Portland Bureau of Transportation
Resource and FTE Summary
FY 2012-13 Adopted
FY 2013-14 Base
FY 2013-14 Reductions
FY 2013-14 Add Packages
FY 2013-14 Requested
GF Ongoing $7,481,599 $7,061,725 $0 $784,637 $7,846,362GF One-Time $120,000 - - $120,000 $120,000GF Overhead - - - - -Bureau’s Choice - - - - -Other Revenues $332,154,935 $234,191,164 ($5,000,614) $1,275,000 $230,465,550Total Revenues
$339,756,534 $241,252,889 ($5,000,614) $2,179,637 $238,431,912
FTE 745.17 737.65 (19.00) 5.00 723.65
Bureau Overview and Significant Issues The Portland Bureau of Transportation (PBOT) is the steward of the city’s transportation system and a community partner in shaping a livable city. The Bureau plans, builds, manages and maintains an effective and safe transportation system that provides access and mobility. Portland is a national leader in safe, efficient and sustainable transportation solutions. PBOT employs more than 700 people at the Portland Building downtown, its maintenance facility in Lower Albina and the Sunderland Yard recycling facility in Northeast Portland. The Bureau delivers its services through five groups: Office of the Director, System Management, Maintenance, Development and Capital Program, and Engineering and Technical Services. PBOT’s business plan guides the annual budget process and links the Bureau’s work to the Portland Plan. The business plan is developed to set priorities, and establish action items, outcomes and performance measures. PBOT receives funding from the”gas tax” (a combination of motor fuels taxes, weight-mile tax and vehicle titling and registration fees), grants, other City agencies, parking garages and meters, fees and the City general fund. In addition, bonds are sold to finance transportation projects. Funds are spent in two budgets: the operating budget and the capital budget. The operating budget includes costs to plan, manage and maintain the existing transportation system, and the capital budget includes costs to construct new elements of the system. Transportation funding is in a state of crisis nationwide, and the PBOT revenue picture is complicated. Each of the Bureau’s revenue sources brings its own variables, restrictions and trend line. Revenue streams are increasingly inadequate to meet basic maintenance obligations, much less burgeoning community desire for new assets, e.g., transit, sidewalks, accessible crossings and bikeways. Historically, the federal government has funded most transportation investments. All signs suggest that the federal government is significantly divesting from a leadership role. As a result, cities will be obliged to maintain and expand their transportation networks with their own resources to retain economic competitiveness and community vitality.
Management Data Commissioner in Charge: Charlie Hales Bureau Director: Toby Widmer Website: www.portlandoregon.gov/transportation Administration: 5% M/W/ESB Contract: 37.5% Prime & 46.55% Sub
Workforce Data Minorities: 17.89% Female: 25.81% Non-Represented: 21.4% Span of Control: 8.8 positions per supervisor Management Layers: 1 to 4
Performance Dashboard
Operating and Capital Requirements
FY 2011-12 Actuals
FY 2012-13 Adopted
FY 2013-14 Base
FY 2013-14 Request
FY 2014-15 Estimate
Operating - Base $115,679,161 $166,115,081 $190,985,825 $189,994,848 $195,694,700 Operating - One-Time Initiatives $170,000 $120,000 - $120,000 - Capital - New Construction $85,805,540 $172,492,235 $49,237,846 $47,687,846* $29,217,463 Capital - Major Maintenance $4,734,827 $1,029,218 $1,029,218 $629,218* $629,218 Unappropriated Ending Balance $30,721,573 - - - - Total $237,111,101 $339,756,534 $241,252,889 $238,431,912 $225,541,381
*GTR is 21.5% of total CIP. GTR carryover $1.7M; GTR ongoing $2.5M; GTR One Time $6M; Fees/Rates/IA’s $3.5M; Grants, $25.2M; Other $9.2M
Overview of Major Projects and Initiatives
NE Marine Dr. repaving: Grinding off old pavement and repaving miles of lanes for a critical transportation link and high-crash corridor means effective asset management and prioritizing maintenance work where safety warrants. NE 12th Ave. bridge over I-84: Low-cost redesign and signal modernization closes a gap in the bikeway network and increases freight mobility for nearby industry. Central Loop streetcar expansion: Portland leads the nation in a streetcar renaissance. The Central Loop nearly doubles the existing system, puts Made in Oregon streetcars on city streets and has already encouraged more than $900 million in development along the tracks. Statewide Transportation Improvement Program (STIP): The bureau is pursuing grant funds to enhance the transportation system and improve safety of the system. Projects include all modes: freight, transit, pedestrian and bicycling. If awarded, funds will be available in FY 16-17. Financial Task Force: The FY 2012-13 budget directed PBOT to empanel a committee to propose alternative revenue streams for transportation funding. The report concluded that PBOT lacks sufficient funding to meet its mission and that the structure of transportation funding is antiquated, unstable and in need of an overhaul. Several funding strategies were proposed within the report, available online at www.portlandoregon.gov/transportation/article/428067
