Fameco General Contracting Co. LLC P.O Box No. 51610 Tel: +971 2 6329300/5543636 Fax: +971 2 6329440/5543533 Email: [email protected] [email protected] Abu Dhabi, UAE ENVIRONMENT INSPECTION CHECKLIST Document No.: PM-13-A Revision No.: 00 Date: February 02, 2011 Name of Site : P3B Borouge- 3 Job No. : Sl. No Description Observation Measures 1 Availability of sufficient quantity of waste bins with colour coding & labelling. 2 Disposal of wastes from bins at regular intervals 3 Soil contamination due to improper storage of chemicals/oil 4 Soil contamination due spillage of any hazardous material from equipments 5 Water Stagnation (near canteen, L camps and Drinking water facility) 6 Quality of drinking water at a. Labour colony b. Office c. Canteen d. Water supplied to site 7 Wastage of water workplaces 8 Quality of treated water from sewage treatment plant (if any) 9 Dust pollution control 10 Emissions from D.G , equipments and vehicles under control 11 Acoustic control for DG 12 Noise level in workplace

PM-13-A Environment Inspection Checklist

Embed Size (px)

DESCRIPTION

Environment Inspection report

Citation preview

Fameco General Contracting Co. LLC

P.O Box No. 51610Tel: +971 2 6329300/5543636Fax: +971 2 6329440/5543533Email: [email protected] [email protected] Dhabi, UAEENVIRONMENT INSPECTION CHECKLISTDocument No.: PM-13-ARevision No.: 00Date: February 02, 2011

Name of Site: P3B Borouge- 3 Job No. : Sl. NoDescriptionObservationMeasures

1Availability of sufficient quantity of waste bins with colour coding & labelling.

2Disposal of wastes from bins at regular intervals

3

Soil contamination due to improper storage of chemicals/oil

4Soil contamination due spillage of any hazardous material from equipments

5Water Stagnation (near canteen, L camps and Drinking water facility)

6Quality of drinking water at

a. Labour colony

b. Office

c. Canteen

d. Water supplied to site

7Wastage of water workplaces

8Quality of treated water from sewage treatment plant (if any)

9Dust pollution control

10Emissions from D.G , equipments and vehicles under control

11Acoustic control for DG

12Noise level in workplace

________________________HSE Officer