14,833.56

2019 6 13 12 3,593.93 456.13 563.73 15,700.78 0.00 0.00 15,700.78

2019 6 13 13 3,593.93 455.97 590.81 16,592.87 0.00 0.00 16,592.87

2019 6 13 14 3,593.93 455.86 601.28 16,817.69 0.00 0.00 16,817.69

2019 6 13 15 3,593.93 455.86 601.66 16,830.31 0.00 0.00 16,830.31

2019 6 13 16 3,593.93 455.86 601.47 16,827.97 0.00 0.00 16,827.97

2019 6 13 17 3,593.93 455.88 600.11 16,786.11 0.00 0.00 16,786.11

2019 6 13 18 3,593.93 455.90 598.59 16,749.76 0.00 0.00 16,749.76

2019 6 13 19 3,593.93 456.00 587.10 16,428.94 0.00 0.00 16,428.94

2019 6 13 20 3,593.93 455.89 599.54 16,763.19 0.00 0.00 16,763.19

2019 6 13 21 3,593.93 455.91 598.31 16,736.82 0.00 0.00 16,736.82

2019 6 13 22 3,593.93 456.20 579.41 16,265.21 0.00 0.00 16,265.21

2019 6 13 23 3,593.93 456.87 507.65 14,257.88 0.00 0.00 14,257.88

2019 6 13 24 3,595.13 458.97 419.21 11,751.01 0.00 0.00 11,751.01

2019 6 14 1 3,595.13 460.06 328.72 9,369.50 0.00 0.00 9,369.50

2019 6 14 2 3,595.13 460.17 329.52 9,189.20 0.00 0.00 9,189.20

2019 6 14 3 3,595.13 460.18 330.89 9,187.11 0.00 0.00 9,187.11

2019 6 14 4 3,595.13 460.12 332.13 9,233.63 0.00 0.00 9,233.63

2019 6 14 5 3,595.13 459.49 379.60 10,629.53 0.00 0.00 10,629.53

2019 6 14 6 3,595.13 458.60 459.37 12,833.21 0.00 0.00 12,833.21

2019 6 14 7 3,595.13 458.18 491.17 13,681.63 0.00 0.00 13,681.63

2019 6 14 8 3,595.13 457.81 524.10 14,564.53 0.00 0.00 14,564.53

2019 6 14 9 3,595.13 457.80 524.34 14,577.30 0.00 0.00 14,577.30

2019 6 14 10 3,595.13 457.68 534.76 14,858.90 0.00 0.00 14,858.90

2019 6 14 11 3,595.13 457.59 545.43 15,178.68 0.00 0.00 15,178.68

2019 6 14 12 3,595.70 458.11 548.92 15,277.87 0.00 0.00 15,277.87

2019 6 14 13 3,595.70 458.05 557.49 15,595.75 0.00 0.00 15,595.75

2019 6 14 14 3,595.70 457.84 583.30 16,259.17 0.00 0.00 16,259.17

Page 8: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

2019 6 14 15 3,595.70 457.64 601.90 16,795.35 0.00 0.00 16,795.35

2019 6 14 16 3,595.70 457.63 603.58 16,821.53 0.00 0.00 16,821.53

2019 6 14 17 3,595.70 457.63 603.60 16,834.54 0.00 0.00 16,834.54

2019 6 14 18 3,595.70 457.70 601.73 16,792.49 0.00 0.00 16,792.49

2019 6 14 19 3,595.70 457.95 565.79 15,851.13 0.00 0.00 15,851.13

2019 6 14 20 3,595.70 457.64 601.97 16,766.44 0.00 0.00 16,766.44

2019 6 14 21 3,595.70 457.64 603.55 16,799.93 0.00 0.00 16,799.93

2019 6 14 22 3,595.70 457.76 594.67 16,618.28 0.00 0.00 16,618.28

2019 6 14 23 3,595.70 458.53 509.21 14,254.29 0.00 0.00 14,254.29

2019 6 14 24 3,596.27 460.09 421.26 11,758.67 0.00 0.00 11,758.67

2019 6 15 1 3,596.27 461.25 326.77 9,426.61 0.00 0.00 9,426.61

2019 6 15 2 3,596.27 460.94 356.06 10,009.65 0.00 0.00 10,009.65

2019 6 15 3 3,596.27 460.94 357.76 10,062.25 0.00 0.00 10,062.25

2019 6 15 4 3,596.27 461.35 325.84 9,232.69 0.00 0.00 9,232.69

2019 6 15 5 3,596.27 460.96 356.09 9,995.78 0.00 0.00 9,995.78

2019 6 15 6 3,596.27 460.91 358.55 10,065.60 0.00 0.00 10,065.60

2019 6 15 7 3,596.27 460.94 357.63 10,055.81 0.00 0.00 10,055.81

2019 6 15 8 3,596.27 460.94 357.81 10,027.12 0.00 0.00 10,027.12

2019 6 15 9 3,596.27 460.94 357.82 10,039.33 0.00 0.00 10,039.33

2019 6 15 10 3,596.27 460.94 357.61 10,040.30 0.00 0.00 10,040.30

2019 6 15 11 3,596.27 460.93 357.81 10,052.53 0.00 0.00 10,052.53

2019 6 15 12 3,596.85 461.37 364.85 10,231.72 0.00 0.00 10,231.72

2019 6 15 13 3,596.85 461.52 358.65 10,081.47 0.00 0.00 10,081.47

2019 6 15 14 3,596.85 461.53 357.75 10,050.74 0.00 0.00 10,050.74

2019 6 15 15 3,596.85 461.53 357.77 10,040.73 0.00 0.00 10,040.73

2019 6 15 16 3,596.85 461.42 357.65 10,147.25 0.00 0.00 10,147.25

2019 6 15 17 3,596.85 461.53 357.89 10,058.45 0.00 0.00 10,058.45

2019 6 15 18 3,596.85 461.53 357.71 10,046.94 0.00 0.00 10,046.94

2019 6 15 19 3,596.85 461.54 357.88 10,031.55 0.00 0.00 10,031.55

2019 6 15 20 3,596.85 461.53 357.68 10,004.38 0.00 0.00 10,004.38

2019 6 15 21 3,596.85 461.53 357.83 10,034.76 0.00 0.00 10,034.76

2019 6 15 22 3,596.85 461.53 357.77 9,992.66 0.00 0.00 9,992.66

2019 6 15 23 3,596.85 461.57 339.72 9,559.53 0.00 0.00 9,559.53

2019 6 15 24 3,597.55 462.28 354.09 9,615.51 0.00 0.00 9,615.51

