HENDRA PERMANA ST., Project Field Engineer; QA/QC No. 35, Kebon Sirih Street, RT. 02/RW. 01, Babakan Ciamis, Sumur Bandung, Bandung 40117, West Java, Indonesia. HP. (+62) 0823 8729 8363 Porto Folio Heavy Concrete Light Civil Work Steel Work & Structure Painting & Blasting Mechanical Electrical Piping ICT HVAC Inspection, Testing Commissioning Controling Oil & gas

Porto Folio HP39

Embed Size (px)

Citation preview

Page 1: Porto Folio HP39

HENDRA PERMANA ST., Project Field Engineer; QA/QC

No. 35, Kebon Sirih Street, RT. 02/RW. 01, Babakan Ciamis, Sumur Bandung, Bandung 40117, West Java,

Indonesia. HP. (+62) 0823 8729 8363

Porto Folio

Heavy Concrete Light Civil Work

Steel Work & Structure Painting & Blasting

Mechanical Electrical Piping

ICT HVAC

Inspection, Testing Commissioning

Controling Oil & gas

Page 2: Porto Folio HP39

Construction of Jetty for PT. Oiltanking Karimun, Teluk Paku, May 2013 – Dec 2014.

Tank Storage Prefabrication at PT. Oiltanking– Karimun 2015

Page 3: Porto Folio HP39

Pipeline, Pipe Sleeper Foundation and Painting at Teluk Paku, 2015-2016

Batching Plant Manufacturing & Production, 2013-2015

Page 4: Porto Folio HP39

Gorgon Project, PT. Saipem Indonesia 2014

Page 5: Porto Folio HP39

Heli Landing at PT. Saipem Indonesia – Karimun 2011- 2012

Gantry Crane for Automatic blasting and Prefabrication at PT. Saipem Indonesia – Karimun 2011- 2012

Page 6: Porto Folio HP39

Automatic blasting and Prefabrication at PT. Saipem Indonesia – Karimun 2011- 2012

Page 7: Porto Folio HP39

Gas Storage for Prefabrication at PT. Saipem Indonesia – Karimun 2011- 2012

Pump Station at Saipem Indonesia Karimun, 2011- 2012

Page 8: Porto Folio HP39

Boundary Wall Part II at PT. Saipem Indonesia – Karimun 2011- 2012

Steel Structure Erection of Automatic blasting and Prefabrication at PT. Saipem Indonesia – Karimun 2011- 2012

Page 9: Porto Folio HP39

Precast Wall Installation at PT. Saipem Indonesia – Karimun 2012

Steel Structure Assembly Hall PT. Saipem Indonesia – Karimun 2011-2012

Page 10: Porto Folio HP39

Hull Steel Structure at Karimun Sembawang Shipyard

Storm Water Flood Drain and pavement at Saipem Indonesia, Karimun 2010

Page 11: Porto Folio HP39

Mechanical and Electrical for 4 Dormitory at Saipem Indonesia Karimun April 4, 2011 till November 3, 2012

Boundary Wall and Fence Installation at Saipem Indonesia, 2012

Page 12: Porto Folio HP39

Ruko at Tj. Balai Karimun 2010

Galvanis Handrail for stairs at dormitory house

Page 13: Porto Folio HP39

Client’s house at Tj. Balai Karimun 2016

32.5m high Mosque Tower at Tj. Balai Karimun 2015

Page 14: Porto Folio HP39

Sekupang- Batam, Additional Ferry Terminal Section II, 2015

HDPE Pipe, Batam 2015-2016

Page 15: Porto Folio HP39

Arsitecture , Building and Renovation Work at Batam, Bandung 2015-2016

Page 16: Porto Folio HP39

Construction, Steel Erection & Mechanical Electrical: “IPD Jempol, Bandar Serting, Daerah Jempol, Negeri Sembilan Darul Khusus untuk tetuan Polis Diraja Malaysia” Complex of buildings for Office Police States (Maincont. Namfatt Sdn. Bhd). 2009

12 Unit Semi-D Factory and Warehouse at Bukit Jelutong Electrical, Telephone and Mechanical Services, Malaysia 2008

Page 17: Porto Folio HP39

1380 unit Low Cost Housing in Kinrara,Kuala Lumpur Electrical, ICT and Mechanical Services, Malaysia 2008

Page 18: Porto Folio HP39
Page 19: Porto Folio HP39
Page 20: Porto Folio HP39

Site Facilities Layout

Page 21: Porto Folio HP39

Earth Control Measures

Page 22: Porto Folio HP39

• Excavation

• Pile Caps

• Sub Structure

• Super Structure

• Architectural Works

• External Works

• M&E works

• T&C

Construction Sequence of Works for one Building

Typical RC Work Sequence

Page 23: Porto Folio HP39

Typical RC Work Sequence

Schematic RC Work Sequence: ADMN Building

Page 24: Porto Folio HP39

Programme Of Works

Page 25: Porto Folio HP39

Critical Activities for Program • Piling works completion – ECC remedial

• M&E equipment order & delivery

• Shop Drawings submissions & approvals

• Substation works & power on

• Roof Steel Structure

• NSC works

• Testing & commissioning

Construction Criticality & Approach • Completing all the Buildings concurrently poses challenge.

