Power Calculation (r1)

Embed Size (px)

Citation preview

  • 7/28/2019 Power Calculation (r1)

    1/21

    DRAWING: 2601193A/EL/205

    Lighting Utility Power

    LOW ZONE

    Office Common area B3 542 10 15 13,

    Office Common area B2 517.68 10 15 12,

    Office Common area B1 866.12 10 15 21,

    Office Common area 1ST 1514.7 15 15 45,

    Trading floor 2nd 1330 15 110 166

    Office 3rd 1330 15 65 106

    B3to1stSTY

    LevelFloor area

    (m2)No. Description

    Conn

    lo

    (W

    pf=

    Load Density (W/m2)

    Office Common area

    Trading Floor Future

  • 7/28/2019 Power Calculation (r1)

    2/21

    HIGH ZONE

    Trading Floor 22nd 1435 15 110 17

    Office 23th 1440 15 65 11

    Office 24th 1440 15 65 11

    Office 25th 1440 15 65 11

    Office 26th 1440 15 65 11

    Office 27th 1440 15 65 11

    Office 28th 1330 15 65 10

    Office 29th 1430 15 65 11

    Office 30th 1430 15 65 11

    Office 31th 1430 15 65 11

    Office 32th 1430 15 65 11

    Office 33th 684 15 65 54

    Office 34th 684 15 65 54

    Office 35th 15 65

    5658 15 65 45

    Total (23th-29th)

    RiserTenant-L30toL35

    RiserTenant-L23toL29

    Trading Floor Future

    Total (22nd-30th) Future

    Total (30th-35th) Future

    Total (30th-35th)

  • 7/28/2019 Power Calculation (r1)

    3/21

    EAF-OFF-35-01 (VSD)FIRE TANK &

    PUMP ROOM2.24 3.80

    EAF-OFF-35-04 (VSD)

    FIRE PUMP

    ROOM

    L35

    4 6.79

    EAF-OFF-35-03 (VSD) GENSET L35 2.24 3.80 20

    EAF-OFF-35-B1M (VSD) GENSET L35 11 18.68 30

    EAF-OFF-37-01

    OFFICE

    PANTRY

    L34-L35

    0.3 1.53 20

    EAF-OFF-37-02 OFF l34-l35 2.24 3.80 20

    FAF-OFF-L1-01 (VSD) Exit Staircase 0.3 1.53 20

    FAF-OFF-L1-02(VSD) Lobby 0.3 1.53 20

    FAF-OFF-L1-03 (VSD) Lobby 0.3 1.53 20

    FAF-OFF-L1-04 (VSD) Lobby 0.3 1.53 20

    FAF-OFF-B2-01/02/03 B2 0.9 4.60 20FAF-OFF-B2-05/06 B2 2.78 4.72 20

    FAF-OFF-B1M-41/42 B1M 0.6 3.07 20

    FAF-OFF-B1M-44/43 B1M 0.6 3.07 20

    FAF-OFF-B1M-45/46 B1M 0.52 2.66 20

    FAF-OFF-B1M-35/36 B1M 2.78 4.72 20

    FAF-OFF-B1M-37a &37b B1M 11 18.68 30

    FAF-OFF-B1M-38/39 B1M 3.63 6.16 20

    FAF-OFF-B1M-39a/40a B1M 18.5 31.41 40

    26.0

    42.5

    S

    BE-OFF-33-MV

    EDB-OFF-B1-MV

    20

  • 7/28/2019 Power Calculation (r1)

    4/21

    No. DescriptionDemand Load

    (KW)

    Amp

    (A)-pf=0.85

    MCCB

    (A)

    ACB

    (A)

    ACB

    (A)

