Upload
ankiabormans
View
936
Download
0
Tags:
Embed Size (px)
Citation preview
BURG
UND
Y ES
TATE
- M
EDIU
M IN
CO
ME
HOUS
ING
EST
ATE
CO
NSI
STIN
G O
F PH
ASE
S A
,B,C
,D A
ND
E
LANDSCAPE MASTERPLAN
PORTFOLIO: ANKIA BORMANS SEPTEMBER 2009
PORTFOLIO: ANKIA BORMANS SEPTEMBER 2009
BURG
UND
Y ES
TATE
- M
EDIU
M IN
CO
ME
HOUS
ING
EST
ATE
C
ON
SIST
ING
OF
PHA
SES
A,B
,C,D
AN
D E
BRIEF DESCRIPTION:
Medium income Housing Estate on re-zoned agricultural land. Landscaping included all road tree planting and verges, small internal parks, channels to accommodate stormwater and extensive landscaping of the servitude area under the Powerlines. This included a Mashie Golf Course, Irrigaiton ponds using treated effluent and other amenities. The project is currently in implementation and implementation is done in Phases.
RESPONSIBILITIES:
PHASE A and B (completed)
Site Management during implementationContract managementApproval of Claims Site Inspection and quality controlClient liaisingOn site problem resolution (design and construction)Site inspection for practical and final completion
PHASE C (practical completion, under maintenance)
Planting designPlanting plans Working drawingsTender DocumentationBill of QuantitiesDesign of individual internal parks, including smaller hardlandscaping detailSite Management during implementationContract managementApproval of Claims Site Inspection and quality controlClient liaisingOn site problem resolution (design and construction)Site inspection for practical completion
PHASE D and E (under implementation)
Planting designPlanting plans Working drawingsTender DocumentationBill of QuantitiesDesign of individual internal parks, including smaller hardlandscaping detailSite Management during implementationContract managementApproval of Claims Site Inspection and quality controlClient liaisingOn site problem resolution (design and construction)
PORTFOLIO: ANKIA BORMANS SEPTEMBER 2009
BUH-
REIN
EST
ATE
- M
EDIU
M IN
CO
ME
HOUS
ING
EST
ATE
BRIEF DESCRIPTION:
Medium income Housing Estate on re-zoned agricultural land. Landscaping included all road tree planting and verges, small internal parks, and landscaping of the servitude area under the Powerlines. This included Irrigaiton ponds using treated effluent and other amenities. The project is in the final design phase and construction on site is due to start in November.
RESPONSIBILITIES:
Working drawingsCost EstimatesDesign of individual internal parksClient liaisingMeeting with Council officialsPlan approvalsDocumentation
LANDSCAPE MASTERPLAN
PORTFOLIO: ANKIA BORMANS SEPTEMBER 2009
STO
NEH
URST
CLO
SE -
HIG
H IN
CO
ME
HOUS
ING
EST
ATE
BRIEF DESCRIPTION:
High income Housing Estate. Landscaping included all individual houses, small internal park. The project has been completed
RESPONSIBILITIES:
Working drawingsBill of QuantitiesDesign of some of the individual gardenssite supervisionContract mangementClient liaisingDetail design
LANDSCAPE PLAN
PORTFOLIO: ANKIA BORMANS SEPTEMBER 2009
CEN
TRA
L PA
RK -
LIG
HT IN
DUS
TRIA
L BU
SIN
ESS
PARK
CONCEPTUAL MASTERPLAN
CONCEPTUAL STREET SECTIONS
PORTFOLIO: ANKIA BORMANS SEPTEMBER 2009 PORTFOLIO: ANKIA BORMANS SEPTEMBER 2009
CEN
TRA
L PA
RK -
LIG
HT IN
DUS
TRIA
L BU
SIN
ESS
PARK
BRIEF DESCRIPTION:
Light Industrial business Park on re-zoned agricultural land. Landscaping included all road tree planting and verges, and rehabilitation of the ecologically sensitive areas. The project is in the final design phase and planning approval is pending.
RESPONSIBILITIES:
Masterplan DesignWorking drawings (CAD)Cost EstimatesClient liaisingDocumentationLandscape guidelines/documentation
PORTFOLIO: ANKIA BORMANS SEPTEMBER 2009
ERF
5109
LEU
KEN
BERG
- M
IXED
USE
DEV
ELO
PMEM
T
BRIEF DESCRIPTION:
Mixed use Development on re-zoned agricultural land. Landscaping included all road tree planting and verges, and rehabilitation of the ecologically sensitive areas including the rehabilitaion of the riverine area. The project is still in the conceptual phase/early stages of design.
RESPONSIBILITIES:
Masterplan DesignCost EstimatesClient liaisingMeetings with client, peers and other diciplines.DocumentationCity liaising
CONCEPTUAL MASTERPLAN
PORTFOLIO: ANKIA BORMANS SEPTEMBER 2009
WA
TERG
AET
EST
ATE
- LO
W IN
CO
ME
HOUS
ING
DEV
ELO
PMEM
T
CO
NSI
STIN
G O
F PH
ASE
S A
,B A
ND
C
PHASE A - CONCEPTUAL MASTERPLAN
PHASE B AND C - LANDSCAPE PLAN (COUNCIL SUBMISSION)
PHASE A - CONCEPTUAL SECTION THROUGH PIAZZA
PORTFOLIO: ANKIA BORMANS SEPTEMBER 2009
WA
TERG
AET
EST
ATE
- LO
W IN
CO
ME
HOUS
ING
DEV
ELO
PMEM
T
CO
NSI
STIN
G O
F PH
ASE
S A
,B A
ND
C
BRIEF DESCRIPTION:
Low Income Housing Development. Landscaping included all road tree planting and verges, small internal parks and sporting facilities. Creative implementation with a limited budget allowed for solutions to create dignified spaces in an impoveridged area.Phase A is in the final stages of design and Phase B and C has been approved by Council.