Major Asset Managed – Example of Bridges
BRIDGES 5 Years Ago Current 5 Years From Now Percent Very Good/Good Condition 58% 48% 41%Percent in Fair Condition 22% 33% 44%Percent in Very Poor/Poor Condition 20% 19% 15%Unmet need (resources needed to maintain asset at fair or better condition)
$136.9M $126.7M $153M
Replacement Value Total $398.7M $378.5M $457M
FINANCIAL SERVICESPrincipal Fin Anlst (1.0 R)
100% GTR
FY 2013-14 Requested BudgetBureau of TransportationOffice of the Director 2/15/2013
APPLICATION DEV / BUS ANALYSISPrin IS Anlst-Gen (1.0 R) – Vacant)100% GTRSr Bus Sys Anlst (1.0 R)100% GTRAppl Anlst IV-Gen (2.0 R)100% GTR
MAPPING & GISGIS Tech III (1.0 R)100% GTRGIS Tech II (2.0 R)100% GTRGIS Tech II (1.0 R)25% GTRGIS Tech II (1.0 R) - Vacant100% GTR
INFORMATION MGMTSr Program Mgr (1.0 R)
100% GTR
Fin Anlst (1.0 R)100% GTRAsst Fin Anlst (1.0 R)100% GTRAsst Fin Anlst (1.0 R) – Vacant100% GTRAcct I (2.0 R)100% GTRAcct I (1.0 R) – Vacant100% GTR
Sr Fin Anlst (2.0 R)100% GTRFin Anlst (2.0 R)100% GTR
ASSET MANAGEMENTPrin Mgmt Anlst (1.0 R)
100% GTR
OPERATIONSBusiness Ops Mgr (1.0 R)
100% GTR
Timekpg Spec (4.0 R)100% GTR
HR SUPPORTAdmin Asst (1.0 R)100% GTRSr Admin Spec (1.0 R)100% GTRTimekeeping Spec (1.0 R)100% GTR
PAYROLLAdmin Supv II (1.0 R)
100% GTR
FINANCIAL PLANNING & ANALYSIS
Bus Ops Supv (1.0 R)100% GTR
FINANCIAL ACCOUNTINGBus Ops Supv (1.0 R)
100% GTR
Transportation Director (1.0 R)100% GTR
LOSS CONTROL / TRAININGSafety&Risk Officer II (1.0 R)
100% GTR
RIsk Spec (1.0 R)100% GTR
CENTERS & CORRIDORSSr City Planner-TRA (1.0 R)1 – 6% GTRSr City Planner-TRAM (1.0 R)80% GTRCity Planner II-TRN (1.0 R)1 – 5% GTR
POLICY & SYSTEMSTrans Plng Coord (1.0 R)75% GTRSr City Planner-TRA (2.0 R)1 – 80% GTR1 – 5% GTRCity Planner II-TRN (1.0 R)1 – 7% GTR
Exec Asst (1.0 R)100% GTR
TRANSPORTATION PLANNINGTrans Planning Mgr (1.0 R)
100% GTR
BUSINESS SERVICESSenior Business Ops Mgr (1.0 R)
100% GTR
Prin IS Anlst-Gen (1.0 R)100% GTRAppl Anlst IV-Gen (1.0 R)100% GTRAppl Anlst III-Gen (4.0 R)100% GTR
BUREAU OF TECH SERVICES IS Manager (1.0 R)
100% GTR
General Transportation Revenue (GTR) is primarily State Highway Fund revenues (comprised of motor fuels tax, vehicle titling and registration fees, and weight-mile tax imposed on trucks) and City parking revenues.
Non-GTR funding includes intergovernmental revenues from federal, state, and local sources, interagency revenues from other City funds and bureaus, and cost recovery revenues (service charges, licenses, and permits.)
COMMUNICATIONS & PUBLIC AFFAIRSAsst to Bureau Director (1.0 R) – Vacant100% GTRSr Cmty Outrch & Info Rep (2.0 R)100% GTRGraphic Designer II (1.0 R)100% GTR
CONTRACTS & PROCUREMENTSr Mmgt Anlst (2.0 R)100% GTR
Trans Devl & Engr Svcs Grp Mgr (1.0 R)100% GTR
Engr-TRAF (1.0 R)<4% GTREngr Tech III (1.0 R)<4% GTREngr Tech II (1.0 R)<4% GTREngr Tech II (1.0 R) –Vacant <4% GTREngr Tech I (1.0 R)<4% GTRSr City Plnr-LNDU(1.0 R) <4% GTRCity Plnr II-LNDU(1.0 R) <4% GTR
DEVELOPMENT SERVICES Principal Engineer (1.0 R)
<70% GTR
ROW Agt III (3.0 R)<2% GTRROW Agt II (3.0 R)<2% GTRROW Agt I (1.0 R) <2% GTR
STREET SYSTEMS / UTILITIES MGMT
Dev Svcs Mgr (1.0 R)<25% GTR
Engr Tech III (1.0 R)<4% GTR
Engr Tech III (1.0 R)<4% GTREngr Tech II (1.0 R)<4% GTREngr Tech I (1.0 R) –Vacant <4% GTR
Engr-CIV (1.0 R)<20% GTRSr Engr Assoc-CIV (2.0 R) <20% GTREngr Tech I (1.0 R)<20% GTR
Engr Tech III (1.0 R)<4% GTREngr Tech II (2.0 R)<4% GTRSr PW Insp (1.0 R) –Vacant)<4% GTRPW Insp (5.0 R)<4% GTR
Dev Svc Tech III (1.0 R ) <4% GTREngr Tech I (3.5 R)<4% GTR
OSS II (1.0 R)100% GTR
Cap Proj Mgr III (1.0 R)<50% GTRCap Proj Mgr II (1.0 R)<4% GTRCap Proj Mgr I (3.0 R)<4% GTR
Senior Engr (1.0 R)<4% GTRCap Proj Mgr II (3.0 R)2 – <4% GTR1 – <9% GTROSS III (1.0 R)100% GTR
Strcar Ops Supv (3.0 R)<41% GTRStrcar Ops Supv (1.0 R) –Vacant <41% GTRStreetcar Officer (1.0 R)<41% GTRStreetcar Officer (1.0 R) –Vacant <41% GTR
Streetcar Mnt Supv (3.0 R)<41% GTRUW I (4.0 R)<41% GTRUW I (1.0 R) – Vacant<41% GTR
SYSTEM DEV CHARGE/TRAM
Dev Spv II (1.0 R)0% GTR
PERMIT PROCESS PW Permit Engr Mgr(1.0 R) <30% GTR
PERMIT ENGRSenior Engr (1.0 R)
<20% GTR
CENTRAL BUSINESS DIST
Dev Supv I (1.0 R)<30% GTR
DEV & BLDG PLAN REVIEW
Supv Engr (1.0 R)<30% GTR
ROW ACQUISITIONROW Acq Spv (1.0 R)
<30% GTR
STREETCAR MAINTStrcar Mnt Mgr (1.0 R)
<41% GTR
STREETCAR OPS/SAFETY
Strcar Ops Mgr (1.0 R)<41% GTR
Admin Asst (1.0 R)100% GTR
Cap Proj Mgr III (2.0 R)1 – < 30% GTR 1 – <34% GTR
PROJECT CONTROLSCap Proj Control Mgr (1.0 R)
<50% GTR
CAPITAL PROJECTSCap Program Mgr (1.0 R)
<50% GTR
TRAN MGMT SUPPORTAdmin Supv I (1.0 R)
100% GTR
General Transportation Revenue (GTR) is primarily State Highway Fund revenues (comprised of motor fuels tax, vehicle titling and registration fees, and weight-mile tax imposed on trucks) and City parking revenues.
Non-GTR funding includes intergovernmental revenues from federal, state, and local sources, interagency revenues from other City funds and bureaus, and cost recovery revenues (service charges, licenses, and permits.)
