Jakarta, 15 November 2011
INDONESIAN POWERS & ELECTRICITY EXPO 2011
POTENCY OF POWER SUPPLY POTENCY OF POWER SUPPLY POTENCY OF POWER SUPPLY POTENCY OF POWER SUPPLY
DEVELOPMENT ON DOMESTIC DEVELOPMENT ON DOMESTIC DEVELOPMENT ON DOMESTIC DEVELOPMENT ON DOMESTIC
CAPABILITY ORIONTATIONCAPABILITY ORIONTATIONCAPABILITY ORIONTATIONCAPABILITY ORIONTATION
DIRECTOR OF PLANNING AND RISK MANAGEMENT
REALIZATION AND PROJECTION OF POWER (2011-2020)
-
50,000
100,000
150,000
200,000
250,000
300,000
350,000
Indonesia
Jawa-Bali
Indonesia Barat
Indonesia Timur
Realization Projection
Indonesia Electricity needs predicted to grow averagely 8,46% per annum (Jawa-
Bali 7.8%, West Indonesia 10,2% and East Indonesia 10,8%)
328 TWh
241 TWh
55 TWh
31 TWh
1
Sumber : RUPTL
4,676
10,788 15,246
17,307 19,411
21,505 23,211 25,290
28,231 31,676
1,083
2,375
3,158
4,992
8,807
13,205
17,219
19,449
20,859
21,834
-
10,000
20,000
30,000
40,000
50,000
60,000
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Kumulatif IPP
Kumulatif PLN
DEVELOPMENT OF PLANT CAPACITY (2011 – 2020)
• Increasing plant until year 2020 by 53.509 MW
(PLN 31.676 MW and IPP 21.834MW)
• Average plants increase around 5.400 MW/year
MW
22
Sumber : RUPTL
DEVELOPMENT OF ELECTRICITY PRIMARY SYSTEM OF PLN YEAR 2012
Domestic Industry Opportunity
4
� To Support National Economy Growth 7 % required electricity growth around 8-10 %
� In line with RUPTL (General Plan of Power Supply) 2011 - 2020, then in 2012 PLN will build
among others:
1. Power Plants Additional Plan : 6.113 MW
2. Line
System 150 kV 6.889 kms
System 70 kV 74 kms
System 500 kV 172 kms
Total 8.035 kms
3. GI with Transformer by
500/150 kV 1.830 MVA
275/150 kV 2.500 MVA
150/70 kV 60 MVA
150/20 kV 11.470 MVA
70/20 kV 570 MVA
4. Distribution
TM Line 18.573 kms
TR Line 21.080 kms
Distribusi
Transformer
3 .721 MVA
6
QUALIFICATION OF THE ELECTRICTY PROJECT IMPLEMENTER PLN needs Capable Implementer in Finance, Technique and Experience
Qualification of
Finance
Criteria
o Total Asset : equal to project value
o Net profit : sufficient for working
capital
±±±±20% of project value
o Healthy and bankable balance sheet
o Offer price < HPS
POLICY
So the National contractor could
build his basic capacity,thus:
o Foreign constructor imposed to
collaborate with National
Contractor
o Contractor could make consortium
with strong financial company
o Could make consortium with
proven manufacturer
o Has experience as partner/sub
contractor of foreign company
Accredited and or Combined
Experience
o Can have Partnership with Design
Institute in engineering field
o For APLN and APBN Fund Source
provided to Domestic Preference
Qualification of
Technique
CRITERIA
o Supplied machine base on
international standard
o The equipment has been proven
o Offered machine has been operated
successfully for 2 years.
