Power Grid Corporation Of India Ltd. Welcomes Shri Jairam Ramesh, Hon’ble Minister of State for Power, Commerce & Industry to. Northern Regional Load Dispatch Center New Delhi. Presentation Outline. Overview - Indian Power System Grid Operation Indian Electricity Market - PowerPoint PPT Presentation
Citation preview
Power Grid Corporation Of India Ltd.
WelcomesShri Jairam Ramesh,Honble Minister of State for Power,Commerce & IndustrytoNorthern Regional Load Dispatch CenterNew Delhi
*POWERGRID - NRLDC*Presentation OutlineOverview - Indian Power SystemGrid OperationIndian Electricity Market ABT & UI Settlement SystemShort Term Open AccessTSO vs. ISO
POWERGRID - NRLDC
Overview - Indian Power System
*POWERGRID - NRLDC*Spatial Distribution Of Load Source:Powerline(Siemens Ad), Oct-2006
POWERGRID - NRLDC
One Nation One GridNEW GridSouthGridSouthWestNorthEastNortheastFive Regional GridsFive FrequenciesOctober 1991East and Northeast synchronizedMarch 2003West synchronized With East & NortheastAugust 2006North synchronized With Central GridCentral GridINDIA3,287,263 sq. km areaMore than 1 Billion people (2001 census)Installed Capacity of 141.08 GW (Jan-08)
*POWERGRID - NRLDC*N-E-W GridSOUTH Grid
POWERGRID - NRLDC
*POWERGRID - NRLDC*Regional Grids GeographicalInstalled Generation CapacityCurrent: 141,080 MWTarget for Year 2012: 200,000 MWFigures as on 31-Jan-2008
Inter regional LinkMW capacityNER-ER1,240ER-NR6,020ER-SR1,120ER-WR1,760SR-WR1,680WR-NR2,080Other 132 KV Links200Talcher Kolar HVDC Bipole2,500Total as on date17,000Target for 201237,700
POWERGRID - NRLDC
*POWERGRID - NRLDC*Diversity Time Generation Resources Load Centers Long Haulage of Power Weather Seasons
POWERGRID - NRLDC
*POWERGRID - NRLDC*Peculiarities of Regional Grids in IndiaDeficit RegionSnow fed run-of the river hydroHighly weather sensitive loadAdverse weather conditions: Fog & Dust StormVery low loadHigh hydro potentialEvacuation problemsIndustrial load and agricultural loadLow loadHigh coal reservesPit head base load plantsHigh load (40% agricultural load)Monsoon dependent hydroCHICKEN-NECK
POWERGRID - NRLDC
*POWERGRID - NRLDC*
POWERGRID - NRLDC
*POWERGRID - NRLDC*Typical Seasonal Load Curves For Northern Region
POWERGRID - NRLDC
*POWERGRID - NRLDC*WINTERMONSOONSUMMEREVENING PEAKTypical Seasonal Load Curves For Southern Region
POWERGRID - NRLDC
*POWERGRID - NRLDC*International ConnectionsBhutanTala HEP (1020 MW) 400 KVChukha HEP (336 MW) 220 KVKurichu HEP (60 MW) 132 KVNet import by IndiaNepalOver 16 links of 132/33/11 KVNet export to Nepal (about 10% of Nepals demand)
POWERGRID - NRLDC
SYNCHRONOUS INTERCONNECTION WITH BHUTAN2 x 139 + 2 x 144 kms. of400 kV lines in BhutanSnapshot from National Power System DeskTALA HEP 1020 MW (6x170 MW)(BHUTAN)DELHIBARELILUCKNOWUNNAOGORAKHPURMUZAFFARPURPURNEABINAGURIEASTERN GRIDNORTHERN GRID3200 CIRCUIT KILOMETERS TALA TRANSMISSION SYSTEM
Grid Operation
*POWERGRID - NRLDC*A Typical Dispatch FIRM SHARES IN ISGS
BILATERAL CONTRACTSSurpluses/Deficits - Balance supply and demandHoursMW
123456789101112131415161718192021222324
3634323028262422
POWERGRID - NRLDC
*POWERGRID - NRLDC*Operated as loose power poolsStates have full operational autonomyState power system treated as notional (flexible) control areaVery tight control of actual interchange by state utilities & Inter State Generating Stations not mandatedDeviations from net drawal schedules appropriately pricedRegional Grid Operation: Philosophy
POWERGRID - NRLDC
*POWERGRID - NRLDC*
POWERGRID - NRLDC
DAILY OPERATIONAL CHALLENGESFLOATING FREQUENCY: 49 - 50.5 HzVOLTAGE VARIATIONS: 380- 430 kVHIGH RAMP RATEBI-DIRECTIONAL LINE FLOWS
*POWERGRID - NRLDC*REAL TIME OPERATIONREAL TIME OPERATION STANDS ON TWO FIRM FOOTINGSIEGC THE INDIAN ELECTRICITY GRID CODEABT AVAILABILITY BASED TARIFF
POWERGRID - NRLDC
*POWERGRID - NRLDC*GRID MANAGEMENT FUNCTIONSEx-ante functionsSchedulingReal-time functionsSupervision & control of system parametersFacilitating Open Access transactionsPost-facto functionsSettlement system operationInteraction with stakeholders
POWERGRID - NRLDC
*POWERGRID - NRLDC*GRID MANAGEMENT FUNCTIONS EX-ANTE Demand Estimation and Forecasting Resource Scheduling Grid element Outage PlanningOpen Access transmission corridor reservations
POWERGRID - NRLDC
*POWERGRID - NRLDC*GRID MANAGEMENT FUNCTIONS REAL-TIME Resource re-scheduling Implementation of contractsSupervision & Control of system parametersReal-time balancingEnsuring grid security & reliabilityOutage CoordinationEnsuring power qualityLoss minimization & resource optimizationTackling Emergencies
POWERGRID - NRLDC
*POWERGRID - NRLDC*GRID MANAGEMENT FUNCTIONS POST FACTO Event Information & ReportingSequence of Event Analysis & ReplayEnergy meter data collection Data processingEnergy accountingPool Account operationUnscheduled Interchange accountReactive Energy Account
POWERGRID - NRLDC
Indian Electricity Market
*POWERGRID - NRLDC*Development of the Power Market in IndiaDevelopment of the Power Market Section 66, IE Act 2003National Electricity Policy, 12-Feb-2005, Para 5.7.1(d)Implementation of Inter-State ABT : 2002-03Metering, Scheduling and SettlementIntroduction of Open Access in Inter State Transmission : May 2004Development of PXStaff paper by CERC : July 2006Public hearing : December 2006Guidelines for setting up PX : February 2007Approval for setting up first PX : MCX, August 2007
*POWERGRID - NRLDC*BuyerSellerRegional Electricity Market in IndiaLong term contractsTSOPhysical deliveryPhysical Off takeDaily Delivery CommitmentDaily off-take commitmentPool AccountWeekly settlementOperated bySystem OperatorBuyerSellerUI UI Transmission ChargesAvailability & Energy ChargesShort term ContractGridLong term transmission contracts
*POWERGRID - NRLDC*DECENTRALIZED SCHEDULINGAvailability DeclarationEntitlementsSLDC
Requisition & Bilateral AgreementsInjection ScheduleDrawal ScheduleRevision in DCRevision in RequisitionFinalInjection ScheduleFinalDrawal ScheduleRLDCISGSTimeRevisions duringCurrent dayRevisions duringCurrent day0 to 24 hours
10:00 11:0015:0017:0022:0023:00
ABT & UI Settlement System
*POWERGRID - NRLDC*Settlement System ABT & UIABT is a scientific settlement system for contracted sale & purchase of powerHas three componentsFixed Charges or capacity chargeLinked to day-ahead declared availability/subscriptionVariable Charges or fuel chargesLinked to before the fact energy schedulesCharges for deviation from commitments
POWERGRID - NRLDC
*POWERGRID - NRLDC*Settlement System ABT & UIFrequency actuated signalSignal transmitted at the speed of dynamics to be controlledReal time pricing stretched to its physical limitsMerit orderEconomic load managementIncentives for helping the gridOpportunities for a diligent playerSimple, dispute-free weekly settlement system
POWERGRID - NRLDC
*POWERGRID - NRLDC*UI mechanismMaximizes social welfareTransparent, neutral & rigging proofDiffuses market power Ultimate open accessFacilitates reforms in the sectorEncourages trade and bilateral exchangesFacilitates exchanges (arbitrage) between regional power pools
POWERGRID - NRLDC
*POWERGRID - NRLDC*ADVANTAGES ABT & UIInculcates self discipline among participantsIncentives to those who help the gridDisincentives to those who harm the gridIs scientific commercial mechanismBrings in economy and efficiencyAchieves natural merit order in generationConducive for competition in power sectorProvides platform for power market to flourish
POWERGRID - NRLDC
*POWERGRID - NRLDC*The End Result .Frequency is collectively controlleddemocratically stabilizedWholesale market is workably competitive allocative efficiencyproductive efficiencyEconomic signal available for optimum utilization of resource investments in generation capacitySettlement isstreamlined dispute-free
POWERGRID - NRLDC
*POWERGRID - NRLDC*Balancing market guiding vectorDeficitSurplusNormal Band (IEGC)