FY 2013-14 Requested BudgetBureau of TransportationDevelopment & Capital Program 2/15/2013
CAD Tech III (1.0 R) – Vacant100% GTREngr Tech II (2.0 R)100% GTREngr Tech I (1.0 R)100% GTREngr Tech I (1.0 R) - Vacant100% GTR
Chief Engineer (1.0 R)100% GTR
Sr Engr Assoc-CIV (2.0 R)<10% GTRCap Proj Mgr II (1.0 R)<10% GTRCAD Tech II (1.0 R)<10% GTR
Engr-BRDGE (2.0 R)1 – 100% GTR1 – <7% GTRSr Engr Assoc-STR (1.0 R) <22% GTR
SURVEYEngr Survey Mgr (1.0 R)
100% GTR
Surveyor II (2.0 R) <2% GTRSurveyor II (1.0 R) –Vacant <2% GTRSurveyor I (6.0 R) <2% GTRSurvey Aide II (8.0 R) <2% GTRMap Data Tech II (1.0 R) <2% GTRMap Data Tech I (1.0 R) <2% GTRSurvey Proj Sup Tech(1.0 R) <2% GTR
CONSTR, INSP & PAVEMENT Principal Engr (1.0 R)
100% GTR
Sr PW Insp (3.0 R)<2%GTRPW Insp (3.0 R)<2%GTR
Material QC Spec (1.0 R) <40%GTREngr Tech II (4.0 R)<2%GTREngr Tech I(1.0 R)<2%GTR
Engr-Traffic (3.0 R)1 – <30% GTR1 – <35% GTR1 – <75% GTRSr Eng Assoc-Traf (2.0 R)1 – <20% GTR1 – <45% GTRL & S Inspector (1.0 R)<2% GTREngr Tech II (2.0 R)1 – <75% GTR1 – <40% GTRGIS Tech II (1.0 R)<30% GTR
Electrician (8.0 R)<90% GTRAEO I (5.0 R)<90% GTR
Cap Proj Mgr II (1.0 R)<65% GTRMgmt Analyst (1.0 R)100% GTR
SIGNALS & ST LIGHTSPrincipal Engr (1.0 R)
100% GTR
Sr Engr Assoc-CIV (2.0 R)<10% GTRCap Proj Mgr II (1.0 R)<10% GTREngr Assoc-CIV (1.0 R)<10% GTRCAD Tech II (1.0 R)<10% GTR
Engineer-CIV (1.0 R)<10% GTRSr Engr Assoc-CIV (1.0 R)<10% GTREngr Tech III (1.0 R)<10% GTRCAD Tech II (1.0 R)<10% GTR
CIVIL DESIGNSupv Engr (1.0 R)
100% GTR
CAD Anlyst (1.0 R)100% GTR
S&SL Tech (1.0 R)<90% GTRElectrician (2.0 R)<90% GTRElect Tech II - Traf Signal (3.0 R)<90% GTR
BRIDGES & STRUCTURES
Supv Engr (1.0 R)<65% GTR
CIVIL DESIGN 1Senior Engr (1.0 R)
<10% GTR
CIVIL DESIGN 2Senior Engr (1.0 R)
<10% GTR
CIVIL DESIGN 3Senior Engr (1.0 R)
<10% GTR
SURVEY FIELD OPSSurvey Supv (1.0 R)
<50% GTR
INSPECTION SVCSPW Insp Supv (1.0 R)
<15%GTR
TECH SERVICESSenior Engr (1.0 R)
<25%GTR
S&SL ENGINEERINGSenior Engr (1.0 R)
<70% GTR
ELECTRICAL MAINTElectrical Supv(1.0 R) – Vacant
100% GTR
SIGNAL MAINTElectrical Supv (1.0 R)
100% GTR
General Transportation Revenue (GTR) is primarily State Highway Fund revenues (comprised of motor fuels tax, vehicle titling and registration fees, and weight-mile tax imposed on trucks) and City parking revenues.
Non-GTR funding includes intergovernmental revenues from federal, state, and local sources, interagency revenues from other City funds and bureaus, and cost recovery revenues (service charges, licenses, and permits.)
FY 2013-14 Requested BudgetBureau of TransportationEngineering Services 2/15/2013
INTELLIGENT TRANS SYSTEMSEngr – Traff (1.0 R)<70% GTR
OSS III (1.0 R)65% GTR
ACTIVE TRANSPORTATIONTrans Div Mgr (1.0 R)
49% GTR
Sr City Plnr -TRA (1.0 R) 14% GTRTDM Spec II (1.5 R)1 FT 15% GTR1 PT 8% GTR TDM Spec I (1.0 R)14% GTRTDM Asst (3.0 R)1 FT 20% GTR1 FT 18% GTR1 PT 6% GTR
PARKING ENFORCEMENTTrans Div Mgr (1.0 R)
100% GTR
Pkg Code Enf Off(15.0 R) 100% GTRPkg Code Enf Off(1.0 R) – Vacant100% GTRPCEO–Abandon Auto (3.0 R) 100% GTRUtil Worker II (1.0 R)100% GTR
Pkg Code Enf Off (31.0 R) 100% GTRPkg Code Enf Off (1.0 R) – Vacant100% GTR
OSS II (3.0 R)100% GTROSS II (1.0 R) –Vacant 100% GTR
PARKING OPERATIONSTrans Div Mgr (1.0 R)
100% GTR
Prog Coord (1.0 R)100% GTREngr Tech II (4.0 R)100% GTREngr Tech II (1.0 R) –Vacant 100% GTREngr Tech I (0.50 R)100% GTREngr Tech I (0.50 R) –Vacant 100% GTR
OPERATIONSPkg Pay Station Anlyst (1.0 R)90% GTRProg Coord (0.50 R)100% GTRMgmt Anlst (1.0 R) –Vacant 100% GTRProg Spec (1.0 R)100% GTRTDM Spec I (1.0 R)100% GTROSS III (1.0 R)95% GTR
Transp System Group Mgr (1.0 R)_ 100% GTR
Engineer-TRAF (2.0 R)6% GTRSr Eng Assoc-TRAF (1.0 R)6% GTRSr Eng Assoc-TRAF (1.0 R) 43% GTRSr Eng Assoc-CIV(1.0 R)6% GTR
Prog Spec (1.5 R)1 FT 0% GTR1 PT 0% GTRTDM Spec II (1.0 R)33% GTRTDM Spec I (2.5 R)1 FT 56% GTR1 FT 25% GTR1 PT 0% GTR
PKG CONTROLPkg Ctrl Mgr (1.0 R)
100% GTR
AT PROGRAMSProg Mgr (1.0 R)
12% GTR
AT OPERATIONSProg Mgr (1.0 R)
35% GTR
AT PROJECTS & FUNDINGTraffic Invest Mgr (1.0 R)
65% GTR
Sr Engr Assoc-Traf (3.0 R)1 – 96% GTR1 – 66% GTR1 – 62% GTREngr Assoc-Civ(2.0 R)1 – 96% GTR1 – 73% GTRAsst Prog Spec(1.0 R)94% GTREngr Tech III (1.0 R)97% GTREngr Tech I (1.0 R)95% GTR
PKG DISPATCHAdmin Supv I (1.0 R)
100% GTR
PKG ENF OPS 2Pkg Enf Supv (1.0 R)
100% GTR
PKG ENF OPS 1Pkg Enf Supv (1.0 R)
100% GTR
PARKING GARAGESProgram Mgr (1.0 R)
0% GTR
Pkg Pay Station Tech (8.0 R)90% GTRPkg Pay Station Tech (1.0 R) –Vacant 90% GTR
Trans Plng Coord (2.0 R)1 – 89% GTR1 – 53% GTREngr-Traffic (1.0 R)10% GTRProg Spec (1.0 R)19% GTRTDM Spec II (0.50 R)26% GTR
PKG METERSPW Supv II (1.0 R)
100% GTR
TRAFFIC DIST OPSSr Engineer (1.0 R)
94% GTR
TRAFFIC DESIGNSupv Engr (1.0 R)
51% GTR
PKG ENF OPS3Pkg Enf Supv (1.0 R) – Vacant 100% GTR
Pkg Code Enf Off (17.5 R) – Vacant 100% GTR
FY 2013-14 Requested BudgetBureau of TransportationTransportation System Management2/15/2013
General Transportation Revenue (GTR) is primarily State Highway Fund revenues (comprised of motor fuels tax, vehicle titling and registration fees, and weight-mile tax imposed on trucks) and City parking revenues.
