The BAMB project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 642384. #BuildingCircular Potential of BAMB’s Reversible Building Design Tools for the future of sustainable procurement Elma Durmisevic Dr. Research leader Universityof Twente/4D architects

Potential of BAMB’s Reversible Building Design …...Building Design Tools for the future of sustainable procurement Elma Durmisevic Dr. Research leader Universityof Twente/4D architects

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Potential of BAMB’s Reversible Building Design …...Building Design Tools for the future of sustainable procurement Elma Durmisevic Dr. Research leader Universityof Twente/4D architects

The BAMB project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 642384.

#BuildingCircular

Potential of BAMB’s Reversible Building Design Tools for the future of sustainable procurementElma DurmisevicDr. Research leaderUniversityof Twente/4D architects

Page 2: Potential of BAMB’s Reversible Building Design …...Building Design Tools for the future of sustainable procurement Elma Durmisevic Dr. Research leader Universityof Twente/4D architects

The BAMB project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 642384.

#BuildingCircular

Reversible B u i l d i n g D e s i g nD i m e n s i o n s

THREE INDICATORS OF REVERSIBLE BUILDINGTranslated into key design requirements for the circular procurement

Page 3: Potential of BAMB’s Reversible Building Design …...Building Design Tools for the future of sustainable procurement Elma Durmisevic Dr. Research leader Universityof Twente/4D architects

The BAMB project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 642384.

#BuildingCircular

Reconfigure structureSeparate materials

Spatial ReversibilityTechnical Reversibility

REVERSIBLE BUILDING DESIGN protocol

Virtual simulator Tool

Transformation capacity Tool _ building level

Reuse potential Tool _ product levelReversible B u i l d i n g D e s i g nT o o l k i t

Adapt

Reuse

Page 4: Potential of BAMB’s Reversible Building Design …...Building Design Tools for the future of sustainable procurement Elma Durmisevic Dr. Research leader Universityof Twente/4D architects

The BAMB project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 642384.

#BuildingCircular

Low reversibility High reversibility

Reuse

• Material

• Components

• Systems

1 Fixed structure 2 Partly reversible 3 Reversible structure

Procurement and assessment of impact level of Reversible / Circular Building Design

Adapt ReuseAdapt Reuse Adapt

ReversibleB u i l d i n gR e u s e Po t e n t i a l

space

structure

material

Disassembly DisassemblyDisassembly

space

structure

material space

structure

material

Page 5: Potential of BAMB’s Reversible Building Design …...Building Design Tools for the future of sustainable procurement Elma Durmisevic Dr. Research leader Universityof Twente/4D architects

The BAMB project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 642384.

#BuildingCircular79

Indicators of

reuse options

Direct Reuse ReparationRe

ConfigurationRe

Manufacture UpgradabilityDimensional Adjustability

tolerance

Spatial capacityDYMENSIONALstandardization

REUSE TRANSFORMATION

reuse options

independence exchangeability

Indicators of reuse potential technical reversibilityReversibleB u i l d i n gR e u s e Po t e n t i a l

Functional dependency Technical dependency Physical dependency

Page 6: Potential of BAMB’s Reversible Building Design …...Building Design Tools for the future of sustainable procurement Elma Durmisevic Dr. Research leader Universityof Twente/4D architects

The BAMB project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 642384.

#BuildingCircular

Reuse potential floor = 0,48

Reuse options: Direct reusereconfiguration, upgrading

Dr. Elma Durmisevc,BAMB program/research leader of Reversible Building Design groupUniversity of Twente/ founder GTB lab & GDC SGDF

ReversibleB u i l d i n gR e u s e Po t e n t i a l

Procurement and reuse potential assessment and impact level

Page 7: Potential of BAMB’s Reversible Building Design …...Building Design Tools for the future of sustainable procurement Elma Durmisevic Dr. Research leader Universityof Twente/4D architects

The BAMB project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 642384.

#BuildingCircular

81

Digitalizationof Indicators for of circular procurement /construction of reversible building structure

Number and type of relations

Connection typologies

Page 8: Potential of BAMB’s Reversible Building Design …...Building Design Tools for the future of sustainable procurement Elma Durmisevic Dr. Research leader Universityof Twente/4D architects

The BAMB project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 642384.

#BuildingCircular

3 categories of reversible structures vs impact indicators

Irreversible (1) if RP indicates that a system has RP < than 0,3 these systems

will be characterised as irreversible and the end of life options = recycling/down cycling.

Partly reversible (2) If system has RP> 0,3 and RP < 0,6 end of life options =

repair, direct reuse and remanufacturing.

Reversible (3) if system has RP > 0,6 this would mean that besides direct

reuse and repair of its parts the system can be reconfigured and upgraded and its dimensions adjusted to fit new requirement.

Page 9: Potential of BAMB’s Reversible Building Design …...Building Design Tools for the future of sustainable procurement Elma Durmisevic Dr. Research leader Universityof Twente/4D architects

The BAMB project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 642384.

#BuildingCircular83

INDICATORS OF TRANSFORMATION on building level

Transformation potential building 0,9

Input from RP

ReversibleB u i l d i n gT r a n s f o rm a t i o n C a p a c i t y

Page 10: Potential of BAMB’s Reversible Building Design …...Building Design Tools for the future of sustainable procurement Elma Durmisevic Dr. Research leader Universityof Twente/4D architects

The BAMB project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 642384.

#BuildingCircular

Transformation by(20% core and 20% Substantial Demolition other) and replacement/reconfiguration

Direct use or transformation by addition of removable products

Transformation by disassembly, andReplacement / reconfiguration

Transformation byPartial Demolition (0% core/LB structure, 10% other) and replacement/reconfiguration

Transformation byMajor Demolition (60% core and 40%other) and replacement/reconfiguration

0,9 spatial and technical Transformation 0,9 0,6 restriction in spatial and tech 0,4 0,2

office smaal

house big

extendshrink/replace

cell office

meeting office

open officehouse office school cell

officemeeting

officeopen office

office smaal

house big

extendshrink/replace

Page 11: Potential of BAMB’s Reversible Building Design …...Building Design Tools for the future of sustainable procurement Elma Durmisevic Dr. Research leader Universityof Twente/4D architects

The BAMB project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 642384.

#BuildingCircular

ContactName: Elma Durmisevic E-mail: [email protected]: +31 (0)6 2900 8667