PoA Standards. Courtney Blodgett Joint Coordination Workshop, Bonn 24 March 2012. New PoA Standards. Standard for demonstration of additionality, development of eligibility criteria and application of multiple methodologies for Programme of Activities Approved EB 65 - PowerPoint PPT Presentation
Citation preview
www.perspectives.cc · [email protected] © 2012 Perspectives GmbH
PoA Standards
Courtney Blodgett
Joint Coordination Workshop, Bonn
24 March 2012
www.perspectives.cc · [email protected] 2
New PoA Standards
Standard for demonstration of additionality, development of eligibility criteria and application of multiple methodologies for Programme of Activities- Approved EB 65
Also relevant: Standard for sampling and surveys for CDM project activities and programmes of activities- Approved EB 65
www.perspectives.cc · [email protected] 3
Key challenges of PoA standards - timing
Deadline of 25 July for uploading for registration- 226 PoAs in validation* - 15 PoAs submitted in February- Average time for start of comment period to requesting
registration: 255 days, approximately 8.5 months- Average time from requesting registration until registration: 100
days (approximately 3.3 months)- = Already a tight schedule for being registered by 2012
- High number of PoAs in non- LDCs: 32 PoAs in China, 27 in South Africa, 22 in India, 12 in Indonesia, 10 in Kenya
Compliance with the standards adds further complications/ possible delays to validation
* March 2012 CDM Pipeline, UNEP Risoe
www.perspectives.cc · [email protected] 4
Key challenges of PoA standards - Implementation
Co-ordinating & Managing Entity (CME) Manual- Useful document for thinking long term- But adds significant complications during validation
- 20 – 40 page document- Adds a substantial amount of extra work (and therefore
adds to the cost) during validation which adds to the 2012 time pressure
- Currently no precedence for a CME manual- A standardized optional template would be useful for facilitating
writing and validation
www.perspectives.cc · [email protected] 5
Sampling and survey standards
Single sampling plan covering a group of Component Project Activities (CPAs) now allowed - For micro or small scale PoAs applying a 95/10
confidence/precision- When there is either homogeneity of included CPAs or the
differences among the included CPAs is taken into account in the sample size calculation
- Highly relevant for i.e. energy efficient lighting and cookstove PoAs
Reduces transaction costs by not needing to sample each and every CPA
Very positive step: remains to be seen how DOEs apply the standards during validation