Non-GTR funding includes intergovernmental revenues from federal, state, and local sources, interagency revenues from other City funds and bureaus, and cost recovery revenues (service charges, licenses, and permits.)
Maintenance Group Mgr (1.0 R)100% GTR
Prin Mgmt Anlst (1.0 R)100% GTRMgmt Asst (1.0 R) –Vacant 100% GTR
AEO II-SWPR (3.0 R)1 – 76% GTR2 – 76% GTR BES I/A AEO I (3.0 R)2 – 76% GTR1 – 76% GTR BES I/AUW II (8.0 R)76% GTR
AEO II-SWPR (5.0 R)76% GTRAEO I (3.0 R)76% GTRUW II (3.0 R)76% GTRUW II (2.0 R) - Vacant76% GTRUW II (1.0 R) (Vacant)76% GTR BES I/A
FLEETAEO I (2.0 R)100% GTR
Storekper III (2.0 R)87% GTRStorekper II (3.0 R) 87% GTR
Svc Disp Lead (1.0 R) 100% GTRSvc Disp (5.0 R)3 FT 100% GTR4 PT 100% GTR
MAINT CONSTRUCTION & OPERATIONSPW Div Mgr (1.0 R)
100% GTR
Admin Asst (1.0 R)100% GTRSidewlk Insp (1.0 R)64% GTR
STORES &PURCHASING
PW Supv II (1.0 R)87% GTR
NIGHT ST CLN & FLEET
PW Supv II (1.0 R) 76% GTR
DAY ST CLN PW Supv II (1.0 R)
76% GTR
STRCT MNT 1PW Supv II 1.0 R)
94% GTR
STRCT MNT 2PW Supv II 1.0 R)
94% GTR
Carpenter (4.0 R)94% GTRConc Fin (1.0 R)94% GTRWelder (1.0 R)94% GTRWelder (1.0 R) –Vacant 94% GTRAEO I (1.0 R)94% GTR
Carpenter (1.0 R)94% GTRConc Fin (1.0 R)94% GTRPainter (1.0 R)94% GTRAEO I (1.0 R)94% GTRUW II (3.0 R)94% GTR
St. Maint Crew Ldr (1.0 R)73% GTRCEO (2.0 R)73% GTRUW II (1.0 R) – Vacant73% GTRStorekper I (1.0 R)73% GTR
FACILITIESGen Mech (2.0 R)97% GTRUWI (2.0 R)97% GTR
SUNDERLAND & FACILITIES
Prog Mgr (1.0 R)73% GTR
Sidewlk Insp (3.0 R) 64% GTRConc Fin (5.0 R)64% GTRAEO I (1.0 R)64% GTRUW II (3.0 R)64% GTRGIS Tech II (1.0 R)64% GTR
SIDEWALK MNT 2PW Supv II (1.0 R)
64% GTR
SIDEWALK MNT 1PW Supv II (1.0 R) –Vacant 64% GTR
Conc Fin (5.0 R)64% GTRCEO (1.0 R)64% GTRAEO I (1.0 R)64% GTRUW II (4.0 R)64% GTR
COMMUNICATIONS& DISPATCH
PW Supv II (.50 R)100% GTR
General Transportation Revenue (GTR) is primarily State Highway Fund revenues (comprised of motor fuels tax, vehicle titling and registration fees, and weight-mile tax imposed on trucks) and City parking revenues.
Non-GTR funding includes intergovernmental revenues from federal, state, and local sources, interagency revenues from other City funds and bureaus, and cost recovery revenues (service charges, licenses, and permits.)