*POWERGRID - NRLDC*Time Line For SettlementSettlement weekMonday 0000 Sunday 2400Tuesday2400Meter Data download & receipt at RLDC & preliminary checksThursday 1200Data validation, processing and computation at RLDC. Forwarded to Regional Power Committee SecretariatSaturday2400Data cross checking by Regional Power Committee Secretariat & Issue of Pool Account
Unscheduled Interchange Account Reactive Energy AccountTuesday2400Payment by utilities to the pool account managed by System Operator (RLDC)Tuesday2400Friday 2400Disbursement to utilities from the pool accountThree day grace periodFor Bank processing0.04 % per day interest on defaultersAccount Settled within 21 days Monday 2400
POWERGRID - NRLDC
*POWERGRID - NRLDC*Metering System
Meter LocationsNo. of Meters
North1941098East98419West85421Southern85463North East55201All India5172602
POWERGRID - NRLDC
Open Access
OPEN ACCESS: DEFINITION AS PER ELECTRICITY ACT, 2003Section 2 (47) Open access means the non-discriminatory provision for the use of transmission lines or distribution system or associated facilities with such lines or system by any licensee or consumer or a person engaged in generation in accordance with the regulations specified by the Appropriate Commission;
POWERGRID - NRLDC
CERC Open Access Regulations, 20083. Subject to any other regulations specified by the Commission, the long-term customer shall have first priority for using the inter-State transmission system for the designated use. These Regulations shall apply for utilization of surplus capacity available thereafter on the inter-State transmission system by virtue of-(a) Inherent design margins; (b) Margins available due to variations in power flows; and (c )Margins available due to in-built spare transmission capacity created to cater to future load growth or generation addition:
POWERGRID - NRLDC
Transmission CapacityIs a coordinated exerciseTransmission system developed asGeneration linked Associated Transmission SystemInter-regional schemesGrid strengthening schemesBeneficiaries identified aprioriTransmission system can be constructed only with commitmentN-1 criterion adoptedOptimum capacityInherent design margin available in the transmission systemTo accommodate the variation of 15% unallocated powerSkewed dispatch scenariosActual margins available in the systemGeneration outages, unbalanced load growthLaws of physics prevail
POWERGRID - NRLDC
Transmission Capacity vs Transfer Capability
POWERGRID - NRLDC
*POWERGRID - NRLDC*Total Transfer CapabilityThermal LimitStability LimitTotal Transfer CapabilityTotal Transfer Capability is the minimum of the Thermal Limit, Voltage Limit and the Stability LimitTime Power Flow
POWERGRID - NRLDC
*POWERGRID - NRLDC*Total & Available Transfer CapabilityATC = TTC TRM CBM Transfer Reliability Margin (TRM)Capacity Benefit Margin (CBM)Long Term Open Access (LTOA)Short Term Open Access (STOA)TTCATC
POWERGRID - NRLDC
*POWERGRID - NRLDC*OPEN ACCESS IN INTER-STATE TRANSMISSIONImplemented w.e.f. 6-May-2004Products Long term AccessShort term AccessMonthlyAdvanceFirst Come First ServeDay ahead Intra day transactionsPermits usage of spare transmission capacity through a transparent processOffers choice and freedom to buy & sell power
POWERGRID - NRLDC
CERC Open Access Regulations, 2008Effective 01.04.2008Regulations cover only Short-term Open AccessTransactions categorized as Bilateral and Collective (through PX)Earlier Products of Short-Term retained under Bilateral TransactionsNodal AgencyBilateral : RLDCsCollective : NLDC
POWERGRID - NRLDC
*POWERGRID - NRLDC*Time Line For Open AccessM1M2M3M4DLDL-5DL-10DL+5DOPDOP-1DOP-4Adv Application for M2Adv Application for M3, Approvals for M2Adv Application for M4,Approvals for M3Approvals for M4FCFSDay Ahead / PX LEGEND: DOP : Day of Operation DL : Last day of M1New Open Access Regulations w.e.f. 01-April-2008
POWERGRID - NRLDC
Short-Term Open Access transactionby Captive Power Plant
A typical example:From : SAIL Durgapur Steel Plant (DVC),ERTo: SAIL Bhilai Steel Plant (CSEB),WRQuantum: 20 MWSource : SAIL
POWERGRID - NRLDC
DSP/ASP CPP(2*60 MW)DVCER ISTSWR ISTSCSEBSellerCo-ordination for Scheduling, Settlement & System Operation bySeam ChangesSLDC-DVCERLDCWRLDCSLDC-ChattisgarhBSPBuyerNETWORK INVOLVED
POWERGRID - NRLDC
BSP2.466 Rs/kwhWR ISTSTSC+SOC=0.034 RsCSEBTSC+SOC=0.034 RsDSP2.33 Rs/kwhDVCTSC +SOC =0.034 RsER ISTSTSC+SOC= 0.034 Rs2.364Rs/kwh2.398Rs/kwh2.432Rs/kwhTransmission & System Operation Charges
POWERGRID - NRLDC
DSP20MWBSP17.03MWDVC2.82% Loss ER ISTS3.5% Loss WR ISTS5.5% LossCSEB3.93% Loss19.44MW18.76MW17.73MWTransmission Losses
POWERGRID - NRLDC
Transparency - Information Sharing Available Transfer Capacity (ATC) -3 months aheadPast & Current TransactionsInjection & Drawal SchedulesUn-requisitioned SurplusFrequency TrendUrgent market information unit tripping, load crash, contingencies52 week ISTS pooled lossesSTOA Rate / Procedures for capacity reservation much more on RLDCs websites
POWERGRID - NRLDC
Trade under Short-Term Open Access
POWERGRID - NRLDC
Chart1
86936
33776
4120
10175
Installed Capacity (as on 31.07.2007)
Chart2
45906
70682
18418
Sheet1
Thermal86936Central Sector45906
Hydro33776State Sector70682
Nuclear4120Pvt. Sector18418
Other-Wind & Renewable10175
Chart3
16.641778
22.5263938
23.5985933
29.839560
&A
Page &P
Volume of trade (BUs)
No. of transactions
Energy (BUs) ----->
Number of Transactions ---->
Sheet2
2004-052005-062006-072007-08
Volume of trade (BUs)16.64122.52623.59829.83
No. of transactions778393859339560
778393859339000
Sheet3
POWERGRID - NRLDC
Chart1
502382447
471572093
510961736
498751671
520601695
506351901
515962320
519801997
515722276
544642032
503572092
526101998
536931987
482881787
554051836
544362141
570323107
542782421
556012989
573613027
541292561
567722769
535722402
548082604
ALL INDIA ENERGY MET (MU)
Open Access(MU)
Open Access Share - 3-6%
ENERGY MET
ENERGY APPROVED UNDERSTOA
Energy Met(MUs)--->
Open Access (MUs)--->
Open Access vis-a-vis Energy Met
Chart3
5023824474.870814921
4715720934.4383654601
5109617363.3975262251
4987516713.3503759398
5206016953.2558586247
5063519013.7543201343
5159623204.4964725948
5198019973.8418622547
5157222764.4132474986
5446420323.7309048179
5035720924.1543380265
5261019983.7977570804
5369319873.700668616
4828817873.7007123923
5540518363.3137803447
5443621413.9330590051
5703231075.4478187684
5427824214.4603706843
5560129895.3758025935
5736130275.277104653
5412925614.7312900663
5677227694.8774043543
5357224024.4836855074
5480826044.7511312217
&A
Page &P
Chart2
4.870814921
4.4383654601
3.3975262251
3.3503759398
3.2558586247
3.7543201343
4.4964725948
3.8418622547
4.4132474986
3.7309048179
4.1543380265
3.7977570804
3.700668616
3.7007123923
3.3137803447
3.9330590051
5.4478187684
4.4603706843
5.3758025935
5.277104653
4.7312900663
4.8774043543
4.4836855074
4.7511312217
4.0550742352
3.7636239782
3.8163047348
%of Energy Approved (STOA) vs Energy Met
Short Term Open Access Market Share
Sheet1
ALL INDIA ENERGY MET Vs APPROVED ENERGY UNDER STOA
ENERGY MET (MU)ENERGY APPROVED UNDER STOA(MU)% TOTAL ENERGY MET
JAN'065023824474.9
FEB'064715720934.4
MAR'065109617363.4
APR'064987516713.4
MAY'065206016953.3
JUNE'065063519013.8
JULY'065159623204.5
AUG'065198019973.8
SEP'065157222764.4
OCT'065446420323.7
NOV'065035720924.2
DEC'065261019983.8
JAN'075369319873.7
FEB'074828817873.7
MAR'075540518363.3
APR'075443621413.9
MAY'075703231075.4
JUNE'075427824214.5
JULY'075560129895.4
AUG'075736130275.3
SEP'075412925614.7
OCT'075677227694.9
NOV'075357224024.5
DEC'075480826044.8
JAN'085563422564.1
FEB'085284819893.8
MAR'085618021443.8
AVG. % SHARE OF STOA4.2
Sheet2
ENERGY MET
Sheet3
Introduction of Day-Ahead Productfrom April,2005
POWERGRID - NRLDC
NO.OF TRANS.(LINE)
APRIL36253724
67114239593
69142352489
59194437441
69436484755
76260527601
60244484838
58372628831
707447831003
81648747JAN
YEAR'04-05
YEAR'05-06
YUEAR'06-07
YEAR'07-08
MONTHS
NO. OF TRANSACTIONS
TOTAL STOA TRANSACTIONS
TOTAL TRANS.