2019 6 16 1 3,597.55 462.22 348.95 10,058.62 0.00 0.00 10,058.62

2019 6 16 2 3,597.55 462.22 358.68 10,040.24 0.00 0.00 10,040.24

2019 6 16 3 3,597.55 462.21 358.86 10,062.67 0.00 0.00 10,062.67

2019 6 16 4 3,597.55 462.22 358.69 10,044.95 0.00 0.00 10,044.95

2019 6 16 5 3,597.55 462.22 358.74 10,055.27 0.00 0.00 10,055.27

2019 6 16 6 3,597.55 462.22 358.63 10,055.53 0.00 0.00 10,055.53

2019 6 16 7 3,597.55 462.22 358.64 10,024.59 0.00 0.00 10,024.59

2019 6 16 8 3,597.55 462.23 357.16 10,005.04 0.00 0.00 10,005.04

2019 6 16 9 3,597.55 462.23 358.73 10,054.22 0.00 0.00 10,054.22

2019 6 16 10 3,597.55 462.23 358.88 10,054.86 0.00 0.00 10,054.86

2019 6 16 11 3,597.55 462.22 358.84 10,049.43 0.00 0.00 10,049.43

2019 6 16 12 3,598.17 462.84 358.79 10,037.13 0.00 0.00 10,037.13

2019 6 16 13 3,598.17 462.83 358.72 10,020.99 0.00 0.00 10,020.99

Page 9: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

2019 6 16 14 3,598.17 462.86 358.74 10,036.19 0.00 0.00 10,036.19

2019 6 16 15 3,598.17 462.87 357.27 9,994.91 0.00 0.00 9,994.91

2019 6 16 16 3,598.17 462.86 357.95 10,022.20 0.00 0.00 10,022.20

2019 6 16 17 3,598.17 462.84 358.58 10,032.38 0.00 0.00 10,032.38

2019 6 16 18 3,598.17 462.84 358.78 10,040.38 0.00 0.00 10,040.38

2019 6 16 19 3,598.17 462.85 359.10 10,012.03 0.00 0.00 10,012.03

2019 6 16 20 3,598.17 462.85 358.59 10,038.54 0.00 0.00 10,038.54

2019 6 16 21 3,598.17 462.85 358.67 10,027.36 0.00 0.00 10,027.36

2019 6 16 22 3,598.17 462.84 358.81 10,009.22 0.00 0.00 10,009.22

2019 6 16 23 3,598.17 462.84 358.59 10,032.93 0.00 0.00 10,032.93

2019 6 16 24 3,598.80 463.50 357.61 10,014.13 0.00 0.00 10,014.13

2019 6 17 1 3,598.80 463.64 338.01 9,623.13 0.00 0.00 9,623.13

2019 6 17 2 3,598.80 464.14 311.18 8,633.24 0.00 0.00 8,633.24

2019 6 17 3 3,598.80 463.83 330.43 9,100.34 0.00 0.00 9,100.34

2019 6 17 4 3,598.80 463.33 361.64 10,022.06 0.00 0.00 10,022.06

2019 6 17 5 3,598.80 462.93 396.82 10,961.58 0.00 0.00 10,961.58

2019 6 17 6 3,598.80 462.46 435.01 12,076.28 0.00 0.00 12,076.28

2019 6 17 7 3,598.80 461.50 527.91 14,514.11 0.00 0.00 14,514.11

2019 6 17 8 3,598.80 461.71 505.78 13,995.08 0.00 0.00 13,995.08

2019 6 17 9 3,598.80 461.50 524.10 14,684.88 0.00 0.00 14,684.88

2019 6 17 10 3,598.80 461.32 536.54 14,785.84 0.00 0.00 14,785.84

2019 6 17 11 3,598.80 460.87 591.30 16,340.30 0.00 0.00 16,340.30

2019 6 17 12 3,598.80 460.82 593.77 16,444.98 0.00 0.00 16,444.98

2019 6 17 13 3,599.48 461.50 593.72 16,419.29 0.00 0.00 16,419.29

2019 6 17 14 3,599.48 461.50 593.73 16,438.40 0.00 0.00 16,438.40

2019 6 17 15 3,599.48 461.68 582.31 16,077.83 0.00 0.00 16,077.83

2019 6 17 16 3,599.48 461.59 582.46 16,091.94 0.00 0.00 16,091.94

2019 6 17 17 3,599.48 461.50 591.42 16,357.95 0.00 0.00 16,357.95

2019 6 17 18 3,599.48 461.50 593.78 16,410.54 0.00 0.00 16,410.54

2019 6 17 19 3,599.48 461.38 598.57 16,576.54 0.00 0.00 16,576.54

2019 6 17 20 3,599.48 461.51 593.14 16,384.84 0.00 0.00 16,384.84

2019 6 17 21 3,599.48 461.68 575.74 15,893.72 0.00 0.00 15,893.72

2019 6 17 22 3,599.48 461.78 566.06 15,621.12 0.00 0.00 15,621.12

2019 6 17 23 3,599.48 462.13 536.35 14,785.29 0.00 0.00 14,785.29

2019 6 17 24 3,600.02 463.42 467.25 12,988.28 0.00 0.00 12,988.28

2019 6 18 1 3,600.02 464.31 381.44 10,638.71 0.00 0.00 10,638.71

2019 6 18 2 3,600.02 464.19 389.24 10,770.99 0.00 0.00 10,770.99

2019 6 18 3 3,600.02 464.45 372.76 10,354.25 0.00 0.00 10,354.25

2019 6 18 4 3,600.02 464.51 367.25 10,205.06 0.00 0.00 10,205.06

2019 6 18 5 3,600.02 463.81 418.85 11,540.46 0.00 0.00 11,540.46

2019 6 18 6 3,600.02 463.20 479.17 13,320.03 0.00 0.00 13,320.03

2019 6 18 7 3,600.02 462.65 532.49 14,590.38 0.00 0.00 14,590.38

2019 6 18 8 3,600.02 462.46 551.10 15,131.31 0.00 0.00 15,131.31

2019 6 18 9 3,600.02 462.40 551.74 15,221.78 0.00 0.00 15,221.78

2019 6 18 10 3,600.02 462.10 587.98 16,263.65 0.00 0.00 16,263.65

2019 6 18 11 3,600.02 462.07 591.80 16,323.52 0.00 0.00 16,323.52

2019 6 18 12 3,600.61 462.66 591.67 16,326.42 0.00 0.00 16,326.42

