8
INSTALLATION FOR BEARING POT BEARING Alignment & preparation of concrete box-out 1. Before casting of the headstock, use template c/w wooden pads taped onto the 50mm x 100mm pvc pipe to form the box-out (recesses) for the bottom cast on anchorage. 2. The dimension of the cast in dowels would be as indicated in Herlcules drawings. The box-out diameter will provide at least 15mm tolerance for the alignment of the cast anchorage.

Pot Bearing Intsallation Feb 11

Embed Size (px)

Citation preview

Page 1: Pot Bearing Intsallation Feb 11

INSTALLATION FOR BEARING

POT BEARING

Alignment & preparation of concrete box-out

1. Before casting of the headstock, use template c/w wooden pads taped onto the 50mm x 100mm

pvc pipe to form the box-out (recesses) for the bottom cast on anchorage.

2. The dimension of the cast in dowels would be as indicated in Herlcules drawings. The box-out

diameter will provide at least 15mm tolerance for the alignment of the cast anchorage.

Page 2: Pot Bearing Intsallation Feb 11

3. Setting out of the box out be checked and confirmed by the QA Engineer prior to positioning

installation.

4. The box out and concrete surface area where the bearing is to be positioned should be cleaned

and roughened prior to positioning installation

5. Position the bearing such that the cast in anchorages are contained in the concrete.

Page 3: Pot Bearing Intsallation Feb 11

GROUTING OF BOTTOM PLINTHS (POT BEARING-FIXED)

1. Form a pool or bottom plinth using timber formwork. Ensure the dimensions of plinth are

50mm all round large then the bearing base plate.

2. Reconfirm the alignment and the level of the beam thence bearing; grout the box out then bed

the bearing plinth in one operation.

3. Grouting was carried out using the hose feeding in from only one side to the other sides of the

bearing to ensure all air is expelled from the beneath the steel plate

4. Pouring should be slow and constant until the grout level on all side of bearing approximate

5mm above the soffit of the bearing base plate. This is to allow the settlement of the grout.

Pre-installing the pot bearing before grouting the bottom plinth.

Unloading the sikagrout-215 and pressure pump equipments

Page 4: Pot Bearing Intsallation Feb 11

Delivered the equipments to the top of headstock

Setup for the pressure pump & clean the surface of grout area

Insert the hose feeding to the bottom of bearing.

Page 5: Pot Bearing Intsallation Feb 11

Pump the sika-grout slow and constant and prevent idling, the grout must be continuous

The grout shall 5mm above the soffit of bearing plate to prevent settlement of grout.

Leveling the mortar grout to get desire

surface and level.

Page 6: Pot Bearing Intsallation Feb 11

GROUT FOR ELASTOMERIC BEARING (FREE FLOW TYPE)

Box out the bottom plinth using timber formwork. Ensure the dimensions of plinth are 50mm all round

large then the bearing base plate.

After mixing, stir lightly with a spatula for a few seconds to

release any entrapped air. The grout is then poured immediately

into the prepared formwork.

The mix ratio for pourable with 4.0 liter per pack of 25kg Sikagrout-215

Page 7: Pot Bearing Intsallation Feb 11

Placing the grout over the form work and maintain a continuous flow throughout to avoid interruption

Leveling to desired level and expelled the entrapped air

Final product of mortar bedding for

free flow bearing

HACKING EXISTING

CONCRETE (ABUTMENT A&B)

Page 8: Pot Bearing Intsallation Feb 11

Completed hacking work. Pending for water proofing work for the inner side of abutment wall.

1000mm Concrete to

be hacked