7/28/2019 Power Calculation (r1)
1/21
DRAWING: 2601193A/EL/205
Lighting Utility Power
LOW ZONE
Office Common area B3 542 10 15 13,
Office Common area B2 517.68 10 15 12,
Office Common area B1 866.12 10 15 21,
Office Common area 1ST 1514.7 15 15 45,
Trading floor 2nd 1330 15 110 166
Office 3rd 1330 15 65 106
B3to1stSTY
LevelFloor area
(m2)No. Description
Conn
lo
(W
pf=
Load Density (W/m2)
Office Common area
Trading Floor Future
7/28/2019 Power Calculation (r1)
2/21
HIGH ZONE
Trading Floor 22nd 1435 15 110 17
Office 23th 1440 15 65 11
Office 24th 1440 15 65 11
Office 25th 1440 15 65 11
Office 26th 1440 15 65 11
Office 27th 1440 15 65 11
Office 28th 1330 15 65 10
Office 29th 1430 15 65 11
Office 30th 1430 15 65 11
Office 31th 1430 15 65 11
Office 32th 1430 15 65 11
Office 33th 684 15 65 54
Office 34th 684 15 65 54
Office 35th 15 65
5658 15 65 45
Total (23th-29th)
RiserTenant-L30toL35
RiserTenant-L23toL29
Trading Floor Future
Total (22nd-30th) Future
Total (30th-35th) Future
Total (30th-35th)
7/28/2019 Power Calculation (r1)
3/21
EAF-OFF-35-01 (VSD)FIRE TANK &
PUMP ROOM2.24 3.80
EAF-OFF-35-04 (VSD)
FIRE PUMP
ROOM
L35
4 6.79
EAF-OFF-35-03 (VSD) GENSET L35 2.24 3.80 20
EAF-OFF-35-B1M (VSD) GENSET L35 11 18.68 30
EAF-OFF-37-01
OFFICE
PANTRY
L34-L35
0.3 1.53 20
EAF-OFF-37-02 OFF l34-l35 2.24 3.80 20
FAF-OFF-L1-01 (VSD) Exit Staircase 0.3 1.53 20
FAF-OFF-L1-02(VSD) Lobby 0.3 1.53 20
FAF-OFF-L1-03 (VSD) Lobby 0.3 1.53 20
FAF-OFF-L1-04 (VSD) Lobby 0.3 1.53 20
FAF-OFF-B2-01/02/03 B2 0.9 4.60 20FAF-OFF-B2-05/06 B2 2.78 4.72 20
FAF-OFF-B1M-41/42 B1M 0.6 3.07 20
FAF-OFF-B1M-44/43 B1M 0.6 3.07 20
FAF-OFF-B1M-45/46 B1M 0.52 2.66 20
FAF-OFF-B1M-35/36 B1M 2.78 4.72 20
FAF-OFF-B1M-37a &37b B1M 11 18.68 30
FAF-OFF-B1M-38/39 B1M 3.63 6.16 20
FAF-OFF-B1M-39a/40a B1M 18.5 31.41 40
26.0
42.5
S
BE-OFF-33-MV
EDB-OFF-B1-MV
20
7/28/2019 Power Calculation (r1)
4/21
No. DescriptionDemand Load
(KW)
Amp
(A)-pf=0.85
MCCB
(A)
ACB
(A)
ACB
(A)
1 Trading Floor 2nd 133 225.85 400
2 Trading Floor 2nd Future 133 225.85 400
3 Tenant Riser L3 to L10 527.6 895.93 2000
4 Tenant Riser L3 to L10 (Future) 753.7 1279.90 2000
5 Tenant Riser L12 to L20 628.6 1067.40 2000
6 Tenant Riser L12 to L20 (Future) 898.0 1524.86 2000
7 To EMSB-OFF-B1-T1 396.4 673.14 1200
SPARE 400
SPARE 400
SPARE 1200
Sub Total P (KW) 3470.3
IN-COMINGMSB-OFF-B1-1
Group D.F =0.82776.3 4714.33 5000 5000
TX Load (25% spare) 3470.3
Max Demand Load
LOW ZONE LOAD
MSB-OFF-B1-T1
7/28/2019 Power Calculation (r1)
5/21
DB Main Breaker Size: 63A TPN MCB
Type of ELCB Protective Device: Yes
CCT
No.
