Mr. Nutdhapun Ngernbumroong ENSOL Company Limited Potential of Energy Efficiency in Thai Petrochemical and Food Processing Industry www.efficiency-from-germany.info

Potential of Energy Efficiency in Thai Petrochemical and ... · PDF filePotential of Energy Efficiency in Thai Petrochemical and Food Processing Industry ... Energy Efficiency and

  • Upload
    hanhu

  • View
    218

  • Download
    1

Embed Size (px)

Citation preview

Mr. Nutdhapun Ngernbumroong

ENSOL Company Limited

Potential of Energy Efficiency in Thai

Petrochemical and Food Processing Industry

www.efficiency-from-germany.info

Sustainable in Energy Efficiency

Save Energy and Resources Reduce CO2 Emission

Save Cost

Knowledge Transfer

CSR Energy Management

Varieties of Business Services and Segmentation

Innovative Project

Development

Energy Saving

New Energy

Feasibility

Study Design

Project

Management

Main

Contractor Operator Maintenance Service

s

Power generation by energy source

Current Energy Efficiency Situation in Thailand

Ranking of Electricity Consumption Food

Iron and Steel

Cement

Glass

Textile

Electronics

Plastic

Chemical

Automotive

Process Improvement Technologies

Type of Industry SEC(MJ/Ton)

Electricity Thermal Total

1. Production, processing and preservation of meat, fish, fruit, vegetables, oils and fats

Processing and preservation of meat, fish, fruit, vegetables, oils and fats

1.1. Processing and preserving of fruit and vegetables 1,760 1,040 2,800

1.2. Production, processing and preserving of meat and meat products

1,200 580 1,780

1.3. Processing and preserving of fish and fish products 4,040 1,480 5,520

Cool Room

1.5. Cool room for preserving of fruit and vegetables 480 - 480

1.6. Cool room for preserving of fish and fish products 890 - 890

1.7. Cool room for preserving of meat and meat products 525 - 525

2. Ice-making Industry

2.1 Ice Pack 300 - 300

2.2 Ice Tube 370 - 370

3. Canned Food Product Industry 3.1. Canned fish and fish products (Canned Tuna and Canned Mckerel)

480 2,420 2,900

3.2 Canned fruit and vegetables 1,000 6,500 7,500 3.3 Sealed package of fruit and vegetables juices 240 1,260 1,500 3.4 Canned pineapple and pineapple juice 260 1,430 1,690

Analysis about Overall Energy Consumption

Sub-sector 2006 2007 2008 2009 2010

Food and Beverages 6,779 7,123 7,294 7,282 7,222

28.9% 30.3% 30.1% 30.6% 28.6%

Textiles 948 1,191 997 863 783

4.0% 5.1% 4.1% 3.6% 3.1%

Wood and Furniture 192 212 196 197 231

0.8% 0.9% 0.8% 0.8% 0.9%

Paper 814 1,348 2,081 1,836 386

3.5% 5.7% 8.6% 7.7% 1.5%

Chemical 2,509 2,689 2,059 2,439 4,037

10.7% 11.4% 8.5% 10.2% 16.0%

Non-Metallic 7,461 7,171 7,928 7,406 7,787

31.8% 30.5% 32.8% 31.1% 30.8%

Basic Metal 1,287 938 1,024 1,030 1,503

5.5% 4.0% 4.2% 4.3% 6.0%

Fabricated Metal 1,557 1,644 1,598 1,244 1,503

6.6% 7.0% 6.6% 5.2% 5.9%

Others (Unclassified) 1,895 1,220 1,018 1,501 1,829

8.1% 5.2% 4.2% 6.3% 7.2%

Total 23,442 23,536 24,195 23,798 25,281

100.0% 100.0% 100.0% 100.0% 100.0%

Characteristics

Energy consumption proportion

Petrochemical Industry

Plastic Resins

Synthetic Fibers

Synthetic Rubbers

Surface Coating Materials

Various Types of Adhesives

Energy Consumption in Thailand’s Petrochemical Industry

Petrochemical Industry

Audited Plants (%)

Energy Use (Ktoe)

Year 2005 (%) Year 2006 (%)

Upstream 100 2,172 68.91 2,186 64.4

8

Intermediate 43 213 6.76 475 14.0

1

Downstream 32 768 24.33 729 21.5

Total 3,152 100 3,390 100

Energy Conservation potential

House Keeping and Energy

Management

High Efficiency Equipment

Process Improvement

House Keeping and EnMs

• Energy Management by all participation

• Energy Management conform to ENCON Act

• ISO 50001

• ASEAN energy management standard

High Efficiency Equipment and Process

improvement

• Petro Chemical

• Focus on Major Equipment in facilities (Boiler,

Compressor, Chiller and Etc)

