Phone: 613-475-1162 · 613-475-1830 · Fax: 613-475-2599 · Email: linda@brighton.ca 67 Sharp Road, Brighton, Ontario, K0K 1H0 MUNICIPALITY OF BRIGHTON REQUEST FOR PROPOSAL PW 2018-12 Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided and mandatory to assist in the issuance of any addendum/addenda (via fax or email), should the need arise. Prospective Contractors are required to register and also, check Municipality’s Website site for any addendum(s) that may have been issued prior to submission of their final documents. The Municipality of Brighton is not responsible for the Contractor's failure to register for updates or addendum/Addenda to the originally posted Bid; it is the Contractor’s responsibility. To Register Bid Please Email: [email protected]

PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Phone: 613-475-1162 · 613-475-1830 · Fax: 613-475-2599 · Email: [email protected]

67 Sharp Road, Brighton, Ontario, K0K 1H0

MUNICIPALITY OF BRIGHTON REQUEST FOR PROPOSAL PW 2018-12Preliminary and Final Design Services

MBBR AdditionBrighton Wastewater Treatment System

PLEASE NOTE: BID REGISTRATION

Bid Registration is provided and mandatory to assist in the issuance of any addendum/addenda (via fax or email), should the need arise. Prospective Contractors are required to register and also, check Municipality’s Website site for any addendum(s) that may have been issued prior to submission of

their final documents. The Municipality of Brighton is not responsible for the Contractor's failure to register for updates or addendum/Addenda to the

originally posted Bid; it is the Contractor’s responsibility.

To Register Bid Please Email: [email protected]

Page 2: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Municipality of Brighton

Request for Proposal PW 2018 -12

Preliminary and Final Design Services

MBBR Addition Brighton Wastewater Treatment System

July 18, 2018

Page 3: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

The Corporation of the Municipality of Brighton

Request for Proposal PW 2018 – 12

Preliminary and Final Design Services - MBBR Addition for the Brighton Wastewater Treatment System

Please submit the complete proposal in sealed envelopes. Address label sheets provided by the Municipality shall be firmly affixed to the outside of the envelopes, quoting the above proposal number and forward to the following before the Closing Date and Time:

Ms. Linda Widdifield Director of Finance and Administrative Services Municipality of Brighton 35 Alice Street, P.O. Box 189 Brighton, Ontario K0K 1H0

Closing Date and Time: Friday, August 24, 2018 - 11:30 A.M. Local Time

Issued: July 18, 2018

Page 4: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MBBR Addition Brighton Wastewater Treatment System RFP PW 2018 -12

July, 2018 Page 1

Section 1 – Proposal Information

Description of Undertaking

The Municipality of Brighton (Municipality) wishes to engage the services of a consulting engineering firm (Consultant) to complete preliminary and final design to upgrade the Brighton Wastewater Treatment System with a Moving Bed Biological Reactor (MBBR) system. The project will also include all approvals, tendering of the project and construction supervision and contract administration. Proposal Submission Deadline The Proposal must be received and time-stamped at Municipal Hall, located at 35 Alice Street, Brighton, Ontario, K0K 1H0 on or before the Proposal Closing Date and Time which shall be Friday, August 24, 2018 at 11:30 am local time. The Municipality is not responsible for proposals which arrive late, are not properly marked, or are delivered to any facility other than the Municipal Hall. Proposals received late will be rejected and returned un-opened. Proposal Criteria 1. Proposal Submissions

All proposals are to be submitted in sealed envelopes with the address label sheet(s), as provided by this RFP, affixed firmly to the front of the envelopes with all details completed as required on the envelopes. The Proposal must be submitted in two envelopes, as follows:

Envelope 1 – Engineering Proposal The first address label sheet entitled “Detailed Engineering Proposal” shall be firmly affixed to Envelope 1. This envelope shall contain four (4) original hard copies of the Engineering Proposal and a duplicate pdf copy on a memory stick. The Engineering Proposal shall not exceed 20 pages in length (excluding Appendices) and should include the following information at minimum. See also recommended Appendices at end of this section.

• A comprehensive but concise description of the Consultant’s company history, staff resources and applicable experience completing similar wastewater treatment plant designs, including application for MOECC and other approvals, tendering and contract administration and supervision. Indicate the firm’s base of operations and the main office from which the project will be completed. The main office shall be the normal work location of the named Project Manager.

Page 5: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MBBR Addition Brighton Wastewater Treatment System RFP PW 2018 -12

July, 2018 Page 2

• A thorough description of the Consultant’s understanding of the scope of work, including a description of the key elements of the project,

• Identify the Project Manager and key project staff and sub-consultants for all phases of the assignment. Provide single page project team matrix showing Project Team and reporting structure. Such matrix to include staff names and staff function or discipline.

• Describe the relevant experience of the Project Manager and key project staff. Provide same for sub-consultants (including geotechnical engineering staff). Descriptions shall emphasize experience on similar wastewater treatment plant final designs. Provide references in Schedule 1 provided with this RFP. (See Appendix A below).

• Provide detailed Task/Time table (Table 1) showing the breakdown of staff time (in hours) for each Main Task and subtask. Main Tasks shall be Task 1 to Task 10 as per Section 3. Table 1 to be maximum 3 pages long on 11 by 17 inch (ledger) paper. Table to sum the total man hours for each person vertically. Table 1 shall also sum horizontally, all person hours for each subtask and Main Task.

• Table 1 is to show clearly the names and positions of each member of the Consultant’s project team and support staff as required to complete all tasks of the project. Table 1 is to also list sub-consultant staff and hours for sub-consultant staff for each task.

• Provide detailed graphical project schedule (Table 2) outlining the time requirements and date of completion of the project’s 10 Main Tasks, and subtasks, to complete the project, by the specified completion dates including: o start and finish dates of Main Tasks o milestone dates for provision of deliverables to the Municipality o Include provision of two to three weeks for Municipality review of deliverables

depending on level of review necessary;

Note: It is assumed that the preliminary design will take at most 2 months once engineering assignment awarded, and then an additional 3 months for final design (including preselection of the preferred MBBR vendor). Two months additional are assumed to apply and receive MOECC approvals. Overall project schedule is to tender the contract in spring, 2019 with an early summer, 2019 construction start. The Proposal is to include a discussion of the project schedule and will provide additional detail and explanation if the schedule is shorter, or longer, than generally described above. The following information is to be included in the Appendices of the Detailed Engineering Proposal. It is recommended that the Appendices be organized as follows:

Page 6: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MBBR Addition Brighton Wastewater Treatment System RFP PW 2018 -12

July, 2018 Page 3

Appendix A of Proposal. Include Section 4 (Form of Proposal, Schedule 1, Schedule 2 and Statement of Bidder). Total of 4 pages to be completed, signed by company principle, witnessed where indicated and dated. Appendix B of Proposal. Include corporate literature, including literature for any sub consultants. Appendix C of Proposal. Include professional profiles for all key staff, including key staff of any sub consultants. Appendix D of Proposal. Copy of standard insurance certificate for company for all insurances currently in place, including insurance certificates for any sub consultants. Include current WSIB insurance certificate(s) as well. Appendix E of Proposal. Copy of Certificate of Authorization from Professional Engineers Ontario (PEO). Include copy of same for sub consultants, as appropriate, including geotechnical sub consultants. Envelope 2 – Cost Proposal The second address label sheet entitled “Upset Cost Estimate” shall be firmly affixed to Envelope 2. This envelope shall contain two (2) hard copies of the Cost Proposal and one pdf copy of the Cost Proposal on a memory stick. The Cost Proposal shall be submitted in Envelope 2 separate from the Engineering Proposal. Prices shall not include HST. An Upset Cost Estimate Table (Table A) shall be prepared which shall be identical in structure as Table 1 (Task/Time Table) except this Table will also include the daily rates for all named staff members and sub-consultant staff. In addition, the Bid Form (on yellow paper) at the end of this RFP is to be completed and included in the Cost Proposal. The Upset Cost Estimate Table will clearly show the total cost of each staff member for each of the Main Tasks, as well as the total costs for each staff member for all tasks when added vertically. As well, total staff costs for each subtask (and a total cost for each Main Task) will be shown horizontally. Total fees and disbursements for each sub task and Main Task to be shown separately. Show also the total cost for each Main Task and Subtask (fees plus disbursements). Include line items in the Upset Cost Table for the $8,000 Contingency Item for geotechnical investigations plus a separate line for the $4,000 Contingency Items for concrete and compaction testing during the construction phase.

Page 7: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MBBR Addition Brighton Wastewater Treatment System RFP PW 2018 -12

July, 2018 Page 4

The costs as presented in the Bid Form and in the Upset Cost Estimate Table are to match for each main task. The Municipality will pay directly for all tender advertisement costs and any fees charged by approval authorities Cost Proposal Allowances As above, the Cost proposal is to include an allowance of $8,000.00 for geotechnical investigations of the preferred location during preliminary and or final design. The Cost Proposal to also include an allowance of $4,000.00 for compaction and concrete testing during the construction phase. The above allowances exclude HST. Site Supervision Costs For purposes of pricing, the Cost proposal shall assume full time construction supervision for 8 calendar work weeks (a total of 40 days) at 10 hours on site per day. On site inspection time therefore to be assumed to be 400 hours. 2. Proposal Selection Criteria

The following selection criteria outline the areas of importance that will be considered in project award. Proposal submissions should satisfy all criteria points wherever possible. Consultants will be evaluated based on the following weighted evaluation factors: Quality Factors (Envelope 1) Firm's Qualifications and Experience on Similar Assignments 15% Project Team’s Experience and Structure 20% Project Understanding and Approach 10% Work Plan, Methodology, Communication and Quality Assurance Plan 15% Project Schedule 10% Subtotal 70% Cost Estimate Factor (Envelope 2) 30% Total 100%

Page 8: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MBBR Addition Brighton Wastewater Treatment System RFP PW 2018 -12

July, 2018 Page 5

3. Inquiries During Proposal Preparation

Inquiries regarding the interpretation or scope of the Request for Proposal shall be directed by email to;

Mr. Jeff Graham, P. Eng. GSS Engineering Consultants Ltd.

E-mail: [email protected]

Only clarifications confirmed in writing shall have any bearing on the Consultant selection process. All replies to inquiries will be answered in the form of an addendum and posted on the Municipal website. Bidders are required to monitor the Municipality’s website for any addendums. Bidders shall not make verbal inquiries to Municipal staff or any other related person including Council members. 4. Addenda Required additions, deletions or alterations in the requirements of the Request for Proposal documents will be supplied in the form of an addendum and posted on the Municipality’s website. All such changes shall become an integral part of the Request for Proposal documents. Proponents are required to insert and state on the Form of Proposal, in the space provided, the number of addenda reviewed as part of their proposal preparation, and as posted to the Municipality’s website during the Proposal period or provide an initialled copy of the addenda with the proposal submission. Failure to acknowledge all addenda may result in your proposal being disqualified. 5. Consultant Selection Committee

The Consultant Selection Committee will consist of representatives of the Municipality. An independent consultant(s) may be retained to assist with the selection process. Such consultant(s) shall be ineligible to submit a proposal for this RFP. 6. Public Opening

This proposal will be opened at a public opening following the Closing Date and Time on Tuesday, July 31, 2018 at 2:00 P.M. Local Time. Proposals will be opened in the Council Chambers at the Municipal Town Hall. The opening will acknowledge receipt of submitted proposals only. Prices and detailed information will not be released.

Page 9: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MBBR Addition Brighton Wastewater Treatment System RFP PW 2018 -12

July, 2018 Page 6

RFP Schedule

Milestone Dates Date

RFP Posted July 18, 2018

RFP Questions Received Deadline August 17, 2018

RFP Addenda / Answers to Questions Posted to the Municipality ’s Website August 21, 2018

Closing Date and Public Opening of Proposals August 24, 2018

Contract Awarded (est.) September 14, 2018

Engineering Agreement Signed (est.) September 21, 2018

7. Consultants to Investigate Consulting firms submitting a proposal shall understand and acknowledge that while this Request for Proposal outlines the scope of work and specific requirements, the Consultants shall satisfy themselves by such means as they prefer, as to the extent of work required to complete the assignment. 8. Engineering Agreement and Execution

The 2006 Municipal Engineers Association – Consulting Engineers of Ontario (MEA-CEO) Long form Agreement, as amended solely by the Municipality of Brighton, will be used as the contract document. The Agreement to be executed within fifteen calendar days of written notice of award. 9. Proposals to Address Requirements

All proposals shall address the requirements as per attached “Form of Proposal” in Section 4. All 4 pages provided in Section 4 to be completed and signed as an original document by an authorized signing officer. Corporate Seals are requested but are not mandatory. Faxed or reproductions of these pages are not acceptable. Vendors/Consultants are to submit their proposal packages to satisfy the Corporation's needs. 10. Irrevocable

Proposals are irrevocable for 60 calendar days from date of Proposal closing. All proposals shall be and remain irrevocable unless withdrawn prior to the designated closing time.

Page 10: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MBBR Addition Brighton Wastewater Treatment System RFP PW 2018 -12

July, 2018 Page 7

11. Legible

All proposals to be typed with a minimum of color attributes using Arial font size 12.

12. Right to Reject or Not Open

The Municipality reserves the right to reject any or all proposals, and the lowest cost proposal will not necessarily be accepted. The Municipality reserves the right not to open a bid call should the Municipality deem, in its opinion, to have received an inadequate number of bid responses to the bid call and further the right is reserved to cancel and recall the competition. Unopened proposals will be returned to all vendors who responded. The Municipality reserves the right not to accept a proposal from any bidder who previously failed to accept a contract with the Municipality, or who provided unsatisfactory performance of a contract with the Municipality. The Municipality reserves the right not to accept a proposal from any person or corporation which includes any related corporation who, or which, has a claim or instituted a legal proceeding against the Municipality or against whom the Municipality has a claim or instituted a legal proceeding with respect to any previous contracts, bid submissions or business transactions who is listed as either the proposed general contractor or sub-contractor or vendor within the submitted proposal. As well, in the event that the project does not proceed to construction, for whatever reason, the Municipality reserves the right to terminate the project after the ECA has been applied for received, without cost or penalty. 13. No Claim for Compensation

No Proponent shall have any claim for any compensation of any kind whatsoever, as a result of participating in this RFP, and by submitting a proposal each proponent shall be deemed to have agreed that it has no claim. The Municipality assumes no responsibility or liability for costs incurred by the Vendors/Consultants prior to the entering into a written contract. 14. Proposal / Price / Taxes / Budget

All prices submitted shall be FIRM and in Canadian Dollars for the project and shall include, without limitation, all required labour, materials, disbursements. Harmonized Sales Tax (HST) is to be calculated separately. All costs incurred by the Proponent in carrying out research, investigation or otherwise as may be necessary for the preparation of a response to this Request for Proposal

Page 11: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MBBR Addition Brighton Wastewater Treatment System RFP PW 2018 -12

July, 2018 Page 8

shall be borne by the Proponent and will not be chargeable in any way to the Municipality. The award of this project is subject to final budget approval of the project by Brighton Council and/or senior Municipal staff. The Municipality reserves the right to change the scope of this project to bring the price within approved budget limits. The Municipality reserves the right to waive formalities and enter into negotiations with the successful Proponent in order to bring the project to within the budget available 15. Subject to Budget Provision

Should qualified bid submissions exceed the Municipality’s budget provision for this project, the Municipality reserves the right to cancel or recall the RFP process. 16. Adjustments Prior to Closing

Adjustments to submitted proposals by telephone, telegram, fax, or email shall not be considered. A bidder wishing to make adjustments to a submitted proposal must supersede it with a later proposal or letter enclosed in a proposal envelope and received on or before the closing time. Only the latest proposal received from a bidder will be opened and reviewed. 17. No Additional Content

Sketches, renderings or models illustrating the content of the proposal not otherwise requested or permitted are not to be supplied and will not be accepted by the Municipality. 18. Information Concerning Award

Only the successful Consultant will necessarily be advised of the proposal award. Those wishing to obtain information concerning the award may call the Muncipality at (613) 475 - 0670 during regular office hours. 19. Insurance

The following is taken from the Engineering Agreement. Satisfactory insurance certificates must be provided by the successful Consultant prior to signing of the Engineering Agreement. (a) The Consultant shall ensure that all insurance coverage, including all provisions

relating to insurance coverage set out in this section, are in place prior to the commencement of services pursuant to this Agreement.

Page 12: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MBBR Addition Brighton Wastewater Treatment System RFP PW 2018 -12

July, 2018 Page 9

(b) During the Term of this Agreement, and any renewal or extension thereof, the Consultant will, at its expense (including the cost of deductibles) maintain in effect, with an insurer licensed in Ontario:

(i) a contract of general liability insurance for its operations, with limits of not less

than Five Million ($5,000,000) Dollars, in addition to coverages for defence and claimants’ costs, all for any one occurrence, including coverage’s for:

• personal injury including death; • property damage or loss (direct or indirect and including loss of use thereof); • broad form property damage; • contractual liability; • non-owned automobile liability; • products – completed operations; • contingent employers liability; • cross liability; • severability of interest; and • blanket contractual liability.

The policy of insurance shall name the Municipality of Brighton as an additional insured with respect to its interest in the operations of the Consultant; shall provide that the policy shall be non-contributing with, and apply only as primary and not as excess to any other insurance available to the Municipality; and shall also provide that neither the Consultant nor the insurer shall cancel, materially change or allow the policy to lapse without first giving the Municipality thirty (30) days prior written notice.

(ii) a policy of professional liability insurance for errors and omissions insurance

covering claims and expenses for liability for loss or damage arising from negligence in the provision of the services, of standard wording, with coverage of no less than Two Million ($2,000,000) Dollars exclusive of interest or costs per occurrence; and

(iii) a policy of motor vehicle liability insurance of standard wording, covering:

• motor vehicles owned, leased or operated by or on behalf of the Consultant,

in connection with the services provided or to be provided under this Agreement, with coverage of not less than Two Million ($2,000,000) Dollars per claim; and

(c) Every policy of insurance shall contain either no deductible amount or a

deductible amount which is reasonable considering the financial circumstances of the Consultant. The Consultant shall be responsible to pay all deductible amounts.

Page 13: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MBBR Addition Brighton Wastewater Treatment System RFP PW 2018 -12

July, 2018 Page 10

(d) No policy shall contain any provision which would contravene the obligations of the Consultant hereunder or otherwise be to the detriment of the Municipality.

(e) The Consultant shall provide or cause to be provided to the Municipality, prior to

award of Contract, a certificate from its insurer, which shows that the policy or policies placed and maintained by it complies with the requirements of this agreement. No review or approval of any such insurance certificate by the Municipality shall derogate from or diminish the Municipality’s rights or the Consultant’s obligation contained in this Agreement.

(f) If at any time the Municipality is of the opinion that the insurance taken out by the

Consultant is inadequate in any respect, it shall forthwith advise the Consultant of the reasons therefore and the Consultant shall forthwith take out additional insurance satisfactory to the Municipality.

(g) The taking out of insurance shall not relieve the Consultant of any of its

obligations under this agreement or limit its liability hereunder.

(h) All policies of insurance shall be:

(i) written with an insurer licensed to do business in Ontario;

(ii) in form and content acceptable to the Municipality acting reasonably;

(iii) be non-contributing with, and will apply only as primary and not excess to any other insurance available to the Municipality; and

(iv) Contain an undertaking by the insurers to notify the Municipality in writing not less than thirty (30) days before any material change, cancellation, lapse or termination of the policies.

(i) Failure to provide the aforementioned insurance will result in the withholding of payments or at the sole option of the Municipality, forfeiture of the Contract.

20. Workplace Safety and Insurance Board

The Consultant shall be responsible for and shall pay all dues and assessments payable under the Workplace Safety and Insurance Act, the Employment Insurance Act or any other Act, whether Provincial or Federal, in respect to all his employees or operations and shall, upon request, furnish the Municipality of Brighton with satisfactory evidence that as, the Consultant, the provisions of any act have been complied with. A WSIB Clearance Certificate or Confirmation of Independent Operator Status must be submitted to the Municipality of Brighton prior to the execution of the contract.

Page 14: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MBBR Addition Brighton Wastewater Treatment System RFP PW 2018 -12

July, 2018 Page 11

21. Intellectual and Proprietary Rights

Upon award, all trade secrets, copyright patents and other intellectual and proprietary rights are and remain the property of the Municipality. Also, all artwork and print production devices will become the property of the Municipality. As well, the Consultant shall provide all AutoCAD drawing files in original AutoCAD program files as well as PDF format, on electronic media. All such drawing files shall become the property of the Municipality. Submit such drawing files at the preliminary design, final design, tender and record drawing steps. The same will apply for all Word files and Excel files if deemed required by the Municipality. Consultant to submit original Word and Excel files as well as PDF versions at milestone dates on electronic media. Consultant shall provide all above computer files above at no extra cost. 22. Employment Standards Act

There are specific requirements of the Employment Standards Act (2000), which came into effect September 4, 2001. Requirements must be adhered to by any vendors responding to this bid call. 23. Conflict of Interest

The Municipality reserves the right to disqualify a Proposal where the Municipality believes a conflict of interest or potential conflict of interest exists in regard to the Consultant and the intended project. The successful Consultant shall work solely and exclusively in the interests of the Municipality at all times to ensure that the project is successfully completed. The Consultant must identify current claims, potential claims, or disputes against the Municipality, if any, that the firm is involved with. The Consultant must identify current developer and development interest that the firm has in the service area, if any. This information and any conditions attached to the proposal will be considered in the Municipality’s evaluation of the proposal. The bidder asserts the following: • No person, firm or corporation other than the bidder has any interest in this proposal

or in the proposed contract for which this proposal is made and to which it relates.

• This proposal is made by the bidder without any connection, knowledge, comparison of figures or arrangement with any other person or persons making a proposal for the same work and is in all respects fair and without collusion or fraud.

• No member of the Council and no officer or employee of the Municipality is, will be,

or has become interested, directly or indirectly as a contracting party, partner,

Page 15: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MBBR Addition Brighton Wastewater Treatment System RFP PW 2018 -12

July, 2018 Page 12

stockholder, surety or otherwise howsoever in or in the performance of the said contract, or in the supplies, work or business in connection with the said contract or in any portion of the profits thereof, or any supplies to be used herein, or in any of the monies to be derived there from.