RESPONSIBILITIES:
Masterplan DesignCost EstimatesClient liaisingMeetings with client, peers and other diciplines.DocumentationCity liaising
PORTFOLIO: ANKIA BORMANS SEPTEMBER 2009
OLI
EVEN
HOUT
MA
LL -
CO
MM
ERC
IAL
DEV
ELO
PMEM
T
BRIEF DESCRIPTION:
Commercial Shopping Development. Landscaping incorporated the existing trees on site and the existing drainage lines and water systems. The pedestrian movement was a strong design influence. The parking areas were carefully considered to create the least amount of impact on the environment.The project is still in the conceptual phase/early stages of design.
RESPONSIBILITIES:
Masterplan DesignLandscape PlanWorking Drawings (CAD)Cost EstimatesClient liaisingMeetings with client, peers and other diciplines.DocumentationCity liaisingCouncil approvals
ROUGH CONCEPTUAL MASTERPLAN
PORTFOLIO: ANKIA BORMANS SEPTEMBER 2009
PAA
RL W
ATE
RFRO
NT
- MIX
ED U
SE D
EVEL
OPM
ENT
INC
LUD
ING
SPO
RTIN
G A
ND
A 2
010
TRA
IING
FA
CIL
ITY
LANDSCAPE MASTERPLAN
LANDSCAPE MASTERPLAN INCLUDING ARBORETUM
RIVER EDGE MANAGEMENT - SKETCH PROPOSALS
PORTFOLIO: ANKIA BORMANS SEPTEMBER 2009 PORTFOLIO: ANKIA BORMANS SEPTEMBER 2009
BRIEF DESCRIPTION:
Mixed - use Development. Landscaping incorporated the existing trees on site and the existing drainage lines and water systems. An extensive tree survey was done on site and certain tees were identified that were of value. The existing sportsfield was incorporated and a creative and ecologically sound approach was taken to incorpo-rate the river edge. The stormwater management on site was an important influence on the design.The project is still in the early stages of design.
RESPONSIBILITIES:
Masterplan DesignLandscape PlanWorking Drawings (CAD)Cost EstimatesClient liaisingMeetings with client, peers and other diciplines.DocumentationCity liaisingCouncil approvals
PAA
RL W
ATE
RFRO
NT
- MIX
ED U
SE D
EVEL
OPM
ENT
INC
LUD
ING
SPO
RTIN
G A
ND
A 2
010
TRA
IING
FA
CIL
ITY
PORTFOLIO: ANKIA BORMANS SEPTEMBER 2009
ERF
1201
0 D
’URB
AN
VA
LE -
RESI
DEN
TIAL
DW
ELLI
NG
BRIEF DESCRIPTION:
A residential dwelling in a Ecological Estate. There were severe constraints in terms of conservation areas on site. These areas were dealt with in a creative manner to incorporate them into the overall design without the risk of damage to the areas. This was accomplished by means of a redirected wetland area as a buffer.
RESPONSIBILITIES:
Landscape Concept DesignLandscape PlanWorking Drawings (CAD)Client liaisingMeetings with client, peers and other diciplines.DocumentationCity liaisingCouncil approvals
PORTFOLIO: ANKIA BORMANS SEPTEMBER 2009
priv
ate
wor
k
PORTFOLIO: ANKIA BORMANS SEPTEMBER 2009
BRIEF DESCRIPTION:
A residential dwelling in a coastal area. The brief from the client was an “english type” garden with tranquil areas, but it must accommodate her two active children and an entertainment area.
RESPONSIBILITIES:
Landscape Concept DesignLandscape PlanWorking Drawings (CAD)Planting plansCo-ordination with contractors on siteContract managementClient liaisingSite supervisionQuality Control
HOUS
E ST
ELLI
NG
- C
AM
PS B
AY
PORTFOLIO: ANKIA BORMANS SEPTEMBER 2009
HOUS
E ST
ELLI
NG
- C
AM
PS B
AY
PORTFOLIO: ANKIA BORMANS SEPTEMBER 2009
HOUS
E M
ULLE
R - B
AKO
VEN
PORTFOLIO: ANKIA BORMANS SEPTEMBER 2009
HOUS
E M
ULLE
R - B
AKO
VEN
PORTFOLIO: ANKIA BORMANS SEPTEMBER 2009
HOUS
E M
ULLE
R - B
AKO
VEN
PORTFOLIO: ANKIA BORMANS SEPTEMBER 2009
HOUS
E M
ULLE
R - B
AKO
VEN
BRIEF DESCRIPTION:
A residential dwelling in a coastal area. The brief from the client was a low maintenance garden with indigenous yet colourful plants. The challenge is that the garden is right on the sea edge and the choice of plant material was essential to a successful design. There was a very close interaction between the architect and the interior de-signer to accomplish the ultimate design and to accommodate the client’s wishes.
RESPONSIBILITIES:
Landscape Concept DesignLandscape PlanWorking Drawings (CAD)Planting plansCo-ordination with contractors on siteContract managementClient liaisingSite supervisionQuality Control