Page 10: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

2019 6 18 13 3,600.61 462.66 591.73 16,324.26 0.00 0.00 16,324.26

2019 6 18 14 3,600.61 462.66 591.42 16,315.03 0.00 0.00 16,315.03

2019 6 18 15 3,600.61 462.66 591.60 16,307.90 0.00 0.00 16,307.90

2019 6 18 16 3,600.61 462.66 591.81 16,329.44 0.00 0.00 16,329.44

2019 6 18 17 3,600.61 462.66 591.75 16,262.88 0.00 0.00 16,262.88

2019 6 18 18 3,600.61 462.66 591.67 16,321.25 0.00 0.00 16,321.25

2019 6 18 19 3,600.61 462.66 591.61 16,249.84 0.00 0.00 16,249.84

2019 6 18 20 3,600.61 462.71 585.58 16,215.54 0.00 0.00 16,215.54

2019 6 18 21 3,600.61 462.86 571.02 15,695.50 0.00 0.00 15,695.50

2019 6 18 22 3,600.61 463.03 556.82 15,311.42 0.00 0.00 15,311.42

2019 6 18 23 3,600.61 463.71 507.31 13,987.88 0.00 0.00 13,987.88

2019 6 18 24 3,601.23 465.11 418.18 11,552.10 0.00 0.00 11,552.10

2019 6 19 1 3,601.23 465.15 413.20 11,367.47 0.00 0.00 11,367.47

2019 6 19 2 3,601.23 466.27 345.41 9,644.18 0.00 0.00 9,644.18

2019 6 19 3 3,601.23 466.05 358.76 9,942.24 0.00 0.00 9,942.24

2019 6 19 4 3,601.23 465.98 363.33 10,080.73 0.00 0.00 10,080.73

2019 6 19 5 3,601.23 464.84 436.15 11,915.14 0.00 0.00 11,915.14

2019 6 19 6 3,601.23 464.31 491.69 13,563.73 0.00 0.00 13,563.73

2019 6 19 7 3,601.23 464.64 460.56 12,673.15 0.00 0.00 12,673.15

2019 6 19 8 3,601.23 464.49 456.76 12,561.08 0.00 0.00 12,561.08

2019 6 19 9 3,601.23 463.83 531.84 14,587.39 0.00 0.00 14,587.39

2019 6 19 10 3,601.23 463.33 589.94 16,196.14 0.00 0.00 16,196.14

2019 6 19 11 3,601.23 463.32 590.04 16,242.07 0.00 0.00 16,242.07

2019 6 19 12 3,601.71 463.77 592.71 16,310.47 0.00 0.00 16,310.47

2019 6 19 13 3,601.71 463.77 592.72 16,316.36 0.00 0.00 16,316.36

2019 6 19 14 3,601.71 463.76 593.06 16,310.77 0.00 0.00 16,310.77

2019 6 19 15 3,601.71 463.77 592.74 16,311.42 0.00 0.00 16,311.42

2019 6 19 16 3,601.71 463.77 592.77 16,269.30 0.00 0.00 16,269.30

2019 6 19 17 3,601.71 463.77 592.71 16,288.27 0.00 0.00 16,288.27

2019 6 19 18 3,601.71 463.77 592.77 16,282.46 0.00 0.00 16,282.46

2019 6 19 19 3,601.71 463.77 592.79 16,245.75 0.00 0.00 16,245.75

2019 6 19 20 3,601.71 463.83 588.00 16,152.02 0.00 0.00 16,152.02

2019 6 19 21 3,601.71 464.02 579.14 15,662.64 0.00 0.00 15,662.64

2019 6 19 22 3,601.71 464.08 562.62 15,448.89 0.00 0.00 15,448.89

2019 6 19 23 3,601.71 464.61 521.37 14,332.13 0.00 0.00 14,332.13

2019 6 19 24 3,602.25 465.90 424.95 12,160.12 0.00 0.00 12,160.12

2019 6 20 1 3,602.25 466.60 387.03 10,685.95 0.00 0.00 10,685.95

2019 6 20 2 3,602.25 466.88 364.62 10,105.38 0.00 0.00 10,105.38

2019 6 20 3 3,602.25 466.94 360.84 10,002.55 0.00 0.00 10,002.55

2019 6 20 4 3,602.25 466.88 364.81 10,094.13 0.00 0.00 10,094.13

2019 6 20 5 3,602.25 466.24 411.45 11,333.13 0.00 0.00 11,333.13

2019 6 20 6 3,602.25 465.67 461.77 12,735.79 0.00 0.00 12,735.79

2019 6 20 7 3,602.25 464.80 540.33 14,764.47 0.00 0.00 14,764.47

2019 6 20 8 3,602.25 464.59 567.69 15,559.86 0.00 0.00 15,559.86

2019 6 20 9 3,602.25 464.63 559.77 15,308.76 0.00 0.00 15,308.76

2019 6 20 10 3,602.25 464.47 576.87 15,815.46 0.00 0.00 15,815.46

2019 6 20 11 3,602.25 464.46 577.62 15,813.51 0.00 0.00 15,813.51

Page 11: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

2019 6 20 12 3,602.25 464.45 577.21 15,830.49 0.00 0.00 15,830.49

2019 6 20 13 3,602.78 464.99 576.85 15,815.08 0.00 0.00 15,815.08

2019 6 20 14 3,602.78 465.00 576.03 15,794.98 0.00 0.00 15,794.98

2019 6 20 15 3,602.78 464.97 577.74 15,835.74 0.00 0.00 15,835.74

2019 6 20 16 3,602.78 465.00 577.03 15,816.28 0.00 0.00 15,816.28

2019 6 20 17 3,602.78 464.99 577.39 15,822.04 0.00 0.00 15,822.04

2019 6 20 18 3,602.78 464.97 577.69 15,805.35 0.00 0.00 15,805.35

2019 6 20 19 3,602.78 464.98 578.02 15,827.70 0.00 0.00 15,827.70

2019 6 20 20 3,602.78 464.97 577.61 15,816.84 0.00 0.00 15,816.84

2019 6 20 21 3,602.78 464.99 577.21 15,803.10 0.00 0.00 15,803.10

2019 6 20 22 3,602.78 465.38 550.68 15,174.40 0.00 0.00 15,174.40

2019 6 20 23 3,602.78 465.84 499.41 13,705.06 0.00 0.00 13,705.06

2019 6 20 24 3,603.26 466.94 428.31 11,960.38 0.00 0.00 11,960.38

