Upload
mackenzie-ivory
View
213
Download
0
Tags:
Embed Size (px)
Citation preview
PLM
The View From a Project House
• We are Unique (just like everyone else)• Project Size - $1,000 to $4.9MM• Project Duration – 2 days to 3.5 years• Serial Number 2 is the rare event• Lifecycle of Product – 3 years to 25 years• 41 Employees executing 155 projects a year
• Our Challenges• Right Sizing the Tool to the Project• Maintaining the Ability to Maintain• Loss of Revision Control Through Customer Modifications• Integrating PM with PLM (convergence of data)• Accessing obsolete data with obsolete tools
• Our Tools• Intranet Integrated Job Costing System• AutoCAD Electrical, Inventor and Vault• Custom Workflows• Virtualization
Job Progress
BOM
Material Status
Time Charged