• Need Technology expert and Proven

technology on process improvement

• High Qualification and Quality in Human

Resource

High Efficiency Equipment and Process

improvement

• Food Industry

Measure/Program - Results and Plan

Main components Results 2003 - 2008 Plan in Progress

• Modify the law -- Use different measures/criteria for public / private buildings -- Issue Energy Management Standards -- Issues new building codes for each type of buildings (Hotel, Office, Hospital, Department store)

•Overall compliance rate of 84% •1,964 Designated Buildings

- PRE appointed 93% - EC Report 92% - T&P submitted 82%

3,313 Designated Factories - PRE appointed 86% - EC Report % - T&P submitted 69%

•Appointment of Energy manager (PRE)

•Implementing Energy Management System

•Submission of EM report annually

• Monitoring and Evaluating for better improvements

•Enforce only large energy consuming buildings and factories (over 1 MW peak)

Law and Regulation

Description Future Plan

Revolving Fund Program

Low interest loan for Energy Efficiency via financial institutes • Less than 4% interest • Loan period of 7 years with one year grace period • Up to 50 million baht (1.3 milion USD)

• Support over 240 EE/RE projects • Total investment around 500 million USD – of 150 million USD of Government’s Revolving Fund • Energy savings of 120 million USD per year.

Secured additonal 60 million USD of budget Long term Plan •Reduce DEDE roles on Funding Sources – providing more technical assistance • More co-financing from the banks • Training banking officers on EE technical knowledge

Results - 8

Measure/Program - Results and Plan

Description Future Plan

ESCO Fund Program

Co-investment fund with private sector/investors • Equity Investment • Venture Capital • Equipment Leasing • Carbon Credit Trading • Technical Assistance • Credit Guarantee Facility

• Set up the Fund (initial budget of 15 million USD • Selected 2 Fund Managers - Energy Conservation of Thailand Foundation - Energy for Environment Foundation

Promoting and Marketing the Fund • Support at least 20 projects • Leverage minimum of 50 million USD • Energy Savings of 10 million USD Long term Plan • Increase the Fund to 100 to 200 million USD • Corporatise the program to be Investment Company • Open for private investors

Results 8

Measure/Program - Results and Plan

• Approved 17 projects for the total investment of 125 million USD. The investment from ESCO Fund is around 8.8 million USD with generating energy saving around 14

million USD /year

Curriculum Results 2002-2008 Future Plan

EE Training and Capacity Building

General courses PRE Senior PRE

Specialized Courses - Energy Management - Energy Audit

- Energy Efficiency in Major Systems such as airconditioning, lighting, heating, etc

- Energy Efficiency in Specific groups of industries (e.g. Textile, paper, Cement, etc.0

Cooperate with Vocational Study Department to add EE study in regular curriculum

•Trained over 4,000 PREs •Trained 250 Senior PREs •Trained over 15,000 people in other courses •Added 4 EE courses in vocational study • Train 40 college teachers to deliver EE course

•Train over 12engineers and building operators •Over 10,000 students attend EE courses every year

Next Step •DEDE develop Curriculums and allow private sectors to deliver the courses and charge trainees •Train 500 vocational school teachers all over the country

Measure/Program - Results and Plan

Main Components Results 2002-2008 Future plan

Cooperative Efforts for Energy Conservation

• On-siteTechnical Assistance to embed Sustainableenergy management system in facilities • Establish EC Team and assess energy situation •Identify EE opportunities •Implement EE Projects •M&E

• implemented over 3,000 facilities including • 1250 Designated factories Metallic FoodChemical Textile • 600 Designated buildings hospitals, hotels • over 1200 SMEs • energy savings 80 million USD/ y Housekeeping, Low cost

measures)

Implement in over 600buildings and factories •saving million baht per year Long term plan • Cost Sharing between government and private sector •Develop Energy Management Standards as Ministerial Orders

Measure/Program - Results and Plan

Various ways to provide information and consultation

Results 2002 - 2008

Future Plan

Information and Knowledge Dissemination

•EE Display Center • display over 54 EE technologies for building industry and residential sector • EE Demonstration houses • Energy Conservation building

•EE and RE Knowledge center

•Center of Data and Information concerning EE and RE development •Compile EE/RE data for planning and evaluation •Disseminate information through internet web-based

•Over 20 0 people have used the services •Completion of EE Display Center

•Develop Thailand EE/RE Knowledge Network

Measure/Program - Results and Plan

•EE Cliniques •EE One Stop Service •EE Consulting Centers and Branches

Energy Efficiency and Renewable Energy

PROJECT: Privilege of Tax-Exempt to the Revenue Department for equipment affected energy saving project

CLIENT:

PROJECT LOCATION:

DEDE

Thailand

SCOPE OF WORK

PROJECT COST

PROJECT PERIOD

200 Million Bath

15 month

Provided the project public relation, audited the proposal documents, analyzed saving budget before and after equipment changing, prepared proving documents.