2019 6 21 1 3,603.26 467.61 378.92 10,457.69 0.00 0.00 10,457.69

2019 6 21 2 3,603.26 467.62 382.18 10,533.20 0.00 0.00 10,533.20

2019 6 21 3 3,603.26 467.63 378.94 10,430.85 0.00 0.00 10,430.85

2019 6 21 4 3,603.26 467.65 379.35 10,422.41 0.00 0.00 10,422.41

2019 6 21 5 3,603.26 467.13 414.72 11,332.86 0.00 0.00 11,332.86

2019 6 21 6 3,603.26 466.64 460.06 12,582.75 0.00 0.00 12,582.75

2019 6 21 7 3,603.26 465.71 551.72 15,071.15 0.00 0.00 15,071.15

2019 6 21 8 3,603.26 465.39 590.05 16,154.17 0.00 0.00 16,154.17

2019 6 21 9 3,603.26 465.51 581.07 15,900.19 0.00 0.00 15,900.19

2019 6 21 10 3,603.26 465.34 589.52 16,133.54 0.00 0.00 16,133.54

2019 6 21 11 3,603.26 465.27 603.07 16,530.22 0.00 0.00 16,530.22

2019 6 21 12 3,603.82 465.76 609.15 16,721.38 0.00 0.00 16,721.38

2019 6 21 13 3,603.82 465.89 594.61 16,287.56 0.00 0.00 16,287.56

2019 6 21 14 3,603.82 465.89 593.48 16,257.41 0.00 0.00 16,257.41

2019 6 21 15 3,603.82 465.90 593.08 16,243.12 0.00 0.00 16,243.12

2019 6 21 16 3,603.82 465.91 592.16 16,206.62 0.00 0.00 16,206.62

2019 6 21 17 3,603.82 465.86 595.49 16,301.76 0.00 0.00 16,301.76

2019 6 21 18 3,603.82 465.68 621.97 17,125.19 0.00 0.00 17,125.19

2019 6 21 19 3,603.82 465.88 595.14 16,297.42 0.00 0.00 16,297.42

2019 6 21 20 3,603.82 465.92 592.75 15,931.06 0.00 0.00 15,931.06

2019 6 21 21 3,603.82 466.13 567.58 15,518.98 0.00 0.00 15,518.98

2019 6 21 22 3,603.82 466.25 561.36 15,343.27 0.00 0.00 15,343.27

2019 6 21 23 3,603.82 466.86 500.76 13,743.11 0.00 0.00 13,743.11

2019 6 21 24 3,604.33 467.98 434.88 12,104.78 0.00 0.00 12,104.78

2019 6 22 1 3,604.33 468.85 376.42 10,364.31 0.00 0.00 10,364.31

2019 6 22 2 3,604.33 468.93 372.73 10,259.50 0.00 0.00 10,259.50

2019 6 22 3 3,604.33 468.93 372.86 10,262.58 0.00 0.00 10,262.58

2019 6 22 4 3,604.33 468.94 372.80 10,239.20 0.00 0.00 10,239.20

2019 6 22 5 3,604.33 468.91 372.78 10,244.22 0.00 0.00 10,244.22

2019 6 22 6 3,604.33 468.94 372.73 10,253.54 0.00 0.00 10,253.54

2019 6 22 7 3,604.33 468.97 369.63 10,177.20 0.00 0.00 10,177.20

2019 6 22 8 3,604.33 468.97 364.84 10,046.85 0.00 0.00 10,046.85

2019 6 22 9 3,604.33 468.94 372.22 10,225.95 0.00 0.00 10,225.95

2019 6 22 10 3,604.33 468.93 372.71 10,226.65 0.00 0.00 10,226.65

Page 12: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

2019 6 22 11 3,604.33 468.94 372.89 10,254.60 0.00 0.00 10,254.60

2019 6 22 12 3,604.82 469.15 396.80 10,853.09 0.00 0.00 10,853.09

2019 6 22 13 3,604.82 469.40 373.93 10,287.41 0.00 0.00 10,287.41

2019 6 22 14 3,604.82 469.43 372.76 10,235.75 0.00 0.00 10,235.75

2019 6 22 15 3,604.82 469.05 392.16 10,695.91 0.00 0.00 10,695.91

2019 6 22 16 3,604.82 468.99 398.66 11,151.29 0.00 0.00 11,151.29

2019 6 22 17 3,604.82 469.00 395.95 10,820.08 0.00 0.00 10,820.08

2019 6 22 18 3,604.82 469.39 374.44 10,292.61 0.00 0.00 10,292.61

2019 6 22 19 3,604.82 469.42 372.91 10,248.96 0.00 0.00 10,248.96

2019 6 22 20 3,604.82 469.43 372.68 10,245.27 0.00 0.00 10,245.27

2019 6 22 21 3,604.82 469.43 372.66 10,229.08 0.00 0.00 10,229.08

2019 6 22 22 3,604.82 469.43 372.74 10,228.78 0.00 0.00 10,228.78

2019 6 22 23 3,604.82 469.43 372.94 10,242.33 0.00 0.00 10,242.33

2019 6 22 24 3,605.35 469.95 372.76 10,237.26 0.00 0.00 10,237.26

2019 6 23 1 3,605.35 469.96 372.85 10,240.18 0.00 0.00 10,240.18

2019 6 23 2 3,605.35 469.97 372.70 10,224.60 0.00 0.00 10,224.60

2019 6 23 3 3,605.35 469.97 372.53 10,232.99 0.00 0.00 10,232.99

2019 6 23 4 3,605.35 469.96 372.82 10,224.68 0.00 0.00 10,224.68

2019 6 23 5 3,605.35 469.97 372.84 10,238.70 0.00 0.00 10,238.70

2019 6 23 6 3,605.35 469.97 372.84 10,223.96 0.00 0.00 10,223.96

2019 6 23 7 3,605.35 469.96 372.13 10,218.00 0.00 0.00 10,218.00

2019 6 23 8 3,605.35 469.98 372.51 10,231.21 0.00 0.00 10,231.21

2019 6 23 9 3,605.35 469.97 371.79 10,206.44 0.00 0.00 10,206.44

2019 6 23 10 3,605.35 469.79 385.95 10,561.68 0.00 0.00 10,561.68

2019 6 23 11 3,605.35 469.85 384.01 10,657.31 0.00 0.00 10,657.31

2019 6 23 12 3,605.84 470.21 382.94 10,479.56 0.00 0.00 10,479.56

2019 6 23 13 3,605.84 470.58 367.66 10,113.23 0.00 0.00 10,113.23

