1 R. Padgett - IDRN Overview
Russell Padgett
JTEG OverviewFeb 2019
NAVAIR’s Digital Thread:
PLM / Digital Backbone Environment
IDRN PM / ISE DIO
Justin ReynoldsFRC East MBD Project Lead
R. Padgett: IDRN Exec Overview
Core MBD Deployment
3 R. Padgett - IDRN Overview
Recapping the MBD Problem
3
OEMDelivered
Models/2d Dwgs
Healed Models/Analysis
TranslatedMachine
Code
QA against 2D Data
CM Loss CM Loss CM LossNMCI, PCs, Disc's RDT&E Non-IA Net Paper
CM Loss: MFG. ECM – Complete at FRCE, expanding to other customers. Underway at FRCSE and FRCSW
• Discrepant Work Orders (wrong version manufactured)
• Airworthiness Risk (Installation of compromised component)
• Shut Down Risk
• Repeat Data Healing & Translation
Connectivity Gaps: IC – COMPLETE FOR MFG at FRCE. Deployed at FRCSE and FRCSW, pursuing
accreditation
• Data Hunting
• Sneaker Netting Delays
• Non-IA Compliant Networks
• Shut Down Risk
FRCs Pre-MBD State
4 R. Padgett - IDRN Overview 4
OEMDeliveredModels
Healed Models/Analysis
TranslatedMachine
Code
QA against Original Data
RDT&E
DATA
PDM(Team Center)
MBD Environment
Processes
Facilities Training
People
Recapping the Solution: MBD = IC + ECM + OI
Software Controlled,
Network Facilitated,
Closed Loop Process
IC = Industrial Connectivity on the RDT&E Network (CIP Project)
ECM = Engineering Configuration Management, Teamcenter PDM deployment on RDT&E (CIP Project)
OI = Organizational Implementation, supporting local investment project (people, processes, training, facilities)
5 R. Padgett - IDRN Overview
RDT&E Network Team
6 R. Padgett - IDRN Overview
RDT&E Network Diagram
7 R. Padgett - IDRN Overview
MFG Teamcenter Workflow
8 R. Padgett - IDRN Overview
MFG Teamcenter Data Structure
8
Machining Operation
Operation Related Datasets
Manufacturing Part
Machining Operation Revision
Manufacturing Part Revision
MEWorkarea (Workcenter)
Mfg. Part Related Datasets
Eng. Part Related Datasets
Engineering Part Revision
Manufacturing part revision linked to the Machining Operation as a Mfg. Target relation.
Manufacturing Part Revision is pasted to the Machining Operation Revision as a METarget occurrence type.
MEWorkarea Revision (Workcenter) is pasted to the Machining Operation Revision as a MEWorkarea occurrence type.
9 R. Padgett - IDRN Overview
MBD Questions?
R. Padgett: IDRN Exec Overview
Expansion to IDRN
11 R. Padgett - IDRN Overview
The Problem
ISSCFRC-I
6.06.1
6.26.3
6.47.2
7.1010.0
321170
818
74179
1221
1340
1000s ofInstructions &
Processes
10,000s
of pages
Disparate IT Systems, E-mail, Spreadsheets, Paper
12 R. Padgett - IDRN Overview
The Problem
ISSCFRC-I
6.06.1
6.26.3
6.47.2
7.1010.0
321170
818
74179
1221
1340
1000s ofInstructions &
Processes
10,000s
of pages
Disparate IT Systems, E-mail, Spreadsheets, Paper
13 R. Padgett - IDRN Overview
IDRN Solution: 100k Ft
- One System / One Environment
- Common Digital Processes
- Automated Processes
- Common Data Access
- Resource Sharing/Surging
- Single PLM Environment- Aviation PLM Foundation
- Connected Data Sources- Enterprise Service Bus Foundation
- Reduced Fleet Support Turnaround Time
- Increased Fleet Support Response Time
