  • SCHOOL PLANNING

    schoolplanning.hcdsb.org

    2019-20 Milton Secondary School Boundary Review

    Portal #5.2: Holding LocationLester B. Pearson High School

    Virtual Public Information Meeting Portals

  • 1433 Headon Road, Burlington

    Scho

    ol In

    form

    atio

    n

    Building Capacity

    642Portable Capacity 1

    294Site Capacity 1

    936Site Status: Owned by HDSBCurrent Use: VacantConstructed: 1975Stories: 2Site Size: 5.6 ha Parking Spaces: 218

    Lester B. Pearson High SchoolHolding Locations - Option 2B-1

    Projected Enrolment

    0Available Space (incl. portables) 4

    936

    Projected Enrolment

    0Available Space (incl. portables) 4

    936

    Notes:

    Available No. of Rooms/Portables4

    45Available No. of Rooms/Portables4

    45

    2021-22 School Year 2022-23 School Year

    Lester B. Pearson HSLester B. Pearson HS

    21 km23-28 mins

    Max. No. Portables 1

    14

    MAXMAX 14 POTENTIAL POTENTIAL 11 TBD1 Data based on capacity information from 2016-17 school year prior to the closure of the school. Additional portables may be accommodated on site.

    M i l t o nM i l t o n

    Projected Enrolment

    2021-22 School Year 2022-23 School YearMIL3

    GR9 GR9-10

    287

    GR9-10 GR9-11

    550Projected Enrolment

    701 994Rooms Required for Milton #3 CSS

    14 26Rooms Required for Milton #3 CSS

    33 47

    Feasibility to Accommodate Feasibility to Accommodate

    Y

    Available No. of Rooms/Portables

    45Available No. of Rooms/Portables

    45

    Prop

    osed

    Sch

    ool D

    ayPr

    opos

    ed T

    rans

    port

    atio

    n

    Average distance/time from Milton #3 catchment to holding school

    • The school could accommodate Grade 9 and 10 students for the 2021-22 and 2022-23 school years. If portable capacity can be expanded, Grade 9-11 may be accommodated in 2022--23.

    • School could hold all students in the event of a delay in the new school opening.

    • Full access to specialized classrooms as the school building will be fully utilized for the holding school.

    • Similar bus pickup and slightly later drop off times to current times at Jean Vanier CSS.

    • Access for before and after school activities in Milton may pose challenges, therefore late bus will be provided to accommodate students.

    • Opportunity to create and establish own school identity higher than options where space is shared with a different school community.

    1 Data based on capacity information from 2016-17 school year prior to the closure of the school. Additional portables may be accommodated on site.

    Y Y NY5 Dependent on number of portables that can be placed on site. Details will be determined through further discussion with HDSB.

    5

    Enro

    lmen

    t Pro

    ject

    ions

    Ho

    ldin

    g Sc

    hool

    Pro

    ject

    ions

    (Opt

    ion

    A)

    O a k v i l l eO a k v i l l e

    B u r l i n g t o nB u r l i n g t o n

    Start Time (±10 mins) 2

    8:30 amEnd Time (±10 mins) 2

    2:30 pm

    Periods per Day

    4

    AMAM PMPM

    2 Times are estimated based on current information and is subject to change

    Pick-up Time (Earliest) 3

    7:39 amAMAMDrop-off Time (Latest) 3

    3:30 pm

    Avg. Travel Time

    23-28 minsMax. Travel Time

    30 mins

    PMPM

    3 Times are estimated based on current information and is subject to change

  • Next Portal:

    P5.3 to P5.4 Potential Interim Accommodation Options