2019 6 23 14 3,605.84 470.52 368.85 10,101.97 0.00 0.00 10,101.97

2019 6 23 15 3,605.84 470.46 367.25 10,134.04 0.00 0.00 10,134.04

2019 6 23 16 3,605.84 470.42 380.87 10,428.23 0.00 0.00 10,428.23

2019 6 23 17 3,605.84 470.45 372.86 10,229.34 0.00 0.00 10,229.34

2019 6 23 18 3,605.84 470.47 372.89 10,212.62 0.00 0.00 10,212.62

2019 6 23 19 3,605.84 470.45 374.01 10,238.37 0.00 0.00 10,238.37

2019 6 23 20 3,605.84 470.47 372.67 10,219.75 0.00 0.00 10,219.75

2019 6 23 21 3,605.84 470.46 372.68 10,218.70 0.00 0.00 10,218.70

2019 6 23 22 3,605.84 470.45 372.82 10,218.20 0.00 0.00 10,218.20

2019 6 23 23 3,605.84 470.47 372.74 10,202.78 0.00 0.00 10,202.78

2019 6 23 24 3,606.43 471.04 372.79 10,217.36 0.00 0.00 10,217.36

2019 6 24 1 3,606.43 471.04 371.88 10,263.69 0.00 0.00 10,263.69

2019 6 24 2 3,606.43 471.11 369.17 10,127.19 0.00 0.00 10,127.19

2019 6 24 3 3,606.43 471.09 370.44 10,143.15 0.00 0.00 10,143.15

2019 6 24 4 3,606.43 471.11 364.96 10,001.27 0.00 0.00 10,001.27

2019 6 24 5 3,606.43 470.42 412.41 11,265.88 0.00 0.00 11,265.88

2019 6 24 6 3,606.43 469.78 473.07 12,903.64 0.00 0.00 12,903.64

2019 6 24 7 3,606.43 468.98 544.54 14,756.18 0.00 0.00 14,756.18

2019 6 24 8 3,606.43 468.58 591.54 16,079.36 0.00 0.00 16,079.36

2019 6 24 9 3,606.43 468.29 623.81 17,031.53 0.00 0.00 17,031.53

Page 13: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

2019 6 24 10 3,606.43 468.82 562.27 15,287.86 0.00 0.00 15,287.86

2019 6 24 11 3,606.43 468.56 592.09 16,090.32 0.00 0.00 16,090.32

2019 6 24 12 3,606.92 469.04 593.85 16,150.08 0.00 0.00 16,150.08

2019 6 24 13 3,606.92 469.03 593.86 16,130.87 0.00 0.00 16,130.87

2019 6 24 14 3,606.92 469.03 593.81 16,145.24 0.00 0.00 16,145.24

2019 6 24 15 3,606.92 469.04 593.97 16,113.94 0.00 0.00 16,113.94

2019 6 24 16 3,606.92 469.05 593.52 16,115.60 0.00 0.00 16,115.60

2019 6 24 17 3,606.92 468.80 618.55 16,856.02 0.00 0.00 16,856.02

2019 6 24 18 3,606.92 469.02 595.28 16,190.70 0.00 0.00 16,190.70

2019 6 24 19 3,606.92 469.33 566.38 15,378.46 0.00 0.00 15,378.46

2019 6 24 20 3,606.92 468.95 604.18 16,410.00 0.00 0.00 16,410.00

2019 6 24 21 3,606.92 469.25 579.60 15,759.13 0.00 0.00 15,759.13

2019 6 24 22 3,606.92 469.35 565.87 15,323.57 0.00 0.00 15,323.57

2019 6 24 23 3,606.92 469.91 512.30 13,938.22 0.00 0.00 13,938.22

2019 6 24 24 3,607.43 471.12 446.58 12,165.09 0.00 0.00 12,165.09

2019 6 25 1 3,607.43 472.06 372.95 10,323.73 0.00 0.00 10,323.73

2019 6 25 2 3,607.43 472.13 370.99 10,225.31 0.00 0.00 10,225.31

2019 6 25 3 3,607.43 471.96 387.95 10,575.97 0.00 0.00 10,575.97

2019 6 25 4 3,607.43 472.06 376.58 10,294.30 0.00 0.00 10,294.30

2019 6 25 5 3,607.43 471.58 406.67 11,024.42 0.00 0.00 11,024.42

2019 6 25 6 3,607.43 470.70 463.96 12,576.40 0.00 0.00 12,576.40

2019 6 25 7 3,607.43 470.07 542.84 14,736.79 0.00 0.00 14,736.79

2019 6 25 8 3,607.43 470.20 525.97 14,266.71 0.00 0.00 14,266.71

2019 6 25 9 3,607.43 469.92 552.12 14,935.79 0.00 0.00 14,935.79

2019 6 25 10 3,607.43 469.58 592.00 16,049.68 0.00 0.00 16,049.68

2019 6 25 11 3,607.43 469.56 593.80 16,098.63 0.00 0.00 16,098.63

2019 6 25 12 3,607.86 469.99 593.68 16,110.73 0.00 0.00 16,110.73

2019 6 25 13 3,607.86 469.99 593.77 16,112.67 0.00 0.00 16,112.67

2019 6 25 14 3,607.86 469.98 593.81 16,107.38 0.00 0.00 16,107.38

2019 6 25 15 3,607.86 469.98 593.73 16,103.80 0.00 0.00 16,103.80

2019 6 25 16 3,607.86 469.98 593.70 16,102.25 0.00 0.00 16,102.25

2019 6 25 17 3,607.86 469.98 593.68 16,102.51 0.00 0.00 16,102.51

2019 6 25 18 3,607.86 469.98 593.74 16,097.45 0.00 0.00 16,097.45

2019 6 25 19 3,607.86 469.98 593.90 16,087.34 0.00 0.00 16,087.34

2019 6 25 20 3,607.86 469.70 621.78 16,924.21 0.00 0.00 16,924.21

2019 6 25 21 3,607.86 469.96 595.93 16,185.52 0.00 0.00 16,185.52

2019 6 25 22 3,607.86 470.05 591.44 16,042.25 0.00 0.00 16,042.25

2019 6 25 23 3,607.86 470.73 526.24 14,275.18 0.00 0.00 14,275.18

2019 6 25 24 3,608.31 472.05 437.76 11,904.81 0.00 0.00 11,904.81

2019 6 26 1 3,608.31 472.71 374.22 10,380.04 0.00 0.00 10,380.04