    1 Trading Floor 2nd 133 225.85 400

    2 Trading Floor 2nd Future 133 225.85 400

    3 Tenant Riser L3 to L10 527.6 895.93 2000

    4 Tenant Riser L3 to L10 (Future) 753.7 1279.90 2000

    5 Tenant Riser L12 to L20 628.6 1067.40 2000

    6 Tenant Riser L12 to L20 (Future) 898.0 1524.86 2000

    7 To EMSB-OFF-B1-T1 396.4 673.14 1200

    SPARE 400

    SPARE 400

    SPARE 1200

    Sub Total P (KW) 3470.3

    IN-COMINGMSB-OFF-B1-1

    Group D.F =0.82776.3 4714.33 5000 5000

    TX Load (25% spare) 3470.3

    Max Demand Load

    LOW ZONE LOAD

    MSB-OFF-B1-T1

  • 7/28/2019 Power Calculation (r1)

    5/21

    DB Main Breaker Size: 63A TPN MCB

    Type of ELCB Protective Device: Yes

    CCT

    No.

    MCB

    Rating (A)MCB Type

    MCB Fault

    Rating(KA)

    RCCB

    RatingLoad Detail/Description

    RYB1 63 TP C 63A, 30mA Split Bar Feeder 1

    R1 20 C 10

    Y1 20 C 10

    B1 20 C 10

    R2 20 C 10

    Y2 20 C 10

    B2 20 C 10

    RYB 30 C 10

    RYB2 30 TP C 40A, 30mA Split Bar Feeder 2

    R1 10 C 10

    Y1 10 C 10

    B1 10 C 10

    R2 10 C 10

    Y2 10 C 10

    B2 10 C 10

    Distibution Board: DB-OFF-01-1

    DB Main Breaker Size: 80A TPN MCB

    Type of ELCB Protective Device: Yes

    CCT

    No.

    MCB

    Rating (A)MCB Type

    MCB Fault

    Rating(KA)

    RCCB

    RatingLoad Detail/Description

    RYB1 63 TP C 63A, 30mA Split Bar Feeder 1

    R1 20 C 10

  • 7/28/2019 Power Calculation (r1)

    6/21

    No. DescriptionDemand Load

    (KW)

    Amp

    (A)-pf=0.85

    MCCB

    (A)

    ACB

    (A)

    A

    1 Trading Floor 22nd 143.5 243.68 400

    2 Riser Tenant L22 to L29 637.4 1082.43 1250

    3 Riser Tenant L30 to L35Future

    362.1 614.90 1250

    4 Trading Floor 22nd Future 143.5 243.68 400

    5Riser Tenant L22 to L29

    Future637.4 1082.43 1600

    6 Riser Tenant L30 to L35 253.5 430.43 1000

    7 EMSB-OFF-36-T1 239.9 407.36 800

    8 SPARE 400

    9 SPARE 400

    10 SPARE 800

    HIGH ZONE LOAD

    MSB-OFF-36-T1

  • 7/28/2019 Power Calculation (r1)

    7/21

    IN-COMINGLESB-OFF-32M-T1

    Max.Demand Load (D.F=0.8)211 358.64 600 4P

  • 7/28/2019 Power Calculation (r1)

    8/21

    No. DescriptionDemand Load

    (KW)

    Amp

    (A)-pf=0.85

    MCCB

    (A)REMARKS

    1 42KW Fire Lift 42.00 71.32 100 4P

    2 38KW Service Lift 38.00 64.53 100 4P

    3 SPARE 63 4P

    IN-COMINGSub Total P (KW)

    LEDB-OFF-34R-280.00 135.85 250 4P

    No. DescriptionDemand Load

    (KW)

    Amp

    (A)-pf=0.85

    MCCB/

    MCB

    (A)

    Remarks

    1 EAF-OFF-11-01 7.5 12.74 30 3 p

    2 EAF-OFF-21-01 (OFF PANTRY) 2.24 3.80 20 3 p

    3 EAF-OFF-21-02 (OFF) 7.5 12.74 30 3 p

    4 EAF-OFF-21-03 (VSD) 2.24 3.80 20 3 p

    5 SPARE 20 3 p

    6 SPARE 20 3 p

    SBE-0FF-21M-MV (TYPICAL)

    OUT-GOING

    LEDB-OFF-34R-2

  • 7/28/2019 Power Calculation (r1)