MCB
Rating (A)MCB Type
MCB Fault
Rating(KA)
RCCB
RatingLoad Detail/Description
RYB1 63 TP C 63A, 30mA Split Bar Feeder 1
R1 20 C 10
Y1 20 C 10
B1 20 C 10
R2 20 C 10
Y2 20 C 10
B2 20 C 10
RYB 30 C 10
RYB2 30 TP C 40A, 30mA Split Bar Feeder 2
R1 10 C 10
Y1 10 C 10
B1 10 C 10
R2 10 C 10
Y2 10 C 10
B2 10 C 10
Distibution Board: DB-OFF-01-1
DB Main Breaker Size: 80A TPN MCB
Type of ELCB Protective Device: Yes
CCT
No.
MCB
Rating (A)MCB Type
MCB Fault
Rating(KA)
RCCB
RatingLoad Detail/Description
RYB1 63 TP C 63A, 30mA Split Bar Feeder 1
R1 20 C 10
7/28/2019 Power Calculation (r1)
6/21
No. DescriptionDemand Load
(KW)
Amp
(A)-pf=0.85
MCCB
(A)
ACB
(A)
A
1 Trading Floor 22nd 143.5 243.68 400
2 Riser Tenant L22 to L29 637.4 1082.43 1250
3 Riser Tenant L30 to L35Future
362.1 614.90 1250
4 Trading Floor 22nd Future 143.5 243.68 400
5Riser Tenant L22 to L29
Future637.4 1082.43 1600
6 Riser Tenant L30 to L35 253.5 430.43 1000
7 EMSB-OFF-36-T1 239.9 407.36 800
8 SPARE 400
9 SPARE 400
10 SPARE 800
HIGH ZONE LOAD
MSB-OFF-36-T1
7/28/2019 Power Calculation (r1)
7/21
IN-COMINGLESB-OFF-32M-T1
Max.Demand Load (D.F=0.8)211 358.64 600 4P
7/28/2019 Power Calculation (r1)
8/21
No. DescriptionDemand Load
(KW)
Amp
(A)-pf=0.85
MCCB
(A)REMARKS
1 42KW Fire Lift 42.00 71.32 100 4P
2 38KW Service Lift 38.00 64.53 100 4P
3 SPARE 63 4P
IN-COMINGSub Total P (KW)
LEDB-OFF-34R-280.00 135.85 250 4P
No. DescriptionDemand Load
(KW)
Amp
(A)-pf=0.85
MCCB/
MCB
(A)
Remarks
1 EAF-OFF-11-01 7.5 12.74 30 3 p
2 EAF-OFF-21-01 (OFF PANTRY) 2.24 3.80 20 3 p
3 EAF-OFF-21-02 (OFF) 7.5 12.74 30 3 p
4 EAF-OFF-21-03 (VSD) 2.24 3.80 20 3 p
5 SPARE 20 3 p
6 SPARE 20 3 p
SBE-0FF-21M-MV (TYPICAL)
OUT-GOING
LEDB-OFF-34R-2
7/28/2019 Power Calculation (r1)
9/21
DRAWING: 2601193A/EL/203
1 Linghting point 11 40 440
0
Power/Data/Tel. 0
1G 13A SSO 7 250 1,750
1G 13A SSO, FCU, HL (MCLAD) 1 370 370
Universal Power outlet 2 250 500
2G 13A SSO 6 500 3,000
1G 15A SSO (Hair Dryer) 1 1,850 1,850
TV Point 2 0
Data Point 2 0
Tel. Point 2 0
Speaker 1 0
Key Card 1 0
DND Control Panel 1 50 50
DND Indicator Panel (Outside) 1 50 50
D Chi (B ll) 1 50 50
Estimated electrical load for Hotel Guest Room
No. Description Q'ty
Estimated
power
(W)
Subtotal
Power
(W)
7/28/2019 Power Calculation (r1)
10/21
34 Nos Hotel Guestroom 9 221,952 0.6 133,171
34 Nos Hotel Guestroom 10 221,952 0.6 133,171
34 Nos Hotel Guestroom 11 221,952 0.6 133,171
36 Nos Hotel Guestroom 12 235,008 0.6 141,005
36 Nos Hotel Guestroom 13 235,008 0.6 141,005
36 Nos Hotel Guestroom 14 235,008 0.6 141,005
0.8 0
822,528
36 Nos Hotel Guestroom 15 235,008 0.6 141,005
36 Nos Hotel Guestroom 16 235,008 0.6 141,005
36 Nos Hotel Guestroom 17 235,008 0.6 141,005
36 Nos Hotel Guestroom 19 235,008 0.6 141,005
36 Nos Hotel Guestroom 20 235,008 0.6 141,005
36 Nos Hotel Guestroom 21 235,008 0.6 141,005
0.8 0
846,029
Hotel common 1 46,025
Isol for FCU/MV 21,168
Hotel common 2 21,203
Isol for FCU/MV 21,168
Hotel common 3 20,055
Isol for FCU/MV 21,168
