1. Which of the following will not result in improving
operations productivity:
a) increasing working speed.
b) improving working method.
c) reducing cost.
d) reducing wastage.
e) reducing participation.
2. Which of the following ratios does not express
productivity:
a) results achieved to resources consumed
b) output produced to numbers of hours used
c) output achieved to number of people employed
d) input used divided by output produced
e) output produced to number of machines used
3. Employee productivity can be improved by which
of the following:
a) structure of the organization
b) goals of the organization
c) unionization of the company
d) al l of the above
4. Which of the following factors have lesser affecton the productivity of an organization
a) government regulations
b) process automation
c) diversification
d) process layout
e) inventory management
5. Which of the following is not the primary activity
in an organization
a) operationsb) marketing and sales
c) human resources development
d) inbound logistics
e) after sales services
6. Which of the following can have the most impact
on a company’s productivity:
a) innovation
b) industrial dispute
c) investment
d) interest rate
e) inflation rate
7. Organizational productivity can be improved by
the following except:
a) employee involvement and empowerment
b) customer orientation
c) effective leadership and change managementd) continuous developments of product and services
e) economic contraction
8. Which of the following may not be an order win-
ning criteria:
a) meeting customer quality expectation
b) lowering costs
c) on-time delivery
d) design abil ity
9. Continuous improvement is a system to improvetotal quality
a) True
b) False
10. The Kaizen approach requires operational man-
agers to be process-oriented.
a) True
b) False
11. The 5S system is an initial stage of TQM imple-
mentation
a) True
b) False
12. Japanese companies are not famous for group-
based activities.
a) True
b) False
page 1 of 2
Name: E#: Date
PRODUCTIVITY MEASUREMENT POST-TEST
8/17/2019 POM Test 01
2/2
13. A process-oriented manager should put high
value on:
a) skills development
b) employee morale
c) communication
d) al l of the above
e) only (a)
14. The 5S system includes the following elements:
a) tidiness.
b) order.
c) discipline.
d) cleanliness.
e) All the above.
15. Which of the following does group-based activity
not achieve:
a) improved productivity
b) increased profits
c) financial rewards for group leader
d) improved morale
e) none of the above
16. To create a team culture, which of the followingshould an organization not do:
a) organize teams round functions
b) use cross-functional teams
c) integrate people abilities with team objectives
d) encourage commitment through non-financial
rewards
e) recognize team effort early
17. Team working can lead to the following, except:
a) co-operation between individualsb) higher staff turnover
c) greater job satisfaction
d) higher social satisfaction
e) lower absenteeism
18. Lean production is ‘lean‘ because it results in
less of the following, with the exception of:
a) human effort
b) manufacturing space
c) investment
d) inventory to keep
e) defects
19. Total integrated management (TIM) is a Japanese
approach aimed at improving product quality.
a) True
b) False
20. Which of the following elements is not part of the
TIM ‘management cycle’:
a) vision
b) strategy
c) planning
d) control
e) processes
21. Key elements of a continuous improvement pro-
gram include:
a) benchmarking
b) team working
c) process redesign
d) all the above
e) none of the above
22. Which of the following will companies aiming to
achieve world class status not benefit from:
a) only top management involvement in strategic
decision-making
b) competitive planning
c) visible commitment from the top
d) delegation and management accountability
e) total communication at all levels
23. Effectiveness means:
a) meeting market requirements
b) producing to specification
c) producing as cheaply as
24. Efficiency means:
a) keeping the operation going at all costs
b) maximizing utilization
c) satisfy customers immediately
d) minimizing cost
25. A flexible manufacturing system is best for:
a) high variety output
b) low variety output
c) medium variety output
page 2 of 2
Name: E#: Date
PRODUCTIVITY MEASUREMENT POST-TEST