2019 6 26 2 3,608.31 472.72 383.19 10,453.21 0.00 0.00 10,453.21

2019 6 26 3 3,608.31 472.74 380.02 10,372.33 0.00 0.00 10,372.33

2019 6 26 4 3,608.31 472.76 384.02 10,467.27 0.00 0.00 10,467.27

2019 6 26 5 3,608.31 472.28 412.11 11,135.33 0.00 0.00 11,135.33

2019 6 26 6 3,608.31 471.80 454.69 12,305.74 0.00 0.00 12,305.74

2019 6 26 7 3,608.31 470.90 543.97 14,716.73 0.00 0.00 14,716.73

2019 6 26 8 3,608.31 470.51 585.77 15,848.36 0.00 0.00 15,848.36

Page 14: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

2019 6 26 9 3,608.31 470.73 562.16 15,204.70 0.00 0.00 15,204.70

2019 6 26 10 3,608.31 470.54 583.54 15,771.27 0.00 0.00 15,771.27

2019 6 26 11 3,608.31 470.53 584.66 15,820.61 0.00 0.00 15,820.61

2019 6 26 12 3,608.31 470.52 584.11 15,810.19 0.00 0.00 15,810.19

2019 6 26 13 3,608.31 470.51 585.12 15,834.82 0.00 0.00 15,834.82

2019 6 26 14 3,608.31 470.45 593.24 16,062.54 0.00 0.00 16,062.54

2019 6 26 15 3,608.31 470.44 593.81 16,068.03 0.00 0.00 16,068.03

2019 6 26 16 3,608.31 470.21 613.22 16,651.55 0.00 0.00 16,651.55

2019 6 26 17 3,608.31 470.22 614.31 16,691.26 0.00 0.00 16,691.26

2019 6 26 18 3,608.31 470.41 595.19 16,102.89 0.00 0.00 16,102.89

2019 6 26 19 3,608.31 470.43 594.08 16,085.34 0.00 0.00 16,085.34

2019 6 26 20 3,608.31 470.43 598.52 16,210.32 0.00 0.00 16,210.32

2019 6 26 21 3,608.31 470.45 592.93 16,053.94 0.00 0.00 16,053.94

2019 6 26 22 3,608.31 470.71 570.76 15,448.41 0.00 0.00 15,448.41

2019 6 26 23 3,608.31 471.32 506.34 13,769.54 0.00 0.00 13,769.54

2019 6 26 24 3,609.04 472.96 429.05 11,635.16 0.00 0.00 11,635.16

2019 6 27 1 3,609.04 473.81 344.37 9,576.50 0.00 0.00 9,576.50

2019 6 27 2 3,609.04 473.89 349.36 9,432.78 0.00 0.00 9,432.78

2019 6 27 3 3,609.04 473.91 349.86 9,446.61 0.00 0.00 9,446.61

2019 6 27 4 3,609.04 473.88 350.38 9,475.09 0.00 0.00 9,475.09

2019 6 27 5 3,609.04 473.50 383.22 10,396.06 0.00 0.00 10,396.06

2019 6 27 6 3,609.04 472.68 437.02 11,788.26 0.00 0.00 11,788.26

2019 6 27 7 3,609.04 471.61 547.17 14,757.33 0.00 0.00 14,757.33

2019 6 27 8 3,609.04 471.06 599.41 16,223.03 0.00 0.00 16,223.03

2019 6 27 9 3,609.04 470.98 613.79 16,688.51 0.00 0.00 16,688.51

2019 6 27 10 3,609.04 471.18 588.44 16,017.93 0.00 0.00 16,017.93

2019 6 27 11 3,609.04 471.16 586.89 16,100.74 0.00 0.00 16,100.74

2019 6 27 12 3,609.41 471.55 588.06 15,983.23 0.00 0.00 15,983.23

2019 6 27 13 3,609.41 471.60 586.47 15,941.50 0.00 0.00 15,941.50

2019 6 27 14 3,609.41 471.56 586.47 15,923.44 0.00 0.00 15,923.44

2019 6 27 15 3,609.41 471.58 589.61 15,944.41 0.00 0.00 15,944.41

2019 6 27 16 3,609.41 471.54 589.87 16,063.90 0.00 0.00 16,063.90

2019 6 27 17 3,609.41 471.59 586.88 15,860.91 0.00 0.00 15,860.91

2019 6 27 18 3,609.41 471.34 615.74 16,670.01 0.00 0.00 16,670.01

2019 6 27 19 3,609.41 471.32 618.01 16,765.17 0.00 0.00 16,765.17

2019 6 27 20 3,609.41 471.57 588.58 15,917.70 0.00 0.00 15,917.70

2019 6 27 21 3,609.41 471.60 586.78 15,562.71 0.00 0.00 15,562.71

2019 6 27 22 3,609.41 471.82 578.17 15,644.79 0.00 0.00 15,644.79

2019 6 27 23 3,609.41 472.53 503.53 13,650.42 0.00 0.00 13,650.42

2019 6 27 24 3,609.75 473.74 427.92 11,591.85 0.00 0.00 11,591.85

2019 6 28 1 3,609.75 474.31 373.02 10,338.55 0.00 0.00 10,338.55

2019 6 28 2 3,609.75 474.29 384.32 10,452.18 0.00 0.00 10,452.18

2019 6 28 3 3,609.75 474.33 380.94 10,354.17 0.00 0.00 10,354.17

2019 6 28 4 3,609.75 474.26 383.88 10,431.42 0.00 0.00 10,431.42

2019 6 28 5 3,609.75 473.81 413.19 11,156.03 0.00 0.00 11,156.03

2019 6 28 6 3,609.75 473.25 454.83 12,191.46 0.00 0.00 12,191.46

2019 6 28 7 3,609.75 472.33 546.70 14,805.49 0.00 0.00 14,805.49

Page 15: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

2019 6 28 8 3,609.75 472.15 566.23 15,269.23 0.00 0.00 15,269.23

2019 6 28 9 3,609.75 472.14 566.84 15,289.02 0.00 0.00 15,289.02

2019 6 28 10 3,609.75 472.15 565.86 15,242.33 0.00 0.00 15,242.33

2019 6 28 11 3,609.75 472.16 564.07 15,229.68 0.00 0.00 15,229.68

2019 6 28 12 3,610.08 472.50 564.80 15,229.05 0.00 0.00 15,229.05

2019 6 28 13 3,610.08 472.50 564.66 15,217.52 0.00 0.00 15,217.52