FY 2013-14 Requested BudgetBureau of TransportationMaintenance Construction & Operations 2/15/2013
CS Video Insp (1.0 R) 12% GTRAEO II-SVOP (3.0 R)12% GTRUW II (8.0 R)12% GTR
Maintenance Group Mgr (1.0 R)100% GTR
ENVIRONMENTAL SYSTEMSPW Div Mgr (1.0 R)
100% GTR
CS Video Insp (1.0 R) 12% GTRCS Invest (1.0 R)12% GTRAEO II-SVOP (2.0 R)12% GTRAEO I (1.0 R)12% GTRUW II (7.0 R)12% GTR
Prin Mgmt Anlst (1.0 R)100% GTRMgmt Asst (1.0 R -Vacant 100% GTR
CS Video Insp (1.0 R)12% GTRCS Invest (1.0 R)12% GTRAEO II-SVOP (2.0 R)12% GTRAEO I (1.0 R)12% GTRUW II (8.0 R)12% GTRUW II (1.0 R)12% GTR BES I/A
ES Mt Crew Ldr (1.0 R)10% GTRCS Invest (1.0 R)10% GTRCEO (1.0 R)10% GTRAEO II-SVOP (1.0 R)10% GTRAEO I (1.0 R)10% GTRUW II (5.0 R)10% GTR
ES Mt Crew Ldr (3.0 R) 10% GTRCEO (3.0 R)10% GTRAEO I (3.0 R)10% GTRUW II (7.0 R)10% GTR
ES Mt Crew Ldr (2.0 R) 10% GTRCS Video Insp (2.0 R)10% GTRAEO I (3.0 R)10% GTRUW II (7.0 R)10% GTR
ES Mt Crew Ldr (3.0 R)10% GTRCEO (3.0 R)10% GTRAEO I (3.0 R)10% GTRUW II (6.0 R)10% GTRUW II (1.0 R) – Vacant10% GTR
SWR RPR N/NEPW Supv II (1.0 R)
100% GTR
SWR RPR WPW Supv II (1.0 R)
100% GTR
SWR RPR SE PW Supv II (1.0 R)
100% GTR
STRMWTR MTPW Supv II (1.0 R)
100% GTR
SWR CLN N/NEPW Supv II (1.0 R)
100% GTR
SWR CLN WPW Supv II (1.0 R)
100% GTR
SWR CLN SEPW Supv II (1.0 R)
100% GTR
Util Locator (5.0 R)12% GTROSS II (1.0 R)12% GTR
RAPID DEPLOYMENTPW Supv II (1.0 R)
100% GTR
Env Policy/HazMat Coord (1.0 R)100% GTRAdmin Asst (1.0 R)100% GTRProg Spec (1.0 R) 12 % GTRMt Plnr/Schdlr (2.0 R)1 – 12% GTR1 – 10% GTR
ES Mt Crew Ldr (1.0 R)12% GTRCS Video Insp (1.0 R)12% GTRCEO (1.0 R)12% GTR AEO II-SVOP (1.0 R)12% GTRAEO I (1.0 R)12% GTRUW II (7.0 R)12% GTR
FY 2013-14 Requested BudgetBureau of TransportationMaintenance Operations – Environmental Systems 2/13/2013
General Transportation Revenue (GTR) is primarily State Highway Fund revenues (comprised of motor fuels tax, vehicle titling and registration fees, and weight-mile tax imposed on trucks) and City parking revenues.
Non-GTR funding includes intergovernmental revenues from federal, state, and local sources, interagency revenues from other City funds and bureaus, and cost recovery revenues (service charges, licenses, and permits.)
UTILITY LOCATESPW Supv II (0.5 R)100% GTR
St Maint Crew Ldr (1.0 R)76% GTRCEO (2.0 R)76% GTRCEO (1.0 R) – Vacant 76% GTRAEO II: TRCTR (1.0 R)76% GTR AEO II: SWPR (2.0 R)76% GTRAEO I (5.0 R)76% GTRAEO I (1.0 R) – Vacant 76% GTRASPHLT RKR (2.0 R)76% GTRUW II (3.0 R)76% GTRUW II (1.0 R) – Vacant 76% GTRUW I (2.0 R)76% GTR
Traffic Crew Ldr (4.0 R)75% GTRAEO I (1.0 R) – Vacant 75% GTRUW II (8.0 R)75% GTRUW II (1.0 R) – Vacant 75% GTRSign Maker (1.0 R)75% GTR
Traffic Crew Ldr (3.0 R) 75% GTRAEO I (2.0 R)75% GTRUW II (9.0 R)75% GTR
STREET SYSTEMSPW Div Mgr (1.0 R)
100% GTR
St. Maint Crew Ldr (2.0 R) 76% GTRCEO (2.0 R)76% GTRAEO I (6.0 R)76% GTRASPHLT RKR (3.0 R) 76% GTRUW II (4.0 R)76% GTRUW II (2.0 R) – Vacant 76% GTRUW I (1.0 R)76% GTR
St. Maint Crew Ldr (3.0 R)76% GTRAEO I (1.0 R)76% GTRASPHLT RKR (3.0 R)76% GTRUW II (5.0 R)76% GTRUW II (1.0 R) – Vacant 76% GTRUW I (1.0 R)76% GTR
Admin Asst (1.0 R)100% GTROSS II (2.0 R)100% GTR
GIS Tech II (2.0 R)75% GTRGIS Tech I (1.0 R)75% GTR
St. Maint Crew Ldr (1.0 R) 76% GTRAEO I (2.0 R)76% GTRASPHLT RKR (1.0 R)76% GTRUW II (10.0 R)76% GTRUW I (1.0 R)76% GTR
ST MAINT 1PW Supv II (1.0 R)
76% GTR
ST MAINT 2PW Supv II (1.0 R)
76% GTR
ST MAINT 3PW Supv II (1.0 R)
76% GTR
ST MAINT 4PW Supv II (1,0 R)
76% GTR
TRAF MAINT EASTPW Supv II (1.0 R)
75% GTR
TRAF MAINT WESTPW Supv II (1.0 R)
75% GTR
FLEET & EQUIPProg Coord (1.0 R)
100% GTR
Maintenance Group Mgr (1.0 R)100% GTR
TRAF SIGNS & MARKINGS
Sr Engr (1.0 R)75% GTR
Prin Mgmt Anlst (1.0 R)100% GTRMgmt Asst (1.0 R -Vacant 100% GTR
General Transportation Revenue (GTR) is primarily State Highway Fund revenues (comprised of motor fuels tax, vehicle titling and registration fees, and weight-mile tax imposed on trucks) and City parking revenues.
Non-GTR funding includes intergovernmental revenues from federal, state, and local sources, interagency revenues from other City funds and bureaus, and cost recovery revenues (service charges, licenses, and permits.)
FY 2013-14 Requested BudgetBureau of TransportationMaintenance Operations – Street Systems2/13/2013
B U D G E T H A N D O U T F Y 2 0 1 3 - 1 4
portland bureau of transportation
The Portland Bureau of Transportation (PBOT) is the steward of the city’s right of way and transportation system and a community partner in shaping a livable city. The Bureau plans, builds, manages and maintains an effective and safe transportation system that provides access and mobility. This mission guides PBOT’s every move.
Portland is a national leader in safe, effective and sustainable transportation solutions. The transportation system is an over $8 billion investment in assets that facilitate the movement of people, goods and services within Portland. The Bureau employs more than 700 people at the Portland Building downtown, its maintenance facility in Lower Albina and the Sunderland Recycling Facility in Northeast Portland.
