9
POWER PLANT MOUNT

Power Plant Mount

Embed Size (px)

DESCRIPTION

32

Citation preview

Page 1: Power Plant Mount

POWER PLANTMOUNT

Page 2: Power Plant Mount

32-1

POWER PLANTMOUNT

CONTENTS

ENGINE MOUNTING 2. . . . . . . . . . . . . . . . . . . . . . . TRANSMISSION MOUNTING 3. . . . . . . . . . . . . . . .

Page 3: Power Plant Mount

POWER PLANT MOUNT – Engine Mounting32-2

ENGINE MOUNTINGREMOVAL AND INSTALLATIONCautionProvisionally tighten the parts marked by an asterisk (*), and then fully tighten after loading thefull weight of the engine on the vehicle body.

Pre-removal and Post-installation OperationCrossmember Removal and Installation (Refer toGROUP 33.)

25 Nm*

2

44 Nm 44 Nm 25 Nm*

25 Nm

25 Nm

2

1

Removal steps1. Engine mount bracket2. Engine mount insulator

Page 4: Power Plant Mount

POWER PLANT MOUNT – Transmission Mounting 32-3

TRANSMISSION MOUNTINGREMOVAL AND INSTALLATIONCautionProvisionally tighten the parts marked by an asterisk (*), and then fully tighten after loading thefull weight of the transmission on the vehicle body.

Pre-removal and Post-installation OperationJack up the Engine and Transmission Assembly untilthere is no weight on the Engine Mount Bracket Insulator.

93 Nm*

3

49 Nm

49 Nm

49 Nm

2

14

7

5

6

Removal steps1. Washer2. Spacer3. Transmission mount bushing4. Transmission mount crossmember

assembly

5. Transmission mount insulator assembly�A� 6. Transmission mount stopper

7. Adaptor

INSTALLATION SERVICE POINT�A� TRANSMISSION MOUNT STOPPER INSTALLATIONInstall the transmission mount stopper so that the arrow facesthe direction shown.

NOTEDisregard F and R stamped as a shared part.

Transmissionmount stopper

Front of vehicle

Transmissionmount insula-tor assembly

Page 5: Power Plant Mount

NOTES

Page 6: Power Plant Mount

POWER PLANT MOUNT – General/Engine Mounting 32-1

GROUP 32

POWER PLANT MOUNTGENERALOUTLINE OF CHANGEThe following service procedures have been added due to the change of the engine mount and transmissionmount.

ENGINE MOUNTINGREMOVAL AND INSTALLATION

Pre-removal and Post-installation OperationCrossmember Removal and Installation

1

2

3

4

49 Nm

49 Nm

49 Nm

49 Nm

49 Nm49 Nm

49 Nm

Removal steps1. Engine mount insulator Assembly

(L.H.)2. Engine mount insulator Assembly

(R.H.)

3. Engine mount bracket (L.H.)4. Engine mount bracket (R.H.)

Page 7: Power Plant Mount

POWER PLANT MOUNT – Transmission Mounting32-2

TRANSMISSION MOUNTINGREMOVAL AND INSTALLATION

Pre-removal and Post-installation OperationJack up the Engine and Transmission Assembly untilthere is no weight on the Engine Mount Bracket Insulator.

1

3

4

4

2

2

49 Nm

49 Nm

49 Nm

49 Nm

49 Nm

<A/T>

<M/T>

1

Removal steps1. Collar2. Transmission mount bushing3. Transmission mount crossmember

Assembly

4. Transmission mount insulator Assembly

Page 8: Power Plant Mount

POWER PLANT MOUNT – General/Engine Mounting 32-1

GROUP 32

POWER PLANT MOUNTGENERALOUTLINE OF CHANGEThe following service procedures have been established due to the addition of vehicles with 4G9-MPIengine. The other service procedures are the same as the vehicles with GDI engine.

ENGINE MOUNTINGREMOVAL AND INSTALLATION

CautionProvisionally tighten the parts marked by an asterisk (*), and then fully tighten after loading thefull weight of the engine on the vehicle body.

Pre-removal and Post-installation OperationCrossmember Removal and Installation (Refer to GROUP 33.)

2

1

49 ± 10 N·m

26 ± 5 N·m*

49 ± 10 N·m

Removal steps1. Engine mount bracket <RH>2. Engine mount insulator