67
69
59
69
76
60
58
70
81
88
81
36
114
142
194
436
260
244
372
744
648
398
350
253
239
352
437
484
527
484
628
783
747
463
536
724
593
489
441
755
601
838
831
1003
1016
1108
944
NO. OF TRANSACTIONS
TOTAL TRANSACTIONS ( 2004-08)
NO.OFTRANS.
YEAR WISE LINE GRAPHTOTAL NO. OF TRANSACTIONS.
CONTINOUS LINE GRAPH
YEAR'04YEAR'05YEAR'06YEAR'07
APRIL36253724MAY'0467
MAY67114239593JUNE69
JUNE69142352489JULY59
JULY59194437441AUG'0469
AUG69436484755SEPT76
SEP76260527601OCT60
OCT60244484838NOV'0458
NOV58372628831DEC70
DEC707447831003JAN'0581
JAN816487471014FEB'0588
FEB88398463MAR81
MAR81350536APRIL36
MAY'05114
JUNE142
JULY194
AUG'05436
SEP260
OCT244
NOV'05372
DEC744
JAN648
FEB'06398
MAR350
APRIL253
MAY'06239
JUNE352
JULY437
AUG'06484
SEP527
OCT484
NOV'06628
DEC783
JAN747
FEB'06463
MAR536
APRIL724
MAY'07593
JUNE489
JULY441
AUG'07755
SEP601
OCT838
NOV'07831
DEC1003
JAN'081016
FEB'081108
MAR944
ENERGY APPR
1405
1060
1569
1943
1968
1119
1451
1716
1434
1444
1332
1091
1528
1647
1699.5
1943.2
2095.5
1818.6
1915.1
2511.3
2447.3
2093.3
1736.6
1671.8
1696
1901
2321
1997
2277
2032
2093
1998
1988
1787
1836.7
2141.3
2672
2421
2989
3027
2562
2769
2422
2605
2258
1989
MARCH'08
STOA ENERGY APPROVED(MU)YEAR 2004-07
MUs
ENERGY( CONTINOUS LINE GRAPH)
YEAR WISE LINE GRAPH
MAY '041405YEAR'04YEAR'05YEAR'06YEAR'07
JUNE'041060
JULY'041569APR109116722141
AUG'041943MAY1405152816962672
SEP1968JUNE1060164719012421
OCT1119JULY1569170023212989
NOV'041451AUG1943194319973027
DEC1716SEP1968209622772562
JAN '051434OCT1119181920322769
FEB'051444NOV1451191520932422
MARCH1332DEC1716251119982605
APRIL'051091JAN143424471988
MAY'051528FEB144420931787
JUNE1647MAR133217371837
JULY1700
AUG'051943
SEP2096
OCT1819
NOV'051915
DEC2511
JAN'062447
FEB'062093
MARCH1737
APRIL '061672
MAY'061696
JUNE1901
JULY2321
AUG'061997
SEP2277
OCT2032
NOV'062093
DEC1998
JAN'071988
FEB'071787
MARCH1837
APRIL'072141
MAY'072672
JUNE2421
JULY2989
AUG'073027
SEP2562
OCT2769
NOV'072422
DEC'072605
JAN'082258
FEB'081989
MARCH'08
ENERGY(BAR)
APR10911671.82141.3
1405152816962672
1060164719012421
15691699.523212989
19431943.219973027
19682095.522772562
11191818.620322769
14511915.120932422
17162511.319982605
14342447.31988JAN
14442093.31787FEB
13321736.61836.7MAR
YEAR'04-05
YEAR'05-06
YER'06-07
YEAR'07-08
MONTHS
MU
ENERGY APPROVED
DIFF TRANS
188332405
616308537
316274361
SAME DAY
FCFS
ADVANCE
NO. OF RANSACTIONS
STOA TRANSACTIONS
DIFF TYPE OF TRANS
SAME DAYDAY AHEADFCFSADVANCE
YEAR'05-061883013332405
YEAR'06-076164472308537
YEAR'07-083165324274361
RLDC WISE BAR GRAPH
10125.710561.2772623444
1088796322100631346
139546287292242522
NRLDC
WRLDC
SRLDC
ERLDC
NERLDC
RLDC WISE ENERGY(MU) APPROVED
RLDC WISE LINE GRAPH
21061140223
44488548118
7257853696
1113531490
1261613630
1142889610
7191049490
864951360
11301268370
11231268370
88896071100
50482894233
44379573334
58179077219
1045790531.2
13458905628.8
1454476670
105410828941
788116259.60
817116041.57.4
9918219.2104
111561318.6195.8
81851133384
43353853784
89542965741
135381850450
184737052152
232948837135
240142816183
164074722153
1190124617316
117889756290
1122865110501
NRLDC
WRLDC
ERLDC
SRLDC
RLDC WISE ENERGY APPROVED(MU)
WR ENERGY
611795429
885790818
785790370
531890488
613476428
8891082747
104911621246
9511160897
1268821865
1268613JAN
960511FEB
828538MAR
WESTERN REGION ENERGY APPROVED(MU)
YEAR 05-06
YEAR 06-07
YEAR 07-08
SR ENERGY
223334741
118219450
961.2152
028.8135
00183
041153
00316
07.4290
0104501
0195.8JAN
100384FEB
233784MAR
SOUTHERN REGION ENERGY APPROVED(MU)
YEAR 05-06
YEAR 06-07
YEAR 07-08
ER ENERGY
407365
487750
365352
495637
636716
618922
4959.617
3641.556
379.2110
3718.6JAN
7133FEB
9453MAR
EASTERN REGION ENERGY APPROVED(MU)
YEAR 05-06
YEAR 06-07
YEAR 07-08
NR ENERGY
210443895
4445811353
72510451847
111313452329
126114542401
114210541640
7197881190
8648171178
11309911122
11231115JAN
888818FEB
504433MAR
NORTHEN REGION ENERGY APPROVED(MU)
YEAR 05-06
YEAR 06-07
YEAR 07-08
RLDC WISE MU
(CONTINOUS LINE GRAPH)
ENERGY APPROVED RLDC WISEBAR GRAPH
NRLDCWRLDCSRLDCERLDCNERLDCNRLDCWRLDCSRLDCERLDCNERLDC
APRIL'05210611223407YEAR'05-0610125.710561.2772623444
MAY'054448851184833
JUNE'0572578596365YEAR'06-071088796322100631346
JULY11135310496.5
AUG'0512616130635.4YEAR'07-08139546287292242522
SEP11428890612
OCT'0571910490490.9
NOV'0586495103663.1
DEC'051130126803775.4
JAN'061123126803798.8NRLDCYEAR 05-06YEAR 06-07YEAR 07-08
FEB'068889601007171.2
MARCH5048282339475.6APRIL
APRIL '064437953347326MAY
MAY'065817902197726JUNE
JUNE'0610457901.25310JULY
JULY134589028.8560AUG
AUG'0614544760670SEP
SEP1054108241899.9OCT
OCT'067881162059.622NOV
NOV'0681711607.441.566.2DEC
DEC'069918211049.271.8JAN
JAN'071115613195.818.645FEB
FEB'078185113843340MAR
MARCH4335387845328
APRIL'078954297416511
MAY'071353818450502
JUNE'071847370152520
JULY2329488135370
AUG'072401428183160
SEP1640747153220
OCT'0711901246316172
NOV'071178897290560
DEC'0711228655011107
JAN
FEB'08
MARCH'08
07-08
14386
9224
YEAR 2007-08 (Upto DEC'07)
06-07
16377
7219
YEAR 2006-07
05-06
16534.9
5991
YEAR 2005-06
INTER-INTRA
NRLDC(TOTAL)INTERINTRAWRLDC(TOTAL)INTERINTRASRLDC(TOTAL)INTERINTRAERLDC(TOTAL)INTERINTRANERLDC(TOTAL)INTERINTRATOTALINTERINTRA
YEAR'05-0610125.75851.7427410561.210180.238177212664662310751644427017422525.916534.95991
INTERINTRA
YEAR'06-07108876361452696329194438210061114896318754434612422223596163777219
INTERINTRA
YEAR'07-08139547856609862875409878292283420884252691562218423610143869224
Chart1
11264157917442000
0.04166666671264157917442000
0.08333333331264157917442000
0.1251264157917442000
0.16666666671264157917442000
0.20833333331264157917442000
0.251264132913462000
0.29166666671264132913462000
0.33333333331264132913462000
0.3751264132913462000
0.41666666671264148915062000
0.45833333331264148915062000
0.51264148915062000
0.54166666671264148915062000
0.58333333331264148915062000
0.6251264148915062000
0.66666666671264148915062000
0.70833333331285131013271750
0.751285131013271750
0.79166666671285131013271750
0.83333333331285131013271750
0.8751285131013271750
0.91666666671285131013271750
0.95833333331285135015151750
241264132914942000
MARGIN AVIALIABLE
WR-NRSTOA APPROVED
ER-NRSTOA APPROVED
LTOA
TOTAL ATC
LTOA
ER-NR STOA APPR.