The Bureau’s work is driven by five goals established by its Budget Advisory Committee:
. Improve transportation safety
. Maintain transportation assets
. Enhance public health and community livability
. Support economic vitality
. Operate efficiently and effectively
P B O T B U D G E T H A N D O U T F Y 2 0 1 3 - 1 4 | 2
PBOT FEES + RATES
PBOT BUDGET PROCESS
• Held four Budget Advisory Committee meetings
• Developed budget in tandem with the Business Plan
• Balanced budget over the five-year forecast
• Aligned activities within the Bureau’s five goals
• Followed existing program rankings in prioritizing decision packages
• Directed existing resources toward street preservation-paving
• Identified opportunities for organizational efficiencies and effectiveness
• Conducted Administrative Services review to inform future steps to streamline and maximize resources
• PBOT receives revenue from permits, services and system development charges
• Council reviews and approves changes, and fees, annually in May
• PBOT will conduct an external review of select fee methodologies this spring
• Land Use Review fees will increase an average of 8 percent in FY 2013-14
• Most Construction and Street Use permit fees have a 0 or 1 percent increase in FY 2013-14, including System Development Charges
• Construction and Street Use permit fees where there is an increase, average 5 percent
• Public Works Permits continue to evolve with a proposed base plus fee methodology new this year
P B O T B U D G E T H A N D O U T F Y 2 0 1 3 - 1 4 | 3
• Engagement of diverse and underrepresented communities in the development of the East Portland in Motion Plan – a Five-Year Implementation Strategy for Active Transportation
• Development of Five-Year Affirmative Action Plan to address underutilization and equal employment opportunity
• Commitment to Title VI of the Civil Rights Act to ensure equal access to all programs and activities
• Integration of public health and equity in long-term transportation planning and prioritization for the Transportation System Plan
• Application of the Equity Impact Assessment Tool to Bureau programs and services to identify opportunities for improvement
• Development of a Safe Routes to School Policy to equitably prioritize education, encouragement and infrastructure improvements according to each school’s student demographics and past access to Safe Routes resources
PBOT BUSINESS PLAN• Represents a strategic, focused and adaptive approach to investments, establishing a strong link between operational goals, performance management, funding strategy and resource allocation
• Aligns Bureau actions with the Portland Plan to help realize the vision of a prosperous, educated, healthy and equitable Portland
• Provides a financial snapshot, including current year revenues and expenditures and the five-year forecast
• Enhances the focus on performance measures and outcomes and ongoing accountability through reporting
• Identifies both work plan targets and strategic actions to “move the dial,” such as targeting 100 miles of paving and crack sealing
>> Taking early steps toward street preservation this summer with fog sealing • Continues momentum to pursue regional Statewide Transportation Improvement Program (STIP) funds for projects providing multi-modal benefits
PBOT EQUITY
$0
$20
$40
$60
$80
$100
$120
$140
$160
$180
$200
$220
REVENUE (MILLIONS)
City
Gen
eral
Fun
d
Fees
City
Age
ncie
s
Gra
nts
Park
ing
Met
ers
+ G
arag
es
Gas
Tax
- M
ultn
omah
Co
unty
Gas
Tax
- St
ate
Hig
hway
Fu
nd
FY 1
3-14
Req
uest
ed B
udge
t: $1
87.4
m in
tot
al r
even
ue a
s sh
own
in t
he c
hart
+ $
9.2m
in o
ne-t
ime
Bond
Sal
es +
$33
.4m
in B
egin
ning
Fun
d Ba
lanc
e =
Tota
l Bud
get
Reso
urce
s $2
30m
.
3.7%
4.
2%
4.3
%
3.3
%
3.7%
City
Eco
nom
ist’s
ant
icip
ated
ble
nded
infla
tion
rate
FY 12-13 BUDGET
FY 13-14REQUESTED
FY 14-15FORECAST
FY 15-16FORECAST
FY 16-17FORECAST
FY 17-18FORECAST
PBO
T FI
VE-Y
EAR
REVE
NU
E FO
RECA
ST
P B O T B U D G E T H A N D O U T F Y 2 0 1 3 - 1 4 | 4
CITY
GEN
ERAL
FU
ND
FEES
CITY
AG
ENCI
ES
GRA
NTS
PARK
ING
MET
ERS
+ G
ARAG
ES
GAS
TAX
- M
ULT
NO
MAH
CO
UN
TY
GAS
TAX
- ST
ATE
HIG
HW
AY F
UN
D
P B O T B U D G E T H A N D O U T F Y 2 0 1 3 - 1 4 | 5
CO
NST
RU
CTI
ON
PR
OJE
CTS
$39.
0
MA
INTE
NA
NC
E SE
WER
+ S
TOR
MW
ATE
R (B
ES)
$19.
7
SMA
RTP
AR
K G
AR
AG
ES IN
CLU
DES
$6.
2M O
F R
ESER
VES
$13.
5
OV
ERH
EAD
+ A
DM
INIS
TRA
TIO
N$1
1.8
MA
INTE
NA
NC
E$2
6.5
CO
NST
RU
CTI
ON
PR
OJE
CTS
$13.
1
DEV
ELO
PMEN
T SE
RV
ICES
$5.5
STR
EETC
AR
$5.2
DEB
T$1
5.4
OTH
ER M
ISC
BU
REA
U P
RO
GR
AM
S,
CO
NTI
NG
ENC
IES
+ R
ESER
VES
$14.
0
OTH
ER M
ISC
BU
REA
U P
RO
GR
AM
S, S
DC
+ R
ESER
VES
$28.
9
TOTA
L EX
PEN
DIT
URE
S
PB
OT
REQ
UES
TED
BU
DG
ET F
Y 2
013-
14
OPE
RA
TIO
NS
AC
TIV
E TR
AN
SPO
RTA
TIO
N
$28.
9
STR
EETL
IGH
T EL
ECTR
ICIT
Y$5
.5
$3.0
$230
m$2
30m
tota
l res
ourc
esto
tal e
xpen
ditu
res
BEG
INN
ING
FU
ND
BA
LAN
CE
CO
NTI
NG
ENC
Y, R
EPLA
CEM
ENT
FUN
DS
+ C
AR
RYO
VER
BO
ND
S S
TREE
TCA
R, L
ED L
IGH
T R
EPLA
CEM
ENT,
N
W P
AR
KIN
G +
PA
RK
ING
PA
Y ST
ATI
ON
S$9
.2
SMA
RTP
AR
K G
AR
AG
ES$1
3.2
CIT
Y G
ENER
AL
FUN
D$8
.0
PAR
KIN
G C
ITA
TIO
NS
$7.5
PAR
KIN
G P
ERM
ITS
$4.0
$33.