Hotel common 4 21,203
Isol for FCU/MV 21,168
Hotel common 5 20,027Isol for FCU/MV 21,168
Hotel common 6 22,232
Isol for FCU/MV 21,168
Hotel common 7 20,678
Isol for FCU/MV 21,168
Hotel common 8 22,232
Isol for FCU/MV 21,168
Hotel common 9 21,602
Isol for FCU/MV 21,168
Hotel common 10 22,960
RiserHTLL15-L20
Total L15 to L21
CommonHTLL2-L1
0
RiserHTLL9-L14
Total L9 to L14
7/28/2019 Power Calculation (r1)
11/21
SERVICE LIFT LOBBY 1 13.50 6 1 26
SERVICE LIFT LOBBY 2 13.50 6 1 26
ENTRANCE HALL 52.00 16 2 26
ELV RISER 1 1 40
TEL RISER 1 1 40
ELECT RISER 1 1 40
STAIRCASE 4 0 40
SubTotal
DB-CB9-02-1
LOCATED AT CB9 1ST STOREY
Lighting Point Power Point Lighting(W)
LIFT LOBBY 1 23.00 14 2 14
STARICASE 26.00 2 0 40
BALL ROOM 700.00 130 20 80
PREP KITCHEN 1& 2 22.50 6 8 80
STAIRCASE 4 0 40
LOBBY 1 23.00 8 2 26
LOBBY 2 27.00 10 2 26
ACMV POWER
SubTotal
CONSERVATION CB14
DB CB14 L1
Qty Estimate
1STS
No. DescriptionFloor area
(m2)
2
ND&MEZZ
7/28/2019 Power Calculation (r1)
12/21
ACMV Power
Total
No Description Level DemandLoad1
(KW)
Amp(A)-pf=0.85
MCB/
ISOL.
FAF-HTL-22-1/2 HTL-22 2.78 4.7 20
SPF-HTL-22-1/2(VSD) 15KW HTL-22 15 25.5 40
FAF-HTL-22-3/4 - 1.39 KW HTL-22 1.39 2.4 20
SPF-HTL-22-3/4(VSD) 15KW HTL-22 15 25.5 40
FAF-HTL-22-5a & 5b -1.39kw HTL-22 1.39 2.36 20
FAF-HTL-22-6/7a & 6/7b -1.08KW HTL-22 1.08 5.52 20
FAF-HTL-22-8/9 -6.89KW HTL-22 6.89 11.7 30
FAF-HTL-18-1 HTL-18 7.5 12.7 30
TEF-HTL-18-1a/1b HTL-18 5.5 9.3 20
TEF-HTL-18-2a/2b HTL-18 5.5 9.3 20
EAF-HTL-18-1/2 HTL-18 1.08 5.52 20
No. Description
Demand
Load
(KW)
Amp
(A)-pf=0.85
MCCB/
MCB
(A)
1 35KW Water Pump 35 59.4 100
2 HEAT PUMP 1 35 59.4 100
3 HEAT PUMP 2 35 59.4 100
4 HEAT PUMP 3 35 59 4 100
SB-HTL-18-PUMP (WATER SYSTEM)
Remar
SBE-HTL-22-MV
SBE-HTL-18-1
POWER REQUIREMENT MECHANICAL VENTILATION
7/28/2019 Power Calculation (r1)
13/21
HOTEL BASEMENT
No. Description
Demand
Load
(KW)
Amp(A)-pf=0.85
MCCB(A)
ACB(A)
1 SB-HTL-B1-1 46.4 78.7 150
2 DB-HTL-B1M-1 (BOH) 75.3 127.8 150
3 SB-CB14-01-1 249.8 424.2 600
4 SB-CB09-01-1 90.0 152.8 250
5 Riser HTL Faciclities 288.0 489.0 600
6 SB for Hot Water System 10.0 17.0 40
7 Isolator for Pneumatic 120.0 203.8 300
8 DB-HTL-B1-BOH 18.0 30.6 63
9 Isolator for Grease Interceptor 80.0 135.8 200
10 EMSB-HTL-B1-2 605.5 1028.2 1200SPARE 300
SPARE 200
Sub Total P (KW) 1583.0
IN-COMINGMSB-HTL-B1-2
Group D.F =0.81266.4 2150.4 3000
TX Load (with 25% spare) 1583.0
M D d L d
MSB-HTL-B1-2
7/28/2019 Power Calculation (r1)
14/21
6
Sub Total P(KW) 220.0
IN-COMINGSB-HTL-18-FAC1
Group D.F =0.8176.0 298.9 400
No. DescriptionDemand
Load
(KW)
Amp
(A)-pf=0.85
MCCB/MCB
(A)Remarks
1 Isol for Water feature 45.0 76.4 100
2 Isol for Water feature 45.0 76.4 100
3 Isol for Pool Deck 30.0 50.9 100
4 DB-HTL-22-GYM 20.0 34.0 63
5 SPARE 63
6 SPARE 63
Sub Total P(KW) 140.0
IN-COMINGSB-HTL-18-FAC1
Group D.F =0.8112.0 190.2 250
Distibution Board: DB-HTL-18-GYM TYPICAL
DB Main Breaker Size: 63 MCB DB-HTL-22-GYM
Type ofELCB Protective Device: No
CCT
No.