WR-NR STOA APPR.
MARGIN AVAILABLE
ATC & MARGIN AVAILABLE FOR IMPORT(MW) TO NORTHEN REGION IN FEB'08
Chart3
1166116611792200
1166116611792200
1166116611792200
1166116611792200
1166116611792200
1166116611792200
1166116611792200
1166116611792200
1166116611792200
1166123612492240
1166123612492200
1166123612492200
1166123612492200
1166123612492200
1166123612492200
1166123612492200
1166123612492200
1166123612492200
1166116611791800
1166116611791800
1166116611791800
1166116611791800
1166116611791800
1166116611791800
1166116611792200
MARGIN AVAILABLE
LTOA
ER-NR STOA APPROVED
WR-NR STOA APPROVED
ATC & MARGIN AVAILABLE FOR IMPORT TO NORTHEN REGION IN MARCH'08
Sheet1
FEBRUARY
TIMELTOAER-NR LINKWR-NR LINKTOTAL ATCMARGIN AVAILABLEER-NR LINKWR-NR LINKMARGIN AVAILABLE
0:001264157917442000256315165256
1:001264157917442000256315165256
2:001264157917442000256315165256
3:001264157917442000256315165256
4:001264157917442000256315165256
5:001264157917442000256315165256
6:0012641329134620006546517654
7:0012641329134620006546517654
8:0012641329134620006546517654
9:0012641329134620006546517654
10:00126414891506200049422517494
11:00126414891506200049422517494
12:00126414891506200049422517494
13:00126414891506200049422517494
14:00126414891506200049422517494
15:00126414891506200049422517494
16:00126414891506200049422517494
17:0012851310132717504232517423
18:0012851310132717504232517423
19:0012851310132717504232517423
20:0012851310132717504232517423
21:0012851310132717504232517423
22:0012851310132717504232517423
23:00128513501515175023565165235
0:00126413291494200050665165506
MARCH
TIMELTOAER-NR LINKWR-NR LINKTOTAL ATCMARGIN AVAILABLEER-NR LINKWR-NR LINK
0:0011661166117922001021013
1:0011661166117922001021013
2:0011661166117922001021013
3:0011661166117922001021013
4:0011661166117922001021013
5:0011661166117922001021013
6:0011661166117922001021013
7:0011661166117922001021013
8:0011661166117922001021013
9:0011661236124922409917013
10:0011661236124922009517013
11:0011661236124922009517013
12:0011661236124922009517013
13:0011661236124922009517013
14:0011661236124922009517013
15:0011661236124922009517013
16:0011661236124922009517013
17:0011661236124922009517013
18:001166116611791800621013
19:001166116611791800621013
20:001166116611791800621013
21:001166116611791800621013
22:001166116611791800621013
23:001166116611791800621013
0:0011661166117922001021013
POWERGRID - NRLDC
NO.OF TRANS.(LINE)
APRIL36253724
67114239593
69142352488
59194437484
69436484756
76260527603
60244484867
58372628848
707447831080
81648747JAN
YEAR'04-05
YEAR'05-06
YUEAR'06-07
YEAR'07-08
MONTHS
NO. OF TRANSACTIONS
TOTAL STOA TRANSACTIONS
TOTAL TRANS.
67
69
59
69
76
60
58
70
81
88
81
36
114
142
194
436
260
244
372
744
648
398
350
253
239
352
437
484
527
484
628
783
747
463
536
724
593
489
441
755
601
838
831
1003
JAN
FEB
MAR
MONTHS
NO. OF TRANSACTIONS
TOTAL STOA TRANSACTIONS
NO.OFTRANS.
YEAR WISE LINE GRAPHTOTAL NO. OF TRANSACTIONS.
CONTINOUS LINE GRAPH
YEAR'04YEAR'05YEAR'06YEAR'07
APRIL36253724MAY'0467
MAY67114239593JUNE69
JUNE69142352488JULY59
JULY59194437484AUG'0469
AUG69436484756SEPT76
SEP76260527603OCT60
OCT60244484867NOV'0458
NOV58372628848DEC70
DEC707447831080JAN'0581
JAN816487471072FEB'0588
FEB883984631101MAR81
MAR81350536944APRIL36
MAY'05114
JUNE142
JULY194
AUG'05436
SEP260
OCT244
NOV'05372
DEC744
JAN648
FEB'06398
MAR350
APRIL253
MAY'06239
JUNE352
JULY437
AUG'06484
SEP527
OCT484
NOV'06628
DEC783
JAN747
FEB'06463
MAR536
APRIL724
MAY'07593
JUNE489
JULY441
AUG'07755
SEP601
OCT838
NOV'07831
DEC1003
JAN
FEB
MAR
ENERGY APPR
1405
1060
1569
1943
1968
1119
1451
1716
1434
1444
1332
1091
1528
1647
1699.5
1943.2
2095.5
1818.6
1915.1
2511.3
2447.3
2093.3
1736.6
1671.8
1696
1901
2321
1997
2277
2032
2093
1998
1988
1787
1836.7
2141.3
2672
2421
2989
3027
2562
2769
2422
2605
2258
1989
2144
Month---->
Approved Energy (MUs)------->
ENERGY APPROVED(MUs)- 2004-08
ENERGY(BAR)
APR10911671.82141.3
1405152816962672
1060164719012421
15691699.523212989
19431943.219973027
19682095.522772562
11191818.620322769
14511915.120932422
17162511.319982605
14342447.31988JAN
14442093.31787FEB
13321736.61836.7MAR
YEAR'04-05
YEAR'05-06
YER'06-07
YEAR'07-08
MONTHS
MU
ENERGY APPROVED
MUs
ENERGY( CONTINOUS LINE GRAPH)
YEAR WISE LINE GRAPH
MAY '041405YEAR'04YEAR'05YEAR'06YEAR'07
JUNE'041060
JULY'041569APR109116722141
AUG'041943MAY1405152816962672
SEP1968JUNE1060164719012421
OCT1119JULY1569170023212989
NOV'041451AUG1943194319973027
DEC1716SEP1968209622772562
JAN '051434OCT1119181920322769
FEB'051444NOV1451191520932422
MARCH1332DEC1716251119982605
APRIL'051091JAN143424471988
MAY'051528FEB144420931787
JUNE1647MAR133217371837
JULY1700
AUG'051943
SEP2096
OCT1819
NOV'051915
DEC2511
JAN'062447
FEB'062093
MARCH1737
APRIL '061672
MAY'061696
JUNE1901
JULY2321
AUG'061997
SEP2277
OCT2032
NOV'062093
DEC1998
JAN'071988
FEB'071787
MARCH1837
APRIL'072141
MAY'072672
JUNE2421
JULY2989
AUG'073027
SEP2562
OCT2769
NOV'072422
DEC'072605
JAN'082258
FEB'081989
MARCH'082144
DIFF TRANS
188332405
616308537
316274361
SAME DAY
FCFS
ADVANCE
NO. OF RANSACTIONS
STOA TRANSACTIONS
DIFF TYPE OF TRANS
SAME DAYDAY AHEADFCFSADVANCE
YEAR'05-061883013332405
YEAR'06-076164472308537
YEAR'07-084378237392494
RLDC WISE BAR GRAPH
10125.710561.2772623444
1088796322100631346
139546287292242522
NRLDC
WRLDC
SRLDC
ERLDC
NERLDC
RLDC WISE ENERGY(MU) APPROVED
RLDC WISE LINE GRAPH
21061140223
44488548118
7257853696
1113531490
1261613630
1142889610
7191049490
864951360
11301268370
11231268370
88896071100
50482894233
44379573334
58179077219
1045790531.2
13458905628.8
1454476670
105410828941
788116259.60
817116041.57.4
9918219.2104
111561318.6195.8
81851133384
43353853784
89542965741
135381850450
184737052152
232948837135
240142816183
164074722153
1190124617316
117889756290
1122865110501
NRLDC
WRLDC
ERLDC
SRLDC
RLDC WISE ENERGY APPROVED(MU)
WR ENERGY
611795429
885790818
785790370
531890488
613476428
8891082747
104911621246