o Has standard QA/QC and
technically accepted by PLN
Qualification of
Experience
CRITERIA
o Has ever designing similar project/
a project with compatible
complexity Eengineering Design
o Has done similar project/a project
with compatible complexity
(Construction Experience)
7
EPC
Contractor
Transportation
Services Industry
Construction Services
Industry
Manufacturing Services
Industry
Repair shop
Industry
Engineering
Services Industry
Certification
Services Industry
Finance and
Banking Services
Industry
Primary Energy
Supplier Industry
STAKEHOLDER OF ELECTRICITY PRIMARY SYSTEM DEVELOPMENT The role of Industry in National electricity Development
PLN SUPPORTS TKDN POLICY TKDN
PLN has conducted TKDN policy on the project 10.000 MW Phase I in line with
National Policy on Domestic Product Utilization (Up-to-date Policy; Regulation of
Ministry of Industry no. 48/M-IND/PER/4/2010):
Sumber: Lampiran Permen Perindustrian
No. 48/M-IND/PER/4/2010
Domestic Industry Product and Primary System Equipment Appririate Used
For PLN Electricity System:
a. Material for Main Distribution (MDU)
All (100%) local product, which are :
� Transformer of Distribution 20/0,4 kV
� TM cable
� TR cable
� Kwh meter + MCB (electronic, elektromechanic, prepaid)
� Isolator
b. Material for Main Transmission (MTU)
Local product used among others consist of :
� Pole for Tower Base
� Steel Structure / Tower TT
� Cable
� Conductor 300 mm
DOMESTIC PRODUCT HAS BEEN PROVEN
PRODUCTS ALREADY DOMESTICALLY PRODUCE HAVE TO USEDuring CDA: PLN appoints third party to verified the products domestically produced and recorded in the
vendor list prohibeted to import
PLN TRUST ON THE NATIONAL EPC CONTRACTORS PLN manages National Contractor gradually
10
NO CONTRACTOR PLTU PROJECT
1 PT Hutama KaryaPLTU Ampana 2X3 MW
PLTU Kendari 1X10 MW
2 PT Twink Indonesia dan Perfect Circle Eng PLTU Sumbawa Barat 2X7 MW
3 PT Amarta-Tehate PLTU Alor 2X3 MW
4 PT Zug PLTU Rote 2X3 MW
5 PT Adhi Karya PLTU Sintang 3X7 MW
6 PT Citicon-Weltes PLTU Kota Baru 2X7 MW
7 PT Indokomas-PT Buana Perkasa- Jiangxi PLTU Berau 2X7 MW
8 PT PAL + Waskita Karya PLTU Malinau 2X3 MW
9 Truba Jaya Engineering PLTU Buntok 2X7 MW
10 PT Adhi Karya dan PT KMN PLTU Tanjung selor 2X7 MW
11 PT Wijaya Karya PLTU Ketapang 2X7 MW
12 PT Mega Eltra-PT Sakti Mas Mulia PLTU Bau-Bau 2X10 MW
National EPC Contractor That Implements Small scale PLTU projects (has been trusted to
carry out Total EPC Turnkey Project of Small PLTU) , among others:
CONSTRUCTION SERVICES
Several National EPC Contractor have been trusted by Bank as IPP Developer
CAPABILITY IMPROVEMENT OF NATIONAL EPC CONTRUCTOR
11
NO CONTRUCTOR Remark
1 PT. Rekadaya Industri Total EPC, Design Institute (foreign)
2 PT. Adhi Karya Total EPC, Design Institute (foreign)
3 PT. Wijaya Karya Total EPC, Design Institute (asing)
4 PT. Poeser Indonesia Total EPC, Design Institute (asing)
5 PT. Truba Jaya Engineering Total EPC, Design Institute (asing)
NO Contractor Strategic Partnership Land Improvement
1 PT. Rekayasa Industri CNTIC Project management & Engineering
2 PT. Truba Jurong Engineering Chengda Engineering Project Management & Erection
3 PT. Dalle Energie Dongfang Project Management
4 PT. Penta Adi Samudera Sinomach Project Management
5 PT. Maxima Infrastruktur Shanghai Electric Project Management & Erection
6 PT. Priamanaya Djan International Zeland SDN BHD Project Management & Engineering
7 PT. Cahaya Mulia Energi Konstruksi
dan PT. Bajragraha Sentranusa
CNTIC dan Shanghai Electric Project Management
8 PT. Mitra Selaras Hutama Energi Harbin Power Engineering Project Management
National EPC Contractor That Capable of Construct PLTU 100 MW
National EPC Contractor Kontraktor EPC Nasional dalam proses Capability Improvement
untuk mampu membangun PLTU s.d 660 MW
Implementer of Transmission and Distribution Project All national contractor
12
1 PT Modaco
2 PT BBS
3 PT Areva/Multifab
4 PT Bukaka Teknik Utama
5 PT Perfect Circle Eng
6 KSO (Joint Operation) PT Metaepsi-
Dalima Raya
7 PT Mega Eltra
8 KSO (Joint Operation) Ratu Pola-
Perfect Elektro
9 PT Modern Surya Jaya
10 KSO (Joint Operation) Citramasjaya-
Wahanayasa
..... dll.
National EPC Contractor That Carries Out PLN Line:
CONSULTING SERVICES OPPORTUNITY
13
Consultation Services
For project funded by APLN all consultant, start from Basic Design, Design Review and
Construction Supervision handled by National Consultant, among others :
i. PT PLN PUSENLIS
ii. PT PLN-E
iii. PT Rekadaya Elektrika
iv. PT PLN JMK
and National Consultant supported by Overseas Consultant, among others :
i. PT Connusa Energindo
ii. PT Kwarsa Hexagon
iii. PT Arkonin Engineering Manggala Pratama
iv. PT Tata Guna Patria
v. PT Jaya CM