Page 16: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MBBR Addition Brighton Wastewater Treatment System RFP PW 2018 -12

July, 2018 Page 13

Section 2 – Project Information Package

The Municipality of Brighton (Brighton) wishes to engage the services of a consulting engineering firm (Consultant) to complete a preliminary and final design to upgrade the Brighton Wastewater Treatment with a Moving Bed Biological Reactor (MBBR) system.

A Schedule B Class EA is currently being completed. The Class EA final report will be recommending that a MBBR system be constructed near the downstream end of the facultative lagoon to provide primarily removal of ammonia. It is anticipated that the Class EA final report will be placed on the 30 day public review period in the near future.

The capacity of the new MBBR system is to match the existing average day, rated capacity of the lagoon system (4,600 m³/day) with an appropriate allowance for higher maximum day sewage flows. The final design is also to include features to facilitate expansion of the MBBR system in the future, if necessary.

The engineering assignment to also include the preselection of the preferred MBBR equipment and media vendor at the end of the preliminary design and include the vendor’s process design and equipment design in the final design phase of the project.

The Consultant is to also apply for all required approvals including obtaining an updated ECA from the Ministry of the Environment and Climate Change (MOECC) or subsequent ministry.

The Consultant shall also complete tendering of the project and provide all required construction supervision and contract administration services, including post completion warranty services.

1.1 Description of Existing Wastewater Treatment System

Figure 1 provides an aerial view of the existing Brighton Wastewater Treatment System including the initial aeration cell (cell), the large triangular stabilization pond (lagoon) with 3 baffles and inlet area of the two, parallel, artificial wetland cells (wetland). Figure 2 outlines the total property limits of the Wastewater Treatment System. The Brighton sewage system is classified as a Class 1 Wastewater Treatment Plant and a Class II Wastewater Collection System. The existing sewage lagoon system operates under Amended Environmental Compliance Approval (ECA) Number 3081-9XQNZK dated July 7, 2015. A copy of the ECA is provided at the end of this RFP in Appendix A. The wastewater treatment system has the following major components:

1. Sewage lagoon system. Located at 100 County Rd. 64, Concession B, Part Lot 33 and 34, Municipality of Brighton, Northumberland County. The site consists of the aerated cell, the 5.44 ha lagoon, a coagulant feed and mix system and two sludge drying beds. A small control building is provided which houses the coagulant feed

Page 17: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MBBR Addition Brighton Wastewater Treatment System RFP PW 2018 -12

July, 2018 Page 14

pumps and MCC’s etc. No back up generator is provided. Arena Creek runs adjacent to the aeration cell, lagoon and the wetland. The sewage lagoon system is located at the south end of Brighton.

The current, rated capacity of the sewage lagoon system is 4,600 m³/day (Average

Day Flow). 2. The constructed wetlands form part of the sewage lagoon system and are located

across from County Road 64 from the main lagoon component of the sewage lagoon system. The wetlands receive treated effluent from the lagoon portion of the sewage lagoon system and provide effluent polishing. The wetlands have continuous discharge to an existing marsh and Presqu’ile Bay.

Appendix B provides a copy of the 2017 annual report for the Brighton Wastewater Treatment System. This report provides current a summary of current sewage flows, raw sewage quality and effluent quality. A major issue with the existing system is inadequate ammonia treatment.

A more specific description of the Brighton Wastewater Treatment System is provided as follows:

a) An earthen berm aeration cell with area of 0.68 ha and depth of approximately 3 m. Aeration is provided with two, 11.2 kW mechanical aerators and two 18 kW floating, aspirator type aerators. Raw sewage enters the aeration cell for initial treatment.

b) Coagulant feed system featuring a coagulant mixing chamber located in the

discharge channel from the aeration cell. A Parshall flume is located in the outfall channel (with ultrasound level monitoring) to provide a continuous record of treated sewage flows.

c) An earthen berm, facultative stabilization lagoon receiving the effluent from the

aeration cell. The stabilization lagoon has an area of 5.44 ha with a depth of approximately 1.5 m. The effluent from the south end of the stabilization lagoon is sampled to confirm compliance with ECA effluent quality requirements. The stabilization lagoon is equipped with 3 floating baffles to minimize short circuiting in the lagoon.

d) Two parallel constructed wetland cells which receive treated flow from the

stabilization lagoon. The wetland cells are located on the south side of County Road 64. Each cell is of the same size and configuration and receives approximately the same influent flow from a flow splitting and measurement chamber located at the inlet end of the wetland cells. The total area of the wetland cells is 6.2 ha. Each cell has an outflow structure that discharges to a common effluent chamber. From the common effluent chamber, the final effluent discharges to natural wetlands at the

Page 18: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MBBR Addition Brighton Wastewater Treatment System RFP PW 2018 -12

July, 2018 Page 15

edge of Presqu’ile Bay. Effluent from the wetlands is sampled to confirm the quality of the effluent satisfies the effluent Objectives.

e) The coagulant feed system includes a 35 m³ external coagulant storage tank, two

chemical feed pumps located in basement of control building and discharge piping to the coagulant mixing chamber.

f) Control building located adjacent to south end of the aeration cell. This building

provides an electrical room area for the motor control center (MCC) for the incoming 3 phase power supply and alarm panel, and a work room, washroom and storage room area. A rudimentary office area is also provided to support the collection of operating records and to maintain the sewage lagoon system log book. The coagulant pumps and piping valve panel is located in the basement of the control building.

g) Power supply to Control Building is a single, 100 amp, three phase power supply. h) Sludge drying beds with underdrain system directing water drained from sludges to

return to the aerated cell. i) Aerated cell bypass piping. The bypass piping runs along the west side of the

aerated cell and can be used to bypass raw sewage around the aerated cell to the aerated cell outfall channel. However, this bypass piping is currently not usable.

1.2 General Description of MBBR Upgrade for the Wastewater Treatment System

As per section 1.1, the current, average day rated capacity of the wastewater treatment system is 4,600 m³/day. Sewage flows over the last several years have averaged approximately 3,000 m³/day though flows in 2017 averaged much higher (4,040 m³/day) due to very wet weather and extremely high water levels in Lake Ontario, which increased infiltration into sanitary sewers near the Presquile Bay waterfront.

In comparison, the average day sewage flow for 2016 was only 2,717 m³/day due to unusually dry and warm conditions in that year.

The Municipality has been completing repairs to the sanitary sewer system for the last three years to reduce infiltration rates. Overall, average sewage flows have remained similar for several years even though residential growth in Brighton remains strong. Such sewer repairs, and smoke testing of the sewers, are scheduled for 2018 and continued reduction of infiltration and inflow is anticipated.

The draft, Schedule B Class EA report prepared by JL Richards (dated April 2017) reviewed various treatment alternatives to upgrade the existing wastewater treatment system.

Page 19: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MBBR Addition Brighton Wastewater Treatment System RFP PW 2018 -12

July, 2018 Page 16

The draft Schedule B report recommended consideration of a fixed media system to better treat ammonia. As well, Brighton Council recently passed a motion to complete the Schedule B Class EA with the preferred alternative being a MBBR system installed at the downstream end of the lagoon.

The following key criteria will apply to the MBBR system design:

- MBBR system to be rated for an average day flow of 4,600 m³/day with design features to facilitate expansion of the MBBR system in the future by approximately 50%.

- At the above capacity of 4,600 m³/day, the i) summer time ammonia effluent criteria to be 6 mg/l with an objective of 3 mg/l and ii) during the winter period the ammonia effluent criteria to be 8 mg/l with an objective of 4 mg/l, assuming the inflow temperature is as low as 0.5 deg. C.

- For the above ammonia limits, the inflow design concentration of ammonia to be 25 mg/l.

- The peak flow rate through the MBBR to be as high as 12,000 m³/day. At this peak flow rate, ammonia removal rates to decline by no more than 50% from the proposed limits above at the design flow rate of 4,600 m³/day.

- The MBBR system will receive influent from the stabilization lagoon (pond). This influent to the MBBR system will contain, periodically, large objects such as turtles as well as aquatic vegetation that grows in the stabilization lagoon. As such, during preliminary design, the consultant to consider a coarse bar screen (with manual cleaning) or an automatic bar screen. Such screening shall potentially be in a separate inlet building to protect the screening system during the winter.

- If an automatic screen is recommended, a screenings washer compactor system should not be required. Rather, the screenings need to be dried by gravity before being disposed of by the operators.

- The MBBR tankages may be a single tank or dual tank system. To be confirmed during preliminary design. If dual tank, each tank to be the same dimensions and same volume and one tank shall be fully functional if the other tank is off line.

- The Consultant shall complete a total station survey of the lagoon and all connecting piping, structures, etc. to the constructed wetlands and complete a hydraulic analysis to determine if the MBBR system can operate by gravity, or whether lagoon effluent needs to be pumped into the MBBR system with dedicated effluent pumping system. This survey to be done at the onset of the project.

- There is a possibility that a pumping system will be required to introduce lagoon effluent into the MBBR system, as the hydraulic gradient between the lagoon and the downstream wetlands is relatively flat. Effluent piping under County Rd 64 further complicates the existing hydraulic grade line. If screening is recommended, it shall be completed ahead of the pumping system.

Page 20: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MBBR Addition Brighton Wastewater Treatment System RFP PW 2018 -12

July, 2018 Page 17

- The MBBR design must feature a fail safe system such that if the MBBR fails, or becomes plugged, the lagoon effluent will continue to flow over the existing lagoon effluent discharge structure to the downstream constructed lagoons, as it does now.

- The MBBR system will be constructed within reinforced concrete tanks partially or fully below grade and designed for water tight treatment of sewage. The Consultant will determine if the tank(s) need to be covered with a building or can be left open.

- Any pumping system required to introduce lagoon effluent into the MBBR to feature two (or three) influent sewage pumps and sized to allow one pump to be out of service and still pump the peak sewage flow of 12,000 m³/day.

- The MBBR system to feature an adjacent building to house the MBBR blowers and controls and all MCC’s/electrical etc. Building to be fully insulated and weatherproof.

- The building will feature an adjacent backup generator (external to building with weather and acoustic covers) to provide 100% back up power to operate the MBBR, the MBBR pumping system and blowers and all building electrical and control.

- The Consultant to determine if the MBBR to requires any effluent filtration system. - Figures 10-1, 10-2, 10-3 and 10-4 identify four (4) possible locations for the MBBR

system and associated control building. The consultant to review each location and identify the preferred location of the MBBR and building. The four alternatives are described briefly as follows, including preliminary advantages and disadvantages of each location:

Figure 10-1 (Alternative 1) – adjacent to wetlands on south side of County Road 64. Disadvantages may include minimal room to construct MBBR system due to proximity of Arena Creek and separation from control building and main access road on north side of County Road 64. A new hydro service likely required.

Figure 10-2 (Alternative 2) – adjacent and west of effluent outfall structure from lagoon. Disadvantages may include the need to relocate drainage ditch, further distance away from control building and main access road, power supply etc and need to travel along top of lagoon berm to access MBBR system.

Figure 10-3 (Alternative 3) – adjacent and east of effluent outfall structure from lagoon. While closer to main control building and lagoon access road than Alternative 2, still need to travel along top of lagoon berm to access. Adjacent Arena Creek may limit available room at this site.

Figure 10-4 (Alternative 4) – in south east corner of lagoon. Advantages include close proximity to main access road and existing control building and existing hydro supply. Potentially allows new bypass pipe from aeration cell discharge channel directly to MBBR which would allow bypass of lagoon for sludge removal etc. Disadvantages include adjacent, buried main Bell fiber line, and potential need to relocate lagoon baffle # 2 and lagoon baffle # 3.

Page 21: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MBBR Addition Brighton Wastewater Treatment System RFP PW 2018 -12

July, 2018 Page 18

Section 3 – Key Requirements of Engineering Process

This project will include, but will not be limited to, the following Main Tasks:

Task 1: Review all existing information Task 2: Complete Preliminary Design Task 3: Complete preselection of preferred MBBR equipment supplier Task 4: Compete Final Design of MBBR Task 5: Apply and receive all MOECC approvals Task 6: Tender MBBR Project Task 7: Provide construction supervision services Task 8: Provide contract administration services including warranty services The above Main Tasks to be completed by the selected Consultant are outlined below. This list should be augmented as required and believed necessary based on the Consultant’s experience and knowledge. Task 1: Review all existing information. A summary of the activities to be undertaken in this task is as follows: • Meet with Municipal Council, staff and others to identify available background

information;

• Collect and review all annual operating reports, available Record Drawings, operating and maintenance data, etc.;

• Collect and review government agency information and policies;

• Inspect existing facilities with Municipal wastewater operations staff;

Task 2: Complete Preliminary Design

• Meet on site with Municipal staff and carefully review advantages and disadvantages of each of the four alternative locations of the MBBR

• As part of the above review of alternative locations, complete topographic survey of lagoon and north end of wetlands including all piping and chambers etc, Fully document existing hydraulic grade line conditions for average day flows and peak flows.

• Confirm preliminary depth of MBBR tank (or tanks) and tank dimensions. Confirm if MBBR pumping system is required and provide recommendation whether effluent filtration (for removal of excess suspended solids) is required.

Page 22: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MBBR Addition Brighton Wastewater Treatment System RFP PW 2018 -12

July, 2018 Page 19

• Confirm if influent screening is required, including type of screen, and means to drain/store temporarily the screenings. Confirm building requirements.

• Recommend whether MBBR tankage should be contained within a building.

• Prepare preliminary design report which documents recommended location for MBBR system. Report to include full justification for selection of preferred location. Review carefully with Municipal staff.

• Report to also include schematic plan view and profile view to scale of MBBR system, preliminary elevations and hydraulic grade lines and tank volumes.

• Preliminary Design Report to also provide preliminary estimate of project cost and operating and maintenance costs.

Task 3: Preselection of Preferred MBBR Equipment Supplier. • Initiate preselection of MBBR equipment supplier immediately after preliminary

design report approved by Muncipality. • Prepare MBBR system preselection document in draft for review and approval by

Muncipality. Identify possible MBBR equipment suppliers with input from Muncipality. • Issue preselection document to suppliers and provide recommendation report to

Muncipality as to preferred MBBR supplier. • Recommendation report to include, at minimum, costs by each supplier to provide

process and tankage design for MBBR, costs by supplier to provide required blowers, diffusers, controls, MBBR media, media retention sieves etc. Report to also document performance warrantyies offered by each supplier, including guaranteed ammonia removal rates under winter and summer conditions.

• Recommendation report to identify preferred MBBR system supplier.

Recommendation report to also identify any changes to preliminary MBBR system design based on selected MBBR supplier equipment, normal tank depths or size etc.

• Update as necessary preliminary estimates of project cost and operations and

maintenance costs.

Page 23: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MBBR Addition Brighton Wastewater Treatment System RFP PW 2018 -12

July, 2018 Page 20

Task 4: Compete Final Design of MBBR System

• Obtain MBBR process design from preferred MBBR equipment supplier. Confirm required MBBR tank volumes, configuration and dimensions.

• Compete geotechnical investigations for preferred location of MBBR system. As per Section 1, assume a cost allowance of $8,000,00 (plus HST) for geotechnical investigations. Include allowance in Cost proposal. Consultant to prepare tender with scope of geotechnical investigation and obtain at least 3 price proposals for geotechnical work. Final selection to be confirmed by Municipality. Cost to obtain costs to be included in proposal costs.

• Complete final design of MBBR tankage, pumping system (if required), influent

screening system, effluent filtration (if required), control building design and related design of all process and aeration piping, site work design, site electrical etc. Provide complete final design drawing set including all site work and site piping drawings, structural and architectural drawings, electrical and control drawings. Include backup generator details etc.

• Provide construction specifications and Form of Tender etc. When combined with

drawings, to form complete Contract Documents for project. • Prepare Design Report for project to satisfy MOECC application requirements.

Include all process design information from MBBR supplier.

• Provide updated project cost estimate as well as updated operations and maintenance cost.

Task 5: Apply and receive all MOECC Approvals • Submit final drawing set, specifications and Design Report to MOECC along with

ECA application. Obtain ECA amendment for MBBR project on behalf of Muncipality. • Submit additional applications to conservation authority, if necessary, for stream or

drainage relocations.

Task 6: Tender MBBR Project

• Consultant to prepare complete Tender Document package and assist Municipality in tendering the contract.

• Consultant to organize mandatory bidders meeting during tender period and provide

addendum documenting the bidders present. • Consultant to prepare all required addendums during tendering.

Page 24: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MBBR Addition Brighton Wastewater Treatment System RFP PW 2018 -12

July, 2018 Page 21

• Consultant to review all tenders, check references for all least the two lowest bidders, and provide a recommendation of tender award.

Task 7: Provide construction supervision services

• Provide full time qualified site inspector. Assume total of eight work weeks of inspection time at 10 hours per day on site time.

• Site inspector to complete daily construction log and shall submit the construction

log book to the Municipality at the time of Substantial Performance. • Site inspector to take daily photos of key activities and email photos to Wastewater

Supervisor each day with summary notes. • Site inspector to arrange audit tests for compaction and arrange audit testing of

concrete. • Supervisor to immediately notify Consultant’s project manager and Muncipality of

any issue that might result in extra costs or delay of contract. • Supervisor shall take daily measurements of any item paid by quantity and record

such daily measurements or quantity in his log book. Task 8: Provide contract administration services including warranty services • Organize preconstruction meeting and attend site construction meetings at least

monthly. • Schedule all site meetings and prepare all meeting minutes.

• Compete compaction and concrete testing by approved materials testing company.

As per Section 1, assume a cost allowance of $4,000,00 (plus HST) for materials testing during construction. Include allowance in Cost proposal.

• Prepare payment certificates and review all requests for change orders and process

change orders when justified. • Determine Substantial Performance and Contract Completion and prepare such

documents when appropriate. • Provide as constructed drawings within 30 days of Substantial Performance. Provide

AutoCAD and pdf versions on memory stick and 3 copies of as constructed drawings on large format paper.

Page 25: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MBBR Addition Brighton Wastewater Treatment System RFP PW 2018 -12

July, 2018 Page 22

• Prior to Substantial Performance, document all uncompleted work and all contract deficiencies, including associates values of uncompleted work and deficiencies.

• Complete warranty inspection of project approximately one month prior to the end of

the 12-month warranty period. Document warranty inspection and document all deficiencies.

Page 26: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MBBR Addition Brighton Wastewater Treatment System RFP PW 2018 -12

July, 2018 Page 23

Section 4 – Form of Proposal, Schedules 1 and 2 and Statement by Bidder

These 4 pages are to be completed and signed and witnessed (where indicated) and included in the Proposal as Appendix A.

I/We hereby submit the attached proposal documents to satisfy the requirements as laid out by the Municipality of Brighton, inclusive of Addenda No(s): __________ (as applicable). I/We agree that we have reviewed and understand the proposal documents and I/We are capable and willing to perform the requirements of the contract and enter into a legal agreement with the Municipality in regard thereto and where the proposal is submitted by a Corporation, it shall be signed by a duly authorized officer of the company. Should the proposal be submitted by a Partnership or Proprietor, it shall be signed by the partners or owner. I/We agree that this offer shall be irrevocable from the time the proposals are opened and for a period of 60 calendar days. ______________________________________________________________________ Proposal Submitted By: (Please type/print) Name of Signing Officer below ____________________________________________ Firm Name: ____________________________________________________________ Address: ______________________________________________________________ Telephone: _____________________ Date: _____________________ Email of Singing Officer __________________________________________________ Signed and Submitted in the Presence of: ______________________________________ __________________________ Signing Officer Witness Note: This proposal will be received by the Closing Date and Time. Failure to complete and submit this Form of Proposal with original signatures as required will disqualify the proposal submission.

Page 27: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MBBR Addition Brighton Wastewater Treatment System RFP PW 2018 -12

July, 2018 Page 24

Form of Proposal - Schedule 1

References

Please provide at minimum, three (3) references for similar projects that your firm has provided similar services for since January, 2010. References will be equal in complexity and service requirements as outlined in this proposal call.

Location and Project

Description

Name/Position/Phone #

of Reference

Start and Completion

Dates of Project

Note to Bidder: Refer to the Proposal Information Failure to provide Schedule 1 will render the proposal informal. Informal proposals will not be considered for award.

Page 28: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MBBR Addition Brighton Wastewater Treatment System RFP PW 2018 -12

July, 2018 Page 25

Form of Proposal - Schedule 2

List of Sub-Consultants

Task

Name of Sub-Consultant

Address of Sub-Consultant

Value of Sub-Contract

Note to Bidder: Refer to the Proposal Information Names, addresses and contract amounts must be filled in and submitted with the proposal. If a sub-Consultant is not to be used for any work listed, then indicate "by own forces" under Task heading above. Failure to provide Schedule 2 will render the proposal informal. Informal proposals will not be considered for award.

Page 29: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MBBR Addition Brighton Wastewater Treatment System RFP PW 2018 -12

July, 2018 Page 26

Statement by Bidder

Bid Document Name: Preliminary and Final Design Services – MBBR Addition

Brighton Wastewater Treatment System. Bid Document Number: RFP No. 2018 - 10 Bidder Company Name: _____________________________________________ Bidder Company Address: _____________________________________________ _____________________________________________ Email of Signing Officer _____________________________________________ 1. I/We have reviewed all terms and conditions of all forms included as part of this bid

package. 2. I/We have read and understand all of the terms and conditions of the forms

included as part of this bid package. 3. I/We understand that if our bid is successful, all requirements of the successful

bidder as outlined in this bid document will be completed by the time and in the format required.

Dated at ___________________this_________ day of _________________, 20_____. ____________________________ ____________________________________ Witness Signature of Signing Officer ____________________________________ Name of Signing Officer (Please Print) ____________________________________ Position

Page 30: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MBBR Addition Brighton Wastewater Treatment System RFP PW 2018 -12

July, 2018 Page 27

BID FORM Municipality of Brighton

Request for Proposal PW – 2018-12

Item or Task Description Cost

1 Review all existing information

2 Complete Preliminary Design

3 Complete preselection of preferred MBBR equipment supplier

4 Complete final Design of MBBR

5 Apply and receive all MOE approvals*

6 Tender MBBR Project

7 Provide construction supervision services

8 Provide contract administration services including warranty services

Allowance Geotechnical Investigation $ 8,000.00

Allowance Compaction and Concrete Testing $ 4,000.00

Total (excluding HST)

* Ministry of Environment, Conservation and Parks

Page 31: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Affix this address label sheet to the front of your envelope / submission.