9511160897
1268821865
1268613JAN
960511FEB
828538MAR
WESTERN REGION ENERGY APPROVED(MU)
YEAR 05-06
YEAR 06-07
YEAR 07-08
SR ENERGY
223334741
118219450
961.2152
028.8135
00183
041153
00316
07.4290
0104501
0195.8JAN
100384FEB
233784MAR
SOUTHERN REGION ENERGY APPROVED(MU)
YEAR 05-06
YEAR 06-07
YEAR 07-08
ER ENERGY
407365
487750
365352
495637
636716
618922
4959.617
3641.556
379.2110
3718.6JAN
7133FEB
9453MAR
EASTERN REGION ENERGY APPROVED(MU)
YEAR 05-06
YEAR 06-07
YEAR 07-08
NR ENERGY
210443895
4445811353
72510451847
111313452329
126114542401
114210541640
7197881190
8648171178
11309911122
11231115JAN
888818FEB
504433MAR
NORTHEN REGION ENERGY APPROVED(MU)
YEAR 05-06
YEAR 06-07
YEAR 07-08
RLDC WISE MU
(CONTINOUS LINE GRAPH)
ENERGY APPROVED RLDC WISEBAR GRAPH
NRLDCWRLDCSRLDCERLDCNERLDCNRLDCWRLDCSRLDCERLDCNERLDC
APRIL'05210611223407YEAR'05-0610125.710561.2772623444
MAY'054448851184833
JUNE'0572578596365YEAR'06-071088796322100631346
JULY11135310496.5
AUG'0512616130635.4YEAR'07-08139546287292242522
SEP11428890612
OCT'0571910490490.9
NOV'0586495103663.1
DEC'051130126803775.4
JAN'061123126803798.8NRLDCYEAR 05-06YEAR 06-07YEAR 07-08
FEB'068889601007171.2
MARCH5048282339475.6APRIL
APRIL '064437953347326MAY
MAY'065817902197726JUNE
JUNE'0610457901.25310JULY
JULY134589028.8560AUG
AUG'0614544760670SEP
SEP1054108241899.9OCT
OCT'067881162059.622NOV
NOV'0681711607.441.566.2DEC
DEC'069918211049.271.8JAN
JAN'071115613195.818.645FEB
FEB'078185113843340MAR
MARCH4335387845328
APRIL'078954297416511
MAY'071353818450502
JUNE'071847370152520
JULY2329488135370
AUG'072401428183160
SEP1640747153220
OCT'0711901246316172
NOV'071178897290560
DEC'0711228655011107
JAN115159739312742
FEB'0891244245614744
MARCH'0845548695220745
07-08
14386
9224
YEAR 2007-08 (Upto DEC'07)
06-07
16377
7219
YEAR 2006-07
05-06
16534.9
5991
YEAR 2005-06
INTER-INTRA
NRLDC(TOTAL)INTERINTRAWRLDC(TOTAL)INTERINTRASRLDC(TOTAL)INTERINTRAERLDC(TOTAL)INTERINTRANERLDC(TOTAL)INTERINTRATOTALINTERINTRA
YEAR'05-0610125.75851.7427410561.210180.238177212664662310751644427017422525.916534.95991
INTERINTRA
YEAR'06-07108876361452696329194438210061114896318754434612422223596163777219
INTERINTRA
YEAR'07-08139547856609862875409878292283420884252691562218423610143869224
Chart1
11264157917442000
0.04166666671264157917442000
0.08333333331264157917442000
0.1251264157917442000
0.16666666671264157917442000
0.20833333331264157917442000
0.251264132913462000
0.29166666671264132913462000
0.33333333331264132913462000
0.3751264132913462000
0.41666666671264148915062000
0.45833333331264148915062000
0.51264148915062000
0.54166666671264148915062000
0.58333333331264148915062000
0.6251264148915062000
0.66666666671264148915062000
0.70833333331285131013271750
0.751285131013271750
0.79166666671285131013271750
0.83333333331285131013271750
0.8751285131013271750
0.91666666671285131013271750
0.95833333331285135015151750
241264132914942000
MARGIN AVIALIABLE
WR-NRSTOA APPROVED
ER-NRSTOA APPROVED
LTOA
TOTAL ATC
LTOA
ER-NR STOA APPR.
WR-NR STOA APPR.
MARGIN AVAILABLE
ATC & MARGIN AVAILABLE FOR IMPORT(MW) TO NORTHEN REGION IN FEB'08
Chart3
1166116611792200
1166116611792200
1166116611792200
1166116611792200
1166116611792200
1166116611792200
1166116611792200
1166116611792200
1166116611792200
1166123612492240
1166123612492200
1166123612492200
1166123612492200
1166123612492200
1166123612492200
1166123612492200
1166123612492200
1166123612492200
1166116611791800
1166116611791800
1166116611791800
1166116611791800
1166116611791800
1166116611791800
1166116611792200
MARGIN AVAILABLE
LTOA
ER-NR STOA APPROVED
WR-NR STOA APPROVED
ATC & MARGIN AVAILABLE FOR IMPORT TO NORTHEN REGION IN MARCH'08
Sheet1
FEBRUARY
TIMELTOAER-NR LINKWR-NR LINKTOTAL ATCMARGIN AVAILABLEER-NR LINKWR-NR LINKMARGIN AVAILABLE
0:001264157917442000256315165256
1:001264157917442000256315165256
2:001264157917442000256315165256
3:001264157917442000256315165256
4:001264157917442000256315165256
5:001264157917442000256315165256
6:0012641329134620006546517654
7:0012641329134620006546517654
8:0012641329134620006546517654
9:0012641329134620006546517654
10:00126414891506200049422517494
11:00126414891506200049422517494
12:00126414891506200049422517494
13:00126414891506200049422517494
14:00126414891506200049422517494
15:00126414891506200049422517494
16:00126414891506200049422517494
17:0012851310132717504232517423
18:0012851310132717504232517423
19:0012851310132717504232517423
20:0012851310132717504232517423
21:0012851310132717504232517423
22:0012851310132717504232517423
23:00128513501515175023565165235
0:00126413291494200050665165506
MARCH
TIMELTOAER-NR LINKWR-NR LINKTOTAL ATCMARGIN AVAILABLEER-NR LINKWR-NR LINK
0:0011661166117922001021013
1:0011661166117922001021013
2:0011661166117922001021013
3:0011661166117922001021013
4:0011661166117922001021013
5:0011661166117922001021013
6:0011661166117922001021013
7:0011661166117922001021013
8:0011661166117922001021013
9:0011661236124922409917013
10:0011661236124922009517013
11:0011661236124922009517013
12:0011661236124922009517013
13:0011661236124922009517013
14:0011661236124922009517013
15:0011661236124922009517013
16:0011661236124922009517013
17:0011661236124922009517013
18:001166116611791800621013
19:001166116611791800621013
20:001166116611791800621013
21:001166116611791800621013
22:001166116611791800621013
23:001166116611791800621013
0:0011661166117922001021013
Intra and Inter Regional Transactions
POWERGRID - NRLDC
NO.OF TRANS.(LINE)
APRIL36253724
67114239593
69142352489
59194437441
69436484755
76260527601
60244484838
58372628831
707447831003
816487471014
YEAR'04-05
YEAR'05-06
YUEAR'06-07
YEAR'07-08
TOTAL TRANS.
67
69
59
69
76
60
58
70
81
88
81
36
114
142
194
436
260
244
372
744
648
398
350
253
239
352
437
484
527
484
628
783
747
463
536
724
593
489
441
755
601
838
831
1003
1014
NO. OF TRANSACTIONS
TOTAL STOA TRANSACTIONSYEAR 2004-05
NO.OFTRANS.
YEAR WISE LINE GRAPHTOTAL NO. OF TRANSACTIONS.