Details information of production and energy usage of more than 150 factories in our databases with the plant sizes from the large enterprises (P&G, True Corp., Seagate, etc) to small players (ice factory, printing factory, cold storage, etc.)

Benefits &Values

Renewable Energy

PROJECT: Tesco Lotus Amata Green Store Pre Feasibility Study on Efficiency Initiative & Renewable Energy

CLIENT:

PROJECT LOCATION:

Tesco Lotus

Pre-feasibility Study, Technology and Investment Consultancy

Thailand, Amata Nakorn, Chonburi

SCOPE OF WORK

• Give consultancy and recommendations Incorporated with Tesco construction & Energy team and designer on Renewable Energy item e.g. Roof Top Solar Cell, 8 x Wind Turbine s, Solar cooling system by Solar parabolic trough • Completed pre-feasibilities study that contain of technology, investment, financial (savings, IRR, RCOI, payback) as well as carbon emission reduction plan

Works Description

PROJECT COST

170 MB

PICTURE

PROJECT PERIOD

6 Months

Renewable Energy

PROJECT: Hybrid Wind Farm 50 kW with diesel generator at MonLan Chiang Mai by DEDE, under Ministry of Energy

CLIENT:

PROJECT LOCATION:

DEDE, Ministry of Energy

Engineering, Procurement and Construction (EPC)

Thailand, Chiang Mai, A. Prao, Doi Mon Lan

SCOPE OF WORK

• Wind farm 50kW hybrid with diesel generation design backing up with battery storage to form the reference grid for 30 households in off grid area • Project planning, purchasing, construction, installation, supervision, commissioning, opearation & monitoring • Wind farm and hybrid operation training

Works

Description

PROJECT COST

18 MB

PROJECT PERIOD

12 Months

Energy Efficiency and Renewable Energy

PROJECT: Development of Energy Personnel by Energy Successful Case

CLIENT:

PROJECT LOCATION:

DEDE

Development programs , Training approach & Management Consultant

Thailand

SCOPE OF WORK

Benefits &Values

PROJECT COST

9 MB

PROJECT PERIOD 2008 – 2009

Details information of the contact persons of more than 800 factories in our databases over 3 industries (Ceramic, Automotive and Electronic) in large and SME enterprises

Energy Efficiency and Renewable Energy

PROJECT: Self-sufficient of Energy with Bio-diesel

CLIENT:

PROJECT LOCATION:

DEDE

Selected capability village to demonstrate and train about Bio-diesel producing together with standard oil quality checking

Thailand

SCOPE OF WORK

PROJECT COST 15 MB

PICTURE

PROJECT PERIOD 12 MB

Benefits &Values Details information of the contact persons of more than 150 communities in our databases over northern region

Energy Efficiency and Renewable Energy

PROJECT: PARTICIPATORY ENERGY CONSERVATION IN DESINGNATED FACTORY PROJECT ( 6 PROJECTS)

CLIENT:

PROJECT LOCATION:

DEDE

ENERGY CONSERVATION & MANAGEMENT CONSULTANT

Thailand

SCOPE OF WORK

PROJECT COST 78.5 MB

PROJECT PERIOD 2004 – 2009 (Total 275 Factories)

Details information of the contact persons and productions including energy usage of 275 factories in our databases over the large till SME enterprises

Benefits &Values

Energy Efficiency and Renewable Energy

PROJECT: Performance Assessment and Bio-gas plant improvement project

CLIENT:

PROJECT LOCATION:

DEDE

Existing Bio-gas plant study, performance assessment and details improvement plan

Thailand

SCOPE OF WORK

Details information of production facilities and contact persons of over 150 factories who have availability waste to produce Bio-gas in various industries especially Ethanol plant, Palm oil, food and beverage industries)

PROJECT COST 15 Mil Baht

PROJECT PERIOD 15 Months

Benefits &Values

Energy Efficiency and Renewable Energy

PROJECT: Solar Thermal project

CLIENT:

PROJECT LOCATION:

DEDE

Consultancy services for feasibility study, design development and pre-approval for government subsidy

Thailand

SCOPE OF WORK

- Feasibility study for all grant applications submitted to DEDE - Design development and issue for tender - Pre-approval for government subsidy and handover certification

PROJECT PERIOD 2008 - 2010 (24 Months)

SCOPE OF SERVICE

Training and Seminar Provider

PROJECT: Training for In-house and Customize Training Course

Provide Training course for Client as in-house course and providing for DEDE training department. Provide Material for training, seminar and PR

SCOPE OF SERVICE

Thank You

ENSOL COMPANY LIMITED The Pann Building, 7th Floor, 125 Khlong Lam Chiak Road, Nawamin, Bueng kum, Bangkok 10230, Thailand Telephone +66 (0) 2943-9633 to 35 Fax : +66 (0) 2943-9636 Website : www.ensol.co.th E-mail : [email protected] [email protected] [email protected]