MCB
Rating (A)MCB Type
MCB Fault
Rating(KA)
RCCB
RatingLoad Detail/Description
RYB1 63A TP C 63A,100mA Split Bar Feeder 1
R1 20 C 10 PW points
SB-HTL-22-FAC1
OUT-GOING
7/28/2019 Power Calculation (r1)
15/21
CCT
No.
MCB
Ratin AMCB Type
MCB Fault
Rating(KA)
RCCB
RatinLoad Detail/Description
RYB1 63A TP C 63A,100mA Split Bar Feeder 1
R1 20 C 10 PW points
Y1 20 C 10 PW points
B1 20 C 10 PW points
R2 20 C 10 PW points
Y2 20 C 10 PW points
B2 20 C 10 PW points
R3 20 C 10 SPARE
Y3 20 C 10 SPARE
B3 20 C 10 SPARE
RYB2 40A TP C 40A,100mA Split Bar Feeder 2
R1 10 C 10 LTG Points
Y1 10 C 10 LTG Points
B1 10 C 10 LTG Points
R2 10 C 10 LTG Points
Y2 10 C 10 LTG Points
B2 10 C 10 LTG Points
R3 10 C 10 SPARE
Y3 10 C 10 SPARE
B3 10 C 10 SPARE
RYB3 30 C 10 SPARE
Distibution Board: SB-HTL-XX-1 Typical 32 Guestroom
7/28/2019 Power Calculation (r1)
16/21
B4 40 C 10 SPARE
RYB2 100A TP C 100A,100mA Split Bar Feeder 2R1 40 C 10 GR1
Y1 40 C 10 GR2
B1 40 C 10 GR3
R2 40 C 10 GR4
Y2 40 C 10 GR5
B2 40 C 10 GR6
R3 40 C 10 GR7
Y3 40 C 10 GR8
B3 40 C 10 GR9
R4 40 C 10 GR10
Y4 40 C 10 GR11
B4 40 C 10 SPARE
R5 SPARE
RYB3 100A TP C 100A,100mA Split Bar Feeder 2R1 40 C 10 GR1
Y1 40 C 10 GR2
B1 40 C 10 GR3
R2 40 C 10 GR4
Y2 40 C 10 GR5
B2 40 C 10 GR6
R3 40 C 10 GR7
Y3 40 C 10 GR8
B3 40 C 10 GR9R4 40 C 10 GR10
Y4 40 C 10 GR11
B4 40 C 10 GR12
R5 SPARE
Y5 SPARE
Distribution Board : DB-CB14-1-K1
DB Main Breaker Size : 400A/400A TPN MCCB
E th F lt(E/F) P t ti YES
7/28/2019 Power Calculation (r1)
17/21
DRAWING: 2601193A/EL/204
No. Description QtyEstimated
powerTotal power D.F.
Small power & lighting
1 Lighting point 20 35 700 1
2 General 13A SSO usage 25 250 6250 1
3 Door Chime 1 50 50 1
Main household equipment 11300 1
1 Microwave oven 1 2000 2000
2 Hot plate & hood 1 2500 2500
3 Washing machine 1 1500 1500
4 Refrigerator 1 300 300
5 Water heater 2 2500 5000
A/C 2200 1
1 1 hp 1 950 950
2 1.5 hp 1 1250 1250
3 2 hp 2500 0
Sub total power
group d.f.