Note: The address label sheet must be affixed to the front of your envelope / submission. The Municipality will not be held responsible for submissions that are not labeled.

Proposal Submission

From: Contact: Telephone:

Deliver to:

Ms. Linda Widdifield - Director of Finance and Administrative Services Municipality of Brighton, 35 Alice Street,

P.O. Box 189 Brighton, Ontario

K0K 1H0

Proposal Number: No. 2018 - 10 Closing Date and Time: July 31, 2018 at 2:00 pm Local Time Description: Preliminary and Final Design – MBBR Addition - Brighton Wastewater Treatment System

Envelope #1 - Engineering Proposal (no cost information is to be included in this envelope)

Page 32: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Affix this address label sheet to the front of your envelope / submission.

Note: The address label sheet must be affixed to the front of your envelope / submission. The Municipality will not be held responsible for submissions that are not labeled.

Proposal Submission

From: Contact: Telephone:

Deliver to:

Ms. Linda Widdifield - Director of Finance and Administrative Services Municipality of Brighton, 35 Alice Street,

P.O. Box 189 Brighton, Ontario

K0K 1H0 Proposal Number: No. 2018 - 10 Closing Date and Time: July 31, 2018 at 2:00 pm Local Time Description: Preliminary and Final Design – MBBR Addition - Brighton Wastewater Treatment System Envelope #2 - Cost Proposal

Page 33: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Figure 1 - Aerial View of Brighton SewageLagoon System - Existing Conditions

18-031

AutoCAD SHX Text
STABILIZATION LAGOON
AutoCAD SHX Text
AERATED CELL EFFLUENT
AutoCAD SHX Text
BAFFLE (1 OF 3)
AutoCAD SHX Text
ORIGINAL MECHANICAL AERATORS
AutoCAD SHX Text
APPROX. RAW SEWAGE INLET SEWER
AutoCAD SHX Text
SLUDGE DRYING BED
AutoCAD SHX Text
CONTROL BUILDING AND COAGULATE DOSING
AutoCAD SHX Text
ARTIFICIAL WETLANDS (1 OF 2 CELLS)
AutoCAD SHX Text
LAGOON EFFLUENT TO ARTIFICIAL WETLAND
AutoCAD SHX Text
N
AutoCAD SHX Text
AERATED CELL
AutoCAD SHX Text
APRROX. FLOW PATH
Page 34: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

PROPERTY LIMIT OF THE BRIGHTON

WPCP, INCLUDING SEPARATE LANDS

SOUTH OF COUNTY ROAD 64 FOR

WETLANDS

MUNICIPALITY OF BRIGHTON

18-031 FIGURE 2

METERS

4002000

AutoCAD SHX Text
COUNTY ROAD 64
AutoCAD SHX Text
MUNICIPAL PROPERTY LINE (TYP.)
AutoCAD SHX Text
FACULATATIVE LAGOON
AutoCAD SHX Text
AERATED CELL
AutoCAD SHX Text
TRUNK INLET SEWER
AutoCAD SHX Text
MUNICIPAL PROPERTY LINE (TYP.)
AutoCAD SHX Text
MUNICIPAL PROPERTY LINE (TYP.)
AutoCAD SHX Text
OWNER OF THIS AREA TO BE CONFIRMED
AutoCAD SHX Text
CONSTRUCTED WETLANDS
AutoCAD SHX Text
MUNICIPAL PROPERTY LINE (TYP.)
AutoCAD SHX Text
SLUDGE DRYING BEDS
AutoCAD SHX Text
AERATED CELL
AutoCAD SHX Text
VALVE CHAMBER
AutoCAD SHX Text
INCOMING TRUNK SEWER
AutoCAD SHX Text
CELL EFFLUENT SEWER TO LAGOON
AutoCAD SHX Text
BYPASS SEWER
AutoCAD SHX Text
INCOMING TRUNK SEWER
AutoCAD SHX Text
NEW CONCRETE SCREEN CHAMBER WITH MANUALLY CLEANED ALUMINUM SCREEN
AutoCAD SHX Text
NEW MANHOLE & SEWER
AutoCAD SHX Text
LAGOON
AutoCAD SHX Text
DRAWING No.
AutoCAD SHX Text
REVISION / ISSUE
AutoCAD SHX Text
Drawn:
AutoCAD SHX Text
Date:
AutoCAD SHX Text
Checked:
AutoCAD SHX Text
Approved:
AutoCAD SHX Text
Design:
AutoCAD SHX Text
Scale:
AutoCAD SHX Text
Design Engineer
AutoCAD SHX Text
Seal not valid unless signed and dated
AutoCAD SHX Text
Client:
AutoCAD SHX Text
Title:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
THE POSITION OF POLE LINES, CONDUITS, WATERMAINS, SEWERS AND OTHER UNDERGROUND AND OVERGROUND UTILITIES ARE STRUCTURES IS NOT NECESSARILY SHOWN ON THE CONTRACT DRAWINGS AND WHERE SHOWN, THE ACCURACY OF THE POSITION OF SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED. BEFORE STARTING WORK, THE CONTRACTOR SHALL INFORM HIMSELF OF THE EXACT LOCATION OF ALL SUCH UTILITIES AND STRUCTURES, AND SHOULD ASSUME ALL LIABILITY FOR DAMAGE TO THEM.
AutoCAD SHX Text
CAUTION:
AutoCAD SHX Text
JTG
AutoCAD SHX Text
TDL
AutoCAD SHX Text
JTG
AutoCAD SHX Text
DEC 2015
AutoCAD SHX Text
1:4000
AutoCAD SHX Text
REVISION/ISSUE
AutoCAD SHX Text
DD/MM/YY
AutoCAD SHX Text
AIRPHOTO PROVIDE FROM GOOGLE EARTH TAKEN 5/22/2015
Page 35: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

³

³

³

FIGURE 10-1

MBBR TREATMENT ALTERNATIVES

BRIGHTON WASTEWATER TREATMENT SYSTEM

MUNICIPALITY OF BRIGHTON

METERS

100500

FINAL DRAWING INDICATED BY SEAL AND

SIGNATURE OF DESIGN ENGINEER

ALTERNATIVE 1

AutoCAD SHX Text
CONSTRUCTED WETLAND CELL 1 3.1ha 0.3m DEEP TERRACE 1m DEEP ZONES
AutoCAD SHX Text
CONSTRUCTED WETLAND CELL 2 3.1ha 0.3m DEEP TERRACE 1m DEEP ZONES
AutoCAD SHX Text
WASTE STABILIZATION POND (FACULTATIVE LAGOON) 5.44ha 1.5m DEEP (±81,000m)
AutoCAD SHX Text
AERATED LAGOON (CELL) 0.68ha 3m DEEP (±18,000m)
AutoCAD SHX Text
CONTROL BUILDING
AutoCAD SHX Text
11.3kW MECHANICAL AERATOR (TYP. OF 2)
AutoCAD SHX Text
MAINTENANCE ROAD
AutoCAD SHX Text
ACCESS ROAD
AutoCAD SHX Text
COUNTY ROAD 64
AutoCAD SHX Text
HARBOUR ST.
AutoCAD SHX Text
PRINCE EDWARD ST.
AutoCAD SHX Text
AERATED LAGOON INLET VALVE CHAMBER
AutoCAD SHX Text
SLUDGE DRYING BEDS
AutoCAD SHX Text
LEVEL CONTROL STRUCTURE - WETLAND 2
AutoCAD SHX Text
ROCK LINED OUTFLOW SWALES TO MARSH AREA
AutoCAD SHX Text
WATER LEVEL 80.5
AutoCAD SHX Text
35m³ COAGULANT TANK (3m ) COAGULANT TANK (3m )
AutoCAD SHX Text
CATWALK
AutoCAD SHX Text
CATWALK
AutoCAD SHX Text
1067 GRAVITY SEWER
AutoCAD SHX Text
300 FORCEMAIN
AutoCAD SHX Text
FLOW DIRECTION
AutoCAD SHX Text
1067
AutoCAD SHX Text
MH 198
AutoCAD SHX Text
MH 197
AutoCAD SHX Text
675 GRAVITY SEWER
AutoCAD SHX Text
MH 200
AutoCAD SHX Text
WATER LEVEL 79.4
AutoCAD SHX Text
WATER LEVEL 78.2
AutoCAD SHX Text
WATER LEVEL 78.2
AutoCAD SHX Text
INV - 79.88
AutoCAD SHX Text
INV - 79.18
AutoCAD SHX Text
ARENA CREEK
AutoCAD SHX Text
ARENA CREEK
AutoCAD SHX Text
BULTER CREEK
AutoCAD SHX Text
MAINTENANCE ROAD
AutoCAD SHX Text
HARBOUR ST. SEWAGE PUMPING STATION
AutoCAD SHX Text
GATE VALVE
AutoCAD SHX Text
79.0
AutoCAD SHX Text
78.0
AutoCAD SHX Text
79.5
AutoCAD SHX Text
81.4
AutoCAD SHX Text
83.8
AutoCAD SHX Text
80.5
AutoCAD SHX Text
COAGULANT MIXING CHAMBER
AutoCAD SHX Text
OUTLET CHANNEL WITH PARSHALL FLUME FLOW METER C/W ULTRASONIC
AutoCAD SHX Text
1067 BYPASS SEWER
AutoCAD SHX Text
914 OUTLET SEWER
AutoCAD SHX Text
914 OUTLET SEWER
AutoCAD SHX Text
3.5:1 SIDE SLOPES (TYP.)
AutoCAD SHX Text
1067 CONC.
AutoCAD SHX Text
18.8kW FLOATING AERATORS 1 & 2 (AUG. 2015)
AutoCAD SHX Text
81.0
AutoCAD SHX Text
±2.5:1 SIDE SLOPES (TYP.)
AutoCAD SHX Text
INV - 76.40
AutoCAD SHX Text
80.5
AutoCAD SHX Text
LAGOON LEVEL CONTROL STRUCTURE C/W STOP LOGS
AutoCAD SHX Text
600 CC
AutoCAD SHX Text
600 CC
AutoCAD SHX Text
MH
AutoCAD SHX Text
80.1
AutoCAD SHX Text
79.1
AutoCAD SHX Text
LEVEL CONTROL STRUCTURE - WETLAND 1
AutoCAD SHX Text
600 CC
AutoCAD SHX Text
600 CC
AutoCAD SHX Text
79.9
AutoCAD SHX Text
1m DEEP ZONE (TYP.)
AutoCAD SHX Text
1m DEEP ZONE (TYP.)
AutoCAD SHX Text
3:1 SIDE SLOPES (TYP.)
AutoCAD SHX Text
3:1 SIDE SLOPES (TYP.)
AutoCAD SHX Text
3:1 SIDE SLOPES (TYP.)
AutoCAD SHX Text
3:1 SIDE SLOPES (TYP.)
AutoCAD SHX Text
79.1
AutoCAD SHX Text
79.1
AutoCAD SHX Text
79.1
AutoCAD SHX Text
600 CC
AutoCAD SHX Text
300 FORCEMAIN FROM HARBOUR ST. SPS
AutoCAD SHX Text
300 FORCEMAIN
AutoCAD SHX Text
FLAP GATE VALVE
AutoCAD SHX Text
81.4
AutoCAD SHX Text
WETLAND INFLOW MONITORING STRUCTURE WITH TWO, 600mm WIDE, RECTANGULAR WEIRS C/W ULTRASONIC (1). WEIR INVERTS 78.80 (ADJUSTABLE)
AutoCAD SHX Text
MAINTENANCE ROAD
AutoCAD SHX Text
WETLAND OUTFLOW FLOW CONTROL STRUCTURE WITH TWO, 600mm WIDE, RECTANGULAR WEIRS C/W ULTRASONICS (2). WEIR INVERTS 77.8 (ADJUSTABLE)
AutoCAD SHX Text
600 OVERFLOW
AutoCAD SHX Text
200
AutoCAD SHX Text
MH 234
AutoCAD SHX Text
840
AutoCAD SHX Text
MH 235
AutoCAD SHX Text
840
AutoCAD SHX Text
600 CC
AutoCAD SHX Text
M
AutoCAD SHX Text
M
AutoCAD SHX Text
FORCEMAIN ACCESS CHAMBER
AutoCAD SHX Text
LEGEND MBBR SYSTEM. "P" INDICATES DUAL PUMP INFLUENT FEED SYSTEM. "AT" INDICATES MBBR AERATION TANK. APPROX. 6m x 5m BLOWER/ MCC/ ELECTRICAL BUILDING. EXTERNAL B/U GENERATOR NOT SHOWN.
AutoCAD SHX Text
ARENA CREEK
AutoCAD SHX Text
DRAINAGE DITCH
AutoCAD SHX Text
BAFFLE 1
AutoCAD SHX Text
BAFFLE 2
AutoCAD SHX Text
BAFFLE 3
AutoCAD SHX Text
BE
AutoCAD SHX Text
BURIED BELL FIBRE LINE
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
FINISHED GRADE ELEVATION (m)
AutoCAD SHX Text
80.1
AutoCAD SHX Text
PIPE INVERT (m)
AutoCAD SHX Text
DIRECTION OF FLOW
AutoCAD SHX Text
VALVE
AutoCAD SHX Text
FIG. No.
AutoCAD SHX Text
Drawn:
AutoCAD SHX Text
Date:
AutoCAD SHX Text
APPROVED:
AutoCAD SHX Text
Design:
AutoCAD SHX Text
Scale:
AutoCAD SHX Text
1:1000
AutoCAD SHX Text
JUL. 2018
AutoCAD SHX Text
JTG
AutoCAD SHX Text
TDL
AutoCAD SHX Text
JTG
AutoCAD SHX Text
FILE No.
AutoCAD SHX Text
18-031
AutoCAD SHX Text
NOTE: THE LOCATION AND ELEVATION OF PIPES, MANHOLES, STRUCTURES, VALVES, ETC. ON THIS DRAWING ARE BASED ON BEST AVAILABLE INFORMATION ONLY. DETAILED LOCAL SITE MEASUREMENTS, SURVEYS, AND LOCATES SHOULD BE COMPLETED IN ADVANCE FOR ALL PROJECTS/MODIFICATIONS.
AutoCAD SHX Text
DD/MM/YY
AutoCAD SHX Text
REVISION/ISSUE
AutoCAD SHX Text
P
AutoCAD SHX Text
AT
AutoCAD SHX Text
BE
AutoCAD SHX Text
POTENTIALLY RELOCATE ARENA CREEK
AutoCAD SHX Text
P
AutoCAD SHX Text
AT
Page 36: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

³

³

³

FIGURE 10-2

MBBR TREATMENT ALTERNATIVES

BRIGHTON WASTEWATER TREATMENT SYSTEM

MUNICIPALITY OF BRIGHTON

METERS

100500

FINAL DRAWING INDICATED BY SEAL AND

SIGNATURE OF DESIGN ENGINEER

ALTERNATIVE 2

AutoCAD SHX Text
CONSTRUCTED WETLAND CELL 1 3.1ha 0.3m DEEP TERRACE 1m DEEP ZONES
AutoCAD SHX Text
CONSTRUCTED WETLAND CELL 2 3.1ha 0.3m DEEP TERRACE 1m DEEP ZONES
AutoCAD SHX Text
WASTE STABILIZATION POND (FACULTATIVE LAGOON) 5.44ha 1.5m DEEP (±81,000m)
AutoCAD SHX Text
AERATED LAGOON (CELL) 0.68ha 3m DEEP (±18,000m)
AutoCAD SHX Text
CONTROL BUILDING
AutoCAD SHX Text
11.3kW MECHANICAL AERATOR (TYP. OF 2)
AutoCAD SHX Text
MAINTENANCE ROAD
AutoCAD SHX Text
ACCESS ROAD
AutoCAD SHX Text
COUNTY ROAD 64
AutoCAD SHX Text
HARBOUR ST.
AutoCAD SHX Text
PRINCE EDWARD ST.
AutoCAD SHX Text
AERATED LAGOON INLET VALVE CHAMBER
AutoCAD SHX Text
SLUDGE DRYING BEDS
AutoCAD SHX Text
LEVEL CONTROL STRUCTURE - WETLAND 2
AutoCAD SHX Text
ROCK LINED OUTFLOW SWALES TO MARSH AREA
AutoCAD SHX Text
WATER LEVEL 80.5
AutoCAD SHX Text
35m³ COAGULANT TANK (3m ) COAGULANT TANK (3m )
AutoCAD SHX Text
CATWALK
AutoCAD SHX Text
CATWALK
AutoCAD SHX Text
1067 GRAVITY SEWER
AutoCAD SHX Text
300 FORCEMAIN
AutoCAD SHX Text
FLOW DIRECTION
AutoCAD SHX Text
1067
AutoCAD SHX Text
MH 198
AutoCAD SHX Text
MH 197
AutoCAD SHX Text
675 GRAVITY SEWER
AutoCAD SHX Text
MH 200
AutoCAD SHX Text
WATER LEVEL 79.4
AutoCAD SHX Text
WATER LEVEL 78.2
AutoCAD SHX Text
WATER LEVEL 78.2
AutoCAD SHX Text
INV - 79.88
AutoCAD SHX Text
INV - 79.18
AutoCAD SHX Text
ARENA CREEK
AutoCAD SHX Text
ARENA CREEK
AutoCAD SHX Text
BULTER CREEK
AutoCAD SHX Text
MAINTENANCE ROAD
AutoCAD SHX Text
HARBOUR ST. SEWAGE PUMPING STATION
AutoCAD SHX Text
GATE VALVE
AutoCAD SHX Text
79.0
AutoCAD SHX Text
78.0
AutoCAD SHX Text
79.5
AutoCAD SHX Text
81.4
AutoCAD SHX Text
83.8
AutoCAD SHX Text
80.5
AutoCAD SHX Text
COAGULANT MIXING CHAMBER
AutoCAD SHX Text
OUTLET CHANNEL WITH PARSHALL FLUME FLOW METER C/W ULTRASONIC
AutoCAD SHX Text
1067 BYPASS SEWER
AutoCAD SHX Text
914 OUTLET SEWER
AutoCAD SHX Text
914 OUTLET SEWER
AutoCAD SHX Text
3.5:1 SIDE SLOPES (TYP.)
AutoCAD SHX Text
1067 CONC.
AutoCAD SHX Text
18.8kW FLOATING AERATORS 1 & 2 (AUG. 2015)
AutoCAD SHX Text
81.0
AutoCAD SHX Text
±2.5:1 SIDE SLOPES (TYP.)
AutoCAD SHX Text
INV - 76.40
AutoCAD SHX Text
80.5
AutoCAD SHX Text
LAGOON LEVEL CONTROL STRUCTURE C/W STOP LOGS
AutoCAD SHX Text
600 CC
AutoCAD SHX Text
600 CC
AutoCAD SHX Text
MH
AutoCAD SHX Text
80.1
AutoCAD SHX Text
79.1
AutoCAD SHX Text
LEVEL CONTROL STRUCTURE - WETLAND 1
AutoCAD SHX Text
600 CC
AutoCAD SHX Text
600 CC
AutoCAD SHX Text
79.9
AutoCAD SHX Text
1m DEEP ZONE (TYP.)
AutoCAD SHX Text
1m DEEP ZONE (TYP.)
AutoCAD SHX Text
3:1 SIDE SLOPES (TYP.)
AutoCAD SHX Text
3:1 SIDE SLOPES (TYP.)
AutoCAD SHX Text
3:1 SIDE SLOPES (TYP.)
AutoCAD SHX Text
3:1 SIDE SLOPES (TYP.)
AutoCAD SHX Text
79.1
AutoCAD SHX Text
79.1
AutoCAD SHX Text
79.1
AutoCAD SHX Text
600 CC
AutoCAD SHX Text
300 FORCEMAIN FROM HARBOUR ST. SPS
AutoCAD SHX Text
300 FORCEMAIN
AutoCAD SHX Text
FLAP GATE VALVE
AutoCAD SHX Text
81.4
AutoCAD SHX Text
WETLAND INFLOW MONITORING STRUCTURE WITH TWO, 600mm WIDE, RECTANGULAR WEIRS C/W ULTRASONIC (1). WEIR INVERTS 78.80 (ADJUSTABLE)
AutoCAD SHX Text
MAINTENANCE ROAD
AutoCAD SHX Text
WETLAND OUTFLOW FLOW CONTROL STRUCTURE WITH TWO, 600mm WIDE, RECTANGULAR WEIRS C/W ULTRASONICS (2). WEIR INVERTS 77.8 (ADJUSTABLE)
AutoCAD SHX Text
600 OVERFLOW
AutoCAD SHX Text
200
AutoCAD SHX Text
MH 234
AutoCAD SHX Text
840
AutoCAD SHX Text
MH 235
AutoCAD SHX Text
840
AutoCAD SHX Text
600 CC
AutoCAD SHX Text
M
AutoCAD SHX Text
M
AutoCAD SHX Text
FORCEMAIN ACCESS CHAMBER
AutoCAD SHX Text
LEGEND MBBR SYSTEM. "P" INDICATES DUAL PUMP INFLUENT FEED SYSTEM. "AT" INDICATES MBBR AERATION TANK. APPROX. 6m x 5m BLOWER/ MCC/ ELECTRICAL BUILDING. EXTERNAL B/U GENERATOR NOT SHOWN.
AutoCAD SHX Text
ARENA CREEK
AutoCAD SHX Text
DRAINAGE DITCH
AutoCAD SHX Text
BAFFLE 1
AutoCAD SHX Text
BAFFLE 2
AutoCAD SHX Text
BAFFLE 3
AutoCAD SHX Text
BE
AutoCAD SHX Text
BURIED BELL FIBRE LINE
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
FINISHED GRADE ELEVATION (m)
AutoCAD SHX Text
80.1
AutoCAD SHX Text
PIPE INVERT (m)
AutoCAD SHX Text
DIRECTION OF FLOW
AutoCAD SHX Text
VALVE
AutoCAD SHX Text
FIG. No.
AutoCAD SHX Text
Drawn:
AutoCAD SHX Text
Date:
AutoCAD SHX Text
APPROVED:
AutoCAD SHX Text
Design:
AutoCAD SHX Text
Scale:
AutoCAD SHX Text
1:1000
AutoCAD SHX Text
JUL. 2018
AutoCAD SHX Text
JTG
AutoCAD SHX Text
TDL
AutoCAD SHX Text
JTG
AutoCAD SHX Text
FILE No.
AutoCAD SHX Text
18-031
AutoCAD SHX Text
NOTE: THE LOCATION AND ELEVATION OF PIPES, MANHOLES, STRUCTURES, VALVES, ETC. ON THIS DRAWING ARE BASED ON BEST AVAILABLE INFORMATION ONLY. DETAILED LOCAL SITE MEASUREMENTS, SURVEYS, AND LOCATES SHOULD BE COMPLETED IN ADVANCE FOR ALL PROJECTS/MODIFICATIONS.
AutoCAD SHX Text
DD/MM/YY
AutoCAD SHX Text
REVISION/ISSUE
AutoCAD SHX Text
P
AutoCAD SHX Text
AT
AutoCAD SHX Text
BE
AutoCAD SHX Text
P
AutoCAD SHX Text
AT
AutoCAD SHX Text
POTENTIALLY RELOCATE DRAINAGE DITCH
Page 37: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

