23
Postponement How to respond to demands for – Customized products – Rapid delivery – Competitive prices in the face of short product lifecycles.

Postponement How to respond to demands for –Customized products –Rapid delivery –Competitive prices in the face of short product lifecycles

Embed Size (px)

Citation preview

Page 1: Postponement How to respond to demands for –Customized products –Rapid delivery –Competitive prices in the face of short product lifecycles

Postponement

How to respond to demands for– Customized products– Rapid delivery– Competitive prices

in the face of short product lifecycles.

Page 2: Postponement How to respond to demands for –Customized products –Rapid delivery –Competitive prices in the face of short product lifecycles

The Issues

• To provide rapid delivery need to have – capacity to make to order quickly or– inventory of finished goods

• Capacity means high capital costs

• Inventory is expensive because customization means many skus.

Page 3: Postponement How to respond to demands for –Customized products –Rapid delivery –Competitive prices in the face of short product lifecycles

Example

Auto manufacturers could cut 2 weeks out of delivery time by

• building many small assembly plants with capacity to meet regional demand. Why don’t they do this?

• Positioning inventory of finished vehicles closer to the customers. What are the consequences of this?

Page 4: Postponement How to respond to demands for –Customized products –Rapid delivery –Competitive prices in the face of short product lifecycles

Other dangers from Inventory

• Extends time to market– Guess what products customers will want– Poor forecasts of demand volumes– Slower to bring new technologies to market– Obsolescence

Page 5: Postponement How to respond to demands for –Customized products –Rapid delivery –Competitive prices in the face of short product lifecycles

The Third Way

• Modular design with postponement– Modular design

• reduces the cost of customization

– Postponement• delays the investment in customization

Page 6: Postponement How to respond to demands for –Customized products –Rapid delivery –Competitive prices in the face of short product lifecycles

Consequences• Aggregate forecasts for majority of product

• Detailed forecasts are restricted to customization modules

• Investment in customization is delayed so component forecasts are short

• Customization capacity needs are reduced -- limited to adding customization modules not building the entire product

Page 7: Postponement How to respond to demands for –Customized products –Rapid delivery –Competitive prices in the face of short product lifecycles

Opportunities

• Move customization closer to customer– What are the tradeoffs?

Page 8: Postponement How to respond to demands for –Customized products –Rapid delivery –Competitive prices in the face of short product lifecycles

Apple imac

• 5 Colors. Built to forecast. – Indigo– Ruby– Sage– Graphite– Snow

Page 9: Postponement How to respond to demands for –Customized products –Rapid delivery –Competitive prices in the face of short product lifecycles

Compaq

• Special panels user can apply to change color of the computer at home

Page 10: Postponement How to respond to demands for –Customized products –Rapid delivery –Competitive prices in the face of short product lifecycles

Milliken Carpet

• Before– Dozen Bases– Several Gun Bars– Change overs from Base to Base– Change overs from Gun Bar to Gun Bar– Down time on expensive printer

Page 11: Postponement How to respond to demands for –Customized products –Rapid delivery –Competitive prices in the face of short product lifecycles

Milliken Carpet

• After– 1 (or 2) bases– 1 gun bar– Changeover from one product to next requires

seconds – No down time

Page 12: Postponement How to respond to demands for –Customized products –Rapid delivery –Competitive prices in the face of short product lifecycles

What’s Involved

• Product Design

• Manufacturing Process

• Supply chain design

Page 13: Postponement How to respond to demands for –Customized products –Rapid delivery –Competitive prices in the face of short product lifecycles

Modular Design

• Standardize Components

• Identify and postpone non-standard ones

• Simultaneous assembly of different modules reduces critical path

• Localize problems and re-design efforts

Page 14: Postponement How to respond to demands for –Customized products –Rapid delivery –Competitive prices in the face of short product lifecycles

Power Supply

• Option 1: More expensive supply that can convert voltage

• Example: HP LaserJet– Manufactured in Japan and shipped to the

world.– Change to a versatile power supply saved 5%

on cost to manufacture, stock and deliver

Page 15: Postponement How to respond to demands for –Customized products –Rapid delivery –Competitive prices in the face of short product lifecycles

Power Supply• Option 2: More specialized supplies that cannot

convert voltage installed late.

• Example: HP Deskjet– Made in Singapore– Designed with country specific external power

supply– Shipped to Stuttgart

• where power supply is purchased and added• adds manuals and packing material

Page 16: Postponement How to respond to demands for –Customized products –Rapid delivery –Competitive prices in the face of short product lifecycles

Consequences

• Higher manufacturing costs

• Bottom line: 25% lower manufacturing, shipping and inventory costs.

• Where did the savings come from?

Page 17: Postponement How to respond to demands for –Customized products –Rapid delivery –Competitive prices in the face of short product lifecycles

Trade-offs

• Increased cost of materials and perhaps manufacturing

• Savings in inventory depend on:– Variability and uncertainty in demand– lead time to markets and from suppliers– life cycle– ...

Page 18: Postponement How to respond to demands for –Customized products –Rapid delivery –Competitive prices in the face of short product lifecycles

Conflicting Objectives

• Marketing: every possible product option

• R & D: most functionality at lowest cost

• Manufacturing: Few products and stable volumes

• Resolution should be system wide view

Page 19: Postponement How to respond to demands for –Customized products –Rapid delivery –Competitive prices in the face of short product lifecycles

Example

• Generic Deskjet for Mac and PC rather than two models– What were the arguments

Page 20: Postponement How to respond to demands for –Customized products –Rapid delivery –Competitive prices in the face of short product lifecycles

Manuals and Information

• Printer manuals can be printed in several languages

• Software versions make this even simpler

• Pharmaceutical products require country-specific labels: – dosing info and warnings must be in local language– country specific information– what to do?

Page 21: Postponement How to respond to demands for –Customized products –Rapid delivery –Competitive prices in the face of short product lifecycles

Home Depot Paint

Mix and Add the Colors to Order

• What are the benefits and costs?

Page 22: Postponement How to respond to demands for –Customized products –Rapid delivery –Competitive prices in the face of short product lifecycles

Re-sequencing

• Traditional Clothing manufacture– Dye the yarn– Knit with the dyed yarn

• Benetton– Knit with grey yarn– Dye the sweaters

• Trade-offs?

Page 23: Postponement How to respond to demands for –Customized products –Rapid delivery –Competitive prices in the face of short product lifecycles

Standardization

• HP Disk drives– Add customer-specific driver boards– Test (time consuming)

• Revised process to – Test drive– Insert customer-specific boards– Test board

• Trade-offs?