    9/21

    DRAWING: 2601193A/EL/203

    1 Linghting point 11 40 440

    0

    Power/Data/Tel. 0

    1G 13A SSO 7 250 1,750

    1G 13A SSO, FCU, HL (MCLAD) 1 370 370

    Universal Power outlet 2 250 500

    2G 13A SSO 6 500 3,000

    1G 15A SSO (Hair Dryer) 1 1,850 1,850

    TV Point 2 0

    Data Point 2 0

    Tel. Point 2 0

    Speaker 1 0

    Key Card 1 0

    DND Control Panel 1 50 50

    DND Indicator Panel (Outside) 1 50 50

    D Chi (B ll) 1 50 50

    Estimated electrical load for Hotel Guest Room

    No. Description Q'ty

    Estimated

    power

    (W)

    Subtotal

    Power

    (W)

  • 7/28/2019 Power Calculation (r1)

    10/21

    34 Nos Hotel Guestroom 9 221,952 0.6 133,171

    34 Nos Hotel Guestroom 10 221,952 0.6 133,171

    34 Nos Hotel Guestroom 11 221,952 0.6 133,171

    36 Nos Hotel Guestroom 12 235,008 0.6 141,005

    36 Nos Hotel Guestroom 13 235,008 0.6 141,005

    36 Nos Hotel Guestroom 14 235,008 0.6 141,005

    0.8 0

    822,528

    36 Nos Hotel Guestroom 15 235,008 0.6 141,005

    36 Nos Hotel Guestroom 16 235,008 0.6 141,005

    36 Nos Hotel Guestroom 17 235,008 0.6 141,005

    36 Nos Hotel Guestroom 19 235,008 0.6 141,005

    36 Nos Hotel Guestroom 20 235,008 0.6 141,005

    36 Nos Hotel Guestroom 21 235,008 0.6 141,005

    0.8 0

    846,029

    Hotel common 1 46,025

    Isol for FCU/MV 21,168

    Hotel common 2 21,203

    Isol for FCU/MV 21,168

    Hotel common 3 20,055

    Isol for FCU/MV 21,168

    Hotel common 4 21,203

    Isol for FCU/MV 21,168

    Hotel common 5 20,027Isol for FCU/MV 21,168

    Hotel common 6 22,232

    Isol for FCU/MV 21,168

    Hotel common 7 20,678

    Isol for FCU/MV 21,168

    Hotel common 8 22,232

    Isol for FCU/MV 21,168

    Hotel common 9 21,602

    Isol for FCU/MV 21,168

    Hotel common 10 22,960

    RiserHTLL15-L20

    Total L15 to L21

    CommonHTLL2-L1

    0

    RiserHTLL9-L14

    Total L9 to L14

  • 7/28/2019 Power Calculation (r1)

    11/21

    SERVICE LIFT LOBBY 1 13.50 6 1 26

    SERVICE LIFT LOBBY 2 13.50 6 1 26

    ENTRANCE HALL 52.00 16 2 26

    ELV RISER 1 1 40

    TEL RISER 1 1 40

    ELECT RISER 1 1 40

    STAIRCASE 4 0 40

    SubTotal

    DB-CB9-02-1

    LOCATED AT CB9 1ST STOREY

    Lighting Point Power Point Lighting(W)

    LIFT LOBBY 1 23.00 14 2 14

    STARICASE 26.00 2 0 40

    BALL ROOM 700.00 130 20 80

    PREP KITCHEN 1& 2 22.50 6 8 80

    STAIRCASE 4 0 40

    LOBBY 1 23.00 8 2 26

    LOBBY 2 27.00 10 2 26

    ACMV POWER

    SubTotal

    CONSERVATION CB14

    DB CB14 L1

    Qty Estimate

    1STS

    No. DescriptionFloor area

    (m2)

    2

    ND&MEZZ

  • 7/28/2019 Power Calculation (r1)

    12/21

    ACMV Power

    Total

    No Description Level DemandLoad1

    (KW)

    Amp(A)-pf=0.85

    MCB/

    ISOL.

