Strengthening and Use of Country Safeguards Systems
Sharing Experience – Strengthening Partnerships
, - ,
Strengthening Country Systemsfor Aid Effectiveness in Viet Nam
Cao Manh CuongDeputy Director GeneralFERD/MPI
Development Bank (ADB), or its Board of Governors, or the government they represent. ADB does not guarantee the accuracyof the data included in this presentation and accepts no responsibility for any consequence of their use. Terminology used maynot necessarily be consistent with ADB official terms.
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 2/36
PART I. AID EFFECTIVENESS VIET NAMPART II. DEVELOPMENT EFFECTIVENESS
. COUNTRY SAFEGUARD SYSTEM
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 3/36
PART I. AID EFFECTIVENESS VIET NAM
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 4/36
Global Aid Effectiveness Journey
Dili Declarationon fragile states
(2010)Korea HLF
–
Accra Agenda for Action
. 1 Dec. 2011)
2008
Bogota Statement
Paris Declaration on
Aid
Monterrey Consensus
Harmonisation (2003)
on SSC (2010)
Effectiveness (2005)
(2002) 4
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 5/36
PARIS DECLARATION ON AID EFFECTIVENESS (PD)
56 Commitments and 12 Targets56 Commitments and 12 Targets
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 6/36
HANOI CORE STATEMENT (HCS)LOCALIZED PD TO VIETNAMESE CONTEXT
PARTNERSHIP GROUP ON AID EFFECTIVENESS (PGAE) (2004-2010)
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 7/36
WHAT CONTAINS IN HCS?
• HCS is the joint commitment of the GoV and DonorCommunity at the country level to implement PD inViet Nam.
• “Localizing” means that the contents, indicators and
targets of the PD are selected with fine-tuning to
feasibility and success of implementation in acountry context.
• HCS contains 28 Partnership Commitments and 14Indicators around the 5 PD key principles.
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 8/36
PD vs HCS MONITORING INDICATORS
, -
HCS equivalent
#8 - EIA / SIA (Environmental & social safeguard
indicator) #10 - Common project tools
#12 – Aid delegation
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 9/36
PD/HCS/AAA IMPLEMENTATION IN VIET NAM
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 10/36
KEY ACTIVITIES
1. Organizational Structure
2. Communication Strategy
3. Thematic studies for Policies Dialogues
4. PD/HCS Monitoring and Evaluation Framework
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 11/36
1. ORGANIZATION STRUCTURE
CG
Aid EffectivenessForum Events
Anti-corruptionForum
VietnamBusiness Forum
Aid Effectiveness Forum
Thematic Groups (TGs)
Dual Track:Aid Effectiveness and Development Effectiveness
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 12/36
2. COMMUNICATION STRATEGY
.
Prime Minister, MPI disseminated thespirit and contents of HCS to the Line
the publication of HCS and AAA –
Questions and Answers Book).. ee ng w a ec or ar ners p
Groups and International SupportGroup.
3. Develop the HCS CommunicationStrategy.
Communication
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 13/36
2. THEMATIC STUDIES FOR POLICY DIALOGUES
Establishment of GoV-Donor Co-chairing Thematic Groups (TGs):
1. Procurement2. Public Financial Management (PFM)
3. Social and Environment Impact Assessment (EIA andSIA)
4. ODA-on-bud et
5. Cost Norms
6. HCS Communication
. The outcomes of policy dialogues are regularly updated in the
Aid Effectiveness Report at the Mid-term and Annual CGs
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 14/36
3. PD/HCS MONITORING AND EVALUATION
1. Conduct baseline surve 2005 to define the
current status and the gaps to the indicativetargets in HCS.
2. Conduct HCS Independence Monitoring (2007.
3. In cooperation with OECD-DAC to carry out
Phase I and Phase II of PD/HCS Evaluation(2008 and 2010) and PD/HCS Monitoring
, , , .
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 15/36
GLOBAL PD MONITORING AND EVALUATION
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 16/36
Monitoring and evaluating
2005: Paris Declaration on Aid Effectiveness
Five principles,56 commitments
... and agreement to monitor and evaluate
indicatorsto monitor
.
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 17/36
Have the 2010 targets been met?,
1. Operational Development Strategies
2010 Target2005 Baseline
75%19% 50%
2a. Reliable Public Financial Management (PFM) systems
3. Aid flows are aligned on national priorities
50%38%
85%44%43%
51%4. trengt en capac ty y co-or nate support
5a. Use of country PFM systems
6. Strengthen capacity by avoiding Parallel PIUs
54%40% 47%
5651 696 1 145
49%
7. Aid is more predictable
8. Aid is untied
71%42%40%
>87%87%89%
9. Use of common arrangements or procedures
10a. Joint missions
10b. Joint country analytic work
66%
40%
43%
20%
41%
46%
22%
44%
11. Results-oriented frameworks
12. Mutual accountability
38%7% 25%
100%44% 48%
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 18/36
VIET NAM: RESULTS OF 2011 PD MONITORING SURVEY
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 19/36
PD/HCS MONITORING SURVEY 2011
Indicators
Paris Declaration
Baseline
Progress in 2007
2010
1: Ownership B-rating AER (World Bank)
a: ua y o -po n s or an
2b: Quality of procurement
systems
D-level OECD-DAC
3: Alignment to nationalpriorities
81% 80% 93%
4: Co-ordinated capacity
eve opmen5a: Use of GoV PFM
system32% 63% 62%
5b: Use of GoVprocurement system
33% 56% 65%
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 20/36
PD/HCS MONITORING SURVEY 2011
Par is Dec lara t ion
2005
Baseline Progress in 2007
Achievement for
2010
6: Avoiding parallel PMUs 111 58 16
7: Aid is more predictable 78% 70% 90%
8: Aid is increasingly untied --- --- ---
9: Use of common
procedures
10a: Joint mission 10% 20% 16%
11: Performancemeasurement frameworks
- AER (World Bank)
Annual assessment/12: Mutual accountability - independent
monitoring
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 21/36
Environmental Safeguard Indicator
HCS Commit ment : GoV and donors improve
env ronmen a an soc a sa eguar s eve op specia ize
technical and policy capacity and enforcement of legislation )
n ca or a: ercen o nv ronmen a mpac
Assessments (EIAs undertaken for individual projects such
, ,
implemented to international standards and using
government systems
2010 Target : At least 100% of EIAs under donor-funded
projects implemented to international standards and at least
30% of these carried out using government systems.
