Port of HirtshalsNew Ferry Berth 4

A1 Consult A/SBjørn Dannemare, NordPIANC 2019-09-12

Page 2: Port of Hirtshals New Ferry Berth 4 - Pianc€¦ · Berth 4 Hirtshals –Kristiansand, HSC Fjord Cat (New Fjord Cat from 2020) A1 Consult - NordPIANC 2019 Ref. Fjord Line Ref. ColorLine

Port of Hirtshals

2

Berth 1, Hirtshals – Larvik, SuperSpeed 2

Berth 2, Hirtshals – Kristiansand, SuperSpeed 1

Berth 3, Hirtshals – Torshavn & Seydisfjördur, MS Norröna

Hirtshals – Stavanger & Bergen, MS Bergensfjord / MS Stavangerfjord

Berth 4 Hirtshals – Kristiansand, HSC Fjord Cat (New Fjord Cat from 2020)

A1 Consult - NordPIANC 2019

Ref. Fjord Line

Ref. ColorLine

Ref. Smyril-Line

Ref. Fjord Line

Page 3: Port of Hirtshals New Ferry Berth 4 - Pianc€¦ · Berth 4 Hirtshals –Kristiansand, HSC Fjord Cat (New Fjord Cat from 2020) A1 Consult - NordPIANC 2019 Ref. Fjord Line Ref. ColorLine

New Ferry Berth 4

3

Project information

Client Port of Hirtshals

Clients Consultant A1 Consult

Contractor (Port Structures) CG Jensen

Contractor (Linkspan, ramps) Bladt Industries

Terminal Operator Fjord Line

Time Schedule

Planning & detailed design August – November 2018

Tender & contracting November 2018 – January2019

Construction period Phase 1, Q1 – Q2 2019Phase 2, Q4 2019 – Q1 2020

A1 Consult - NordPIANC 2019

Page 4: Port of Hirtshals New Ferry Berth 4 - Pianc€¦ · Berth 4 Hirtshals –Kristiansand, HSC Fjord Cat (New Fjord Cat from 2020) A1 Consult - NordPIANC 2019 Ref. Fjord Line Ref. ColorLine

General Layout Plan

4A1 Consult - NordPIANC 2019

Existing conditions

Page 5: Port of Hirtshals New Ferry Berth 4 - Pianc€¦ · Berth 4 Hirtshals –Kristiansand, HSC Fjord Cat (New Fjord Cat from 2020) A1 Consult - NordPIANC 2019 Ref. Fjord Line Ref. ColorLine

Main quantities

5A1 Consult - NordPIANC 2019

Piling works

Sheet pile wall 225 tons (100 m new quay)

Concrete piles 3022 m (192 piles)

Concrete works

Reinforced concrete 910 m3

Tremie concrete underwater 2000 m3

Reclamation and Earth works

Excavation / dredging 5200 m3 / 1700 m3

Filling 9300 m3

Armour / filter material 1250 m3 / 3300 m3

Surface works 2280 m2

Quay equipment

PM Fender Systems 6 pcs.

Additional bollards 3 pcs.

Page 6: Port of Hirtshals New Ferry Berth 4 - Pianc€¦ · Berth 4 Hirtshals –Kristiansand, HSC Fjord Cat (New Fjord Cat from 2020) A1 Consult - NordPIANC 2019 Ref. Fjord Line Ref. ColorLine

Main functional requirements

• The ferry berth must be functional for the new HSC catamaran

• New Fjord Cat (aluminum catamaran)

• The ferry berth must also be functional as an emergency berth for:

• SuperSpeed 1 & 2 • MS Norröna• MS Bergensfjord

• The above Ro-Ro ferries require a mooring dolphin west of the ferry berth for safe mooring (to be constructed later)

• Water level variations• MHW – MLW: ± 0,80 m (accessibility satisfied for walkways etc.)• HHW – LLW: +1,40 / -1,10 m (limit for traffic on linkspan)

6A1 Consult - NordPIANC 2019

Ref. Fjord Line

Ref. Fjord Line

Page 7: Port of Hirtshals New Ferry Berth 4 - Pianc€¦ · Berth 4 Hirtshals –Kristiansand, HSC Fjord Cat (New Fjord Cat from 2020) A1 Consult - NordPIANC 2019 Ref. Fjord Line Ref. ColorLine