    FAF-HTL-22-1/2 HTL-22 2.78 4.7 20

    SPF-HTL-22-1/2(VSD) 15KW HTL-22 15 25.5 40

    FAF-HTL-22-3/4 - 1.39 KW HTL-22 1.39 2.4 20

    SPF-HTL-22-3/4(VSD) 15KW HTL-22 15 25.5 40

    FAF-HTL-22-5a & 5b -1.39kw HTL-22 1.39 2.36 20

    FAF-HTL-22-6/7a & 6/7b -1.08KW HTL-22 1.08 5.52 20

    FAF-HTL-22-8/9 -6.89KW HTL-22 6.89 11.7 30

    FAF-HTL-18-1 HTL-18 7.5 12.7 30

    TEF-HTL-18-1a/1b HTL-18 5.5 9.3 20

    TEF-HTL-18-2a/2b HTL-18 5.5 9.3 20

    EAF-HTL-18-1/2 HTL-18 1.08 5.52 20

    No. Description

    Demand

    Load

    (KW)

    Amp

    (A)-pf=0.85

    MCCB/

    MCB

    (A)

    1 35KW Water Pump 35 59.4 100

    2 HEAT PUMP 1 35 59.4 100

    3 HEAT PUMP 2 35 59.4 100

    4 HEAT PUMP 3 35 59 4 100

    SB-HTL-18-PUMP (WATER SYSTEM)

    Remar

    SBE-HTL-22-MV

    SBE-HTL-18-1

    POWER REQUIREMENT MECHANICAL VENTILATION

  • 7/28/2019 Power Calculation (r1)

    13/21

    HOTEL BASEMENT

    No. Description

    Demand

    Load

    (KW)

    Amp(A)-pf=0.85

    MCCB(A)

    ACB(A)

    1 SB-HTL-B1-1 46.4 78.7 150

    2 DB-HTL-B1M-1 (BOH) 75.3 127.8 150

    3 SB-CB14-01-1 249.8 424.2 600

    4 SB-CB09-01-1 90.0 152.8 250

    5 Riser HTL Faciclities 288.0 489.0 600

    6 SB for Hot Water System 10.0 17.0 40

    7 Isolator for Pneumatic 120.0 203.8 300

    8 DB-HTL-B1-BOH 18.0 30.6 63

    9 Isolator for Grease Interceptor 80.0 135.8 200

    10 EMSB-HTL-B1-2 605.5 1028.2 1200SPARE 300

    SPARE 200

    Sub Total P (KW) 1583.0

    IN-COMINGMSB-HTL-B1-2

    Group D.F =0.81266.4 2150.4 3000

    TX Load (with 25% spare) 1583.0

    M D d L d

    MSB-HTL-B1-2

  • 7/28/2019 Power Calculation (r1)

    14/21

    6

    Sub Total P(KW) 220.0

    IN-COMINGSB-HTL-18-FAC1

    Group D.F =0.8176.0 298.9 400

    No. DescriptionDemand

    Load

    (KW)

    Amp

    (A)-pf=0.85

    MCCB/MCB

    (A)Remarks

    1 Isol for Water feature 45.0 76.4 100

    2 Isol for Water feature 45.0 76.4 100

    3 Isol for Pool Deck 30.0 50.9 100

    4 DB-HTL-22-GYM 20.0 34.0 63

    5 SPARE 63

    6 SPARE 63

    Sub Total P(KW) 140.0

    IN-COMINGSB-HTL-18-FAC1

    Group D.F =0.8112.0 190.2 250

    Distibution Board: DB-HTL-18-GYM TYPICAL

    DB Main Breaker Size: 63 MCB DB-HTL-22-GYM

    Type ofELCB Protective Device: No

    CCT

    No.

    MCB

    Rating (A)MCB Type

    MCB Fault

    Rating(KA)

    RCCB

    RatingLoad Detail/Description

    RYB1 63A TP C 63A,100mA Split Bar Feeder 1

    R1 20 C 10 PW points

    SB-HTL-22-FAC1

    OUT-GOING

  • 7/28/2019 Power Calculation (r1)

    15/21

    CCT

    No.