2019 6 28 14 3,610.08 472.39 572.21 15,410.03 0.00 0.00 15,410.03

2019 6 28 15 3,610.08 472.41 572.92 15,445.17 0.00 0.00 15,445.17

2019 6 28 16 3,610.08 472.28 586.05 15,804.34 0.00 0.00 15,804.34

2019 6 28 17 3,610.08 472.28 586.87 15,829.12 0.00 0.00 15,829.12

2019 6 28 18 3,610.08 472.28 586.71 15,831.88 0.00 0.00 15,831.88

2019 6 28 19 3,610.08 472.28 586.84 15,827.84 0.00 0.00 15,827.84

2019 6 28 20 3,610.08 472.28 586.49 15,782.06 0.00 0.00 15,782.06

2019 6 28 21 3,610.08 472.29 585.20 15,789.46 0.00 0.00 15,789.46

2019 6 28 22 3,610.08 472.48 571.69 15,417.37 0.00 0.00 15,417.37

2019 6 28 23 3,610.08 473.23 507.54 13,760.71 0.00 0.00 13,760.71

2019 6 28 24 3,610.40 474.30 431.16 11,711.01 0.00 0.00 11,711.01

2019 6 29 1 3,610.40 475.02 372.01 10,225.92 0.00 0.00 10,225.92

2019 6 29 2 3,610.40 475.00 373.87 10,278.72 0.00 0.00 10,278.72

2019 6 29 3 3,610.40 475.00 376.86 10,278.13 0.00 0.00 10,278.13

2019 6 29 4 3,610.40 475.00 377.83 10,268.00 0.00 0.00 10,268.00

2019 6 29 5 3,610.40 475.01 377.94 10,266.05 0.00 0.00 10,266.05

2019 6 29 6 3,610.40 475.00 377.89 10,278.42 0.00 0.00 10,278.42

2019 6 29 7 3,610.40 475.00 377.89 10,278.82 0.00 0.00 10,278.82

2019 6 29 8 3,610.40 475.01 377.90 10,278.56 0.00 0.00 10,278.56

2019 6 29 9 3,610.40 475.00 377.93 10,281.15 0.00 0.00 10,281.15

2019 6 29 10 3,610.40 475.01 377.86 10,273.36 0.00 0.00 10,273.36

2019 6 29 11 3,610.40 475.01 377.91 10,262.19 0.00 0.00 10,262.19

2019 6 29 12 3,610.82 475.44 376.18 10,230.67 0.00 0.00 10,230.67

2019 6 29 13 3,610.82 475.44 377.84 10,269.57 0.00 0.00 10,269.57

2019 6 29 14 3,610.82 475.43 377.83 10,275.03 0.00 0.00 10,275.03

2019 6 29 15 3,610.82 475.42 377.79 10,239.62 0.00 0.00 10,239.62

2019 6 29 16 3,610.82 475.43 377.91 10,273.65 0.00 0.00 10,273.65

2019 6 29 17 3,610.82 475.43 378.06 10,277.31 0.00 0.00 10,277.31

2019 6 29 18 3,610.82 475.45 377.11 10,255.97 0.00 0.00 10,255.97

2019 6 29 19 3,610.82 475.43 377.94 10,268.32 0.00 0.00 10,268.32

2019 6 29 20 3,610.82 475.41 377.88 10,258.90 0.00 0.00 10,258.90

2019 6 29 21 3,610.82 475.42 377.81 10,270.15 0.00 0.00 10,270.15

2019 6 29 22 3,610.82 475.41 377.87 10,268.50 0.00 0.00 10,268.50

2019 6 29 23 3,610.82 475.44 377.30 10,253.90 0.00 0.00 10,253.90

2019 6 29 24 3,611.12 475.73 377.57 10,246.98 0.00 0.00 10,246.98

2019 6 30 1 3,611.12 475.73 375.13 10,287.91 0.00 0.00 10,287.91

2019 6 30 2 3,611.12 475.72 377.86 10,252.77 0.00 0.00 10,252.77

2019 6 30 3 3,611.12 475.73 377.75 10,264.04 0.00 0.00 10,264.04

2019 6 30 4 3,611.12 475.73 377.89 10,249.94 0.00 0.00 10,249.94

2019 6 30 5 3,611.12 475.72 377.97 10,266.67 0.00 0.00 10,266.67

2019 6 30 6 3,611.12 475.72 377.91 10,265.07 0.00 0.00 10,265.07

Page 16: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

2019 6 30 7 3,611.12 475.72 377.66 10,262.37 0.00 0.00 10,262.37

2019 6 30 8 3,611.12 475.72 378.34 10,273.51 0.00 0.00 10,273.51

2019 6 30 9 3,611.12 475.72 377.88 10,262.39 0.00 0.00 10,262.39

2019 6 30 10 3,611.12 475.73 377.86 10,258.47 0.00 0.00 10,258.47

2019 6 30 11 3,611.12 475.72 378.49 10,274.28 0.00 0.00 10,274.28

2019 6 30 12 3,611.12 475.73 374.86 10,156.25 0.00 0.00 10,156.25

2019 6 30 13 3,611.45 476.06 377.85 10,257.11 0.00 0.00 10,257.11

2019 6 30 14 3,611.45 476.06 377.86 10,260.20 0.00 0.00 10,260.20

2019 6 30 15 3,611.45 476.07 377.81 10,256.84 0.00 0.00 10,256.84

2019 6 30 16 3,611.45 476.13 371.99 10,087.70 0.00 0.00 10,087.70

2019 6 30 17 3,611.45 476.09 372.48 10,172.78 0.00 0.00 10,172.78

2019 6 30 18 3,611.45 476.09 375.10 10,171.63 0.00 0.00 10,171.63

2019 6 30 19 3,611.45 476.07 375.27 10,186.17 0.00 0.00 10,186.17

2019 6 30 20 3,611.45 476.06 377.73 10,240.74 0.00 0.00 10,240.74

2019 6 30 21 3,611.45 476.05 377.93 10,255.93 0.00 0.00 10,255.93

2019 6 30 22 3,611.45 476.06 377.83 10,252.86 0.00 0.00 10,252.86

2019 6 30 23 3,611.45 476.05 377.91 10,254.13 0.00 0.00 10,254.13

2019 6 30 24 3,611.82 476.32 380.64 10,309.10 0.00 0.00 10,309.10

Page 17: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

Ramping

Rate

(cfs)