• This is resolved by planning to have 4 different Subcontractors for RC works based on the Quantum of works.

Construction Criticality – Resources Distribution

Page 26: Porto Folio HP39

Proposed Organization Chart (Tender Submission)

Page 27: Porto Folio HP39

Other Project: • Jetty at Mentangon-Moro Island and Bertam, Batam Island 2015 • Office for Mosque “Baiturrahman” at Teluk Air, Tj. Balai 2015 • 20 unit Warehouse at Grand Niaga Mas , Batam 2014 • 40 Unit Bukit Golf Indah-Batam 2014 • Container Renovation for Office Container/ Housing, Batam 2009, 2012, 2015 • Fresh Water Piping line using Reversis Osmosis System at Bukit Galang, Custom RI, Tj.

Balai 2015 • Fresh Water Piping line using Reversis Osmosis System at Pulau Merak, Custom RI, Tj.

Balai 2015 • Production hollow Block, Paving and Kerb with PT. Link Pangestu Utama 2009-2010 • Steel Erection, Light Civil & Mechanical Electrical: “Cadangan membina dan menyiapkan

3 block Pangsapuri LTAT Bukit Jalil, Mukim Peraling, Kuala Lumpur untuk Tetuan Lembaga Tabungan Angkatan Tentara” Apartment 18 floors (Maincont. PKNS),2008 .

• Steel Erection, Construction & Mechanical Electrical: “Cadangan membina dan menyiapkan Banjaria Court Pangsapuri kos sederhana 13, 15, 16 & 18 tingkat (704 Units) Bandar Selayang Daerah Gombak Selangor Darul Ehsan untuk tetuan Perbadanan,2008. Kemajuan Negeri Selangor” Apartement (Maincont. Namfatt Sdn. Bhd.).

• Steel Erection & Mechanical Electrical: “Cadangan Pembangunan Pasukan Gerakan AM, Simpang Renggam, Johor untuk tetuan Polis Diraja Malaysia” Special Police Base (Maincont. Isyoda Sdn. Bhd),2008.

• Mechanical Electrical: Bustduct Electrical System at Telecom Malaysia – Cyberjaya, Selangor Darul Ehsan. (Maincont. Telecom Malaysia), 2008.

• Heavy Concrete & Steel Erection: Cadangan Pembangunan Lembaga Kemajuan Ikan Malaysia, Selangor DarulEhsan, Gantry Crane Workshop (Maincont. Alshem Bena Sdn. Bhd),2008.

• Etc

References: • Mr. Helmi Som, Mr. Steven Goh, Oiltanking Gmbh ltd, Singapore. • Mr. Dies Den Engelsen, Marine Operations Manager at McConnell Dowell SEA, Singapore. • Mr. Suresh Nair, Mr. Samsu Hendra, McConnell Dowell SEA, Singapore. • Mr. Benardy Nasution, Mr. Mohd. Yacoob, PT. McConnell Dowell Indonesia. • Mr. Guiliano Ferreti, Construction Department Manager, PT. Saipem Indonesia . • Mr. Edi Jones, Package Manager, PT. Saipem Indonesia –Karimun, Indonesia. • Mr. Rudy Bokslag, Vice Director, PT. Multi Adverindo, Indonesia. • Mr. Halim Wirawan, Director, PT. Link Pangestu Utama, Batam, Indonesia. • Mr. Sarkunan a/l Letchimanan, Gen. Manager Syarikat Kejuruteraan Electric KRIS TIGA,

Shah Alam, Malaysia. • Encik Mohd. Fairuz bin Mohd. Otsman, Operation Manager Syarikat Kejuruteraan Electric

KRIS TIGA, Shah Alam, Malaysia. • Mr. John Lee, Project Manager Namfatt Sdn. Bhd, Shah Alam, Malaysia • Mr. Drs. Mohammad Najib M Eng.; HOD Pusdiklat PT. Krakatau Steel, Cilegon, Banten,

Indonesia. • Mr. Ir. Agus Triwahyono, M.Sc.; Directur PT. Tritunggal Duta Konsultan, Serang, Banten,

Indonesia. • Mr. Ir. H. Martiono Muhammad, Msc; HOD of Technology, BPIS, Jakarta. Indonesia.