    MCB

    Ratin AMCB Type

    MCB Fault

    Rating(KA)

    RCCB

    RatinLoad Detail/Description

    RYB1 63A TP C 63A,100mA Split Bar Feeder 1

    R1 20 C 10 PW points

    Y1 20 C 10 PW points

    B1 20 C 10 PW points

    R2 20 C 10 PW points

    Y2 20 C 10 PW points

    B2 20 C 10 PW points

    R3 20 C 10 SPARE

    Y3 20 C 10 SPARE

    B3 20 C 10 SPARE

    RYB2 40A TP C 40A,100mA Split Bar Feeder 2

    R1 10 C 10 LTG Points

    Y1 10 C 10 LTG Points

    B1 10 C 10 LTG Points

    R2 10 C 10 LTG Points

    Y2 10 C 10 LTG Points

    B2 10 C 10 LTG Points

    R3 10 C 10 SPARE

    Y3 10 C 10 SPARE

    B3 10 C 10 SPARE

    RYB3 30 C 10 SPARE

    Distibution Board: SB-HTL-XX-1 Typical 32 Guestroom

  • 7/28/2019 Power Calculation (r1)

    16/21

    B4 40 C 10 SPARE

    RYB2 100A TP C 100A,100mA Split Bar Feeder 2R1 40 C 10 GR1

    Y1 40 C 10 GR2

    B1 40 C 10 GR3

    R2 40 C 10 GR4

    Y2 40 C 10 GR5

    B2 40 C 10 GR6

    R3 40 C 10 GR7

    Y3 40 C 10 GR8

    B3 40 C 10 GR9

    R4 40 C 10 GR10

    Y4 40 C 10 GR11

    B4 40 C 10 SPARE

    R5 SPARE

    RYB3 100A TP C 100A,100mA Split Bar Feeder 2R1 40 C 10 GR1

    Y1 40 C 10 GR2

    B1 40 C 10 GR3

    R2 40 C 10 GR4

    Y2 40 C 10 GR5

    B2 40 C 10 GR6

    R3 40 C 10 GR7

    Y3 40 C 10 GR8

    B3 40 C 10 GR9R4 40 C 10 GR10

    Y4 40 C 10 GR11

    B4 40 C 10 GR12

    R5 SPARE

    Y5 SPARE

    Distribution Board : DB-CB14-1-K1

    DB Main Breaker Size : 400A/400A TPN MCCB

    E th F lt(E/F) P t ti YES

  • 7/28/2019 Power Calculation (r1)

    17/21

    DRAWING: 2601193A/EL/204

    No. Description QtyEstimated

    powerTotal power D.F.

    Small power & lighting

    1 Lighting point 20 35 700 1

    2 General 13A SSO usage 25 250 6250 1

    3 Door Chime 1 50 50 1

    Main household equipment 11300 1

    1 Microwave oven 1 2000 2000

    2 Hot plate & hood 1 2500 2500

    3 Washing machine 1 1500 1500

    4 Refrigerator 1 300 300

    5 Water heater 2 2500 5000

    A/C 2200 1

    1 1 hp 1 950 950

    2 1.5 hp 1 1250 1250

    3 2 hp 2500 0

    Sub total power

    group d.f.

    Total major power

    Current (A)- Single phase

    MCB-2P

    No. Description QtyEstimated

    powerTotal power D.F.

    Estimated electrical load for 2 Bed-room

    Estimated electrical load for 4 Bed-room

  • 7/28/2019 Power Calculation (r1)