³

³

³

FIGURE 10-3

MBBR TREATMENT ALTERNATIVES

BRIGHTON WASTEWATER TREATMENT SYSTEM

MUNICIPALITY OF BRIGHTON

METERS

100500

FINAL DRAWING INDICATED BY SEAL AND

SIGNATURE OF DESIGN ENGINEER

ALTERNATIVE 3

AutoCAD SHX Text
CONSTRUCTED WETLAND CELL 1 3.1ha 0.3m DEEP TERRACE 1m DEEP ZONES
AutoCAD SHX Text
CONSTRUCTED WETLAND CELL 2 3.1ha 0.3m DEEP TERRACE 1m DEEP ZONES
AutoCAD SHX Text
WASTE STABILIZATION POND (FACULTATIVE LAGOON) 5.44ha 1.5m DEEP (±81,000m)
AutoCAD SHX Text
AERATED LAGOON (CELL) 0.68ha 3m DEEP (±18,000m)
AutoCAD SHX Text
CONTROL BUILDING
AutoCAD SHX Text
11.3kW MECHANICAL AERATOR (TYP. OF 2)
AutoCAD SHX Text
MAINTENANCE ROAD
AutoCAD SHX Text
ACCESS ROAD
AutoCAD SHX Text
COUNTY ROAD 64
AutoCAD SHX Text
HARBOUR ST.
AutoCAD SHX Text
PRINCE EDWARD ST.
AutoCAD SHX Text
AERATED LAGOON INLET VALVE CHAMBER
AutoCAD SHX Text
SLUDGE DRYING BEDS
AutoCAD SHX Text
LEVEL CONTROL STRUCTURE - WETLAND 2
AutoCAD SHX Text
ROCK LINED OUTFLOW SWALES TO MARSH AREA
AutoCAD SHX Text
WATER LEVEL 80.5
AutoCAD SHX Text
35m³ COAGULANT TANK (3m ) COAGULANT TANK (3m )
AutoCAD SHX Text
CATWALK
AutoCAD SHX Text
CATWALK
AutoCAD SHX Text
1067 GRAVITY SEWER
AutoCAD SHX Text
300 FORCEMAIN
AutoCAD SHX Text
FLOW DIRECTION
AutoCAD SHX Text
1067
AutoCAD SHX Text
MH 198
AutoCAD SHX Text
MH 197
AutoCAD SHX Text
675 GRAVITY SEWER
AutoCAD SHX Text
MH 200
AutoCAD SHX Text
WATER LEVEL 79.4
AutoCAD SHX Text
WATER LEVEL 78.2
AutoCAD SHX Text
WATER LEVEL 78.2
AutoCAD SHX Text
INV - 79.88
AutoCAD SHX Text
INV - 79.18
AutoCAD SHX Text
ARENA CREEK
AutoCAD SHX Text
ARENA CREEK
AutoCAD SHX Text
BULTER CREEK
AutoCAD SHX Text
MAINTENANCE ROAD
AutoCAD SHX Text
HARBOUR ST. SEWAGE PUMPING STATION
AutoCAD SHX Text
GATE VALVE
AutoCAD SHX Text
79.0
AutoCAD SHX Text
78.0
AutoCAD SHX Text
79.5
AutoCAD SHX Text
81.4
AutoCAD SHX Text
83.8
AutoCAD SHX Text
80.5
AutoCAD SHX Text
COAGULANT MIXING CHAMBER
AutoCAD SHX Text
OUTLET CHANNEL WITH PARSHALL FLUME FLOW METER C/W ULTRASONIC
AutoCAD SHX Text
1067 BYPASS SEWER
AutoCAD SHX Text
914 OUTLET SEWER
AutoCAD SHX Text
914 OUTLET SEWER
AutoCAD SHX Text
3.5:1 SIDE SLOPES (TYP.)
AutoCAD SHX Text
1067 CONC.
AutoCAD SHX Text
18.8kW FLOATING AERATORS 1 & 2 (AUG. 2015)
AutoCAD SHX Text
81.0
AutoCAD SHX Text
±2.5:1 SIDE SLOPES (TYP.)
AutoCAD SHX Text
INV - 76.40
AutoCAD SHX Text
80.5
AutoCAD SHX Text
LAGOON LEVEL CONTROL STRUCTURE C/W STOP LOGS
AutoCAD SHX Text
600 CC
AutoCAD SHX Text
600 CC
AutoCAD SHX Text
MH
AutoCAD SHX Text
80.1
AutoCAD SHX Text
79.1
AutoCAD SHX Text
LEVEL CONTROL STRUCTURE - WETLAND 1
AutoCAD SHX Text
600 CC
AutoCAD SHX Text
600 CC
AutoCAD SHX Text
79.9
AutoCAD SHX Text
1m DEEP ZONE (TYP.)
AutoCAD SHX Text
1m DEEP ZONE (TYP.)
AutoCAD SHX Text
3:1 SIDE SLOPES (TYP.)
AutoCAD SHX Text
3:1 SIDE SLOPES (TYP.)
AutoCAD SHX Text
3:1 SIDE SLOPES (TYP.)
AutoCAD SHX Text
3:1 SIDE SLOPES (TYP.)
AutoCAD SHX Text
79.1
AutoCAD SHX Text
79.1
AutoCAD SHX Text
79.1
AutoCAD SHX Text
600 CC
AutoCAD SHX Text
300 FORCEMAIN FROM HARBOUR ST. SPS
AutoCAD SHX Text
300 FORCEMAIN
AutoCAD SHX Text
FLAP GATE VALVE
AutoCAD SHX Text
81.4
AutoCAD SHX Text
WETLAND INFLOW MONITORING STRUCTURE WITH TWO, 600mm WIDE, RECTANGULAR WEIRS C/W ULTRASONIC (1). WEIR INVERTS 78.80 (ADJUSTABLE)
AutoCAD SHX Text
MAINTENANCE ROAD
AutoCAD SHX Text
WETLAND OUTFLOW FLOW CONTROL STRUCTURE WITH TWO, 600mm WIDE, RECTANGULAR WEIRS C/W ULTRASONICS (2). WEIR INVERTS 77.8 (ADJUSTABLE)
AutoCAD SHX Text
600 OVERFLOW
AutoCAD SHX Text
200
AutoCAD SHX Text
MH 234
AutoCAD SHX Text
840
AutoCAD SHX Text
MH 235
AutoCAD SHX Text
840
AutoCAD SHX Text
600 CC
AutoCAD SHX Text
M
AutoCAD SHX Text
M
AutoCAD SHX Text
FORCEMAIN ACCESS CHAMBER
AutoCAD SHX Text
LEGEND MBBR SYSTEM. "P" INDICATES DUAL PUMP INFLUENT FEED SYSTEM. "AT" INDICATES MBBR AERATION TANK. APPROX. 6m x 5m BLOWER/ MCC/ ELECTRICAL BUILDING. EXTERNAL B/U GENERATOR NOT SHOWN.
AutoCAD SHX Text
ARENA CREEK
AutoCAD SHX Text
DRAINAGE DITCH
AutoCAD SHX Text
BAFFLE 1
AutoCAD SHX Text
BAFFLE 2
AutoCAD SHX Text
BAFFLE 3
AutoCAD SHX Text
BE
AutoCAD SHX Text
BURIED BELL FIBRE LINE
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
FINISHED GRADE ELEVATION (m)
AutoCAD SHX Text
80.1
AutoCAD SHX Text
PIPE INVERT (m)
AutoCAD SHX Text
DIRECTION OF FLOW
AutoCAD SHX Text
VALVE
AutoCAD SHX Text
FIG. No.
AutoCAD SHX Text
Drawn:
AutoCAD SHX Text
Date:
AutoCAD SHX Text
APPROVED:
AutoCAD SHX Text
Design:
AutoCAD SHX Text
Scale:
AutoCAD SHX Text
1:1000
AutoCAD SHX Text
JUL. 2018
AutoCAD SHX Text
JTG
AutoCAD SHX Text
TDL
AutoCAD SHX Text
JTG
AutoCAD SHX Text
FILE No.
AutoCAD SHX Text
18-031
AutoCAD SHX Text
NOTE: THE LOCATION AND ELEVATION OF PIPES, MANHOLES, STRUCTURES, VALVES, ETC. ON THIS DRAWING ARE BASED ON BEST AVAILABLE INFORMATION ONLY. DETAILED LOCAL SITE MEASUREMENTS, SURVEYS, AND LOCATES SHOULD BE COMPLETED IN ADVANCE FOR ALL PROJECTS/MODIFICATIONS.
AutoCAD SHX Text
DD/MM/YY
AutoCAD SHX Text
REVISION/ISSUE
AutoCAD SHX Text
P
AutoCAD SHX Text
AT
AutoCAD SHX Text
BE
AutoCAD SHX Text
600 TOARENA CREEK (EMER. BYPASS)
AutoCAD SHX Text
P
AutoCAD SHX Text
AT
AutoCAD SHX Text
POTENTIALLY REBUILD BYPASS PIPE
Page 38: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

³

³

³

FIGURE 10-4

MBBR TREATMENT ALTERNATIVES

BRIGHTON WASTEWATER TREATMENT SYSTEM

MUNICIPALITY OF BRIGHTON

METERS

100500

FINAL DRAWING INDICATED BY SEAL AND

SIGNATURE OF DESIGN ENGINEER

ALTERNATIVE 4

AutoCAD SHX Text
CONSTRUCTED WETLAND CELL 1 3.1ha 0.3m DEEP TERRACE 1m DEEP ZONES
AutoCAD SHX Text
CONSTRUCTED WETLAND CELL 2 3.1ha 0.3m DEEP TERRACE 1m DEEP ZONES
AutoCAD SHX Text
WASTE STABILIZATION POND (FACULTATIVE LAGOON) 5.44ha 1.5m DEEP (±81,000m)
AutoCAD SHX Text
AERATED LAGOON (CELL) 0.68ha 3m DEEP (±18,000m)
AutoCAD SHX Text
CONTROL BUILDING
AutoCAD SHX Text
11.3kW MECHANICAL AERATOR (TYP. OF 2)
AutoCAD SHX Text
MAINTENANCE ROAD
AutoCAD SHX Text
ACCESS ROAD
AutoCAD SHX Text
COUNTY ROAD 64
AutoCAD SHX Text
HARBOUR ST.
AutoCAD SHX Text
PRINCE EDWARD ST.
AutoCAD SHX Text
AERATED LAGOON INLET VALVE CHAMBER
AutoCAD SHX Text
SLUDGE DRYING BEDS
AutoCAD SHX Text
LEVEL CONTROL STRUCTURE - WETLAND 2
AutoCAD SHX Text
ROCK LINED OUTFLOW SWALES TO MARSH AREA
AutoCAD SHX Text
WATER LEVEL 80.5
AutoCAD SHX Text
35m³ COAGULANT TANK (3m ) COAGULANT TANK (3m )
AutoCAD SHX Text
CATWALK
AutoCAD SHX Text
CATWALK
AutoCAD SHX Text
1067 GRAVITY SEWER
AutoCAD SHX Text
300 FORCEMAIN
AutoCAD SHX Text
FLOW DIRECTION
AutoCAD SHX Text
1067
AutoCAD SHX Text
MH 198
AutoCAD SHX Text
MH 197
AutoCAD SHX Text
675 GRAVITY SEWER
AutoCAD SHX Text
MH 200
AutoCAD SHX Text
WATER LEVEL 79.4
AutoCAD SHX Text
WATER LEVEL 78.2
AutoCAD SHX Text
WATER LEVEL 78.2
AutoCAD SHX Text
INV - 79.88
AutoCAD SHX Text
INV - 79.18
AutoCAD SHX Text
ARENA CREEK
AutoCAD SHX Text
ARENA CREEK
AutoCAD SHX Text
BULTER CREEK
AutoCAD SHX Text
MAINTENANCE ROAD
AutoCAD SHX Text
HARBOUR ST. SEWAGE PUMPING STATION
AutoCAD SHX Text
GATE VALVE
AutoCAD SHX Text
79.0
AutoCAD SHX Text
78.0
AutoCAD SHX Text
79.5
AutoCAD SHX Text
81.4
AutoCAD SHX Text
83.8
AutoCAD SHX Text
80.5
AutoCAD SHX Text
COAGULANT MIXING CHAMBER
AutoCAD SHX Text
OUTLET CHANNEL WITH PARSHALL FLUME FLOW METER C/W ULTRASONIC
AutoCAD SHX Text
1067 BYPASS SEWER
AutoCAD SHX Text
914 OUTLET SEWER
AutoCAD SHX Text
914 OUTLET SEWER
AutoCAD SHX Text
3.5:1 SIDE SLOPES (TYP.)
AutoCAD SHX Text
1067 CONC.
AutoCAD SHX Text
18.8kW FLOATING AERATORS 1 & 2 (AUG. 2015)
AutoCAD SHX Text
81.0
AutoCAD SHX Text
±2.5:1 SIDE SLOPES (TYP.)
AutoCAD SHX Text
INV - 76.40
AutoCAD SHX Text
80.5
AutoCAD SHX Text
LAGOON LEVEL CONTROL STRUCTURE C/W STOP LOGS
AutoCAD SHX Text
600 CC
AutoCAD SHX Text
600 CC
AutoCAD SHX Text
MH
AutoCAD SHX Text
80.1
AutoCAD SHX Text
79.1
AutoCAD SHX Text
LEVEL CONTROL STRUCTURE - WETLAND 1
AutoCAD SHX Text
600 CC
AutoCAD SHX Text
600 CC
AutoCAD SHX Text
79.9
AutoCAD SHX Text
1m DEEP ZONE (TYP.)
AutoCAD SHX Text
1m DEEP ZONE (TYP.)
AutoCAD SHX Text
3:1 SIDE SLOPES (TYP.)
AutoCAD SHX Text
3:1 SIDE SLOPES (TYP.)
AutoCAD SHX Text
3:1 SIDE SLOPES (TYP.)
AutoCAD SHX Text
3:1 SIDE SLOPES (TYP.)
AutoCAD SHX Text
79.1
AutoCAD SHX Text
79.1
AutoCAD SHX Text
79.1
AutoCAD SHX Text
600 CC
AutoCAD SHX Text
300 FORCEMAIN FROM HARBOUR ST. SPS
AutoCAD SHX Text
300 FORCEMAIN
AutoCAD SHX Text
FLAP GATE VALVE
AutoCAD SHX Text
81.4
AutoCAD SHX Text
WETLAND INFLOW MONITORING STRUCTURE WITH TWO, 600mm WIDE, RECTANGULAR WEIRS C/W ULTRASONIC (1). WEIR INVERTS 78.80 (ADJUSTABLE)
AutoCAD SHX Text
MAINTENANCE ROAD
AutoCAD SHX Text
WETLAND OUTFLOW FLOW CONTROL STRUCTURE WITH TWO, 600mm WIDE, RECTANGULAR WEIRS C/W ULTRASONICS (2). WEIR INVERTS 77.8 (ADJUSTABLE)
AutoCAD SHX Text
600 OVERFLOW
AutoCAD SHX Text
200
AutoCAD SHX Text
MH 234
AutoCAD SHX Text
840
AutoCAD SHX Text
MH 235
AutoCAD SHX Text
840
AutoCAD SHX Text
600 CC
AutoCAD SHX Text
M
AutoCAD SHX Text
M
AutoCAD SHX Text
FORCEMAIN ACCESS CHAMBER
AutoCAD SHX Text
LEGEND MBBR SYSTEM. "P" INDICATES DUAL PUMP INFLUENT FEED SYSTEM. "AT" INDICATES MBBR AERATION TANK. APPROX. 6m x 5m BLOWER/ MCC/ ELECTRICAL BUILDING. EXTERNAL B/U GENERATOR NOT SHOWN.
AutoCAD SHX Text
ARENA CREEK
AutoCAD SHX Text
DRAINAGE DITCH
AutoCAD SHX Text
BAFFLE 1
AutoCAD SHX Text
RELOCATED BAFFLE 2
AutoCAD SHX Text
RELOCATED BAFFLE 3
AutoCAD SHX Text
BE
AutoCAD SHX Text
BURIED BELL FIBRE LINE
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
FINISHED GRADE ELEVATION (m)
AutoCAD SHX Text
80.1
AutoCAD SHX Text
PIPE INVERT (m)
AutoCAD SHX Text
DIRECTION OF FLOW
AutoCAD SHX Text
VALVE
AutoCAD SHX Text
FIG. No.
AutoCAD SHX Text
Drawn:
AutoCAD SHX Text
Date:
AutoCAD SHX Text
APPROVED:
AutoCAD SHX Text
Design:
AutoCAD SHX Text
Scale:
AutoCAD SHX Text
1:1000
AutoCAD SHX Text
JUL. 2018
AutoCAD SHX Text
JTG
AutoCAD SHX Text
TDL
AutoCAD SHX Text
JTG
AutoCAD SHX Text
FILE No.
AutoCAD SHX Text
18-031
AutoCAD SHX Text
NOTE: THE LOCATION AND ELEVATION OF PIPES, MANHOLES, STRUCTURES, VALVES, ETC. ON THIS DRAWING ARE BASED ON BEST AVAILABLE INFORMATION ONLY. DETAILED LOCAL SITE MEASUREMENTS, SURVEYS, AND LOCATES SHOULD BE COMPLETED IN ADVANCE FOR ALL PROJECTS/MODIFICATIONS.
AutoCAD SHX Text
DD/MM/YY
AutoCAD SHX Text
REVISION/ISSUE
AutoCAD SHX Text
P
AutoCAD SHX Text
AT
AutoCAD SHX Text
P
AutoCAD SHX Text
AT
AutoCAD SHX Text
BUILD INTO LAGOON
AutoCAD SHX Text
600 TOARENA CREEK (EMER. BYPASS)
AutoCAD SHX Text
POTENTIALLY REBUILD BYPASS PIPE
AutoCAD SHX Text
BE
Page 39: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

APPENDIX A

Current ECA – Brighton Wastewater Treatment Plant

Page 40: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Page 1 - NUMBER 3081-9XQNZK

Ministry of the Environment and Climate ChangeMinistère de l’Environnement et de l’Action en

matière de changement climatique

AMENDED ENVIRONMENTAL COMPLIANCE APPROVALNUMBER 3081-9XQNZKIssue Date: July 7, 2015

The Corporation of the Municipality of Brighton

67 Sharp Road

Suburban Service, No. 8

Brighton, Ontario

K0K 1H0

Site Location: Town of Brighton WPCP

100 County Road 64

Lot 33 & 34, Concession B

Municipality of Brighton

County of Northumberland

You have applied under section 20.2 of Part II.1 of the Environmental Protection Act, R.S.O. 1990, c. E. 19

(Environmental Protection Act) for approval of:

sewage Works servicing the Town of Brighton, for the collection, transmission, treatment and

disposal of domestic sewage, located at the above site location, rated at the capacity mentioned

below and consisting of the following Works;

Brighton Water Pollution Control Plant

(Rated Capacity )

Average Daily Flow 4,600 cubic metres per day

Wastewater Treatment Facilities

- a 0.68 hectare aerated lagoon with two (2) 11.2 kilowatts mechanical aerators;

- coagulant feed system consisting of one (1) 35,000 litres external storage tank, two (2)

chemical feed pumps (one (1) duty and one (1) standby), injection point at the chemical

Page 41: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Page 2 - NUMBER 3081-9XQNZK

mixing chamber, and one (1) flash mixer;

- one (1) Parshall flume flow meter located in the mixing channel and measuring flow

directed into the stabilization pond;

- a 5.44 hectares waste stabilization pond equipped with three (3) floating baffles installed

from east to west direction to improve flow distribution, and effluent discharged to a

constructed wetland described below.

Constructed Wetland

The constructed wetland is located on the south side of County Road 64, immediately east of

Harbour Street)

- a constructed wetland having a surface area of 6.2 hectares, side slopes of 3:1 and 0.8 free

board, constructed south of the waste stabilization pond consisting of Wetland Cell # 1

and Wetland Cell # 2, each wetland cell consisted of a 300 millimetres shallow vegetative

terrace between 1.0 metre deep front and rear zones;

- a 600 millimetres diameter pipe constructed and connected from the waste stabilization

pond outflow chamber to the inlet flow structure of the constructed wetland;

- a 3.0 metres x 2.4 metres x 3.0 metres deep inlet flow structure constructed at the front

end of Wetland Cell # 1 to control waste stabilization pond effluent through weirs and

baffles to the wetland cells by 600 millimetres diameter pipes;

- a 3.0 metres x 2.4 metres x 3.05 metres deep outlet flow structure having weirs and

baffles, constructed at the rear end of Wetland Cell # 2 to receive wetland effluent from a

level control structure (equipped with stop logs) of each wetland cell and discharge

wetland effluent through three (3) outflow swales to the natural wetland in Prequ`ile Bay;

- two (2) 2.4 metres long emergency weir having a weir crest elevation of 79.0 metres,

constructed on the common berm at the rear ends of the two wetland cells and the rear

berm of Wetland Cell # 2; and

- three (3) flow meters: one (1) Parshall flume measuring flow into constructed wetland,

two (2) V notch weirs measuring flow into each of Wetland Cell #1 and Wetland Cell # 2,

and two (2) V notch weirs measuring effluent flows from each constructed wetland cell.

all other controls, electrical equipment, instrumentation, piping, pumps, valves and appurtenances

essential for the proper operation of the aforementioned sewage Works.

all in accordance with supporting documents listed in Schedule 'A'.