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 22/36
Social Safeguard Indicator
HCS Commit ment : GoV and donors improve
environmental and social safeguards (develop specialized
technical and policy capacity and enforcement of legislation )
I ndicator 8b: Percent of Social Impact Assessments
(SIAs relate to issues of resettlement and ethnic minority
to international standards and using government
s stems
2010 Target : At least 100% of SIAs under donor-funded
projects implemented to international standards and at least
30% of these carried out using government systems.
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 23/36
HCS Indicator 8: EIAs & SIAs
2010achievement
8a. GoV and donors 9% b number of EIAs 35%improveenvironmental
safe uards EIA 64% with additional 15%
0.4% by number of28%
. o an onorsimprove socialsafeguards (SIA)
s
82% with additionalsafeguards
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 24/36
Ind icator 8a: 2005-2010 Progress
(30%)• Donors support
environment safeguardthrough EIA TWG
• Note: 49 EIAs surveyed in 2010
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 25/36
Recent EIA initiatives
aw on nv ronmen a ro ec on , ecree
80/2006 & Circular 005/2008
As part of the Law on Environmental Protection
Decree 29 2011 on EIA-SEA & Circular 26 2011
SEA for Socio-economic Development Strategies,Master Plans, Plans
or e ores ry sec or, e c.
Capacity building, EIA technical guidelines
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 26/36
Ind icator 8b: 2005-2010 Progress
• Almost achieved2010 target (30%)
• Gaps & DPsafeguard measures
• Note: 29 SIAs surve ed in 2010
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 27/36
EIA and SIA Harmonization Efforts with
the 6 Banks ADB, AfD, JICA, KEXIM, KfW WB
.Programmes and Projects between the GoV and 6 Banks in thegiven period (2008 – 2009 and 2010 – 2011) and results of JointPorfolio Performance Reviews JPPRs between the GovernmentODA Inter-ministerial Taskforce (IMTF) and the 6 Banks.
2. The Joint Action Plans consists of specific actions with agencies in-charge, deadlines and monitoring indicators.
3. The 6 Banks are also the champions in the EIA and SIA Thematic
roups un er e ormer ar ners p roup on ec veness(PGAE) and currently the Aid Effectiveness Forum (AEF).
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 28/36
VIET NAM: RESULTS OF 2011 PD/HCS EVALUATION
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 29/36
Ke Achievements
1. Strong Government ownership and leadership inthe development agenda.
2. Significant progress in alignment of development.
3. Improvement in aid predictability and the reduction
of number of parallel PMUs.. oo progress n anagemen or eve opmenResults (MfDR)
5. Strong mutual accountability structures
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 30/36
Constraints and Challen es1. Lack of connection between planning and budgeting
. .
3. Aid is still fragmented (PBA, DoL, aid predictability)4. Challenges in harmonization and alignment
(international standards) (get down to technical level).
5. Constraint in ca acit at sub-national level.6. Lack of joint programming,delegated cooperation,
joint missions and analytical works among DPs..
effectiveness and development effectiveness.
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 31/36
PART II. DEVELOPMENT EFFECTIVENESS
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 32/36
.
opportunity for Viet Nam to integrate Aid Effectivenessinto the development.
2. In the Post-Bussan period, Viet Nam is committed to
work with develo ment artners to further im rovecountry systems. Safeguard systems are very high onboth the aid effectiveness and development
.
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 33/36
Remaining Challenges
1. Though a lot of progress has been made in the country safeguard
and the need for donor support
systems the gaps between the Government and DPs and between
the country and international standards or good practices in termsof the policies and institutional framework and the capacitycons ra n s s ex s a requ re e con nue suppor s romdonors.
.obstacle to harmonization and alignment and reducing the spill-over impacts.
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 34/36
ON COUNTRY SAFEGUARD SYSTEM
7/31/2019 Plenary 1_Cao Manh Cuong
http://slidepdf.com/reader/full/plenary-1cao-manh-cuong 35/36
Next Step and Initiatives
1. In line with the commitments of the Bussan Partnership Document, out - out an “tr angu ar” cooperat on nee s to e
promoted in efforts of strengthening Partnership on SafeguardSystems, specially through the Global Building Blocks on Better
.
2. In the Asia – Pacific region a kind of network or a community of
exchange of experiences.