• Berthing of the aluminum catamaran requires a soft fender

• Berthing of the Ro-Ro ferries requires a relative hard fender

• Stand-off distance must be as small as possible ( < 2 m)

• Height of fender panel face: -0.30 m to +5.50 m

• Double contact on the fender panel is not allowed

• The fender panel shall be able to rotate on plan (to accommodate angled berthing to avoid point loads)

• Width of fender panel to suit allowable reaction line load for the aluminum belting on the catamaran

• Fender design in accordance with BS6349-4 and PIANC WG33

Design requirements for fendering

7A1 Consult - NordPIANC 2019

ref. Trelleborg

Page 8: Port of Hirtshals New Ferry Berth 4 - Pianc€¦ · Berth 4 Hirtshals –Kristiansand, HSC Fjord Cat (New Fjord Cat from 2020) A1 Consult - NordPIANC 2019 Ref. Fjord Line Ref. ColorLine

Fender design

8A1 Consult - NordPIANC 2019

• Two cones mounted back-to-back (soft cone + hard cone)• Energy absorption from both cones. Fender reaction ≤ hard cone• No double contact on the fender panel

Page 9: Port of Hirtshals New Ferry Berth 4 - Pianc€¦ · Berth 4 Hirtshals –Kristiansand, HSC Fjord Cat (New Fjord Cat from 2020) A1 Consult - NordPIANC 2019 Ref. Fjord Line Ref. ColorLine

Linkspan and upper car ramp

9A1 Consult - NordPIANC 2019

Ref. Bladt

Page 10: Port of Hirtshals New Ferry Berth 4 - Pianc€¦ · Berth 4 Hirtshals –Kristiansand, HSC Fjord Cat (New Fjord Cat from 2020) A1 Consult - NordPIANC 2019 Ref. Fjord Line Ref. ColorLine

Ramp structure and abutment

10A1 Consult - NordPIANC 2019

Page 11: Port of Hirtshals New Ferry Berth 4 - Pianc€¦ · Berth 4 Hirtshals –Kristiansand, HSC Fjord Cat (New Fjord Cat from 2020) A1 Consult - NordPIANC 2019 Ref. Fjord Line Ref. ColorLine

Berth scour protection

11A1 Consult - NordPIANC 2019

• Catamaran propulsion system: Water jets (twin ducted in each hull)

• The HSC catamaran reverse onto the linkspan (thrust angle 30-45˚)

Forward thrust Reverse thrust

ref. Hawkswood et al., 2013

ref. Hawkswood et al., 2013

Page 12: Port of Hirtshals New Ferry Berth 4 - Pianc€¦ · Berth 4 Hirtshals –Kristiansand, HSC Fjord Cat (New Fjord Cat from 2020) A1 Consult - NordPIANC 2019 Ref. Fjord Line Ref. ColorLine

Berth scour protection

12A1 Consult - NordPIANC 2019

• Concrete slab protection (tremie concrete)• Thickness 0.50 m to cope with seabed variations and tolerances

Page 13: Port of Hirtshals New Ferry Berth 4 - Pianc€¦ · Berth 4 Hirtshals –Kristiansand, HSC Fjord Cat (New Fjord Cat from 2020) A1 Consult - NordPIANC 2019 Ref. Fjord Line Ref. ColorLine

Construction Works, Phase 1

13A1 Consult - NordPIANC 2019

Page 14: Port of Hirtshals New Ferry Berth 4 - Pianc€¦ · Berth 4 Hirtshals –Kristiansand, HSC Fjord Cat (New Fjord Cat from 2020) A1 Consult - NordPIANC 2019 Ref. Fjord Line Ref. ColorLine

Construction Works, Phase 1

14A1 Consult - NordPIANC 2019

Page 15: Port of Hirtshals New Ferry Berth 4 - Pianc€¦ · Berth 4 Hirtshals –Kristiansand, HSC Fjord Cat (New Fjord Cat from 2020) A1 Consult - NordPIANC 2019 Ref. Fjord Line Ref. ColorLine

Construction Works, Phase 2

15A1 Consult - NordPIANC 2019

Ref. Bladt

Ref. Trelleborg