CONTINOUS LINE GRAPH
YEAR'04YEAR'05YEAR'06YEAR'07
APRIL36253724MAY'0467
MAY67114239593JUNE69
JUNE69142352489JULY59
JULY59194437441AUG'0469
AUG69436484755SEPT76
SEP76260527601OCT60
OCT60244484838NOV'0458
NOV58372628831DEC70
DEC707447831003JAN'0581
JAN816487471014FEB'0588
FEB88398463MAR81
MAR81350536APRIL36
MAY'05114
JUNE142
JULY194
AUG'05436
SEP260
OCT244
NOV'05372
DEC744
JAN648
FEB'06398
MAR350
APRIL253
MAY'06239
JUNE352
JULY437
AUG'06484
SEP527
OCT484
NOV'06628
DEC783
JAN747
FEB'06463
MAR536
APRIL724
MAY'07593
JUNE489
JULY441
AUG'07755
SEP601
OCT838
NOV'07831
DEC1003
JAN1014
FEB
MAR
ENERGY APPR
1405
1060
1569
1943
1968
1119
1451
1716
1434
1444
1332
1091
1528
1647
1699.5
1943.2
2095.5
1818.6
1915.1
2511.3
2447.3
2093.3
1736.6
1671.8
1696
1901
2321
1997
2277
2032
2093
1998
1988
1787
1836.7
2141.3
2672
2421
2989
3027
2562
2769
2422
2605
2305
STOA ENERGY APPROVED(MU)YEAR 2004-07
ENERGY(BAR)
APR10911671.82141.3
1405152816962672
1060164719012421
15691699.523212989
19431943.219973027
19682095.522772562
11191818.620322769
14511915.120932422
17162511.319982605
14342447.319882307
14442093.31787FEB
13321736.61836.7MAR
YEAR'04-05
YEAR'05-06
YER'06-07
YEAR'07-08
MONTHS
MU
ENERGY APPROVED
MUs
ENERGY( CONTINOUS LINE GRAPH)
YEAR WISE LINE GRAPH
MAY '041405YEAR'04YEAR'05YEAR'06YEAR'07
JUNE'041060
JULY'041569APR109116722141
AUG'041943MAY1405152816962672
SEP1968JUNE1060164719012421
OCT1119JULY1569170023212989
NOV'041451AUG1943194319973027
DEC1716SEP1968209622772562
JAN '051434OCT1119181920322769
FEB'051444NOV1451191520932422
MARCH1332DEC1716251119982605
APRIL'051091JAN1434244719882307
MAY'051528FEB144420931787
JUNE1647MAR133217371837
JULY1700
AUG'051943
SEP2096
OCT1819
NOV'051915
DEC2511
JAN'062447
FEB'062093
MARCH1737
APRIL '061672
MAY'061696
JUNE1901
JULY2321
AUG'061997
SEP2277
OCT2032
NOV'062093
DEC1998
JAN'071988
FEB'071787
MARCH1837
APRIL'072141
MAY'072672
JUNE2421
JULY2989
AUG'073027
SEP2562
OCT2769
NOV'072422
DEC'072605
JAN2305
FEB'08
MARCH'08
DIFF TRANS
188332405
616308537
316274361
SAME DAY
FCFS
ADVANCE
NO. OF RANSACTIONS
STOA TRANSACTIONS
DIFF TYPE OF TRANS
SAME DAYDAY AHEADFCFSADVANCE
YEAR'05-061883013332405
YEAR'06-076164472308537
YEAR'07-083165324274361
RLDC WISE BAR GRAPH
10125.710561.2772623444
1088796322100631346
139546287292242522
NRLDC
WRLDC
SRLDC
ERLDC
NERLDC
RLDC WISE ENERGY(MU) APPROVED
RLDC WISE LINE GRAPH
2106114040
4448854848
7257853636
11135314949
12616136363
11428896161
71910494949
8649513636
113012683737
112312683737
8889607171
5048289494
4437957373
5817907777
10457905353
13458905656
14544766767
105410828989
788116259.659.6
817116041.541.5
9918219.29.2
111561318.618.6
8185113333
4335385353
8954296565
13538185050
18473705252
23294883737
24014281616
16407472222
119012461717
11788975656
1122865110110
1133612127.6127.6
NRLDC
WRLDC
ERLDC
SRLDC
RLDC WISE ENERGY APPROVED(MU)
WR ENERGY
611795429
885790818
785790370
531890488
613476428
8891082747
104911621246
9511160897
1268821865
1268613612
960511FEB
828538MAR
WESTERN REGION ENERGY APPROVED(MU)
YEAR 05-06
YEAR 06-07
YEAR 07-08
SR ENERGY
223334741
118219450
961.2152
028.8135
00183
041153
00316
07.4290
0104501
0195.8393
100384FEB
233784MAR
SOUTHERN REGION ENERGY APPROVED(MU)
YEAR 05-06
YEAR 06-07
YEAR 07-08
ER ENERGY
407365
487750
365352
495637
636716
618922
4959.617
3641.556
379.2110
3718.6127.6
7133FEB
9453MAR
EASTERN REGION ENERGY APPROVED(MU)
YEAR 05-06
YEAR 06-07
YEAR 07-08
NR ENERGY
210443895
4445811353
72510451847
111313452329
126114542401
114210541640
7197881190
8648171178
11309911122
112311151133
888818FEB
504433MAR
NORTHEN REGION ENERGY APPROVED(MU)
YEAR 05-06
YEAR 06-07
YEAR 07-08
RLDC WISE MU
(CONTINOUS LINE GRAPH)
ENERGY APPROVED RLDC WISEBAR GRAPH
NRLDCWRLDCSRLDCERLDCNERLDCNRLDCWRLDCSRLDCERLDCNERLDC
APRIL'05210611223407YEAR'05-0610125.710561.2772623444
MAY'054448851184833
JUNE'0572578596365YEAR'06-071088796322100631346
JULY11135310496.5
AUG'0512616130635.4YEAR'07-08139546287292242522
SEP11428890612
OCT'0571910490490.9
NOV'0586495103663.1
DEC'051130126803775.4
JAN'061123126803798.8NRLDCYEAR 05-06YEAR 06-07YEAR 07-08
FEB'068889601007171.2
MARCH5048282339475.6APRIL
APRIL '064437953347326MAY
MAY'065817902197726JUNE
JUNE'0610457901.25310JULY
JULY134589028.8560AUG
AUG'0614544760670SEP
SEP1054108241899.9OCT
OCT'067881162059.622NOV
NOV'0681711607.441.566.2DEC
DEC'069918211049.271.8JAN
JAN'071115613195.818.645FEB
FEB'078185113843340MAR
MARCH4335387845328
APRIL'078954297416511
MAY'071353818450502
JUNE'071847370152520
JULY2329488135370
AUG'072401428183160
SEP1640747153220
OCT'0711901246316172
NOV'071178897290560
DEC'0711228655011107
JAN1133612393127.641.5
FEB'0891244245611365
MARCH'08
07-08
17547
12284
YEAR 2007-08
06-07
16377
7219
YEAR 2006-07
05-06
16534.9
5991
YEAR 2005-06
INTER-INTRA
NRLDC(TOTAL)INTERINTRAWRLDC(TOTAL)INTERINTRASRLDC(TOTAL)INTERINTRAERLDC(TOTAL)INTERINTRANERLDC(TOTAL)INTERINTRATOTALINTERINTRA
YEAR'05-0610125.75851.7427410561.210180.238177212664662310751644427017422525.916534.95991
INTERINTRA
YEAR'06-07108876361452696329194438210061114896318754434612422223596163777219
INTERINTRA
YEAR'07-081395478566098628754098782922834208842526915622184298311754712284
Chart1
11264157917442000
0.04166666671264157917442000
0.08333333331264157917442000
0.1251264157917442000
0.16666666671264157917442000
0.20833333331264157917442000
0.251264132913462000
0.29166666671264132913462000
0.33333333331264132913462000
0.3751264132913462000
0.41666666671264148915062000
0.45833333331264148915062000
0.51264148915062000
0.54166666671264148915062000
0.58333333331264148915062000
0.6251264148915062000
0.66666666671264148915062000
0.70833333331285131013271750
0.751285131013271750
0.79166666671285131013271750
0.83333333331285131013271750
0.8751285131013271750
0.91666666671285131013271750
0.95833333331285135015151750
241264132914942000
MARGIN AVIALIABLE
WR-NRSTOA APPROVED
ER-NRSTOA APPROVED
LTOA
TOTAL ATC
LTOA
ER-NR STOA APPR.
WR-NR STOA APPR.