    18/21

    31 80 25 40 250 9,450

    LOW ZONE L22 TO L31

    2 Nos 4bed + 1 no 3bed+ 1 no (2+1)bed 23 80,058 0.8 64,046

    3 Nos 4bed + 1 no 3bed+ 1 no (2+1)bed 24 80,058 0.8 64,046

    4 Nos 4bed + 1 no 3bed+ 1 no (2+1)bed 25 80,058 0.8 64,046

    5 Nos 4bed + 1 no 3bed+ 1 no (2+1)bed 26 80,058 0.8 64,046

    256,186

    2 Nos 4bed + 1 no 3bed+ 1 no (2+1)bed 27 80,058 0.8 64,046

    2 Nos 4bed + 1 no 3bed+ 1 no (2+1)bed 28 80,058 0.8 64,046

    1 Nos 4bed + 2 no 3bed+ 1 no (2+1)bed 29 73,815 0.8 59,052

    1 Nos 4bed + 2 no 3bed+ 1 no (2+1)bed 30 73,815 0.8 59,052

    1 Nos 4bed + 2 no 3bed+ 1 no (2+1)bed 31 73,815 0.8 59,052

    305,249

    2 Nos 4bed + 2 nos 3bed+ 1 no 2 bed 23 92,358 0.8 73,886

    2 Nos 4bed + 2 nos 3bed+ 1 no 2 bed 24 92,358 0.8 73,886

    2 Nos 4bed + 2 nos 3bed+ 1 no 2 bed 25 92,358 0.8 73,886

    2 N 4b d 2 3b d 1 2 b d 26 92 358 0 8 73 886

    ResiL23-L26

    (1)

    Total L23 to L26

    ResiL27-L31

    (1)

    Total L27 to L31

    siL23-

    L26(2)

    ASSUMP

    No. Description Level

    Connected

    Load

    (W)

    Diversity

    factor Max Demand load(W) .

  • 7/28/2019 Power Calculation (r1)

    19/21

    Resi Common 32Mz 9,416

    Resi Common 33 7,560

    Resi Common 34 7,560

    Resi Common 35 7,560

    Resi Common 36 7,560

    Resi Common 37 7,560

    Resi Common 38 7,560

    Resi Common 39 7,560

    Resi Common 40 7,560Resi Common 41 7,560

    Resi Common 42 5,224

    Resi Common 43 6,960

    Resi Common 44 4,168

    Resi Common 45 4,008

    Resi Common 46 4,008

    Resi Common Roof 1,120

    126,000

    No Description Level

    Demand

    Load1

    (KW)

    Amp

    (A)-pf=0.85

    MCB/

    ISOL.

    FAF-RES-32-1a & 1bRES- 32 1.39 2.4 20

    FAF-RES-32-2RES- 32 1.39 2.4 20

    FAF-RES-32-3RES- 32 4 6.8 20

    FAF-RES-44-1 (VSD)RES-44 7.5 12.7 30

    FAF-RES-46-1a & 1b/1RES-46 0.12 0.61 20

    FAF-RES-46-2RES-46 0.28 1.43 20

    FAF-RES-48-1(VSD/1RES-Roof 8.89 15.1 30

    SBE-RES-32M-MV

    SBE-RES-ROOF-MV

    CommonRe

    siL32-Roof

    POWER REQUIREMENT MECHANICAL VENTILATION

    Total L32 to Roof

  • 7/28/2019 Power Calculation (r1)

    20/21

    4 SB-RES-FAC (Facilities) 73.5 124.8 200

    5 SPARE 100

    Sub Total P (KW) 1915.0

    IN-COMINGMSB-RES-B1-1

    Group D.F =0.81532.0 2601.4 1600

    No. Description

    Demand

    Load

    (KW)

    Amp

    (A)-pf=0.85

    MCB/

    MCCB

    (A)

    1 Isol. Ejector Pump 80.0 135.8 200

    2 Isol. Water Sump Pump 40.0 67.9 100

    3 Isol. Water Sump Pump 40.0 67.9 100

    4 Isol. Base. MV 88.2 149.8 200

    5 Isol. Base. MV 88.2 149.8 200

    6 SPARE 63

    Sub Total P (KW) 336.4

    IN-COMINGESB-RES-B1-1

    Group D.F =0.8269.1 457.0 500

    No. Description

    Demand

    Load

    (KW)

    Amp

    (A)-pf=0.85

    MCB/

    MCCB

    (A)

    SB-RES-B1-FAC

    ESB-RES-B1-1

  • 7/28/2019 Power Calculation (r1)

    21/21