Page 42: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Page 3 - NUMBER 3081-9XQNZK

For the purpose of this environmental compliance approval, the following definitions apply:

"Annual Average Concentration" means the arithmetic mean of the Monthly Average

Concentrations of a contaminant in the effluent calculated for any particular calendar year;

"Annual Average Loading" means the value obtained by multiplying the Annual Average

Concentration of a contaminant by the Average Daily Flow over the same calendar year;

"Approval" means this entire document and any schedules attached to it, and the application;

"Average Daily Flow" means the cumulative total sewage flow to the sewage works during a

calendar year divided by the number of days during which sewage was flowing to the sewage

works that year;

"BOD5" (also known as TBOD

5) means five day biochemical oxygen demand measured in an

unfiltered sample and includes carbonaceous and nitrogenous oxygen demand;

"By-pass" means diversion of sewage around one or more unit processes within the Sewage

Treatment Plant with the diverted sewage flows being returned to the Sewage Treatment Plant

treatment train upstream of the Final Effluent sampling location, and discharging to the

environment through the Sewage Treatment Plant outfall;

"CBOD5" means five day carbonaceous (nitrification inhibited) biochemical oxygen demand

measured in an unfiltered sample;

"Daily Concentration" means the concentration of a contaminant in the effluent discharged over

any single day, as measured by a composite or grab sample, whichever is required;

"Director" means a person appointed by the Minister pursuant to section 5 of the EPA for the

purposes of Part II.1 of the EPA;

"E. coli " refers to the thermally tolerant forms of Escherichia that can survive at 44.5 degrees

Celsius;

"Emergency Situation" means a structural, mechanical or electrical failure that causes a

temporary reduction in the capacity of the Sewage Treatment Plant or an unforeseen flow

condition that may result in:

a) danger to the health or safety of any person; or

b) injury or damage to any property, or serious risk of injury or damage to any property; or

c) treatment process biomass washout.

"Equivalent Equipment" means a substituted equipment or like-for-like equipment that meets the

Page 43: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Page 4 - NUMBER 3081-9XQNZK

required quality and performance standards of a named equipment;

"Event" means an action or occurrence, at a given location within the Sewage Treatment Plant

that causes a Plant Bypass or Plant Overflow. An Event ends when there is no recurrence of a

Bypass or Overflow in the 12-hour period following the last Bypass or Overflow. Two Events

are separated by at least 12 hours during which there has been no recurrence of a Bypass or

Overflow;

"Final Effluent" means sewage discharge via the Sewage Treatment Plant outfall after undergoing

the full train of unit processes as listed in the Approval;

"Geometric Mean Density" is the nth root of the product of multiplication of the results of n

number of samples over the period specified;

"Individual Waste Loading" means the loading expressed in kilograms per day and calculated by

multiplying the concentration of a parameter in a sample by the total volume of effluent

discharged from the Works during the day in which the sample is taken;

"Limited Operational Flexibility” (LOF) means any modifications that the Owner is permitted to

make to the Works under this Approval;

"Ministry" means the ministry of the government of Ontario responsible for the EPA and OWRA

and includes all officials, employees or other persons acting on its behalf;

"Monthly Average Concentration" means the arithmetic mean of all Daily Concentrations of a

contaminant in the effluent sampled or measured, or both, during a calendar month;

"Monthly Average Daily Flow" means the cumulative total sewage flow to the sewage works

during a calendar month divided by the number of days during which sewage was flowing to the

sewage works that month;

"Monthly Average Loading" means the value obtained by multiplying the Monthly Average

Concentration of a contaminant by the Monthly Average Daily Flow over the same calendar

month:

"Notice of Modifications" means the form entitled "Notice of Modifications to Sewage Works";

"Owner" means The Corporation of the Municipality of Brighton and its successors and

assignees;

"OWRA" means the Ontario Water Resources Act , R.S.O. 1990, c. O.40, as amended;

"Partial Treatment" means any treatment that does not include the full train of unit processes of

the Sewage Treatment Plant described and approved in the Approval;

Page 44: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Page 5 - NUMBER 3081-9XQNZK

"Peak Flow Rate" means the maximum rate of sewage flow for which the plant or process unit

was designed;

"Plant Overflow" means a discharge to the environment from the Sewage Treatment Plant at a

location other than the plant outfall or into the plant outfall downstream of the Final Effluent

sampling location;

"Rated Capacity" means the Average Daily Flow for which the Works are approved to handle;

"Sewage Treatment Plant" means the entire sewage treatment and effluent discharge facility;

"Water Supervisor" means the Water Supervisor for the Peterborough Office of the Ministry; and

"Works" means the sewage works described in the Owner's application, and this Approval, and

modifications made under Limited Operational Flexibility.

You are hereby notified that this environmental compliance approval is issued to you subject to the terms and

conditions outlined below:

TERMS AND CONDITIONS

1. GENERAL PROVISIONS

(1) The Owner shall ensure that any person authorized to carry out work on or operate any

aspect of the Works is notified of this Approval and the conditions herein and shall take

all reasonable measures to ensure any such person complies with the same.

(2) Except as otherwise provided by these conditions, the Owner shall design, build, install,

operate and maintain the Works in accordance with the description given in this

Approval, and the application for approval of the Works.

(3) Where there is a conflict between a provision of any document in the schedule referred to

in this Approval and the conditions of this Approval, the Conditions in this Approval shall

take precedence, and where there is a conflict between the documents in the schedule, the

document bearing the most recent date shall prevail.

(4) Where there is a conflict between the documents listed in the Schedule A, and the

application, the application shall take precedence unless it is clear that the purpose of the

document was to amend the application.

(5) The Conditions of this Approval are severable. If any Condition of this Approval, or the

application of any requirement of this Approval to any circumstance, is held invalid or

unenforceable, the application of such condition to other circumstances and the remainder

Page 45: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Page 6 - NUMBER 3081-9XQNZK

of this Approval shall not be affected thereby.

2. CHANGE OF OWNER

(1) The Owner shall notify the Water Supervisor and the Director, in writing, of any of the

following changes within thirty (30) days of the change occurring:

(a) change of Owner;

(b) change of address of the Owner;

(c) change of partners where the Owner is or at any time becomes a partnership, and a

copy of the most recent declaration filed under the Business Names Act , R.S.O.

1990, c.B17 shall be included in the notification to the Water Supervisor; and

(d) change of name of the corporation where the Owner is or at any time becomes a

corporation, and a copy of the most current information filed under the

Corporations Information Act , R.S.O. 1990, c. C39 shall be included in the

notification to the Water Supervisor.

(2) In the event of any change in ownership of the Works, other than a change to a successor

municipality, the Owner shall notify in writing the succeeding owner of the existence of

this Approval, and a copy of such notice shall be forwarded to the Water Supervisor and

the Director.

3. BY-PASSES

(1) Any By-pass or Plant Overflow is prohibited, except:

(a) in an Emergency Situation;

(b) where the By-pass / Plant Overflow is a direct and unavoidable result of a planned

maintenance procedure, the Owner notified the Water Supervisor 15 days prior to

the By-pass and the Water Supervisor has given written consent of the By-pass;

and

(c) where the By-pass / Plant Overflow is planned for research or training purposes,

the discharger notified the Water Supervisor 15 days prior to the By-pass / Plant

Overflow and the Water Supervisor has given written consent of the By-pass /

Plant Overflow.

(2) The Owner shall forthwith notify the Spills Action Centre (SAC) and the Medical Officer

of Health of all By-pass and Plant Overflow Events except the events occurring under

Page 46: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Page 7 - NUMBER 3081-9XQNZK

subsection (1)(b). This notice shall include, at a minimum, the following information:

(a) the date, time, and duration of the Event;

(b) the location of the Event;

(c) the measured or estimated volume of the Event (unless the Event is ongoing);

(d) the reason for the Event; and

(e) the level of treatment the By-pass(es) and/or Plant Overflow(s) received and

disinfection status of same.

(3) The Owner shall submit By-pass and Plant Overflow Event Reports to the Ministry's local

office on a quarterly basis, no later than each of the following dates for each calendar

year: February 14, May 15, August 14, and November 15. Event Reports shall be in an

electronic format specified by the Ministry. In each Event Report the Owner shall include,

at a minimum, the following information on any Events that occurred during the

preceding quarter:

(a) the date of the Event(s);

(b) the measured or estimated volume of the Event(s);

(c) the duration of the Event(s);

(d) the location of the Event(s);

(e) the reason for the Event(s); and

(f) the level of treatment the By-pass(es) and/or Plant Overflow(s) received and

disinfection status of same.

(4) The Owner shall use best efforts to collect a representative sample consisting of a

minimum of two (2) grab samples of the By-pass / Plant Overflow and have it analyzed

for parameters outlined in Condition 5 (Effluent Limits Condition) using the protocols

specified in Condition 7 (Monitoring and Recording Condition), one at the beginning of

the Event and the second approximately near the end of the Event, to best reflect the

effluent quality of such By-pass or Plant Overflow.

(5) The Owner shall maintain a logbook of all Plant By-passes and Plant Overflows, which

shall contain, at a minimum; the types of information set out in subsection 2 (a) to 2(e) in

respect of each By-pass and Plant Overflow.

Page 47: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Page 8 - NUMBER 3081-9XQNZK

4. EFFLUENT OBJECTIVES

(1) In order to ensure continuous compliance with the performance criteria stipulated in

Condition 5, the Owner shall use best efforts to design, construct and operate the Works

with the objective that the concentrations of the materials named below as effluent

parameters are not exceeded in the effluent from the constructed wetland.

Table 1 – Effluent Objective – Constructed Wetland

Effluent ParameterConcentration in Effluent

(milligrams per litre)

CBOD5

15.0

Total Suspended Solids 15.0

Ammonia + Ammonium

Nitrogen

10.0 *

15.0 **

Total Phosphorus 0.8

E. coli 200 organisms per 100 millimetres ***

* from May 01 to October 30; ** from November 01 to April 30; and

*** The Geometric Mean Density of E. coli in effluent should not exceed 200 organisms per

100 millimetres for any calendar month.

(2) The Owner shall use best efforts to:

(a) maintain the pH of the effluent from the Works within the range of 6.0 to 9.5,

inclusive, at all times;

(b) operate the Works within the Rated Capacity of the Works; and

(c) ensure that the effluent from the Works is essentially free of floating and settleable

solids and does not contain oil or any other substance in amounts sufficient to

create a visible film or sheen or foam or discolouration on the receiving waters.

(3) The Owner shall include in all reports submitted in accordance with Conditions 7 and 8 a

summary of the efforts made and results achieved under this Condition.

5. EFFLUENT LIMITS

(1) The Owner shall design, construct, operate and maintain the Works such that the

concentrations and waste loadings of the materials named below as effluent parameters

are not exceeded in the effluent from the waste stabilization pond.

Page 48: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Page 9 - NUMBER 3081-9XQNZK

Table 2 – Effluent Limit – Waste Stabilization Pond

Effluent ParameterConcentration in Effluent

(milligrams per litre)

Loading in Effluent

(kilograms per day)

CBOD5

30.0 138.0

Total Suspended Solids 40.0 184.0

Ammonia + Ammonium Nitrogen14.0 *

17.0 **

64.4 *

78.2 **

Total Phosphorus 1.0 4.6

* from May 01 to October 30; and

** from November 01 to April 30.

(2) For the purposes of determining compliance with and enforcing subsection (1):

(a) Non-compliance with respect to concentration of CBOD5 and Total Suspended

Solids in the effluent is deemed to have occurred when the Annual Average

Concentration of any of the parameters, as defined in this Certificate, based on all

grab samples taken in accordance with Condition 7, supplemented by spot

sampling by the Ministry's staff as necessary, prior to and during the effluent

discharge period, exceeds its corresponding concentration in effluent specified in

subsection (1).

(b) Non-compliance with respect to concentration of Ammonia + Ammonium

Nitrogen and Total Phosphorus in the effluent is deemed to have occurred when

the Monthly Average Concentration of any of the parameters, as defined in this

Approval, based on all grab samples taken in accordance with Condition 7,

supplemented by spot sampling by the Ministry's staff as necessary, during any

calendar months, exceeds its corresponding concentration in effluent specified in

subsection (1).

(c) Non-compliance with respect to total loading of CBOD5 and Total Suspended

Solids is deemed to have occurred when the Annual Average Loading of any of

the parameters, as defined in this Approval, based on all grab samples taken in

accordance with Condition 7, supplemented by spot sampling by the Ministry's

staff as necessary, during any twelve (12) consecutive calendar months, exceeds

its corresponding total loading from effluent specified in subsection (1).

(d) Non-compliance with respect to loading of Ammonia + Ammonium Nitrogen is

deemed to have occurred when the Monthly Average Concentration of the

Page 49: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Page 10 - NUMBER 3081-9XQNZK

parameter, as defined in this Approval, based on all grab samples taken in

accordance with Condition 7, supplemented by spot sampling by the Ministry's

staff as necessary, during any calendar day, multiplied by the Average Daily Flow

over the seasonal period the sample was taken, exceeds its corresponding loading

from effluent specified in subsection (1).

(e) Non-compliance with respect to total loading of Total Phosphorus is deemed to

have occurred when the Monthly Average Loading of the parameter, as defined in

this Approval, based on all grab samples taken in accordance with Condition 7,

supplemented by spot sampling by the Ministry's staff as necessary, during any

twelve (12) consecutive calendar months, exceeds its corresponding total

loading from effluent specified in subsection (1).

(3) Paragraph (a), (b), (c), (d) and (e) of subsection (2) shall apply upon the issuance of this

Approval.

6. OPERATION AND MAINTENANCE

(1) The Owner shall exercise due diligence in ensuring that, at all times, the Works and the

related equipment and appurtenances used to achieve compliance with this Approval are

properly operated and maintained. Proper operation and maintenance shall include

effective performance, adequate funding, adequate operator staffing and training,

including training in all procedures and other requirements of this Approval and the

OWRA and regulations, adequate laboratory facilities, process controls and alarms and

the use of process chemicals and other substances used in the Works.

(2) The Owner shall prepare an operations manual prior to the commencement of operation of

the sewage Works that includes, but not necessarily limited to, the following information:

(a) operating procedures for routine operation of the Works;

(b) inspection programs, including frequency of inspection, for the Works and the

methods or tests employed to detect when maintenance is necessary;

(c) repair and maintenance programs, including the frequency of repair and

maintenance for the Works;

(d) procedures for the inspection and calibration of monitoring equipment;

(e) a spill prevention control and countermeasures plan, consisting of contingency

plans and procedures for dealing with equipment breakdowns, potential spills and

any other abnormal situations, including notification of the Water Supervisor; and

(f) procedures for receiving, responding and recording public complaints, including

Page 50: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Page 11 - NUMBER 3081-9XQNZK

recording any follow-up actions taken.

(3) The Owner shall maintain the operations manual current and retain a copy at the location

of the Works for the operational life of the Works. Upon request, the Owner shall make

the manual available to Ministry staff.

(4) The Owner shall provide for the overall operation of the Works with an operator who

holds a licence that is applicable to that type of facility and that is of the same class as or

higher than the class of the facility in accordance with Ontario Regulation 129/04.

7. MONITORING AND RECORDING

The Owner shall, upon commencement of operation of the Works, carry out the following

monitoring program:

(1) All samples and measurements taken for the purposes of this Approval are to be taken at a

time and in a location characteristic of the quality and quantity of the effluent stream over

the time period being monitored.

(2) For the purposes of this condition, the following definitions apply:

(a) Weekly means once each week; and

(b) Monthly means once every month.

(3) Samples shall be collected at the following sampling points, at the frequency specified, by

means of the specified sample type and analyzed for each parameter listed and all results

recorded:

Table 3 – Raw Sewage Monitoring – (sampled at influent structure)

Frequency Monthly

Sample Type Grab

ParametersBOD

5, Total Suspended Solids, Total Phosphorus, and Total Kjeldahl

Nitrogen

Page 51: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Page 12 - NUMBER 3081-9XQNZK

Table 4 – Effluent Monitoring – Waste Stabilization Pond

Parameters Sample Type Frequency

CBOD5

Grab Weekly

Total Suspended Solids Grab Weekly

Total Phosphorus Grab Weekly

Total Kjeldahl Nitrogen Grab Weekly

(Ammonia + Ammonium) Nitrogen Grab Weekly

Nitrate Nitrogen Grab Weekly

Nitrite Nitrogen Grab Weekly

Temperature Grab Weekly

pH Grab Weekly

E. coli Grab Monthly

Table 5 – Effluent Monitoring – Constructed Wetland

Parameters Sample Type Frequency

CBOD5

Grab Weekly

Total Suspended Solids Grab Weekly

Total Phosphorus Grab Weekly

Total Kjeldahl Nitrogen Grab Weekly

(Ammonia + Ammonium) Nitrogen Grab Weekly

Nitrate Nitrogen Grab Weekly

Nitrite Nitrogen Grab Weekly

E. coli Grab Monthly

Temperature Grab Weekly

pH Grab Weekly

Page 52: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Page 13 - NUMBER 3081-9XQNZK

(4) The methods and protocols for sampling, analysis and recording shall conform, in order of

precedence, to the methods and protocols specified in the following:

(a) the Ministry's Procedure F-10-1, “Procedures for Sampling and Analysis

Requirements for Municipal and Private Sewage Treatment Works (Liquid Waste

Streams Only), as amended from time to time by more recently published editions;

(b) the Ministry's publication "Protocol for the Sampling and Analysis of

Industrial/Municipal Wastewater" (January 1999), ISBN 0-7778-1880-9, as

amended from time to time by more recently published editions; and

(c) the publication "Standard Methods for the Examination of Water and Wastewater"

(21st edition), as amended from time to time by more recently published editions.

(5) The temperature and pH of the effluent from the Works shall be determined in the field at

the time of sampling for Total Ammonia Nitrogen. The concentration of un-ionized

ammonia shall be calculated using the total ammonia concentration, pH and temperature

using the methodology stipulated in "Ontario's Provincial Water Quality Objectives" dated

July 1994, as amended, for ammonia (un-ionized).

(6) The Owner shall install and maintain (a) continuous flow measuring device(s), to measure

the flow rate of the effluent from the Works with an accuracy to within plus or minus 15

per cent (+/- 15%) of the actual flow rate for the entire design range of the flow measuring

device, and record the flow rate at a daily frequency.

(7) The Owner shall retain for a minimum of five (5) years from the date of their creation, all

records and information related to or resulting from the monitoring activities required by

this Approval.

8. REPORTING

(1) Ten (10) days prior to the date of a planned By-pass being conducted pursuant to

Condition 3 (By-passes Condition) and as soon as possible for an unplanned By-pass, the

Owner shall notify the Water Supervisor in writing of the pending start date, in addition to

an assessment of the potential adverse effects on the environment and the duration of the

By-pass.

(2) The Owner shall report to the Water Supervisor or designate, any exceedence of any

parameter specified in Condition 5 (Effluent Limits Condition) orally, as soon as

reasonably possible, and in writing within seven (7) days of the exceedence.

(3) In addition to the obligations under Part X of the Environmental Protection Act , the

Owner shall, within ten (10) working days of the occurrence of any reportable spill as

Page 53: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Page 14 - NUMBER 3081-9XQNZK

defined in Ontario Regulation 675/98, bypass or loss of any product, by-product,

intermediate product, oil, solvent, waste material or any other polluting substance into the

environment, submit a full written report of the occurrence to the Water Supervisor

describing the cause and discovery of the spill or loss, clean-up and recovery measures

taken, preventative measures to be taken and schedule of implementation.

(4) The Owner shall, upon request, make all manuals, plans, records, data, procedures and

supporting documentation available to Ministry staff.

(5) The Owner shall prepare and submit a performance report to the Water Supervisor on an

annual basis, within ninety (90) days following the end of the period being reported

upon. The first such report shall cover the first annual period following the

commencement of operation of the Works and subsequent reports shall be submitted to

cover successive annual periods following thereafter. The reports shall contain, but shall

not be limited to, the following information:

(a) a summary and interpretation of all monitoring data and a comparison to the

effluent limits outlined in Condition 5 (Effluent Limits Condition), including an

overview of the success and adequacy of the Works;

(b) a description of any operating problems encountered and corrective actions taken;

(c) a summary of all maintenance carried out on any major structure, equipment,

apparatus, mechanism or thing forming part of the Works;

(d) a summary of any effluent quality assurance or control measures undertaken in the

reporting period;

(e) a summary of the calibration and maintenance carried out on all effluent

monitoring equipment; and

(f) a description of efforts made and results achieved in meeting the Effluent

Objectives of Condition 4 (Effluent Objectives Condition).

(g) a tabulation of the volume of sludge generated in the reporting period, an outline

of anticipated volumes to be generated in the next reporting period and a summary

of the locations to where the sludge was disposed;

(h) a summary of any complaints received during the reporting period and any steps

taken to address the complaints;

(i) a summary of all By-pass, spill or abnormal discharge events;

(j) a copy of all Notice of Modifications submitted to the Water Supervisor as a result

of Schedule B, Section 1, with a status report on the implementation of each

Page 54: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Page 15 - NUMBER 3081-9XQNZK

modification;

(k) a report summarizing all modifications completed as a result of Schedule B,

Section 3; and

(l) any other information the Water Supervisor requires from time to time.

(7) The Owner shall, within thirty (30) calendar days of issuance of this Approval, submit a

Municipal Wastewater System Profile Information Form, and shall resubmit the

updated document every time a notification is provided to the Water Supervisor in

compliance with requirements of change of ownership under this Approval.