MARGIN AVAILABLE
ATC & MARGIN AVAILABLE FOR IMPORT(MW) TO NORTHEN REGION IN FEB'08
Chart3
1166116611792200
1166116611792200
1166116611792200
1166116611792200
1166116611792200
1166116611792200
1166116611792200
1166116611792200
1166116611792200
1166123612492240
1166123612492200
1166123612492200
1166123612492200
1166123612492200
1166123612492200
1166123612492200
1166123612492200
1166123612492200
1166116611791800
1166116611791800
1166116611791800
1166116611791800
1166116611791800
1166116611791800
1166116611792200
MARGIN AVAILABLE
LTOA
ER-NR STOA APPROVED
WR-NR STOA APPROVED
ATC & MARGIN AVAILABLE FOR IMPORT TO NORTHEN REGION IN MARCH'08
Sheet1
FEBRUARY
TIMELTOAER-NR LINKWR-NR LINKTOTAL ATCMARGIN AVAILABLEER-NR LINKWR-NR LINKMARGIN AVAILABLE
0:001264157917442000256315165256
1:001264157917442000256315165256
2:001264157917442000256315165256
3:001264157917442000256315165256
4:001264157917442000256315165256
5:001264157917442000256315165256
6:0012641329134620006546517654
7:0012641329134620006546517654
8:0012641329134620006546517654
9:0012641329134620006546517654
10:00126414891506200049422517494
11:00126414891506200049422517494
12:00126414891506200049422517494
13:00126414891506200049422517494
14:00126414891506200049422517494
15:00126414891506200049422517494
16:00126414891506200049422517494
17:0012851310132717504232517423
18:0012851310132717504232517423
19:0012851310132717504232517423
20:0012851310132717504232517423
21:0012851310132717504232517423
22:0012851310132717504232517423
23:00128513501515175023565165235
0:00126413291494200050665165506
MARCH
TIMELTOAER-NR LINKWR-NR LINKTOTAL ATCMARGIN AVAILABLEER-NR LINKWR-NR LINK
0:0011661166117922001021013
1:0011661166117922001021013
2:0011661166117922001021013
3:0011661166117922001021013
4:0011661166117922001021013
5:0011661166117922001021013
6:0011661166117922001021013
7:0011661166117922001021013
8:0011661166117922001021013
9:0011661236124922409917013
10:0011661236124922009517013
11:0011661236124922009517013
12:0011661236124922009517013
13:0011661236124922009517013
14:0011661236124922009517013
15:0011661236124922009517013
16:0011661236124922009517013
17:0011661236124922009517013
18:001166116611791800621013
19:001166116611791800621013
20:001166116611791800621013
21:001166116611791800621013
22:001166116611791800621013
23:001166116611791800621013
0:0011661166117922001021013
ApprovedActive
POWERGRID - NRLDC
Chart1
134
197
229
2712
Approved Licencee
Active
No. of Players -------->
Number of Trading License issued by CERC
Sheet2
Approved LicenceeActive
2004-05134
2005-06197
2006-07229
2007-082712
VINERGY
VISA
KALYANI
Sheet3
S. No.Name of ApplicantLicence issued onCategoryApplicable to whole India
1Tata Power Trading Company Ltd.,9th June, 2004F CategoryWhole of India
2Adani Enterprises Ltd.,9th June, 2004F CategoryWhole of India
3PTC India Limited30th June,2004F CategoryWhole of India
4Reliance Energy Trading Ltd.30th June,2004F Category
5Vinergy International Private Limited,12th July,2004B Category
6Lanco Electric Utility Limited,23th July,2004F CategoryExcept J&k
7MMTC Limited23th July,2004C CategoryWhole of India
8NTPC Vidyut Vyapar Nigam Ltd.23th July,2004F CategoryWhole of India
9DLF Limited,2nd Nov,2004A CategoryExcept J&k
10Jindal Steel & Power Limited2nd Nov,2004A CategoryExcept J&k
11Chhattisgarh Electricity Company Ltd.3rd Nov,2004A CategoryExcept J&k
12GMR Ltd.9th Nov,2004A CategoryExcept J&k
13Karam Chand Thapar & Bros. (Coal Sales) Limited27th Jan,2005F Category
14Subhash Kabini Power Corporation Ltd.26th May,2005`A` CategoryExcept J&k
15Maheshwary Ispat Limited19th July,2005`A` CategoryExcept J&k
16Special Blasts Ltd.21st July,2005`A` CategoryExcept J&k
17Instinct advertisement & Marketing Limited7th Sep,2005`A CategoryExcept J&k
18Essar Electric Power Development Corporation Limited14th Dec,2005C CategoryExcept J&k
19Suryachakra Power Corporation Ltd.22nd Feb,2006`A` CategoryExcept J&k
20JSW Power Trading Company Limited25th April,2006`F` CategoryWhole of India
21GEA Energy System (India) Limited7thDec,2006`F` CategoryWhole of India
22Malaxmi Energy Trading Private Limited12th Dec,2006`A` CategoryExcept J&k
23Visa Power Limited,Kolkata28th June,2007B CategoryWhole of India
24Kalyani Power Development Private Limited21st Aug,2007F CategoryExcept J&k
25Patni Projects Private Limited23rd Aug,2007C CategoryExcept J&k
26Ispat Energy Limited30th Aug,2007`F` CategoryWhole of India
27Balaji Biomass Power Private Limited22nd Jan,08`A` CategoryExcept J&k
Sheet1
S. No.Name of ApplicantLicence issued onCategoryApplicable to whole India
1Tata Power Trading Company Ltd.,9th June, 2004F CategoryWhole of India
2Adani Enterprises Ltd.,9th June, 2004F CategoryWhole of India
3PTC India Limited30th June,2004F CategoryWhole of India
4Reliance Energy Trading Ltd.30th June,2004F Category
5Sumex Organics Private Limited12th July,2004B CategoryExcept J&k
6Vinergy International Private Limited,12th July,2004B Category
7Lanco Electric Utility Limited,23th July,2004F CategoryExcept J&k
8MMTC Limited23th July,2004C CategoryWhole of India
9NTPC Vidyut Vyapar Nigam Ltd.23th July,2004F CategoryWhole of India
10DLF Limited,2nd Nov,2004A CategoryExcept J&k
11Jindal Steel & Power Limited2nd Nov,2004A CategoryExcept J&k
12Chhattisgarh Electricity Company Ltd.3rd Nov,2004A CategoryExcept J&k
13GMR Ltd.9th Nov,2004A CategoryExcept J&k
14Karam Chand Thapar & Bros. (Coal Sales) Limited27th Jan,2005F Category
15Subhash Kabini Power Corporation Ltd.26th May,2005`A` CategoryExcept J&k
16Maheshwary Ispat Limited19th July,2005`A` CategoryExcept J&k
17Special Blasts Ltd.21st July,2005`A` CategoryExcept J&k
18Instinct advertisement & Marketing Limited7th Sep,2005`A CategoryExcept J&k
19Essar Electric Power Development Corporation Limited14th Dec,2005C CategoryExcept J&k
20Suryachakra Power Corporation Ltd.22nd Feb,2006`A` CategoryExcept J&k
21JSW Power Trading Company Limited25th April,2006`F` CategoryWhole of India
22GEA Energy System (India) Limited7thDec,2006`F` CategoryWhole of India
23Malaxmi Energy Trading Private Limited12th Dec,2006`A` CategoryExcept J&k
24Visa Power Limited,Kolkata28th June,2007B CategoryWhole of India
25Kalyani Power Development Private Limited21st Aug,2007F CategoryExcept J&k
26Patni Projects Private Limited23rd Aug,2007C CategoryExcept J&k
27Ispat Energy Limited30th Aug,2007`F` CategoryWhole of India
28Balaji Biomass Power Private Limited22nd Jan,08`A` CategoryExcept J&k
POWERGRID - NRLDC
Chart3
57912
34465562
24323247
45647184
2004-05
2005-06
2006-07
2007-08
Number of Active Market Players
Sheet2
PSEB5573.26
MSEDCL3788.45
DTL2021.36
TNEB1652.80
MPPTCL1567.90
GUVNL1556.32
HPGCL1454.43
CSEB1220.54
UPPCL567.05
WBSEB498.48
J&K453.22
APPCC434.36
RPPC402.45
HPSEB394.63
UPCL385.19
TATA POWER338.99
MSETCL227.10
MEGHALAYA216.78
CESC157.44
MPSEB155.70
SAIL142.64
ASEB128.18
JVVNL107.54
UTC70.48
AVVNL32.62
JDVVNL24.15
APTRANSCO11.83
NPCL(UP)7.64
GOA4.21
BESCOM2.30
Sheet1
TRADERSELLERBUYERTotal Participating Utilities
2004-055342445
2005-067463264
2006-079553271
2007-0812624784
2004-052005-062006-072007-08
Trader57912
Seller34465562
Buyer24323047
total45647184
STOA Success Story Developed in consultation with all stakeholdersApplications Processed (Since Beginning) > 20,000 No.Volume (Approved Energy) (Since Beginning)> 90BUsApplications Approved > 95 %Refusal/Non-consent by SLDCs > 3 - 4 %Refusal due to system constraints < 0.5 %Curtailment in real time < 1%Near Dispute free implementationLogistics/infrastructure -In-houseRobust Financial Settlement SystemConfidence Building & Dissemination of knowledge
POWERGRID - NRLDC
STOA Encouraging factsTransactions between extreme corners of the countryKerala to PunjabNagaland, Arunachal, Tripura to Maharashtra, UP Most of the States participated.Market Players Simultaneous Buy & Sell on same dayDelhi Buy in Peak, sell in off-peakTransactions from few MW to hundreds of MW 2 MW (JP Cement Rewa,MP JP Cement, Ayodhya,UP) 800 MW (BSES Rajdhani to UP)Surplus during Weekend/Holidays utilisedBudge-Budge of CESC : National Award for PLF of 99.6% in 2005-06Improved performance of Generating Plants Diversity being gainfully utilized
POWERGRID - NRLDC
Typical Reasons for RefusalBalancing Mechanism Consent by STU/SLDC TelemetryMeteringSchedulingFunctional Autonomy of SLDC PPAs
POWERGRID - NRLDC
TSO Vs ISO
HistoryStates had bundled/integrated Generation, Transmission & Distribution entity
Inter state lines conceptualized and started implementation in 60s
In 1964, GoI setup the REBs as Deemed Independent System Operator under CEA to initiate Regional Grid operations and State level operators for State Transmission/ Distribution networks
Migration from Deemed ISO to TSO in India
Inter-State integration was attempted from mid 70s along with Central Generating Companies with ultimate aim to conceptualize Regional Grids.By mid 80s, need for inter regional connections was feltIn 1989, Cabinet approved POWERGRIDs formation with following objectives -Massive Transmission Expansion and establishment of Inter-regional linesOperation of existing RLDCs Correct the lacunae of interstate lines & missing linksEnsuring Grid DisciplineEstablish Unified Load Despatch Centres and dedicated communication Urgently remove Institutional weaknesses to deal with the problems in Regional Grid Operation