Total major power
Current (A)- Single phase
MCB-2P
No. Description QtyEstimated
powerTotal power D.F.
Estimated electrical load for 2 Bed-room
Estimated electrical load for 4 Bed-room
7/28/2019 Power Calculation (r1)
18/21
31 80 25 40 250 9,450
LOW ZONE L22 TO L31
2 Nos 4bed + 1 no 3bed+ 1 no (2+1)bed 23 80,058 0.8 64,046
3 Nos 4bed + 1 no 3bed+ 1 no (2+1)bed 24 80,058 0.8 64,046
4 Nos 4bed + 1 no 3bed+ 1 no (2+1)bed 25 80,058 0.8 64,046
5 Nos 4bed + 1 no 3bed+ 1 no (2+1)bed 26 80,058 0.8 64,046
256,186
2 Nos 4bed + 1 no 3bed+ 1 no (2+1)bed 27 80,058 0.8 64,046
2 Nos 4bed + 1 no 3bed+ 1 no (2+1)bed 28 80,058 0.8 64,046
1 Nos 4bed + 2 no 3bed+ 1 no (2+1)bed 29 73,815 0.8 59,052
1 Nos 4bed + 2 no 3bed+ 1 no (2+1)bed 30 73,815 0.8 59,052
1 Nos 4bed + 2 no 3bed+ 1 no (2+1)bed 31 73,815 0.8 59,052
305,249
2 Nos 4bed + 2 nos 3bed+ 1 no 2 bed 23 92,358 0.8 73,886
2 Nos 4bed + 2 nos 3bed+ 1 no 2 bed 24 92,358 0.8 73,886
2 Nos 4bed + 2 nos 3bed+ 1 no 2 bed 25 92,358 0.8 73,886
2 N 4b d 2 3b d 1 2 b d 26 92 358 0 8 73 886
ResiL23-L26
(1)
Total L23 to L26
ResiL27-L31
(1)
Total L27 to L31
siL23-
L26(2)
ASSUMP
No. Description Level
Connected
Load
(W)
Diversity
factor Max Demand load(W) .
7/28/2019 Power Calculation (r1)
19/21
Resi Common 32Mz 9,416
Resi Common 33 7,560
Resi Common 34 7,560
Resi Common 35 7,560
Resi Common 36 7,560
Resi Common 37 7,560
Resi Common 38 7,560
Resi Common 39 7,560
Resi Common 40 7,560Resi Common 41 7,560
Resi Common 42 5,224
Resi Common 43 6,960
Resi Common 44 4,168
Resi Common 45 4,008
Resi Common 46 4,008
Resi Common Roof 1,120
126,000
No Description Level
Demand
Load1
(KW)
Amp
(A)-pf=0.85
MCB/
ISOL.
FAF-RES-32-1a & 1bRES- 32 1.39 2.4 20
FAF-RES-32-2RES- 32 1.39 2.4 20
FAF-RES-32-3RES- 32 4 6.8 20
FAF-RES-44-1 (VSD)RES-44 7.5 12.7 30
FAF-RES-46-1a & 1b/1RES-46 0.12 0.61 20
FAF-RES-46-2RES-46 0.28 1.43 20
FAF-RES-48-1(VSD/1RES-Roof 8.89 15.1 30
SBE-RES-32M-MV
SBE-RES-ROOF-MV
CommonRe
siL32-Roof
POWER REQUIREMENT MECHANICAL VENTILATION
Total L32 to Roof
7/28/2019 Power Calculation (r1)
20/21
4 SB-RES-FAC (Facilities) 73.5 124.8 200
5 SPARE 100
Sub Total P (KW) 1915.0
IN-COMINGMSB-RES-B1-1
Group D.F =0.81532.0 2601.4 1600
No. Description
Demand
Load
(KW)
Amp
(A)-pf=0.85
MCB/
MCCB
(A)
1 Isol. Ejector Pump 80.0 135.8 200
2 Isol. Water Sump Pump 40.0 67.9 100
3 Isol. Water Sump Pump 40.0 67.9 100
4 Isol. Base. MV 88.2 149.8 200
5 Isol. Base. MV 88.2 149.8 200
6 SPARE 63
Sub Total P (KW) 336.4
IN-COMINGESB-RES-B1-1
Group D.F =0.8269.1 457.0 500
No. Description
Demand
Load
(KW)
Amp
(A)-pf=0.85
MCB/
MCCB
(A)
SB-RES-B1-FAC
ESB-RES-B1-1
7/28/2019 Power Calculation (r1)
21/21