9. LIMITED OPERATIONAL FLEXIBILITY

(1) The Owner may make modifications to the Works in accordance with the Terms and

Conditions of this Approval and subject to the Ministry’s “Limited Operational Flexibility

Criteria for Modifications to Sewage Works ”, included under Schedule B of this

Approval, as amended.

(2) Sewage works proposed under Limited Operational Flexibility shall adhere to the design

guidelines contained within the Ministry’s publication “Design Guidelines for Sewage

Works 2008”, as amended.

(3) The Owner shall ensure at all times, that the Works, related equipment and appurtenances

which are installed or used to achieve compliance are operated in accordance with all

Terms and Conditions of this Approval.

(4) For greater certainty, the following are not permitted as part of Limited Operational

Flexibility:

(a) Modifications to the Works that result in an increase of the Rated Capacity of the

Works;

(b) Modifications to the Works that may adversely affect the approved effluent quality

criteria or the location of the discharge/outfall;

(c) Modifications to the treatment process technology of the Works, or modifications

that involve construction of new reactors (tanks) or alter the treatment train

process design;

(d) Modifications to the Works approved under s.9 of the EPA, and

(e) Modifications to the Works pursuant to an order issued by the Ministry.

Page 55: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Page 16 - NUMBER 3081-9XQNZK

(5) Implementation of Limited Operational Flexibility is not intended to be used for

piecemeal measures that result in major alterations or expansions.

(6) If the implementation of Limited Operational Flexibility requires changes to be made to

the Emergency Response, Spill Reporting and Contingency Plan, the Owner shall, as

deemed necessary in consultation with the Water Supervisor, provide a revised copy of

this plan for approval to the local fire services authority prior to implementing Limited

Operational Flexibility.

(7) For greater certainty, any modification made under the Limited Operational Flexibility

may only be carried out after other legal obligations have been complied with, including

those arising from the Environmental Protection Act , Niagara Escarpment Planning and

Development Act , Oak Ridges Moraine Conservation Act , Lake Simcoe Protection Act

and Greenbelt Act .

(8) Prior to implementing Limited Operational Flexibility, the Owner shall complete a Notice

of Modifications describing any proposed modifications to the Works and submit it to the

Water Supervisor.

Page 56: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Page 17 - NUMBER 3081-9XQNZK

Schedule 'A' forms part of this Approval and contains a list of supporting documentation / information received,

reviewed and relied upon in the issuance of this Approval.

SCHEDULE 'A'

1. Field Alert Number 4073-9XKJTL, created on June 17, 2015, by Ms. Viktoria Light, Drinking Water

Inspector, MOECC, Peterborough Office.

2. Existing ECA # 3560-8A8LEY, issued on November 17, 2010.

Page 57: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Page 18 - NUMBER 3081-9XQNZK

Schedule B

Limited Operational Flexibility Criteria for Modifications

to Municipal Sewage Works

1. The modifications to sewage works approved under an Environmental Compliance Approval

(Approval) that are permitted under the Limited Operational Flexibility (LOF), are outlined

below and are subject to the LOF conditions in the Approval, and require the submission of the

Notice of Modifications. If there is a conflict between the sewage works listed below and the

Terms and Conditions in the Approval, the Terms and Conditions in the Approval shall take

precedence.

1.1 Sewage Pumping Stations

a. Alter pumping capacity by adding or replacing equipment where new equipment is

located within an existing sewage treatment plant site or an existing sewage pumping

station site, provided that the modifications do not result in an increase of the sewage

treatment plant Rated Capacity and the existing flow process and/or treatment train

are maintained, as applicable.

b. Forcemain relining and replacement with similar pipe size where the nominal

diameter is not greater than 1,200mm

1.2 Sewage Treatment Process

a. Installing additional chemical dosage equipment including replacing with alternative

chemicals for pH adjustment or coagulants (non-toxic polymers) provided that there

are no modifications of treatment processes or other modifications that may alter the

intent of operations and may have negative impacts on the effluent quantity and

quality.

b. Expanding the buffer zone between a sanitary sewage lagoon facility or land

treatment area and adjacent uses provided that the buffer zone is entirely on the

proponent’s land.

c. Optimizing existing sanitary sewage lagoons with the purpose to increase efficiency

of treatment operations provided that existing sewage treatment plant rated capacity is

not exceeded and where no land acquisition is required.

d. Optimizing existing sewage treatment plant equipment with the purpose to increase

the efficiency of the existing treatment operations, provided that there are no

modifications to the works that result in an increase of the approved Rated Capacity,

and may have adverse effects to the effluent quality or location of the discharge.

Page 58: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Page 19 - NUMBER 3081-9XQNZK

e. Replacement, refurbishment of previously approved equipment in whole or in part

with Equivalent Equipment, like-for-like of different make and model, provided that

the firm capacity, reliability, performance standard, level of quality and redundancy

of the group of equipment is kept the same or exceeded. For clarity purposes, the

following equipment can be considered under this provision: pumps, screens, grit

separators, blowers, aeration equipment, sludge thickeners, dewatering equipment,

UV systems, chlorine contact equipment, bio-disks, and sludge digester systems.

1.3 Sewage Treatment Plant Outfall

a. Replacement of discharge pipe with similar pipe size or diffusers provided that the

outfall location is not changed.

1.4 Sanitary Sewers

a. Pipe relining and replacement with similar pipe size within the Sewage Treatment

Plant site, where the nominal diameter is not greater than 1,200mm.

1.5 Pilot Systems

a. Installation of pilot systems for new or existing technologies provided that:

i. any effluent from the pilot system is discharged to the inlet of the sewage

treatment plant or hauled off-site for proper disposal,

ii. any effluent from the pilot system discharged to the inlet of the sewage treatment

plant or sewage conveyance system does not significantly alter the

composition/concentration of the influent sewage to be treated in the downstream

process; and that it does not add any inhibiting substances to the downstream

process, and

iii. the pilot system’s duration does not exceed a maximum of two years; and a

report with results is submitted to the Director and Water Supervisor three

months after completion of the pilot project.

2. Sewage works that are exempt from section 53 of the OWRA by O. Reg. 525/98 continue to be

exempt and are not required to follow the notification process under this Limited Operational

Flexibility.

3. Normal or emergency operational modifications, such as repairs, reconstructions, or other

improvements that are part of maintenance activities, including cleaning, renovations to existing

approved sewage works equipment, provided that the modification is made with Equivalent

Equipment, are considered pre-approved.

4. The modifications noted in section (3) above are not required to follow the notification protocols

under Limited Operational Flexibility, provided that the number of pieces and description of the

equipment as described in the Approval does not change.

Page 59: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Page 20 - NUMBER 3081-9XQNZK

Page 60: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Page 21 - NUMBER 3081-9XQNZK

The reasons for the imposition of these terms and conditions are as follows:

1. Condition 1 is imposed to ensure that the Works are built and operated in the manner in which

they were described for review and upon which approval was granted. This condition is also

included to emphasize the precedence of Conditions in the Approval and the practice that the

Approval is based on the most current document, if several conflicting documents are submitted

for review. The condition also advises the Owners their responsibility to notify any person they

authorized to carry out work pursuant to this Approval the existence of this Approval.

2. Condition 2 is included to ensure that the Ministry records are kept accurate and current with

respect to the approved works and to ensure that subsequent owners of the Works are made aware

of the Approval and continue to operate the Works in compliance with it.

3. Condition 3 is included to indicate that By-pass / Plant Overflows of untreated or partially treated

sewage to the receiving watercourse is prohibited, save in certain limited circumstances where

the failure to By-pass / Plant Overflow could result in greater injury to the public interest than the

Bypass itself where a By-pass / Plant Overflow will not violate the approved effluent

requirements, or where the By-pass / Plant Overflow can be limited or otherwise mitigated by

handling it in accordance with an approved contingency plan. The notification and

documentation requirements allow the Ministry to take action in an informed manner and will

ensure the Owner is aware of the extent and frequency of By-pass / Plant Overflow events.

4. Condition 4 is imposed to establish non-enforceable effluent quality objectives which the Owner

is obligated to use best efforts to strive towards on an ongoing basis. These objectives are to be

used as a mechanism to trigger corrective action proactively and voluntarily before environmental

impairment occur and before the compliance limits of Condition 5 are exceeded.

5. Condition 5 is imposed to ensure that the effluent discharged from the Works to the environment

meets the Ministry's effluent quality requirements thus minimizing environmental impact on the

receiver and to protect water quality, fish and other aquatic life in the receiving water body.

6. Condition 6 is included to require that the Works be properly operated, maintained, funded,

staffed and equipped such that the environment is protected and deterioration, loss, injury or

damage to any person or property is prevented. As well, the inclusion of a comprehensive

operations manual governing all significant areas of operation, maintenance and repair is

prepared, implemented and kept up-to-date by the Owner and made available to the Ministry.

Such a manual is an integral part of the operation of the Works. Its compilation and use should

assist the Owner in staff training, in proper plant operation and in identifying and planning for

contingencies during possible abnormal conditions. The manual will also act as a benchmark for

Ministry staff when reviewing the Owner's operation of the Works.

7. Condition 7 is included to enable the Owner to evaluate and demonstrate the performance of the

Works, on a continual basis, so that the Works are properly operated and maintained at a level

Page 61: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Page 22 - NUMBER 3081-9XQNZK

which is consistent with the design objectives and effluent limits specified in the Approval and

that the Works does not cause any impairment to the receiving watercourse.

8. Condition 8 is included to provide a performance record for future references, to ensure that the

Ministry is made aware of problems as they arise, and to provide a compliance record for all the

terms and conditions outlined in this Approval, so that the Ministry can work with the Owner in

resolving any problems in a timely manner.

9. Condition 9 is included to ensure that the Works are operated in accordance with the application

and supporting documentation submitted by the Owner, and not in a manner which the Director

has not been asked to consider. These Conditions are also included to ensure that a Professional

Engineer has reviewed the proposed modifications and attests that the modifications are in line

with that of Limited Operational Flexibility, and provide assurance that the proposed

modifications comply with the Ministry's requirements stipulated in the Terms and Conditions of

this Approval, MOE policies, guidelines, and industry engineering standards and best

management practices.

Upon issuance of the environmental compliance approval, I hereby revoke Approval No(s).

3560-8A8LEY issued on November 17, 2010.

In accordance with Section 139 of the Environmental Protection Act, you may by written Notice served upon

me and the Environmental Review Tribunal within 15 days after receipt of this Notice, require a hearing by the

Tribunal. Section 142 of the Environmental Protection Act provides that the Notice requiring the hearing shall

state:

1. The portions of the environmental compliance approval or each term or condition in the environmental compliance approval in

respect of which the hearing is required, and;

2. The grounds on which you intend to rely at the hearing in relation to each portion appealed.

Pursuant to subsection 139(3) of the Environmental Protection Act, a hearing may not be required with respect

to any terms and conditions in this environmental compliance approval, if the terms and conditions are

substantially the same as those contained in an approval that is amended or revoked by this environmental

compliance approval.

The Notice should also include:

3. The name of the appellant;

4. The address of the appellant;

5. The environmental compliance approval number;

6. The date of the environmental compliance approval;

7. The name of the Director, and;

8. The municipality or municipalities within which the project is to be engaged in.

And the Notice should be signed and dated by the appellant.

Page 62: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Page 23 - NUMBER 3081-9XQNZK

This Notice must be served upon:

The Secretary*

Environmental Review Tribunal

655 Bay Street, Suite 1500

Toronto, Ontario

M5G 1E5

AND

The Director appointed for the purposes of Part II.1 of

the Environmental Protection Act

Ministry of the Environment and Climate Change

135 St. Clair Avenue West, 1st Floor

Toronto, OntarioM4V 1P5

* Further information on the Environmental Review Tribunal’s requirements for an appeal can be obtained directly from the

Tribunal at: Tel: (416) 212-6349, Fax: (416) 314-4506 or www.ert.gov.on.ca

The above noted activity is approved under s.20.3 of Part II.1 of the Environmental Protection Act.

DATED AT TORONTO this 7th day of July, 2015

Fariha Pannu, P.Eng.

Director

appointed for the purposes of Part II.1 of the

Environmental Protection Act

AA/

c: DWMD Supervisor, MOECC Peterborough Office

Viktoria Light, Drinking Water Inspector

Page 63: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

APPENDIX B

2017 Wastewater Treatment Plant Annual Report

Page 64: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

The Municipality of Brighton 1

2017 Wastewater Annual Report

March, 2018

2017 WASTEWATER POLLUTION CONTROL PLANT ANNUAL REPORT

Environmental Compliance Approval No 6166-AJJTGW

Page 65: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

The Municipality of Brighton 2

2017 Wastewater Annual Report

TABLE OF CONTENTS 1.0 INTRODUCTION

2.0 WASTEWATER FLOWS

2.1 Flow Interpretation

2.2 Raw sewage quality

3.0 WASTEWATER EFFLUENT QUALITY

4.0 CONSTRUCTED WETLAND EFFLUENT QUALITY

5.0 OVERVIEW OF SUCCESS AND ADEQUACY OF WORKS

6.0 OPERATING PROBLEMS AND CORRECTIVE ACTIONS

7.0 SUMMARY OF MAINTENANCE

8.0 EFFLUENT QUALITY ASSURANCE AND CONTROL

9.0 SUMMARY OF CALIBRATION AND MAINTENANCE ON MONITORING EQUIPMENT

10.0 EFFORTS AND RESULTS TO MEET EFFLUENT OBJECTIVES

11.0 AMMONIUM NITROGEN

11.1 Total Phosphorus

11.2 CBOD and Suspended Solids

12.0 BIOSOLIDS MANAGEMENT

13.0 SUMMARY OF COMPLAINTS

14.0 SUMMARY OF BY-PASSES, SPILLS AND ABNORMAL DISCHARGES

15.0 SUMMARY OF SEWER WORK COMPLETED

16.0 RAINBOW TROUT TOXICITY TESTING

List of Tables Table I – Monthly Wastewater Flows to WPCP

Table II – Monthly Raw Influent to WPCP

Table III - Monthly Average Waste Stabilization Pond Effluent Quality

Table IV – Monthly Average Waste Stabilization Pond Effluent Load

Table V - Monthly Average Constructed Wetland Effluent Quality

Table VI - Overall Efficiency of WPCP Sewage Works System

Table VII – Summary of Operating Problems and Corrective Actions

Table VIII– Summary of Maintenance

Page 66: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

The Municipality of Brighton 3

2017 Wastewater Annual Report

Table IX – Dates of Equipment Calibration

List of Appendices Appendix A – Notice of Modifications – Submitted to MOECC Under LOF Process – 2017

Page 67: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

The Municipality of Brighton 4

2017 Wastewater Annual Report

1.0 INTRODUCTION

The Municipality of Brighton is pleased to present its Annual Performance Report for wastewater treatment for the operating period of January 1 to December 31, 2017. Brighton’s Water Pollution Control Plant (WPCP) services a population of approximately 6,522 people or 3,263 homes and businesses, as well as Presqu’ile Provincial Park. The WPCP is classified as a Class 1 treatment facility that operates under amended Environmental Compliance Approval (ECA) Number 6166-AJJTGW, issued by the Ontario Ministry of the Environment and Climate Change (MOECC) March 20, 2017. This report has been prepared in accordance with Section 10.5 of the ECA. This ECA includes Limited Operational Flexibility (LOF) provisions to allow expedited changes to the treatment operation, subject to final MOECC approvals and conditions. The WPCP is located at 100 County Road 64. Wastewater collected from the serviced area of the Municipality passes through four treatment components at the WPCP, in the order listed below: 1) A 0.7-hectare aerated cell (Lagoon #1) with two mechanical surface aerators, and two aspirating aerators. 2) A chemical mixing chamber where ferric chloride is added. 3) A 5.44-hectare waste stabilization pond (Lagoon #2) with three baffles. 4) A two-celled constructed wetland having a total surface area of 6.2 hectares. The effluent from the constructed wetland is discharged continuously into a natural wetland that borders Presqu’ile Bay, which is located off the northeast shore of Lake Ontario. 2.0 WASTEWATER FLOWS

The ECA stipulates that the rated flow capacity of the WPCP is a yearly average of 4,600 m3/day. The average flow for 2017 was 4,040 m3/day, which represents 87.8% of the rated flow capacity. The highest average flows occurred in May at a flow of 8,384 m3/day. The lowest average flows occurred in September at 2,088 m3/day. It should be stressed that 2017 was a wet year for precipitation, particularly during spring though to early summer. More importantly though, was water levels in Lake Ontario. In May and June, 2017 water levels in Lake Ontario peaked at record levels. This high lake level caused the groundwater level along the lake shore area to rise in a similar fashion and undoubtedly greatly increased flows into basement weeping tiles, causing a very large increase in sump pump flows being discharged to the sanitary sewer system. As well, the high ground water would increase the amount of water pressure bearing on the

Page 68: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

The Municipality of Brighton 5

2017 Wastewater Annual Report

buried sewer system, increasing the infiltration into the sewer system though cracks in manholes and pipe joints. It should be pointed out the great increase in sewage flows in 2017 were almost entirely clean groundwater or rainwater. Flows in the sewer system dropped significantly, beginning in August, as lake levels dropped. According to the Monthly Water Level Bulletin (http://www.tides-marees.gc.ca/C&A/bulletin-eng.html), water levels in Lake Ontario peaked in May and June 2017, and then dropped by approximately 1 m over the summer and fall. Sewage flows also declined steadily during the same period and sewage flows returned to average flow levels (3,000 cmd or less) by August. Average sewage flows remained below 3,000 cmd for the balance of the year (other than November when average sewage flows increased with wet weather to approximately 3,700 cubic meters per day). We feel it is unlikely that water levels will return to record levels in Lake Ontario and thus average sewage flows are also expected to remain below 3,000 cmd, especially when combined with ongoing leak repairs in the sewer system. The maximum daily flow for the year was 18,052 m3 on May 6, 2017. The lowest daily flow was 1,580 m3 on September 20, 2017. There were no exceedances of the rated flow capacity of the WPCP in 2017, even though we had record high water levels in Lake Ontario, which caused extra high flows to the WPCP due to infiltration from Lake Ontario. Table 1 summarizes sewage flows in 2017.

Table I – Monthly Wastewater Flows to WPCP

Month Total Flow

(m3) Avg. Flow (m3/day)

Percent of the rated capacity (%)

January 112,226 3,620 79%

February 92,753 3,313 72%

March 118,181 3,812 83%

April 163,513 5,450 118%

May 259,905 8,384 182%

June 182,965 6,099 133%

July 129,650 4,182 91%

August 83,585 2,696 59%

September 62,627 2,088 45%

October 76,107 2,455 53%

November 110,777 3,693 80%

December 83,197 2,684 58%

Annual 1,475,486 4,040 87.8%

Page 69: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

The Municipality of Brighton 6

2017 Wastewater Annual Report

2.1 Flow Interpretation The variations in the flow of wastewater received at the WPCP are caused by infiltration and inflow to the collection system, as a result of local precipitation events, fluctuations in ground water elevations and snow melt. In 2015, 2016, and 2017 sewer repair work was completed by Sewer Technologies which has reduced infiltration. Due to extreme conditions in 2017, (very high precipitation and very high lake levels), flows were greatly increased above normal. It is likely average sewage flows would have been significantly higher if sewer repairs had not been completed. 2.2 Raw Sewage Quality As per the ECA, raw sewage samples are to be collected and analyzed for select parameters once per month. However, for 2017, raw sewage samples were collected weekly as part of an intensive study of the WPCP to better assess ammonia. Table II as follows summarizes raw wastewater quality for 2017. For all months, results for all samples collected within a month were averaged to determine raw sewage quality values provided in Table II.

TABLE II - MONTHLY RAW INFLUENT TO WPCP

YEAR CBOD5 TSS TOTAL

PHOSPHOROUS TKN

AMMONIA NITROGEN

2017 Raw

Sewage (mg/L)

Raw Sewage (mg/L)

Raw Sewage (mg/L)

Raw Sewage (mg/L)

Raw Sewage (mg/L)

January 98.1 106.0 3.52 31.0 27.7

February 99.8 127.3 3.67 33.3 24.7

March 99.5 140.5 3.01 24.6 17.1

April 58.5 124.3 2.67 24.6 18.8

May 30.5 97.0 2.18 19.6 15.2

June 60.4 141.5 3.47 31.6 25.2

July 58.9 147.3 3.47 32.8 26.7

August 20.2 48.6 1.59 15.3 13.9

September 29.6 69.0 2.07 19.4 15.1

Page 70: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

The Municipality of Brighton 7

2017 Wastewater Annual Report

October 23.0 40.8 1.62 14.9 12.9

November 23.0 97.8 1.62 27.7 10.6

December 97.1 217.6 5.9 42.4 12.9

Yearly Average

83.8 142.2 4.3 36.5 29.9

3.0 WASTEWATER EFFLUENT QUALITY Section 7 of the ECA lists monthly average limits for the levels of four parameters in the effluent from the waste stabilization pond. The parameters are: five-day carbonaceous biochemical oxygen demand (CBOD5), total suspended solids (TSS), total phosphorus (TP), and ammonia plus ammonium nitrogen (ammonia). Section 9 of the ECA outlines the frequency that the parameters must be tested for and lists an additional six parameters that must be tested: total Kjeldahl nitrogen, nitrate nitrogen, nitrite nitrogen, temperature and E.coli. In 2017, the effluent quality met the limits for the parameters tested, except for ammonia nitrogen from July to October inclusive and December (Table III).