RLDCs were thus gradually transferred to POWERGRID from 1994 to 1996. For effective grid operation, POWERGRID has done the following
Modernization of RLDCs Preparation of Grid Code in the capacity of CTUIntroduced Availability Based Tariff (ABT)Creating a strong & vibrant National GridRing-fencing of the activities of Grid Operation from that of TransmissionManning of RLDCs suitably addressed through massive reduction in non-executive and addition in executive category with suitable training
These efforts of POWERGRID have resulted intoEnhanced grid stability with improved frequency and voltage profileEnhanced inter regional exchangesSubstantial reduction in grid disturbancesFacilitating Inter-state Open AccessEconomic benefitsMigration From ISO to TSO
TSO model in India a few factsFormulation of evolving Market rules & order for implementation of Indian Electricity Grid Code by CERC TSO only an enabler and immune to dispatchOverall planning by CEATSO only the coordinator
CERC oversees implementation of Open Access in inter-State TransmissionTSO only an enablerNo operational / commercial disputes between the constituents and the Grid OperatorMarket rules, Grid codes, Open Access etc. already in place The system has adequate in-built checks and balances by designDecentralized dispatch system operation System Operation and Transmission activities ring fenced
Close interaction between system operator and network owner head and body is togetherfaster decision making, reduces response timeTSO has no commercial interest in Generation, Distribution & Trading (as per the Electricity Act 2003 itself)Information sharing of Transparent and two way communicationReal-time power flowsLong-term & Short-term capacity reservations for non-discriminatory open access
RLDC backed by large organization which provides Buffer for manpowerAvenues for lateral movementJob enrichment and career growthTSO model in India a few facts
Ensure digital quality power through 100% Grid availabilityPlan and expand Grid with adequate redundancy
Ensure effective communication, control and command
Ensure physical Security of the establishments, particularly of the Load Dispatch Centres
Managing complex power system with growing size of the grid because of national & international connections, open access and market developmentPower System Challenges
Continuous expansion of the Grid through system studies and real time feed back from the system operator TSO alone can effectively do it In case of split of TSO to ISO and Transmission utility, the effective co-ordination may be difficult as witnessed in India in the past and being witnessed internationally, particularly USAAdoption of Scenario-and-contingency (S&C) planning tools, in addition to building adequate redundancyAdequate security mechanism, both physical & technical against terrorismContinuous upgradation and modernisation of RLDCs, which calls for Adequate Fund AvailabilityInstitutional Strength to train & redeploy personnel with adequate room for career growth
Challenges can be addressed through
TSO-ISO International experienceModels
TSOISOFranceU.KSwedenGermanyNetherlandItalyChinaSouth AfricaUSA *CanadaBrazil
* Moving towards TSO through RTO
In USA, need felt for shifting to TSO model as ISO model did not help in development of new transmission lines & modernization of LD&C facilitiesTERNA, new Italian TSO made in 2005 by integration of TERNA (Trans. Developer) & GRTN(ISO)Norway choose TSO model for development of the grid and its management for socio-economic efficient transmission networkIn France, both Transmission and System Operation functions delegated to RTEAll European countries follow TSO modelThe World Bank report indicated that TSO model is critical for success of any power sectorIn WEC seminar, it emerged that TSO permits much stronger financial incentives around system security TSO-ISO International Experience
Comparison of TSO vs. ISO
TSOISOHarmonisation of transmission asssets development and its operation & managementsOperator and Grid owners are tied up only through agreements slow decision making and increase response timeTransparent and Simpler information flowCommunication may not be effective between two(2) organisationsGrid management and asset ownership with single entity make better accountability Grid operators and asset owners may blame each other
Decide and implement the right efforts in a socio-economic perspective through integrated instruments by system operator & grid ownerLacks instrument to secure socio-economic development and operation of transmission grid
Comparison of TSO vs. ISO
TSOISORLDC backed up by large organisation which provides - availability of adequate funds, buffer for manpower, Career growth, avenues for lateral movementSmall organisation, less opportunity for career growth, fund mobilisation difficultBacked up by experienced manpower in all fields of transmission helps in efficient grid managementNo backup of experienced manpower in transmission systemNeutrality can be addressed by suitable mechanism, i.e ring fencing, banning TSO from generation & trading and availability of regulatory mechanismNeutral
The World Bank report on Transmission System Operators Lesson From the Frontlines , June, 2002
Quote
Among the new power institutions, Transmission System Operators (TSOs) are critical to the success of any power sector in which competition is sought. A TSO must be the operator of both the high voltage transmission grid and generation dispatch centre
Unquote
In the World Energy Council seminar on Large Power System failure held in London on 02.10.2006, it emerged that
The European approach of establishing TSOs rather than ISOs permits much stronger financial incentives to be put in place around system security.
TSO approach deliver more accountability
Indian power sector maturing & developingNeutrality of TSO in India ensured by designImproved grid management in India thru TSOInstills accountability in SO regarding investment recommendationsArchitectural change may confuse new playersCareer growth & job enrichment possible in TSO to retain the talent poolTransmission Utility only the path-provider & neutral and in no way can influence system operationIt has socio-political impacts and fall outsCannot afford failuresTSO model is more successful internationallyTSO is best suited in Indian contextConclusion
Discussion
ISO - American ModelGGGDDDTTGDGDGDTSOSORTOUSA had adopted this model; As many vertically integrated private players needed to be monitored by an independent entity to oversee Grid Management.
Need felt for shifting to TSO Model as, Co-operative approach did not help in adding new transmission lines & modernizing load dispatch centres Thus, they are now moving to TSO through RTO.
TSO TERNA, ItalyTERNA new Italian TSO - owns & operate more than 93% of Italian Transmission Network, made in 2005 by integration of TERNA & GRTN (ISO)Need for this integration To harmonise transmission asssets creation and its operation & managementsTo ensure transparent and competitive electricity marketTo improve asset management
*- / BDI
TSO vis--vis ISO model Italian experience and way ahead
+
GRTN(asset management)
Dispatching andGrid development planning
TERNA(asset ownership)
TERNARete Elettrica Nazionale
Maintenance and Grid development implementation
Merger
Dispatching & securityGrid operation & maintenancePlanning and implementation of grid development Power sector statistics
The new TSO since November, 1st 2005
Norway Statnett as TSO
Necessity to choose TSO model in Norway
ISO lacks necessary instruments to make grid capacity adaptationsGrid owner without system operator responsibility will often lack incitements to choose instruments that the ISO finds socio-economic efficientTSO model is necessary to carry out the right development of the grid, responding to long-term changes in production and consumption patterns
*
TSO-model gives sufficient instruments
Evaluating instruments
Decide and implement the right efforts in a fast and effective way
System services
Grid utilisation
New grid capacity
Transmission pricing
Instruments available for an ISO
Instruments available for a TSO
Balancing system reliability requirements and the market need for transmission capacity
Use of instruments for a TSO
France T + SOGDEdFRTEThis model is followed in France, wherein Transmission and System Operation functions have been delegated to RTE. EdF is responsible for the Generation and the Distribution to the extent of 95%
TSO Model (European countries)GGGDDDT + SOGDGDThis model is being followed in UK, Norway, Sweden, Finland, Netherland, Denmark
Germany has four Transmission System Operators across the country (TSO model)
*NRLDC*NRLDCNRLDCNRLDCNRLDC*NRLDC*TALA PROJECT-LARGE CENTRAL GRID ARUNACHAL TO GUJARAT ON SAME FREQNRLDC*NRLDC*NRLDC*NRLDC*NRLDC*NRLDC*NRLDCNRLDCNRLDC*NRLDC*NRLDCNRLDCNRLDC*NRLDC*A significant quantum of need is traded through long term bilateral contracts.But the availability of tools to optimize demand helps the operator.
NRLDCNRLDCNRLDCNRLDCNRLDCNRLDCNRLDC*NRLDC*NRLDCNRLDCNRLDCNRLDCNRLDCNRLDCNRLDCNRLDCNRLDC*NRLDC*NRLDCNRLDCNRLDC*NRLDCNRLDCNRLDCNRLDCNRLDC*NRLDC*NRLDC*NRLDC*NRLDCNRLDC*NRLDC*NRLDC*Enriching experience . Still a long way to go Max transfer 2780 on a day 11-Aug-06 . NRLDC*NRLDC*NRLDC*NRLDC*NRLDC*NRLDC*NRLDC*NRLDCNRLDC*NRLDC*NRLDC