POWER POINT PRESENTATION ON
REVIEW ON PLAN SCHEMES & CSS
FOR THE 3rd QUARTER ENDING 31st DECEMBER 2011
DAO, LAWNGTLAI.
1.WEATHER CONDITION Rainfall Record ( in mm) for the Year 2010
Name of District : Lawngtlai
Sl.No Month Rainfall (in mm)
1 January Nil
2 February Nil
3 March 4.2
4 April 33.0
5 May 227.4
6 June 425.9
7 July 316.3
8 August 482.2
9 September 271.2
10 October 170.3
11 November 32.00
12 December 14.7
TOTAL: 1977.2 mm
Sl.
No
Name of Crops
Name of Circle Total of District
(Lawngtlai Dist.) Lawngtlai Diltlang Sangau Chawngte Borapansury Damdep
Area
in Ha.
Produ
ction
in MT
Area
in Ha.
Produc
tion
in MT
Area
in
Ha.
Produc
tion
in MT
Are
a
in
Ha.
Produ
tion
in
MT
Area
in
Ha.
Produ
ction
in MT
Area
in Ha.
Produc
tion
in MT
Area
in Ha.
Produc
tion
in MT
1 PADDY
1) Jhum 526 420 724 579 353 282 640 512 405 324 1304 1043 3952 3160
2) WRC (a)Kharif 75 109 198 297 40 58 130 188.5 360 540 450 630 1253 1822.5
TOTAL OF WRC 75 109 198 297 40 58 130 188.5 360 540 450 630 1253 1822.5
GRAND TOTAL OF PADDY 601 529 922 876 393 340 770 700.5 765 864 1754 1673 5205 4982.5
II MAIZE a) Kharif 96 182 195 370 76 145 23 41 18 33 58 105 466 876
TOTAL OF MAIZE 96 182 195 370 76 145 23 41 18 33 58 105 466 876
III TOPIOCA 3 28 3 26 4 30 2 16 2 17 3 26 17 143
2 PULSES
IV 1)Rice Bean (Kharif) 9 4.4 3 1.44 6 2.88 2 0.96 1 0.48 3 1.38 24 11.54
2) ARHAR (Kharif) 1.5 0.675 1.5 0.675 1 0.45 1 0.40 1 0.40 1 0.40 7 3.0
3)COWPEA (a) Kharif 4 2 5 2.5 5 2.5 3 1.5 3 1.5 3 1.5 23 11.5
TOTAL OF KHARIF 14.5 7.075 9.5 4.615 12 5.83 6 2.86 5 2.38 7 3.28 54 26.04
GRAND TOTAL OF PULSES 14.5 7.075 9.5 4.615 12 5.83 6 2.86 5 2.38 7 3.28 54 26.04
3 OILSEED
1)Soyabean (Kharif) 14 7 8 4 10 5 3 1.5 3 1.5 5 3 43 22
2)Sesamum(Kharif) 1 40 5 2.25 4 1.6 15 6.75 15 6.75 17 7.65 57 25.40
TOTAL OF KHARIF 15 7.4 13 6.25 14 6.6 18 8.25 18 8.25 22 10.65 100 47.40
GRAND TOTAL OF OILSEEDS 15 7.4 13 6.25 14 6.6 18 8.25 18 8.25 22 10.65 100 47.40
GRAND TOTAL OF KHARIF 729.5 753.475 1142.5 1282.865 499 527.43 819 768.61 808 924.63 1844 1817.93 5842 6074.94
2. CROP STITUATION :KHARIF ADVANCE ESTIMATE OF PRODUCTION 2010
2. RABI CROPS PROSPECT
Sl.No Name of Crop Area Covered ( in Ha)
1 Rice 132
2 Potato 9.92
3 Maize -
4 Pulses -
5 Oilseeds -
TOTAL : 141.92
1 12
Sl.
No Name of Project
Target during
2010-2011
Achievement
during the
3rd quarter
Nos.
of
WH
S
const
r-
ucte
d
Total
area of
Terrac
e
constr-
ucted
Total
area
of
land
devel-
oped
Hort.