Page 28: Porto Folio HP39

With Bachelor Degree in Industrial Engineering, UNISBA BANDUNG. I have more than 15 years’ work experiences and have knowledge in QMS, ITP, TPM, TQM, ISO 14001, ISO 9001:2000 Internal Auditors based to ISO 19011, ISO 9002, and Six Sigma Methodology which are mostly used for process improvements through elimination of variation in the process. Task Activity (Man, Material, Machine, Methods and Money), industrial Engineering methodology, to improve process towards better quality, faster lead time, and at lower cost through waste (non value added activities) elimination. MRP (Material Resource Planning), ERP (Enterprise Resource Planning), specifically in establishing system accuracy, Bill of Material accuracy among process specifications.

Construction knowledge, in Batching Plant (Production & Operation, ITP), Earthworks, Concrete Design, Foundation Design, Reinforcement Rebar, Light/Heavy Concrete, Formwork Design, Lifting, Quay-Wall and Jetty. Mechanical, knowledge in Piping, transmission, bearing, electrohydraulic, alignment. Hydraulic, lubrication, balancing, pneumatic and vibration, Electrical knowledge in ICT, HVAC, Pre Commissioning & Commissioning. Strong in Inspection, Testing & Commissioning. Excellent in Site works execution. Safety Work and Enviroment oriented Other knowledge is computer techonology as well.

Page 29: Porto Folio HP39

KEY COMPETENCIES • TPM, TQM, ISO 14001, ISO 9001:2000, ISO 19011, ISO 9002, and Six Sigma Methodology

Value, Task Activity (Man, Material, Machine, Methods And Money), Kanban, visual Control, Poka yoke, Change Management, Kaizen & 5S.

• MRP (Material Resource Planning), ERP (Enterprise Resource Planning), BOM (Bill of Material).

• Earthwork, Concrete Design, Foundation Design, Reinforcement Rebar, Light/Heavy Concrete, Formwork Design and Lifting.

• Mechanical Engineering, Transmission, Bearing, Electro hydraulic, Alignment. Hydraulic, Lubrication, Balancing, Pneumatic and Vibration.

• Industrial Engineering, Manufacturing, Continuous Improvement, Supply Chain Management • Mechanical Electrical & Instrument, HVAC. • QMS (Quality Management System). Quality Assurance & Quality Control. • Manufacturing & Batching Plant Operational and Procedures. • Fabrication, Installation & Assembly Machine & Steel Structure. • Product Costing, Capacity and Productivity Analysis, Time Study Analysis and Capacity

Planning. • Languages: Command of spoken/written in Indonesia, Malaysia and English. • Inspection, Testing and Commissioning • Site works execution.

OTHER PROFESSIONAL COURSE ATTENDED (*= THE CERTIFICATES WAS MISSING WHEN FLOOD TRAGEDY AT JAKARTA DECEMBER 2003)

• McConnell Dowell Management System Induction, McConnell Dowell, November 2014. • Blasting and Painting Technology Course, PT. McConnell Dowell Indonesia – PT. Hempel,

April 2014. • Basic First Aid Training, PT. McConnell Dowell Indonesia, November 2013. • Hydronav Services Training, PT. McConnell Dowell, October 2013 • Autoblasting & Painting Machnine Installation PT. Saipem-ABS Ltd, Singapore 2012 • Lifting Operations and lifting equipment Regulations (LOLER) PT. SAIPEM, Karimun

November 2011. • Safety Observation Training, PT. SAIPEM, August 2010. • Programmed of Mechanical Engineering Training at Center of Education & Training PT.

Krakatau Steel, 2004. • Programmed of Operation Management & Maintenance SYSTEM (POMMS), PSIK-IIP,

Jakarta 2003.* • Training for Trainer Management Training, PSIK Jakarta 2002.* • Programmed of Safety Work & High Crash Building, BRI Towers, Bandung 2001.* • Programmed of Disasters Management, Search And Rescue, Bandung 2000.* • Programmed of Green Management System ISO 1400, FT Unisba Bandung 1999.* • Programmed of ISO 9001 & 9002, Quality Control, BPIS-LPPM Jakarta 1998.* • Programmed of 5R & Auditor 5R (Housekeeping Management), PT. Pindad-BPIS, 1997. Etc