0.00

-147.51

-0.23

11.25

-13.57

-9.30

30.91

222.68

18.95

32.19

-78.77

154.69

35.45

-173.77

-174.78

137.68

39.66

12.32

-197.52

-45.93

8.30

-12.64

13.00

-92.59

38.69

-8.91

9.43

-1.96

2.69

-23.02

16.76

3.85

-1.02

-9.78

-6.66

18.95

-8.68

2.34

-7.25

9.59

-23.73

10.61

-12.52

136.98

Page 18: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

-142.45

16.80

0.25

-58.20

-711.88

367.91

-461.60

35.74

1,069.30

2,078.31

3,448.57

-456.50

259.69

580.10

152.85

71.82

450.98

43.09

123.10

76.57

-40.87

-742.66

58.65

-99.34

-433.51

-1,239.05

-2,394.94

-2,391.60

-624.22

-13.03

12.14

-0.35

63.07

1,462.60

486.24

2,433.63

591.09

317.71

1,063.34

25.63

-90.30

383.43

956.71

-7.22

-21.05

70.61

145.20

Page 19: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

-366.49

75.89

-201.45

-2,469.32

-2,378.18

-2,325.68

-169.10

-17.09

53.52

1,037.32

2,687.24

1,687.68

-850.44

121.38

1,430.01

59.16

-68.00

67.30

1,301.33

227.95

-13.78

-2.18

-14.08

-61.50

-20.50

-6.14

-426.12

-2,207.19

-2,906.55

-812.08

-574.67

-220.59

184.11

805.76

1,582.55

967.80

366.36

465.23

782.24

149.43

34.95

700.21

-126.30

346.58

1,094.60

29.80

-1,372.93

Page 20: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

53.53

476.87

762.05

-1,290.74

-2,351.21

-2,318.61

-1,190.99

-126.22

-122.58

-112.39

1,344.79

1,855.44

2,122.96

344.52

-24.00

289.94

-52.54

359.07

44.51

874.91

210.91

-23.41

24.17

25.09

-11.57

-5.84

-57.21

-435.95

-2,645.26

-2,941.77

-665.72

-75.30

15.19

0.83

-2.97

-16.48

15.21

-21.69

9.80

8.36

0.23

0.18

-2.19

-4.33

-7.18

0.57

-3.08

Page 21: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

12.35

-1.48

-1.43

2.46

-12.84

41.03

-45.89

112.68

-129.34

10.35

0.43

-14.27

12.71

-32.77

-26.44

43.98

-1.79

1.35

-8.50

17.48

1.52

-2.79

3.28

-4.88

-81.78

96.95

-17.89

0.04

347.25

-364.18

-17.36

-770.73

-18.05

-88.23

53.10

1,173.59

1,806.53

2,575.31

769.61

-171.90

616.76

302.43

447.89

-91.51

109.97

7.18

-29.81

Page 22: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

-1,098.77

989.33

109.98

13.95

-72.69

-2,212.89

-2,464.72

-2,376.96

-414.29

17.49

-8.16

34.77

941.68

1,936.18

1,010.45

733.44

-171.25

430.30

316.24

1,240.45

117.77

971.72

15.99

-5.20

-674.92

653.32

1.56

17.26

219.48

-435.78

-2,326.30

-2,501.20

-2,281.70

-196.79

22.89

47.16

1,137.87

1,980.56

1,715.98

835.95

-939.42

481.85

984.85

561.50

746.28

73.15

-10.09

Page 23: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

-51.87

-995.85

976.88

84.47

-21.77

-16.70

-1,044.23

-1,952.79

-2,236.91

-2,315.52

-51.70

-0.52

47.53

1,144.22

1,692.70

-429.57

1,131.42

1,677.43

444.73

-77.69

867.22

892.09

224.82

12.62

-2.34

-41.86

-36.35

-320.82

334.25

-26.37

-471.61

-2,007.33

-2,506.87

-2,381.51

-180.30

-2.09

46.52

1,395.90

2,203.68

848.42

882.90

12.77

281.60

319.78

99.19

317.88

663.42

Page 24: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

536.18

26.18

13.01

-42.05

-941.36

915.31

33.49

-181.65

-2,363.99

-2,495.62

-2,332.06

583.04

52.60

-829.56

763.09

69.82

-9.79

-28.69

12.21

0.97

12.23

179.19

-150.25

-30.73

-10.01

106.52

-88.80

-11.51

-15.39

-27.17

30.38

-42.10

-433.13

55.98

443.11

-18.38

22.43

-17.72

10.32

0.26

-30.94

-19.55

49.18

0.64

-5.43

-12.30

-16.14

Page 25: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

15.20

-41.28

27.29

10.18

8.00

-28.35

26.51

-11.18

-18.14

23.71

-18.80

-391.00

-989.89

467.10

921.72

939.52

1,114.70

2,437.83

-519.03

689.80

100.96

1,554.46

104.68

-25.69

19.11

-360.57

14.11

266.01

52.59

166.00

-191.70

-491.12

-272.60

-835.83

-1,797.01

-2,349.57

132.28

-416.74

-149.19

1,335.40

1,779.57

1,270.35

540.93

90.47

1,041.87

59.87

2.90

Page 26: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

-2.16

-9.23

-7.13

21.54

-66.56

58.37

-71.41

-34.30

-520.04

-384.08

-1,323.54

-2,435.78

-184.63

-1,723.29

298.06

138.49

1,834.41

1,648.59

-890.58

-112.07

2,026.31

1,608.75

45.93

68.40

5.89

-5.59

0.65

-42.12

18.97

-5.81

-36.71

-93.73

-489.38

-213.75

-1,116.76

-2,172.01

-1,474.17

-580.57

-102.83

91.58

1,239.00

1,402.66

2,028.68

795.39

-251.10

506.70

-1.95

Page 27: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

16.98

-15.41

-20.10

40.76

-19.46

5.76

-16.69

22.35

-10.86

-13.74

-628.70

-1,469.34

-1,744.68

-1,502.69

75.51

-102.35

-8.44

910.45

1,249.89

2,488.40

1,083.02

-253.98

233.35

396.68

191.16

-433.82

-30.15

-14.29

-36.50

95.14

823.43

-827.77

-366.36

-412.08

-175.71

-1,600.16

-1,638.33

-1,740.47

-104.81

3.08

-23.38

5.02

9.32

-76.34

-130.35

179.10

0.70

Page 28: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

27.95

598.49

-565.68

-51.66

460.16

455.38

-331.21

-527.47

-43.65

-3.69

-16.19

-0.30

13.55

-5.07

2.92

-15.58

8.39

-8.31

14.02

-14.74

-5.96

13.21

-24.77

355.24

95.63

-177.75

-366.33

-11.26

32.07

294.19

-198.89

-16.72

25.75

-18.62

-1.05

-0.50

-15.42

14.58

46.33

-136.50

15.96

-141.88

1,264.61

1,637.76

1,852.54

1,323.18

952.17

Page 29: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

-1,743.67

802.46

59.76

-19.21

14.37

-31.30

1.66

740.42

-665.32

-812.24

1,031.54

-650.87

-435.56

-1,385.35

-1,773.13

-1,841.36

-98.42

350.66

-281.67

730.12

1,551.98

2,160.39

-470.08

669.08

1,113.89

48.95

12.10

1.94

-5.29

-3.58

-1.55

0.26

-5.06

-10.11

836.87

-738.69

-143.27

-1,767.07

-2,370.37

-1,524.77

73.17

-80.88

94.94

668.06

1,170.41

2,410.99

1,131.63

Page 30: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

-643.66

566.57

49.34

-10.42

24.63

227.72

5.49

583.52

39.71

-588.37

-17.55

124.98

-156.38

-605.53

-1,678.87

-2,134.38

-2,058.66

-143.72

13.83

28.48

920.97

1,392.20

2,969.07

1,465.70

465.48

-670.58

82.81

-117.51

-41.73

-18.06

20.97

119.49

-202.99

809.10

95.16

-847.47

-354.99

82.08

-1,994.37

-2,058.57

-1,253.30

113.63

-98.01

77.25

724.61

1,035.43

2,614.03

Page 31: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

463.74

19.79

-46.69

-12.65

-0.63

-11.53

192.51

35.14

359.17

24.78

2.76

-4.04

-45.78

7.40

-372.09

-1,656.66

-2,049.70

-1,485.09

52.80

-0.59

-10.13

-1.95

12.37

0.40

-0.26

2.59

-7.79

-11.17

-31.52

38.90

5.46

-35.41

34.03

3.66

-21.34

12.35

-9.42

11.25

-1.65

-14.60

-6.92

40.93

-35.14

11.27

-14.10

16.73

-1.60

Page 32: Power Total - WAPAYear Month Day Hour Elevation Head Generation Power Release Spillway Bypass Total Release (ft) (ft) (MW) (cfs) (cfs) (cfs) (cfs) 2019 6 1 1 3,584.65 449.30 351.62

-2.70

11.14

-11.12

-3.92

15.81

-118.03

100.86

3.09

-3.36

-169.14

85.08

-1.15

14.54

54.57

15.19

-3.07

1.27

54.97