Plant.
(name
may be
specifie
d)
Nos.
of
famili
es
assist
ed for
Poul-
try
Nos.
of
famili
es
assist
ed for
Pigge
-ry
Any
other
assistan
ce given
under
Liveliho
od
support
system
Total
nos.
of
famili
es
settle
d so
far
Phy
(Ha.) Fin
(Ha.) Phy. Fin.
A Administrative Cost L.S 10.00 L.S 2.32
Sub –Total L.S 10.00 L.S 2.32
B Watershed Development
works
(1) Construction of
Terraces/Land
Development Works 295.17 Ha. 35.42 15 Ha. 1.80 15 Ha 15 Ha.
(2) Constructions of W.H.S 60 Nos. 12.00 - -
(3) Vegetative Contour Barrier 30 Nos. 1.50 - -
(4) Horticulture Plantation 62.5 Ha. 12.50 - -
(5) Afforestation 154 Ha. 3.08 - -
(6) Crop Demonstration 289.60 Ha. 18.10 - -
Sub – Total 801.27 Ha
90 Nos. 82.60
15 Ha. 1.80 15 Ha 15 Ha.
ABSTRACT
3. PROFORMA FOR REPORTING PROGRESS
REPORTS OF NWDPRA PROJECTS DURING 2010-2011 (PROJECT WISE)
3rd Quarter
Name of District : Lawngtlai Rupees in lakh
1 13
Sl.
No Name of Project
Target during
2010-2011
Achievement
during the
3rd quarter Nos.
of
WHS
Cons-
tr-
ucted
Total
area
of
Terr
ace
const
ructe
d
Total
area
of
land
devel
oped
Hort.
Plant.
(name
may
be
Speci-
fied)
Nos. of
Families
assisted
for
Poultry
Nos. of
families
a
assisted
for
Piggery
Any
other
assistance
Given
under
Liveli
-hood
support
system
Total
nos. of f
families
settled
so far Phy
(Ha.) Fin
(Ha. Phy. Fin.
C Livelihood Activities
(1) Poultry 180 Nos. 9.0 90Nos 4.50 90 Nos. 90 Nos. 90 Nos.
(2) Piggery 180 Nos. 9.0 90Nos 4.50
(3) Pisciculture 180 Nos. 9.0 90Nos 4.50
(4) Kitchen Garden 15 Unit 0.54 - -
Sub – Total 555 27.54 270 13.50
Grand Total 801.27 Ha.
645 Nos.
120.14 15 Ha.
270Nos
17.62 15 Ha 15Ha. 90 Nos. 90 Nos. 90 Nos.
4. PROGRESS REPORT 3rd QUARTER ENDING OF DECEMBER 2010, WDPSCA LAWNGTLAI DISTRICT.
Expenditure sanction of Rs.84.73/- lakhs was obtained as below:-
(a) Administration - 1.95 lakhs (b) Honorarium - 5.54 lakhs ( WDT/Secretary W.C) (c) Corpus Fund - 4.90 lakhs (d) Monitoring and Evaluation - 1.20 lakhs (e) Works - 71.14 lakhs TOTAL - 84.73 lakhs Out of these fund for works (Rs.71.14) and Monitoring and
Evaluation (Rs.1.20) amounting to Rs.72.34 lakhs are not yet drawn. As such no works are taken up yet under WDPSCA till date.
1 15
5. PROGRESS REPORT 3rd QUARTER ENDING OF 2010 ATMA LAWNGTLAI
DISTRICT
--------------------
During the 3rd quarter ending 31st December 2010, 2 Nos. of SHG
are formed under ATMA viz, Daifim SHG Lungpher „S‟ and SHG ATMA,
Lawngtlai Block, Chawnhu. A sum of Rs. 10,000/- each were given to
them as a seed money. In an effort to multiply this seed money both the
SHGs cultivate Onion (Var. Matahari) at Lungpher and Chawnhu
respectively. Below are some of the photos depicting their activities.