4
GA
S TA
X
STA
TE H
IGH
WA
Y FU
ND
$31.
9
FEES
PE
RM
ITS,
SER
VIC
E C
HA
RG
ES +
SYS
TEM
D
EVEL
OPM
ENT
CH
AR
GES
$20.
8
PAR
KIN
G M
ETER
S$2
0.5
GA
S TA
XM
ULT
NO
MA
H C
OU
NTY
IN
TER
GO
VER
NM
ENTA
L A
GR
EEM
ENT
$25.
2
CIT
Y A
GEN
CIE
S$3
0.4
GR
AN
TSFE
DER
AL,
STA
TE +
LO
CA
L G
RA
NTS
, PO
RTL
AN
D
DEV
ELO
PMEN
T C
OM
MIS
SIO
N$2
5.9
WH
ERE
THE
MO
NEY
GO
ESW
HER
E TH
E M
ON
EY C
OM
ES F
RO
M
PBO
T W
HER
E TH
E M
ON
EY G
OES
$8.4
m in
inte
rnal
cas
h tr
ansf
ers
wit
hin
PBO
T ar
e ex
clud
ed t
o av
oid
doub
le c
ount
ing
($5.
1m f
rom
Par
king
Fac
iliti
es F
und
to T
rans
Op
Fund
+ $
2.8m
fr
om T
rans
Op
Fund
to
Gas
Tax
Bon
d Re
dem
ptio
n +$
0.5m
fro
m T
rans
Op
Fund
to
Tran
s Re
serv
e Fu
nd).
P B O T B U D G E T H A N D O U T F Y 2 0 1 3 - 1 4 | 6
Req
uest
Cut
Pac
kage
Prog
ram
Red
uctio
nsR
even
ues
N
umbe
rPr
iorit
yR
ank
GTR
Ong
oing
GTR
One
Tim
eG
ener
al F
und
Oth
erTo
tal
FTE
TR_0
11
26Tr
ansp
orta
tion
Part
ners
hips
($
125,
400)
($12
5,40
0)
TR_0
22
34 (N
R)Bu
sine
ss +
Sup
port
Ser
vice
s ($
305,
000)
($30
5,00
0)
TR_0
33
29 (N
R)Pa
rkin
g O
pera
tions
($
85,0
00)
($85
,000
)
TR_0
44
28 (N
R)Pa
rkin
g En
forc
emen
t ($
20,0
00)
($12
,000
)($
32,0
00)
TR_0
55
27 (N
R)CI
P N
eigh
borh
ood
Safe
ty/ L
ivab
le S
tree
ts
($1,
000,
000)
($1,
000,
000)
(1.0
0)
TR_0
66
21Tr
ansp
orta
tion
Plan
ning
($
45,0
00)
($45
,000
)
TR_0
77
19Ac
tive
Tran
spor
tatio
n ($
551,
275)
($55
1,27
5)(2
.00)
TR_0
88
18Si
dew
alk
Prog
ram
($
47,0
00)
($26
6,61
4)($
313,
614)
(4.0
0)
TR_0
99
27 (N
R)CI
P M
aint
enan
ce
($80
0,00
0)($
150,
000)
($95
0,00
0)(4
.00)
TR_1
010
17Tr
affic
Ope
ratio
ns
($17
0,32
5)($
170,
325)
(2.0
0)
TR_1
111
15St
reet
Sys
tem
s M
anag
emen
t ($
100,
000)
($10
0,00
0)
TR_1
212
9Pr
ojec
t Man
agem
ent
($17
3,00
0)($
173,
000)
(1.0
0)
TR_1
313
4St
ruct
ural
Mai
nten
ance
($
10,0
00)
($72
,000
)($
82,0
00)
(1.0
0)
TR_1
414
2St
reet
Rat
ing
+ Si
gnal
s($
900,
000)
($90
0,00
0)(2
.00)
TR_1
515
8St
reet
Pre
serv
atio
n ($
168,
000)
$0($
168,
000)
(2.0
0)
Tota
l Cut
s($
4,50
0,00
0)($
12,0
00)
$0($
488,
614)
($5,
000,
614)
(19.
00)
19 F
TE
Requ
est
Add
Pac
kage
Prog
ram
Add
itio
nsRe
venu
es
Num
ber
Prio
rity
Rank
GTR
Ong
oing
GTR
One
Tim
eG
ener
al F
und
Oth
erTo
tal
FTE
TR_1
61
8, 2
Stre
et P
rese
rvat
ion,
Sig
nals
+ S
tree
tligh
ts
$784
,637
$784
,637
TR_1
72
19Su
nday
Par
kway
s $1
20,0
00$1
20,0
00
TR_1
83
NR
OM
F In
tera
genc
y $0
$0
TR_1
94
NR
BES
Inte
rage
ncy
- Sew
er C
lean
ing
$175
,000
$175
,000
1.00
TR_2
05
NR
BES
Inte
rage
ncy
- Str
eet C
lean
ing
$1,1
00,0
00$1
,100
,000
4.00
Tota
l Add
s$0
$0$9
04,6
37$1
,275
,000
$2,1
79,6
375.
00
5 FT
E
TOTA
L RE
DU
CTIO
NS
$5M
TOTA
L A
DD
ITIO
NS
$2.2
M
PBO
T D
ECIS
ION
PAC
KAG
ES
$1.3
M B
ES IN
TERA
GEN
CY A
GRE
EMEN
T IM
PACT
S AR
E M
AJO
R.ST
REET
CLE
ANIN
G W
ILL
BE
RED
UCE
D S
IGN
IFIC
ANTL
Y.