Table III – Monthly Average Waste Stabilization Pond Effluent Quality

Parameter CBOD5 (mg/L)

TSS (mg/L)

TP (mg/L)

Ammonia Nitrogen (mg/L)

E. Coli (cfu/100mL)

pH

Effluent Limit (mg/L)

30 40 1.0 (May-Oct 14 mg/l) Nov-Apr 17 mg/l)

No Limit Specified

6.0-9.5

January 13.0 18.8 0.34 16.6 900 7.5

February 4.3 12.5 0.23 14.7 360 7.5

March 4.0 10.5 0.26 13.1 160 7.7

April 3.0 12.5 0.29 11.5 3700 7.9

May 2.6 12.4 0.31 8.4 5300 7.9

June 2.0 6.5 0.18 12.6 80 7.8

July 1.8 4.0 0.18 14.6 60 7.9

August 1.0 3.2 0.21 18.9 24 7.8

September 1.3 3.0 0.26 22.0 60 7.9

October 1.2 3.4 0.21 24.2 10 7.9

November 1.5 6.0 0.22 16.9 1880 7.8

December 2.0 5.8 0.27 18.7 20 7.7

Page 71: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

The Municipality of Brighton 8

2017 Wastewater Annual Report

Section 7 of the ECA also lists effluent loading limits for CBOD5, TSS, TP and Ammonia Nitrogen. The effluent from the waste stabilization pond met the effluent loading limits for all required parameters other than ammonia limits highlighted below in Table IV.

Table IV – Monthly Average Waste Stabilization Pond Effluent Load

CBOD5 (kg/d) TSS (kg/d)

TP (kg/d)

Ammonia Nitrogen (kg/d)

ECA Limit 138 kg/d 184 kg/d 4.6 kd/d May-Oct 64.4 kg/d

Nov-Apr 78.2 kg/d

January 47.1 68.1 1.2 56.8

February 14.1 41.4 0.7 50.3

March 15.2 40.0 1.0 44.9

April 16.4 68.1 1.6 39.3

May 21.8 104.0 2.6 36.3

June 12.2 39.6 1.1 54.6

July 7.3 16.7 0.8 63.2

August 2.7 8.6 0.6 81.9

September 2.6 6.3 0.5 95.1

October 2.9 8.3 0.5 104.5

November (2016)* 5.5 22.2 0.8 71.4*

December (2016)* 5.4 15.4 0.7 79.0* *The last two months of the previous year are used for this calculation (seasonal) as per MOECC.

4.0 CONSTRUCTED WETLAND EFFLUENT QUALITY Section 6 of the ECA lists monthly average objectives for the levels of six parameters in the constructed wetland effluent (CBOD, TSS, TP, Ammonia Nitrogen, E. Coli and pH). Section 9 of the ECA outlines the frequency that the parameters must be tested and lists an additional three parameters that must be tested: nitrate nitrogen, nitrite nitrogen and temperature. In 2017, the effluent quality met the limits for the parameters tested, with the exceptions of ammonia nitrogen for January and from June to December inclusive, and E-coli in January, April, August, September and December. See Table V.

Table V – Monthly Average Constructed Wetland Effluent Quality Objectives

Page 72: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

The Municipality of Brighton 9

2017 Wastewater Annual Report

Parameter CBOD5 (mg/L)

TSS (mg/L)

TP (mg/L)

Ammonia Nitrogen (mg/L)

E. Coli (cfu/200

mL)

pH

Effluent Objective (mg/L)

15 15 0.8 (May-Oct 10 mg/l) Nov-Apr 15 mg/l)

200 6.0-9.5

January 3.6 6.2 0.16 18.0 400 7.8

February 2.0 4.0 0.12 14.7 20 7.7

March 2.0 3.3 0.09 13.1 14 7.8

April 2.8 4.6 0.16 10.1 40 7.8

May 1.6 5 0.52 6.5 380 7.8

June 1.5 5.8 0.47 11.9 200 7.9

July 1.8 4.0 0.26 12.4 100 7.7

August 1.2 4.0 0.29 16.9 254 7.6

September 2.3 3.9 0.44 20.0 1200 7.6

October 1.2 5.0 0.30 21.3 140 7.6

November 1.5 3.0 0.10 16.4 120 7.9

December 1.0 5.0 0.15 17.5 2500 7.8

5.0 OVERVIEW OF SUCCESS AND ADEQUACY OF WORKS For the most part, the WPCP is successfully treating the effluent for the key effluent parameters with the exception of ammonia nitrogen. As per Table III, there were exceedances of ammonia nitrogen for five of the twelve months in 2017. Table VI summarizes overall treatment efficiency of the lagoon system, based on effluent quality from the wetland portion of the treatment works compared to the raw sewage quality.

Table VI – Overall Efficiency of WPCP Sewage Works System

Date CBOD5 (%) TSS (%) TP (%) Ammonia

Nitrogen (%)

January 96.3 94.2 95.5 35.3

February 98.0 96.9 95.6 40.6

March 97.8 97.7 97.0 23.6

April 95.3 96.3 99.8 46.5

May 94.8 94.8 76.1 57.2

June 97.5 95.9 86.4 52.7

July 97.0 97.3 92.4 53.3

August 94.1 91.8 81.6 -21.9*

September 92.4 94.4 79.0 -32.0*

October 94.8 87.7 81.3 -64.8*

November 93.5 96.9 93.7 -55.2*

Page 73: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

The Municipality of Brighton 10

2017 Wastewater Annual Report

December 99.0 97.7 97.5 -35.8*

Average 95.7% 95.1% 89.7% 8.3% * Indicates a production of Ammonia Nitrogen

6.0 OPERATING PROBLEMS AND CORRECTIVE ACTIONS The following table summarizes main mechanical problems experienced in 2017 and the corrective actions taken.

Table VII – Summary of Operating Problems and Corrective Actions

LOCATION PROBLEM CORRECTIVE ACTION Lagoon New Chemical Tank replaced December 2017

Lagoon New Outside Containment ferric containment. 95% completed by Dec. 2017

Liftstation Liftstation debris (twice yearly maintenance)

Quinte Sewer clean wetwell

Liftstation Pumps (2) at liftstation complete rebuild

pumps repairs

Lagoon and Liftstation electrical panels clean contacts on switches

Lagoon Material build up around aeration pond

Cleaned once by contractor, second time inhouse.

Aerated cell Debris on aerators cleaned aerators twice

Loyalist Drive Lateral cleaning twice a year 3 homes on one service

Liftstation Degreaser Pump Install new pump

Liftstation debris in pumps open and remove debris

Lagoon chemical valves replace valves (2)

Lagoon Chemical Pump replace diaphragm (maintenance)

Lagoon Outside water stand replace old parts

Lagoon chemical line worn out parts - replaced

Liftstation Wetwell Lights replace with LED

Lagoon Outside light Replace with LED

7.0 SUMMARY OF MAINTENANCE The following is an abbreviated summary of normal maintenance completed at the lagoon system and sewage pumping stations.

Table VIII – Summary of Maintenance

Page 74: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

The Municipality of Brighton 11

2017 Wastewater Annual Report

DATE NAME OF EQUIPMENT MAINTAINED

ACTION

Weekly pH meter / DO Calibration (in-house)

Quarterly Flash mixer/ Aerators/Pumps

Grease/check oil

February yearly maint. or when required

Chemical Pump 1&2/ flush quarterly

Flushed and clean, replace Diaphragms

April Yearly Constructed wetland Trapping of muskrats

April yearly OCMIII, MultiRanger, Siemens Magmeter, LUT400

Calibration

Spring wetland levels Water levels lowered

Spring, summer and fall Aerators Removed debris

Summer Constructed wetland Water levels raised

Spring ferric system cleaned Flushed lines, clean pumps

November wetland levels Water levels raised

Spring and Fall Constructed wetland Trapping of muskrats

8.0 EFFLUENT QUALITY ASSURANCE AND CONTROL Wastewater exiting the aeration pond passes through a chemical dosing chamber. Ferric Chloride is the coagulant used to precipitate soluble phosphorus. It also aids in the settling of other substances and odour control. The dosing system operates twenty-four hours a day, seven days a week. The system is checked and logged daily by a wastewater operator. Samples are collected by a trained wastewater operator, following the applicable MOECC guidelines. All collected wastewater samples are sent weekly to an accredited laboratory for analysis. The results of the water samples are analyzed weekly by Brighton staff. A result showing non-compliance with the required wastewater quality stated in the ECA is reported to the MOECC, as required by the ECA.

Page 75: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

The Municipality of Brighton 12

2017 Wastewater Annual Report

9.0 SUMMARY OF CALIBRATION AND MAINTENANCE ON MONITORING EQUIPMENT

Table IX – Dates of Equipment Calibration

DATE OF CALIBRATION Or Maintenance

EQUIPMENT CALIBRATED/Maint.

COMPANY PERFORMING CALIBRRATION/Maint.

April 2017 Yearly Flow monitors/ Mag Meters Franklin/MeasureMax

December 2017 Yearly DO meter/ DR2800/ Hach Technician

Weekly Do/pH meters In-house

10.0 EFFORTS AND RESULTS TO MEET EFFLUENT OBJECTIVES In May of 2015, Brighton retained the engineering and wastewater operations firm of GSS Engineering Consultants Ltd. (GSS) to assist with operation of the lagoon system. With the assistance of GSS, the Municipality of Brighton has implemented a number of interim efforts under the LOF process of the ECA to potentially improve performance of the lagoon treatment system. Four aerators are provided in the aerated cell. Total aerator power is approximately 60 kW. While total energy available in the aerated cell is relatively low (3.3 W/m³ based on total volume of 18,000 m³), all four (4) aerators, when running together, will suspend a significant amount of solids in the aerated cell. MOECC design guidelines recommends mixing energy of 15-25 W/m³ to fully suspend mixed liquor, suspended solids. In the early spring of 2016, the aerators were equipped with simple timers to allow all the aerators to operate at the same time and then turn off. The intent was to allow periods of settling during the aerator “off” period, to slowly build volatile suspended solids (VSS) in the aerated cell to achieve nitrification. However, simple on/off operation of the aerators was not successful in increasing VSS levels in the aerated cell. It was then proposed to combine the on/off aerator operation with manual “decanting” of the top layer of effluent from the aerated cell when the aerators were off. This would assumedly retain solids within the aerated cell and allow VSS to build to levels that would support nitrification. A Notice of Modification (Notification Number 7) for trial decanting, combined with on/off aeration, was submitted to MOECC in August, 2017. This notice is included in Appendix A. This modification was approved under the LOF conditions of the current ECA. The decant trial started on September 25, 2017. After approximately 8 weeks of trial, the manual decant process was terminated on November 29, 2017. At that time, the aerators were

Page 76: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

The Municipality of Brighton 13

2017 Wastewater Annual Report

returned to their normal on/off cycle program. The following summarizes the results of the decant trial.

Method

Based on preliminary evaluations, the simplest method to achieve manual decanting was to: - Manually turn off all aerators at approximately 7 am

- Wait one half to one hour to allow settling of solids in the aerated cell

- Manually lift the first 6 inch stop log to release the first “batch” of clear decant

- After approximately 1 additional hour, manually remove the 2nd stop log to release a

second batch of clear decant

- Overall, such draining of decant lowered water levels in the aeration cell by

approximately 12 inches (300 mm).

- At approximately 2 pm, reinstall both stop logs and then turn on all aerators. The

aerated cell would slowly refill

- Allow aerators to run from 2 pm to approximately 7 am. Then repeat the decant

process.

The operators completed regular measurement of dissolved oxygen in the aerated cell. Generally, the 6 hour decant period (8 am to 2 pm) resulted in falling dissolved oxygen levels in the aerated cell, but oxygen levels normally did not fall below 1 mg/l. Once the aerators were restarted, there was sometimes a temporary, further sag in oxygen levels before oxygen levels rebounded to 4 to 6 mg/l. Normally, once the aerated cell was decanted for 6 hours, the remaining storage depth of approximately 12 inches (300 mm) was sufficient to store the incoming sewage flow until the next morning, without overtopping the stop logs. Results – Retention of VSS and Removal of Ammonia

Decanting, as noted above, began in late September 2017. The hoped-for result would be that VSS in the aerated cell would increase to at least 400 mg/l and potentially as high as 600 mg/l. Levels of VSS this high would provide the total mass of VSS in the aerated cell necessary to achieve nitrification. However, higher levels of VSS were not achieved. VSS levels in the aerated cell, when fully mixed using the available aerators, normally remained below 200 mg/l. Also, no additional removal of ammonia was achieved. While levels of ammonia in the aerated cell typically reduced 50% from levels in the incoming raw sewage, no additional removal of ammonia was achieved by the decanting process compared to the normal aeration process in the aeration cell.

Page 77: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

The Municipality of Brighton 14

2017 Wastewater Annual Report

Overall, ammonia levels in the aerated cell effluent remained high (normally greater than 14 mg/l) throughout the decant trial period. There was some formation of nitrite and nitrate in the cell (evidence of some nitrification) but levels of nitrate remained low (typically below 1 mg/l) and were not appreciably higher than levels of nitrate formation seen before the decant trial. Table 1 also shows average levels of nitrite and nitrate in the aerated cell. To assist development of nitrifying bacteria in the aerated cell, loads of activated sludge from the Frankfort sewage plant were imported weekly and discharged into the aerated cell. Sludge was imported between September 27 and October 25, 2017. The Frankford sewage plant is an activated sludge plant that provides nitrification. As above, however, formation of nitrite/nitrates, and a buildup of VSS, did not occur at significant levels. Seeding with nitrifying sludge did not appear to improve ammonia removal. Other Results Other than ammonia, decanting appeared to improve the quality of effluent being discharged from the aeration cell to the large downstream lagoon (facultative lagoon). A key benefit was that relatively high clarity effluent, with few solids, was discharged to the downstream facultative lagoon. Average values of solids in the aerated cell decant in October, 2017, were 55 mg/l. However, this is based on an average of 5 weekly samples. Four of the samples had solids levels between 20 and 28 mg/l. However, the 5th sample (October 18) had an outlier value of 180 mg/l which significantly affected the monthly average value. For November 2017, the average value of decant solids was 39 mg/l. These levels of suspended solids (55 and 39 mg/l) were much lower than previous months where decanting was not practiced. Values of suspended solids in the aerated cell effluent for the months of January, 2017 to September, 2017 averaged 135 mg/l. BOD appeared to be further reduced in the aerated cell during the decanting trials. Values of CBOD in the decant were 11 mg/l in October and 13 mg/l in November. Compared to average values of incoming raw sewage BOD (average values of 76 mg/l in October and November) removal of BOD in the aeration cell was approximately 84%. An initial concern with the decant trial was whether effective dosing of ferric chloride to the “slug” release of decant could be achieved. Ferric chloride is added to the aerated cell effluent to remove phosphorus. During this trial, the operators would manually turn up the ferric pumps just before the stop logs were removed, and then turn down the pumps once the logs were reinstalled in the afternoon.

Page 78: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

The Municipality of Brighton 15

2017 Wastewater Annual Report

However, phosphorus levels at the compliance point (discharge from the lagoon) were very low and averaged 0.21 and 0.22 mg/l, respectively, for October and November, 2017. Therefore, the initial concern of ferric dosing proved not to be a problem. Overall, effluent quality from the lagoon was excellent in 2017 (other than ammonia) and approached or exceeded tertiary quality levels for CBOD, Suspended Solids and Total Phosphorous for numerous months. While high flows very likely diluted pollutants in the treated effluent during 2017, sewage flows had returned to more normal levels by the time the decant trial began (i.e. less than 3,000 cmd during September, October and just under 3,700 cmd for November of 2017). Summary The decant process did not achieve the main objective of building VSS levels in the aerated cell and treating ammonia. While limited nitrification occurs in the aerated cell (based on observed but low levels of nitrite and nitrate), it would appear that the available bacterial mass is not sufficient to allow a long enough “sludge age” to develop which would support significant populations of nitrifying bacteria. Import of nitrifying sludge from the nearby Frankford STP did not significantly improve the level of nitrification in the aerated cell. While significant reduction of ammonia was not achieved, it is recommended that an automatic decant system for the aeration cell, in concert with on/off blower operation, be seriously considered for the following reasons: - The decanting process significantly reduced the sludge solids discharged to the

downstream facultative lagoon. This would significantly reduce sludge accumulation

in the lagoon.

- Reducing sludge loads to the lagoon should improve lagoon effluent quality.

- Reduction of sludge loadings would defer the very expensive and disruptive process

to remove sludge from the lagoon.

- Reduced suspended solids in the decant may allow ferric dosing levels to be

decreased, as the ferric may become more available (i.e. used more efficiently) for

phosphorus removal. This would result in chemical cost savings.

- Decanting appears to improve BOD removal in the aerated cell. Combined with less

CBOD, less sludge, and potentially less phosphorus levels in the lagoon, the chance

of disruptive algae blooms in the lagoon may reduce.

Page 79: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

The Municipality of Brighton 16

2017 Wastewater Annual Report

- While lagoon effluent results were excellent for much of 2017 (other than ammonia),

the decanting process did not appear to effect effluent quality in the lagoon. Rather,

it appeared that decanting from the aerated cell improved the quality of lagoon

effluent for CBOD, TSS and TP.

If an automatic decant system was installed, it would simplify the decanting procedure. Multiple decants each day (say four times per day) would avoid any overflow of mixed, aerated effluent (containing high levels of solids) to the downstream lagoon. If an automatic decanting system was installed, the existing timer system for the aerators would likely suffice. The only upgrade that could be considered is automatic, higher dosing of ferric chloride during the decant periods. 11.0 Ammonium Nitrogen Removal of ammonia nitrogen has been a long-standing issue for the Brighton WPCP. LOF provisions under previously issued Notices were undertaken largely to improve removal of ammonia nitrogen in the lagoon system. In 2017, efforts to improve ammonia removal focused on operation of the aerators on timers in conjunction with manual decanting of the aerated cell. These measures were intended to build levels of VSS and increase sludge age in the aerated cell to promote development of nitrifying bacteria. Efforts to reduce ammonia have continued at the same time a Class EA was being completed to determine the best long term treatment alternative. Previous testing by Enviro Sim (2016) indicated that the raw sewage is treatable (for significant ammonia removal) if proper treatment, with an established mass of nitrifying bacteria, is available. 11.1 Total Phosphorus As per Table III, there was no exceedance of the TP limit of 1.0 mg/l in 2017. Jar testing of the coagulant dosage was completed during the first three months of 2017 to optimize dosing levels of ferric chloride under cold water conditions. Levels of TP in wetland effluent remained below the Objective level of 0.8 mg/l for all months. 11.2 CBOD and Suspended Solids

Page 80: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

The Municipality of Brighton 17

2017 Wastewater Annual Report

Levels of CBOD and Suspended solids remained below the compliance limit and objective limits for all months in 2017. 12.0 BIOSOLIDS MANAGEMENT No sludge was removed during 2017. 13.0 SUMMARY OF COMPLAINTS The Municipality received no complaints in 2017 14.0 SUMMARY OF BY-PASSES, SPILLS AND ABNORMAL DISCHARGES There were no sewage by-passes, spills or abnormal discharges during this reporting period. 15.0 SUMMARY OF SEWER WORK COMPLETED Between 2010 and 2017, the Municipality completed significant maintenance of the sanitary sewer system. This work included flushing and TV inspection and progressed to major repairs of sewers and manholes to reduce infiltration. At the end of 2014, Sewer Technologies completed a priority sewer repair list with the most important problems rated at 5, and the least important problems rated at 1. The repair work has been carried out in 2015, 2016, 2017 and will continue into 2018. In seven years, the Municipality has spent approximately $700,000 on the collection system infrastructure. As noted, average flows have been reduced by approximately 500 cubic meter per day. This lower flow has increased the remaining treatment capacity, potential reduced pollutant loadings on the environment, reduced run time of pumping equipment and reduced energy usage for pumping raw sewage. In 2018, the Municipality plans to invest a further $150,000 on flushing, CCTV and repairs, after which all of the Municipality’s sewer will have been completed. Smoke testing is also planned to find direct inflow sources such as sump pumps and down spouts etc. 16.0 RAINBOW TROUT TOXICITY TESTING Since spring of 2015, Brighton has submitted quarterly samples of final effluent from the constructed wetlands to a toxicity laboratory in Guelph, Ontario (Aquatox Testing and Consulting Ltd.) for LC 50 testing using young rainbow trout.

Page 81: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

The Municipality of Brighton 18

2017 Wastewater Annual Report

All tests completed in 2017 had zero mortalities. Sampling and testing have been done in accordance with Environment Canada requirements. Prepared by: Keith Lee, Wastewater ORO Jeff Graham, P. Eng. Municipality of Brighton GSS Engineering Consultants Ltd

Page 82: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

APPENDIX A

NOTICE OF MODIFICATIONS SUBMITTED TO MOECC UNDER LOF PROCESS – 2017

Page 83: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

The Municipality of Brighton

2017 Wastewater Annual Report

I I I

Notice of Modification to Sewage Works

Ministry of the Environment

1.1 RETAIN COPY OF COMPLETED FORM AS PART OF THE ECA AND SEND A COPY

TO THE WATER SUPERVISOR (FOR MUNICIPAL SYSTEMS) OR DISTRICT MANAGER (FOR INDUSTRIAL SYSTEMS)

Part 1- Environmental Compliance Approval (ECA) with Limited Operational Flexibility (Insert the ECA 's owner, number and issuance date and notice number, which should start with "01" and consecutive numbers thereafter)

ECA Owner ECA number Issuance Dat Notice number (mm/dd/yy)

Municipality of Brighton 3081-9XQNZK 07/07/15 7

Part 2 - Description of the modifications as part of the Limited Operational Flexibility (Attach a detailed description of the sewage works)

Previously, Brighton installed timers on the existing four aerators in the aerated cell of the

sewage treatment works. On/off cycling of the aerators was attempted to retain biological

solids in the aerated cell, to increase sludge age and promote formation and retention of

nitrifying bacteria. This notice seeks to augment aeration timers by allowing removal of

existing stop logs (two, 6" tall stop logs) in the morning to "decant" clarified water from the

aerated cell when the aerators are off. Once the boards are reinstalled later in the same day, all aerators would be returned to operation.

Description shall include: 1. A detail description above of the modifications and/or operations to the sewage works

(e.g. sewage work component, locatlon, size, equipment type/model, material,

process name, etc.)

2. An assessment of t he anticipated environmental effects

3. Updated versions of, or amendments to, all relevant mechanical documents required by

this ECA that are affected by the modifications as applicable, e.g. site plan, design brief,

drawings, emergency and spill prevention plan, etc.