Besides these, exposure visit within state was conducted during
October 2010 at Champhai via N.Vanlaiphai wherein within state training
was also conducted at KVK, N.Vanlaiphai. The team was led by Pu
H.Lalbiaknia, AEO.
6. PROGRESS REPORT 3rd QUARTER ENDING DECEMBER 2010
ISOPOM LAWNGTLAI DISTRICT
The following activities are taken up during the 3rd quarters
(1) Training on Cultivation and Production technology on Oil
Palm was conducted at 4 places viz, Sihtlangpui, Chawngtelui, Diltlang
and Lawngtlai at the cost of Rs.1.05 lakhs i.e. 0.2625 lakhs per training.
6.
(2) Half Moon terraces are constructed in an area of 3.5 Ha. Some of
the beneficiaries are
1) Pu L.Dosanga, Lawngtlai – IV - 0.5 Ha.
2) Pu C.Lalnunzira, Diltlang - 0.5 Ha.
3) Pu Thangbika, Paithar - 0.5 Ha.
4) Pu Lalhmangaihkima,Lawngtlai Bazar - 0.5 Ha.
5) Pu Sangmuana, Mampui - 0.5 Ha.
6) Pu Chuankhupthanga, M.Kawnpui - 0.5 Ha.
7) Pu Ramzauva, Ngengpui - 0.5 Ha.
Another 1.5 Ha. will be covered within February,2011. With this
the total hectarage for construction of half moon terraces will come
to 5 Ha. with an expenditure of Rs. 1.03 lakhs @ Rs.0.206 lakhs
per Ha.
6.
(3) A total fund of Rs.0.75 lakhs was received for construction of 3 Nos. of
Waters Harvesting Structure @ Rs.0.25 lakhs per no. Out of these 2 nos. of
Water Harvesting Structure are already constructed. The beneficiaries are:
1) Pu T.T. Nohmung, Ngengpui
2) Pu Rohlua, M.Kawnpui
7. Other schemes of MMA with focus to SRI and Farm Mechanization
System of Rice Intensification SRI
Sl.
No Month
Unit Target Achievem
ent Remarks Ha/No. Phy Fin Phy Fin
I Demonstration on
System of Rice
Intensification Ha. 9.2 0.69 9.2 0.69
II Small and Marginal
Farmers
III Large and Medium
farmers
7. Farm Mechanization
Sl.
No Month
Unit Target Achievement
Remarks Ha/
No Phy Fin Phy Fin
I Power sources
II Tractor
III Power Tiller Nos. 16 6.756 16 6.756
IV Light weight
power tiller
8. NLUP : As an initial step, launching of NLUP was had at Chawngte on 14th January 2011. A total of 100 beneficiaries received the first installment @ Rs.20,000/- each. Our Department was allotted with 24 beneficiaries and the amount distributed comes to Rs.4,80,000/- (Rupess four lakh eighty thousand)only. List of recipients
Sl.No. Name Address Trade Amount received
(Rs. P)
1 Devamuno Udalthana – I WRC - I 20,000.00
2 Pattar Chandra Udalthana – I WRC – I 20,000.00
3 Soibua Udalthana – I WRC – I 20,000.00
4 Chandra Surijo Udalthana – I WRC – I 20,000.00
5 Mritu joy Udalthana – I WRC – I 20,000.00
6 Santi muni New Jagana sury – I WRC – I 20,000.00
7 Bikash Kurbalovasora WRC – I 20,000.00
8 Raj Kumar Kukurduleya WRC – I 20,000.00
9 Karna Nakdarasora WRC – I 20,000.00
10 Krishna chandra Barapansuri – I WRC – I 20,000.00
11 Manuram Baganpara WRC – I 20,000.00
12 Nolotfal Kurbalovasora WRC – I 20,000.00
13 Notun Kumar Mondirasora WRC – I 20,000.00
14 Subaghya Devasora “N” WRC – I 20,000.00
15 Basanta Kumar Fulsora WRC – I 20,000.00
16 Chandra bidua Moinababsora – II WRC – I 20,000.00
17 Ananta Kumar Barakobahali WRC – I 20,000.00
18 Rangasulo Chotaguisury – I WRC – I 20,000.00
19 Fulo chand Chotaguisury – I WRC – I 20,000.00
20 Ranjan Kumar Udalthana – I WRC - I 20,000.00
21 Ranjani kumar Jaruldubosora WRC – I 20,000.00
22 Purna kumar Udalthana – I WRC – I 20,000.00
23 Subash basu Udalthana – I WRC – I 20,000.00
24 Kalavizia Mondirasora WRC – I 20,000.00
RKVY : Comprehensive District Agriculture Plan (C-DAP) in respect of Lawngtlai
District was already prepared and submitted. An outlay of Rs. 620.47 lakhs was envisaged
in the plan in respect Agriculture Department, Lawngtlai District.