PBOT RESOURCE REALIGNMENT
$4.5M SELLWOOD BRIDGE DEBT SERVICE SAVINGS$1.2M CIP SIDEWALKS (1.58 FTE IMPACT)
$950K DOWNTOWN MARKETING INITIATIVE$500K ADA CURB RAMPS (3 FTE IMPACT)
$5.15M CONTRACT PAVING$1.5M STREET PRESERVATION -
PAVING, CRACK SEALING, FOG SEALING (ADD 20 SEASONAL FTE)$300K SIDEWALK POSTING PROGRAM (ADD 3 FTE)
$200K CURB REPAIRS (ADD 1 FTE)
$7.15M
$7.15MBES INTERGOVERNMENTAL AGREEMENT RESTORATION
OF $1.1M, FOR STREET CLEANING (RESTORE 4 FTE)
BES INTERGOVERNMENTAL AGREEMENT OF $175K FOR SEWER CLEANING (RESTORE 1 FTE)
GENERAL FUND $785K ADD PACKAGE FOR STREET PRESERVATION, SIGNALS + STREETLIGHTS
GENERAL FUND $120K ADD PACKAGE FOR SUNDAY PARKWAYS
PAYS FORSOURCE
341 389 386
600
156
345
573 660
1073
321
0
600
1200
1800
Very Good Good Fair Poor Very Poor
Lane
Mile
s, 1
2-ft
wid
e
Pavement Condition Index Category
PCI: 85-100 75-84 65-74 40-64 0-39
PCI Assessment - September 2012
Local Streets
Arterials + Collectors
PBOT STREET CONDITION 2012
SE C
ESAR
E CH
AVEZ
BLV
D
EPNO
NPNS
NWNW
SEUL
SWNI
CNN
NECN
CENT
SE DIVISION ST
E BURNSIDE ST
NE GLISAN ST
SE POWELL BLVD
SE FOSTER RD
NW ST HELENS RD
N LOMBARD ST
SE HOLGATE BLVD
SE STARK ST
SE 92
ND A
VE
SE 82
ND A
VE
SW BARBUR BLVD
N COLUMBIA BLVD
NE HALSEY ST
NE COLUMBIA BLVD
SE 52
ND A
VE
SE 12
2ND
AVE
NE 12
2ND
AVE
NE 33
RD A
VE
SW CA
PITOL
HWY
NE SANDY BLVD
NE FREMONT ST
NE 82
ND A
VE
N IN
TERS
TATE
AVE
NE 14
8TH
AVE NE AIRPORT WAY
SE 17
TH A
VE
NE KILLINGSWORTH ST
NW SKYLINE BLVD
SE BELMONT ST
SW MACADAM AVE
SE FLAVEL ST
SE WOODSTOCK BLVD
N WILLAMETTE BLVD
N GR
EELE
Y AV
E
NE LOMBARD ST
NW YEON AVE
SE MILWAUKIE AVE
SE 13
6TH
AVE
SE 72
ND A
VE
SE MCLOUGHLIN BLVD
NE 10
2ND
AVE
SE 14
8TH
AVE
NE 42
ND A
VE
W BURNSIDE RD
SE HAWTHORNE BLVD
W BURNSIDE ST
SW VERMONT ST
SE 12
TH A
VE
SW 45
TH A
VE
SW MULTNOMAH BLVD
SE 11
TH A
VE
N PORTLAND RD
SE STEELE ST
SW D
OSCH
RD
NE M
ARTIN
LUTH
ER K
ING
BLVD
SE G
RAND
AVE
SW TE
RWILL
IGER
BLV
D
SW TAYLORS FERRY RD
NE PRESCOTT ST
N ROSA PARKS WAY
SE 28
TH A
VE
SE WASHINGTON ST
SW SH
ATTU
CK R
D
SW N
AITO
PKY
NE CU
LLY B
LVD
NW NAITO PKYNW LOVEJOY ST
NE WEIDLER ST
SE 50TH AVE
SE 62
ND A
VESE
60TH
AVE
SE 76
TH A
VE
NE PORTLAND HWY
NW CORNELL RD
NW 18TH AVE
SW BEAVERTON HILLSDALE HWY
SW PATTON RD
SE 16
2ND
AVE
NW 23
RD A
VE
N KILLINGSWORTH ST
N DE
NVER
AVE
SE TACOMA ST
NW THOMPSON RD
NW NICOLAI ST
SW 35
TH A
VE
SW SUNSET BLVD
SW SUNSET HWY
SW BOONES FERRY RD
NE 21
ST A
VE
NW BRIDGE AVE
SE MORRISON ST
N GOING ST
SW CLAY ST
SE 13
TH A
VE
N UNION CT
SW STEPHENSON ST
SE 16
0TH
AVE
SE 11
2TH
AVE
SUNSET HWY
SW LESSER RD
SW 4T
H AV
E
NE BROADWAY ST
NW VAUGHN ST
N SMITH ST
NW FRONT AVE
SE 20
TH A
VE
SE CLATSOP ST
NE 20
TH A
VE
SE 11
1TH
AVE
N COLUMBIA WAY
SW CAMERON RD
NE 16
2ND
AVE
SE THORBURN ST
SW 6T
H AV
E
SW H
OOD
AVE
SW JEFFERSON ST
N BURGARD RD
SE 10
2ND
AVE
SE MT SCOTT BLVDSE TENINO ST
SW 62
ND A
VE
NE MARTIN LUTHER KING JR BLVD
SW 49
TH A
VE
SW GARDEN HOME RD
N OSW
EGO
AVE
N PHILADELPHIA AVE
SW POMONA ST
NE 82
ND W
AY
NE 21
ST A
VE
NE PRESCOTT ST
SW SUNSET HWY
NE 82
ND A
VE
NE PRESCOTT ST
SE CLATSOP ST
NW CORNELL RD
SE 162ND AVE
NW SKYLINE BLVD
SE STARK ST
SE CLATSOP ST
NW SKYLINE BLVD
N LOMBARD ST
NE HALSEY ST
SE 60
TH A
VE
NE 10
2ND
AVE
NE WEIDLER ST
SE 11
2TH
AVE
N BUR
R AV
E
N WILLIS BLVD
NE HOLMAN ST
N FAILING ST
NE KLICKITAT ST
NE SACRAMENTO ST
SE 13
0TH
AVE
SE 12
9TH
AVE
SE OGDEN STSE KNAPP STSW
VIR
GINI
A AV
E
SW FLORIDA ST
SE C
ESAR
E C
HAVE
Z BLV
D
Revision Date 8-23-2012
Streets of Citywide Significance include the following 6 categories:
I 0 0.5Miles
Freight Only
Streets of Citywide Significance
Both Transit & Freight
Transit Only (Bus Trips >= 75)
(Regional/Priority/Major Truck Streets)
(Regional/Priority/Major Truck Streets)Fixed Rail TransitPriority BikewaysHigh Crash Corridors(High Crash Corridors on State Highways including Barbur Blvd., Powell Blvd., and 82nd Avenue are not shown on Map)
"Streets of Citywide Significance" (SCS) are travel corridors PBOT prioritizes for expenditures due to their high traffic volume across all modes (freight, transit, motor vehicles, pedestrians and bicycles). Safety is a key element that factors into the SCS designation. The prioritization is necessary because the scope of resources needed to maintain transportation infrastructure greatly exceeds resources available. These established priorities guide how Maintenance Operations crews do the work to maintain the infrastructure.
For Maintaining Transportation InfrastructureStreets of Citywide Significance