- Proactive Sustainment
14 R. Padgett - IDRN Overview
Web Services
IDRN: Single PLM Platform & Digital Backbone
JDRS JEDMICSTMAPS SLICWave MRPOther
DBs
TEAMCENTER
eQube®-MI Digital Backbone
Maximo
Out of the Box CommercialConnectors
DevelopedLegacy SystemConnectors
DLA OS File System
*
In-Service Support Digital Environment
15 R. Padgett - IDRN Overview
TMAPS SLIC JEDMICS DIFMs MaximoOS File System
IDRN Capability Establishment Objectives
Initial Prioritized Capabilities - - - - -Continuous Capability Growth
Process ManagementWorkflow Linkage
CAPA
Integrated Quality Management
Centrally HostedNMCI/RDT&E access
Digital ManufacturingIndustrial Connectivity
3D Data ManagementEngineering Toolset
Data Structures Process Mapping & Workflow Configuration
Metrics Reports & Analytics Dashboard
SIMCENTERToolset
WMS JDRS MRP
TEAMCENTER®
eQube®-MI Digital Backbone
• EIs• TDs• Analysis
• TPDRs• Maint Plans• FMECAs
• Source Data• Work Docs• QCLs
• 339s• CDs• ECPs
• STIGs• Message• HRA
• RFA• CPI• Etc…
MS SP PLMs Others
R-BOMManagement
Digital Tech dataDelivery
TMAPS MRP
MRP
MRP JEDMICS TMAPS DIFMS
MAXIMO SLIC JDRS Etc…
MBD
MBD
WMS
Funding ManagementWorkflow Linkage
16 R. Padgett - IDRN Overview
PLM Data/Program/User Construct
User Groups& Roles
Programs &Projects
System Users
CM Group
Ro
les Lead
Journey
Stress Group
Ro
les Lev III
Lev II
Contracts
Ro
les PCO
Specialist
Logistics
Ro
les APML
LEM
Program DataProgram
Processes Project Schedules H-1 Program Data
Program Processes
Project Schedules F-18
Data Item
Structures
Workflow Templates
ScheduleTemplates
17 R. Padgett - IDRN Overview
Digital Backbone & Workflow Example
DLA-ESRS
JEDMICSTMAPS SLICWave MRPOther
DBsMaximo TAA OS File System
339 Example
• 339 Request (From DLA ESRS)
• FST Assignment
• Latest Config Check (From SLICWave)
• (Or From TMAPs or Other)
• Critical Item Check (From JDRS)
• Critical Item Assessment ( To JDRS)
• 339 Developed
• 339 Approved
• 339 Submitted (To DLA ESRS)
• Update JEDMICS if Needed
• Collect Elapsed Time
• Clocked Time (To TAA)
• 339 Performance Metrics
JDRS
MI Digital Backbone
TeamCenter
18 R. Padgett - IDRN Overview
Data Partitioning within Teamcenter
• Dwg• 3D Model• Document• Workflow• Etc
Program 1 Program 2
Program 3 Program 4
Repositories(Public Read Only)
TeamcenterEnvironment
Restricted Program Data• ITAR \ IP
Program Data
Released PLM Public
Data (Read Only)
Global PLM Data
Multi-Program Data
Indicates Program
Data relationship to
released read only
version.
• Data Creation• Data Import• Data Edit• Data Approval• Data Release• Etc.
Workflows:
Data:
19 R. Padgett - IDRN Overview
IDRN Capability Target Milestones
Jan
WMS (FST/FRC Processes)
QMS (Quality System)
FRC Digital Mfg
System Infrastructure
V-22 Bulk Data Import / Orphan Reporting / MRR Reporting
H-60 Data Import
MQ-8 Data Import
Jan Mar
Jun -------------------------
JulJun Aug
Aug
Mar
Apr
Oct Jan May
CY-20JunFeb
First Impacts
for ISS workload
First Impacts
for FRC Quality
- Interdependent on COMFRC EWO Program
Becomes Enterprise PLM
& Enterprise Service Bus
CY-19
20 R. Padgett - IDRN Overview
IDRN Questions?