9. Constraints and Strategies.
A no of constraints are encountered which hinder progress of
development works within Lawngtlai District. These are:-
(i) Poor Communication problem.
(ii) Inadequacy of field staffs.
(iii) Ethnic and cultural diversity
(iv) Lack of conveyance.
(v) Poor out put capacity of the people.
(vi) Political influence.
In order to boost up production in the District efforts are underway to
take up cultivation of Paddy rice in areas where M.I. Department has
constructed M.I projects at 14 locations.
(1) Zotlang M.I Project, Cheural
(2) Sangaului M.I Project, Archhuang
(3) Ailianlui M.I Project, Lungpher
(4) Peki M.I Project, Kawlchaw „W‟
(5) Chinranglui M.I Project, Chawngte „P‟
(6) Ralven M.I Project, Pangkhua
(7) Siachang M.I Project,, Vawmbuk
(8) Tuiphal M.I Project, Lawngtlai
(9) Lower Siachang M.I Project Ph-II , Vawmbuk
(10) Hmunnuam M.I Project, Sangau
(11) Daihuai M.I Project, Bualpui „NG‟
(12) Dawnva M.I Project, Sangau
(13) Nghaktawllui M.I Project, Siachangkawn
(14) Sihdarlui M.I Project, Chawntlangpui
It was also planned that WRC farmers will be led to cultivate winter
vegetables like Field pea, Cabbage , Cauliflower , Tomato, French Bean etc,
by harnessing of these irrigation waters.
After harvest of these Rabi crops, the land will be utilized again for
cultivation of rice paddy and the course will follow the crop plan cycle.
10. Best Practices/ Innovation etc. :
The prevailing best practices within Lawngtlai District is the
double cropping system in respect of Paddy rice. The practice consist of
wetting of rice seeds in a gunny bag for about 3 days and then packed with a
wild Banana leaves for about 3 days in the month of November. The seeds then
began to sprout. The sprouted seeds are then broadcasted in the prepared
nursery. When the seedlings are about 2 inches. high water is admitted in the
nursery and the seedlings are maintained for about 1 month in the nursery.
Then they are transplanted in the main field at a spacing of 10 inches No. of
seedlings per hill are usually 4-5 Nos. Again water is admitted in the field as
per conventional method. On ripening stage water is drained out of the field.
Harvesting is done from 15 of May after which the Field are plough again for
cultivation of Kharif paddy rice. It is practised at Mautlang, Chamdur area,
Devasora, Chhotaguisury etc. The productivity is 200 tins per Ha. equivalent to
20 qtls. per Ha. The variety usually cropped are IRI which is called “Silchar
Buh” as reported by the local farmers. The variety is not very palatable.
This year as many as 110 Nos. of farmers from Chhotaguisury;
Nghalimlui, Devasora „N‟, Golasury and Fangfarlui take up this double
cropping practice. These farmers are all NWDPRA beneficiaries.
THANK YOU
District Agriculture Officer
Lawngtlai District, Lawngtlai