Part 3 - Declaration by Professional Engineer

I hereby declare that I have verified the scope and technical aspects of this modification and

confirm that he design:

1. Has been prepared or reviewed by a Professional Engineer who is licensed to practice the

Province of Ontario;

2. Has been designed in accordance with the Limited Operational Flexibility as described in

the ECA;

3. Has been designed consistent with Ministry's Design Guidelines, adhering to

engineering standards, industry’s best management practices, and demonstrating

ongoing compliance with s.53 of the Ontario Water Resources Act; and other

appropriate regulations.

Page 84: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

The Municipality of Brighton

2017 Wastewater Annual Report

I hereby declare that to the best of my knowledge, information and belief the information

contained in this form is complete and accurate

Part 4 -Declaration by Owner

I hereby declare that:

1. I am authorized by the Owner to complete this Declaration;

2. The Owner consents to the modifications; and

3. This modifications to the sewage works are proposed in accordance with the Limited

Operational Flexibility as described in the ECA. 4. The Owner has fulfilled all applicable requirements of the Environmental Assessment Act,

I hereby declare that to the best of my knowledge, information and belief the information

contained in this form Is complete and accurate

EAS Form August 20, 2013

90222860 Date (mm/dd/yy}

08/25/2017

Consultants Ltd.

Bill Watson, P. Eng.

CAO Dale (mm/dd/yy)

08/25/2017

Page 85: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

APPENDIX C

Phase 2 Report (Draft) – Brighton Wastewater Treatment System

JL Richards Engineers – April 2017

Page 86: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

M

M

BRIGHTON

MUNICIPAL

MUNICIPAL

N WASTEW

CLASS ENV

PHASE 2 R

Ap

Su

203-863

Kingsto

K

JL

LITY OF BRI

WATER TREA

VIRONMEN

REPORT (D

ril 10, 2017

bmitted by:

3 Princess St

on, ON Cana

K7L 5N4

LR 27271

IGHTON

ATMENT SY

NTAL ASSES

DRAFT)

treet

ada

YSTEM

SSMENT

Page 87: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MunicipalBrighton W

J. L. Richa

TABLE

1.0  IN

1

1

1

2.0  S

2

2

3.0  P

4.0  A

4

4

5.0  ID

5

5

5

5

5

5

6.0  P

6

6

7.0  C

ity of BrightonWastewater T

ards & Assoc

E OF CON

NTRODUCT

  Backg.1

  Class .2

  Objec.3

SUMMARY O

  Key F.1

  Phase.2

PHASE 2 PU

ADDITIONAL

  Waste.1

  Recei.2

DENTIFICAT

  Evalu.1

  Waste.2

  Detail.3

.3.1  Proba

.3.2  Proba

.3.3  Evalu

PREFERRED

  Descr.1

  Opinio.2

CONCLUSIO

n Treatment Sys

ciates Limited

NTENTS

TION ............

ground ........

Environmen

ctives of the

OF PHASE 1

Findings .......

e 1 Problem

UBLIC AND A

L AND UPDA

ewater Treat

ving Water A

TION OF WA

ation and Se

ewater Treat

ed Evaluatio

able Costs -

able Costs –

ation Overvi

D SOLUTION

ription of the

on of Probab

ONS AND NE

stem Class E

...................

...................

ntal Assessm

Class EA ....

1 FINDINGS

...................

and Opport

AGENCY CO

ATED SPEC

tment Requi

Assessment

ASTEWATE

election Met

tment Altern

on of Wastew

Capital Cost

Lifecycle Co

iew ..............

N .................

e Preferred A

ble Cost for

EXT STEPS

A

i

...................

...................

ment Proces

...................

S .................

...................

tunity Statem

ONSULTAT

CIALIZED ST

irements .....

t..................

ER TREATM

thodology ...

natives Cons

water Treatm

ts ...............

osts ............

...................

...................

Alternative...

Preferred So

..................

...................

...................

ss ................

...................

...................

...................

ment ............

ION ............

TUDIES ......

...................

...................

ENT ALTER

...................

sidered ........

ment Alterna

...................

...................

...................

...................

...................

olution (inclu

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

RNATIVES ..

...................

...................

atives ..........

...................

...................

...................

...................

...................

uding lifecyc

...................

JLR 2

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

cle upgrades

...................

27271

...... 3 

...... 3 

...... 7 

...... 9 

...... 9 

...... 9 

.... 10 

.... 11 

.... 12 

.... 12 

.... 13 

.... 13 

.... 13 

.... 14 

.... 17 

.... 17 

.... 17 

.... 18 

.... 20 

.... 20 

s) .. 20 

.... 21 

Page 88: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Municipality of Brighton Brighton Wastewater Treatment System Class EA

J. L. Richards & Associates Limited JLR 27271 ii

FIGURES

Figure 1-1 Brighton Municipal Class EA Study Location .............................................................. 5 

Figure 1-2 Municipality of Brighton Wastewater System .............................................................. 6 

Figure 1-3 Municipal Class EA Process ........................................................................................ 8 

TABLES

Table 4-1 Effluent Compliance Limits – Waste Stabilization Pond (ECA No. 3081-9XQNZK) ... 12 

Table 5-1 Description and Preliminary Evaluation of Wastewater Treatment Alternatives ......... 14 

Table 5-2 Total Estimated Cost of Treatment Alternatives (2017 $) ........................................... 17 

Table 5-3 Total Estimated Annual Operating Cost of Preferred Alternative (2017 $) ................. 18 

Table 5-4 Detailed Evaluation Matrix .......................................................................................... 19 

APPENDICES

Appendix A – Public Consultation Summary

Appendix B – Detailed Treatment Technology Evaluation

Appendix C – Conceptual Layouts

Page 89: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MunicipalBrighton W

J. L. Richa

1.0 INTR

Back1.1

The Mun(Class Eexperienalso to eIn order tRichardsof the Cla

The MunMunicipaQuinte Wto the sotends to overview

The comsystem (and forcProvinciasewage via a 8.2 gravity tocommun

As notedcollectionequippedcompleteto Butter

ity of BrightonWastewater T

ards & Assoc

RODUCTION

kground

nicipality of EA) of their w

ced with trensure that into fully defin

s & Associatass EA.

nicipality incality within thWest to the eouth. Highw

be a regionw of the Muni

munal sewa(currently raemain, a smal Park, andgenerated inkm long, 30

o the Lagooal sewage s

d above, the n system. d with threee with inlet a

Creek, and

n Treatment Sys

ciates Limited

N

Brighton (twastewater

eatment (e.gncreased infe the problees Limited (

ludes the fohe County o

east and the ay 401 provnal focus foricipality and

age system gted for 4,60mall sub-ared several kiln the collect00 mm forceon treatmentsystem.

Harbour StrThe SPS g

e dry pit ceand outlet pip

related instr

stem Class E

3

the Municiptreatment s

g. elevated afluent flows fems and idenJLR) was re

ormer Town of NorthumbTown of Cra

vides the mar hamlets instudy locati

generally co00 m3/day), ea sewage ometers of tion system

emain to the t system. R

reet SPS recgenerally contrifugal typping, a standrumentation

A

3

pality) initiatesystem in Auammonia cofrom future gntify a preferetained by th

and Townsberland. Theamahe to theain east-wesn the surrouon.

onsists of thethe Harbourpumping stagravity colleis directed Lagoon trea

Refer to Fig

ceives sewaonsists of ape raw sewadby diesel gand controls

ed a Classugust 2016 oncentrationgrowth can brred solutionhe Municipal

ship of Brighe Municipalie west, with

st corridor thnding areas

e Brighton Wr Street Sewation and foection seweto the Harb

atment systegure 1-2 for

ge from appa wet well/dage pumps

generator, a s for the sta

Phase 2

s Environmeto address s in the treabe effectiveln to address lity to assist

hton and is ity is boundthe shorelin

hrough the Ms. Refer to

Wastewater Twage Pumporcemain seer. Approximbour Street Sem and the o

an overview

proximately hdry well con

(lead/lag/stwet well emtion.

2 Report (DRA

JLR 2

ental Assesvarious pro

ated efflueny accommodthese issue in the comp

the most eaed by the C

ne of Lake OMunicipality,

Figure 1-1

Treatment Laing Station

ervicing Presmately half SPS and puother half flow of the Br

half of the exnfiguration atandby oper

mergency ov

AFT)

27271

sment oblems t) and dated.

es, J.L. pletion

astern City of

Ontario which for an

agoon (SPS) squ’ile of the

umped ows by righton

xisting and is ration)

verflow

Page 90: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Municipality of Brighton Brighton Wastewater Treatment System Class EA Phase 2 Report (DRAFT)

J. L. Richards & Associates Limited JLR 27271 4

The wastewater treatment system consists of a 0.68 ha single cell aerated lagoon followed by a single cell 5.44 ha waste stabilization pond with baffle partition curtains followed by a 2-cell constructed wetland with a total surface area of 6.2 ha. There is also a chemical storage/feed system used to facilitate continuous phosphorus removal. Chemical is introduced after the aerated lagoon and upstream of the waste stabilization pond. Treated effluent from the waste stabilization pond is discharged continuously to the constructed wetland and from the constructed wetland it continuously discharges to a natural wetland and ultimately to Presqu’ile Bay, which is located off the northeast shore of Lake Ontario.

Page 91: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

DRAWING NO.:

DESIGN:

CHECKED:

DRAWN:

DRAWING:

PROJECT:

www.jlrichards.ca

JLR NO:This drawing is copyright protected and maynot be reproduced or used for purposes

other than execution of the described workwithout the express written consent of

J.L. Richards & Associates Limited.

JW

KTK

BH

27271

FIGURE 1-1

BRIGHTON WASTEWATER TREATMENT SYSTEM CLASS EAMUNICIPALITY OF BRIGHTON, ONTARIO

LOCATION PLAN

UV33

401

401UV25

UV30

UV64

L a k e O n t a r i o

Presqu'ileBay

Trenton

Brighton

Colborne

Trent River

Murray Canal

MUNICIPALITY OFBRIGHTON

L a k eO n t a r i o!.

Brighton Water PollutionControl Plant

Urban Development

MUNICIPALITYOF TRENT HILLS

TOWNSHIP OFALNWICK/HALDIMAND

CITY OF QUINTE WEST

TOWNSHIP OF CRAMAHE

MUNICIPALITY OF TRENT HILLS

COUNTY OFPRINCE EDWARDCOUNTY

UV29

UV21

UV25

UV64UV3

UV26

UV30

UV40

UV33

UV41

UV27UV5

UV31

UV28

UV2 UV2

Presqu'ileProvincial Park

File

Loc

atio

n: K

:\270

00\2

7271

- Br

ight

on L

agoo

n\JL

R D

WG

\Pla

n\27

271

Mun

icip

ality

.mxd

Plot

Dat

e: D

ecem

ber 6

, 201

6 2:

49:0

3 PM

¯

0 2 4 61Kilometers

Page 92: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

DRAWING NO.:

DESIGN:

CHECKED:

DRAWN:

DRAWING:

PROJECT:

www.jlrichards.ca

JLR NO:This drawing is copyright protected and maynot be reproduced or used for purposes

other than execution of the described workwithout the express written consent of

J.L. Richards & Associates Limited.

JW

KTK

BH

27271

BRIGHTON WASTEWATER TREATMENT SYSTEM CLASS EAMUNICIPALITY OF BRIGHTON, ONTARIO

SYSTEM MAP (PUMPING STATION(S), FORCEMAIN, LAGOON SITE)

FIGURE 1-2

Presqu'ileBay

BRIGHTON WASTEWATERTREATMENT SYSTEM

HARBOUR ST. SEWAGEPUMPING STATION

PRESQU'ILEPARK SEWAGE

PUMPING STATION

File

Loc

atio

n: K

:\270

00\2

7271

- Br

ight

on L

agoo

n\JL

R D

WG

\Pla

n\27

271

Syst

emM

ap.m

xd

Plot

Dat

e: D

ecem

ber 6

, 201

6 2:

52:0

9 PM

¯̄

LegendGravity FlowHarbour StreetSewage Pumping Station

Page 93: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MunicipalBrighton W

J. L. Richa

Clas1.2

The Ontaprocess purpose (R.S.O. 1

The Munreview pdetailed and stakMunicipathe Act. 2015.

This ClasundertakPhase 1 parties thFile that Schedulethe projeClass EA

The ClasSchedulerequired:

P

P

The Proje2 of the Cof the Enperiod, th

ity of BrightonWastewater T

ards & Assoc

ss Environm

ario Environso that poteof the Act i

1990, c.E.18

nicipal Classrocess whilesite-specific

keholder ageal Engineers Updates a

ss EA has bkings have th

and Phase hat may potedocuments

e is reviewedect needs to A process ar

ss EA framee B projects:

Phase 1 – Ide

Phase 2 – Ide

ect File shalClass EA pronvironment ahen the proje

n Treatment Sys

ciates Limited

mental Asse

nmental Assential enviros to provide

8, s.2).

s EA procese ensuring t

c informationencies. In Associationnd amendm

been initiatedhe potential 2 specified entially be athe Class E

d to determiproceed as

re completed

ework defines, the comp

entify the Pro

entify Alterna

ll be made aocess for a mand Climate ect may proc

stem Class E

7

essment Pro

essment Aconmental effe for the pro

ss is followthat the pron gathering 1987 the fi

n (MEA) on ments were s

d as a Schedfor significa

under the Mffected by thEA process ine if the proa Schedule

d.

es the procepletion of th

oblem and/o

ative Solutio

available for mandatory 3Change (M

ceed to impl

A

7

ocess

ct (the Act) sffects are cootection and

ed for commoject meets tand studiesirst Class Ebehalf of Onsubsequentl

dule ‘B’ projant environm

Municipal Clahe project, afor the proj

oject is compe C undertak

ess for each he following

or Opportuni

ons to the Pr

public and a30-day perio

MOECC) for aementation

sets out a ponsidered bconservatio

mon types the requirem

s, as well asEA guidancentario Municy made in 1

ect. Projectsmental effectass EA. Thisand the prepject. At theplete under king in which

type of prog Phases of

ity

roblem and/o

agency revied. If there aa ‘Part II Or(Phase 5).

Phase 2

planning andefore a proj

on of the na

of projects ments of thes consultatioe document cipalities wa1993, 2000,

s categorizets, and are

s includes coparation of ae end of Pha

a Schedule h case Phas

oject (refer tof the Class

or Opportun

ew at the comare no requerder’ within t

2 Report (DRA

JLR 2

d decision-moject begins.atural enviro

to streamline Act. It invon with the

prepared bs approved 2007, 2011

ed as Schedrequired to

onsultation wa Class EA Pase 2, the p‘B’ Schedul

ses 3 and 4

o Figure 1-3 EA proces

ity

mpletion of Pests to the Mthis 30-day r

AFT)

27271

making . The nment

ne the volves public

by the under

1, and

ule ‘B’ follow

with all Project project le or if of the

3). For ss are

Phase Ministry review

Page 94: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided
Page 95: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MunicipalBrighton W

J. L. Richa

Obje1.3

The objefor the msewage s

The purpincludingProblem Report aand sum

2.0 SUM

Key 2.1

The follo

Tsamsuow

Tpefthst(w

Aexovinth

Ttr

ity of BrightonWastewater T

ards & Assoc

ectives of th

ective of this main sewagsystem over

pose of this g providing a

Statement dlso summarmarizes age

MMARY OF

Findings

wing are som

The raw sewamples each

municipal wauggests thatther sources

was originally

The main coarticular, amffluent) and

he six yeartabilization pwetland) was

A detailed rexisting systverloading,

nefficient aehroughout th

he wetland reatment with

n Treatment Sys

ciates Limited

he Class EA

Class EA isge pumping r a 20-year p

Report is ta review of determined dizes Phase

ency and pub

PHASE 1 F

me of the ke

wage is relh year fallingastewater. t non-resides) may be sy designed fo

ncern over mmonia conobjectives (s reviewed,pond. Theres not met in

eview of thetem experiepotential sh

eration, raphe year.

portion of thh the except

stem Class E

9

A

s to identify tstation and

planning per

to summarizthe various

during Phas1 findings (bblic consulta

INDINGS

ey Phase 1 f

atively “higg in the rangSome maxi

ential contribignificant anor treating.

the past sevncentration (wetland effl, the ECA e are no limfive of the s

e wastewateences a n

hort circuitinid sludge a

he treatmention of some

A

9

the preferredd associatediod.

ze the result options thae 1 and to re

based on a sation activitie

findings:

h strength”ge of literaturmum values

butions to thend may be lo

veral years has exceed

luent) on selimits for toits specifiedix years rev

er treatmentnumber of g, and limitaccumulatio

t system doe marginal de

d strategies d forcemain

ts of Phaseat have beeecommend separate repes;

for a domre values fors are reporte waste streoading the la

is related toded the EC

everal occasotal phosph

d in the ECAiewed.

t system pechallenges

ted hydraulicn, and poo

oes not appeecreases in

Phase 2

for wastewan for the Br

e 2 of the Cen considerea preferred

port complete

mestic sewar medium to ted to be eveam (e.g. inagoon at a

o treated effCA limits (ssions. Addihorous wereA for E. Coli,

erformance including:

c detention or ammonia

ear to be proTotal Phosp

2 Report (DRA

JLR 2

ater treatmenrighton com

Class EA proed to addresalternative. ed for that P

ge, with mhigh streng

ven higher. dustrial washigher rate t

fluent qualitystabilization itionally, in fe not met , but the obj

indicates thregular o

time, issuea effluent q

oviding signphorus.

AFT)

27271

nt and munal

ocess, ss the This

Phase)

onthly th raw This

stes or than it

y. In pond

four of in the jective

at the rganic s with quality

nificant

Page 96: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MunicipalBrighton W

J. L. Richa

DaS

Ucap

Phas2.2

Based onproblem/

The Brig

collection

continuo

stabilizat

removal.

(ECA) N

The syst

projected

increase

approxim

Based on

determin

required

Phospho

configura

raw sewa

the treate

the organ

of the tre

of concer

In additio

part of Ph

within the

is require

ity of BrightonWastewater T

ards & Assoc

Due to the pproximately

Street SPS a

Updated popapacity of thlanning perio

se 1 Problem

n the informa/opportunity

ghton comm

n sewers,

usly dischar

tion pond, a

The treatm

No. 3081-9XQ

tem currently

d to occur w

hydraulic lo

mately 60% t

n an evalua

ned that the

by ECA N

orus. A revie

ation of the L

age combine

ed effluent e

nic loadings

eatment syst

rn.

on, the Harb

hase 1 of th

e next 7 yea

ed.

n Treatment Sys

ciates Limited

age and y $500,000 nd Lagoon i

pulation andhe existing trod for this st

m and Oppo

ation develostatement w

munal sewag

a main pu

rged lagoon

constructed

ment system

QNZK which

y services a

within the 2

oading to th

to 70% of its

ation of the a

treatment s

No. 3081-9X

ew of histori

Lagoon bas

ed with phys

exceedances

received fro

tem is not pr

our Street S

e Class EA.

ars approxim

stem Class E

1

condition oin infrastrucs required o

flow projecreatment systudy.

ortunity Sta

oped and anwas develope

ge system

umping stat

based treat

d wetland an

is currently

h stipulates

an estimated

20 year plan

he treatment

s ECA rated

available op

system has

XQNZK, pa

rical raw sew

sed treatmen

sical limitatio

s. The syste

om the collec

roviding any

SPS and the

Due to the

mately $500,0

A

10

of the existcture rehabi

over approxim

ctions show stem is not a

atement

alyzed durined for the pr

generally co

tion, a sma

tment system

d a continuo

y licensed un

certain ope

d population

nning period

t system. Th

“hydraulic” c

perational his

s regular dif

articularly fo

wage quality

nt system, in

ons of the tr

em, as curre

ction system

y significant

Lagoon bas

age and co

000 in infras

ting infrastrilitation and mately the n

w that the cuanticipated t

ng Phase 1 oroject:

onsists of s

aller sub-ar

m that inclu

ous chemica

nder Environ

erational and

n of 6462 an

d that will g

The system i

capacity.

storical trea

fficulties in a

or ammonia

y, hydraulic i

ndicates that

reatment sys

ently configu

m. Further th

treatment w

sed treatmen

ndition of th

structure reh

Phase 2

ucture, it imaintenanc

next 7 years.

urrently appto be exceed

of this Class

several kilom

rea pumpin

udes an aera

al feed syste

nmental Com

d performan

nd some pop

generate add

is currently

ted effluent

achieving th

a and in so

input and th

t the relati

ystem is the

ured, is not c

he constructe

with respect

nt system we

e existing in

abilitation an

2 Report (DRA

JLR 2

s estimatedce at the Ha.

proved ECA ded in the 20

s EA, the foll

meters of g

g station a

ation cell, a

em for phosp

mpliance Ap

nce requirem

pulation gro

ditional flow

only operat

data, it has

he effluent q

ome cases

he overall ph

ively high str

primary cau

capable of tr

ed wetland p

to the param

ere evaluate

nfrastructure,

nd maintena

AFT)

27271

d that arbour

rated 0-year

lowing

gravity

and a

waste

phorus

proval

ments.

owth is

ws and

ting at

s been

quality

Total

hysical

rength

use for

reating

portion

meters

ed as

,

ance

Page 97: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Municipality of Brighton Brighton Wastewater Treatment System Class EA Phase 2 Report (DRAFT)

J. L. Richards & Associates Limited JLR 27271 11

3.0 PHASE 2 PUBLIC AND AGENCY CONSULTATION

The Class EA process requires consultation with parties that may potentially be affected by the project. As part of Phase 2, the consultation plan developed in Phase 1 was followed in order to facilitate communication with the public and various agencies and other interested parties. Refer to Appendix A for the Phase 2 Public Consultation Summary and supporting documentation.

Key components of Phase 2 Stakeholder consultation include:

Reviewing the Public Consultation Plan (developed in Phase 1) Project Team/Committee Meetings Responding to Public Stakeholder Comments Responding to Review Agency Comments Maintaining Project Mailing List and Contacts Public Information Centre Notice of Completion

Key consultation correspondence from Phase 2 is included in Appendix A. A brief summary of some of the key results of this consultation is presented below:

MOECC - The MOECC reviewed the Phase 1 Report and other available information on the project and determined that the existing effluent limits will remain in place. The Ministry noted that the Class EA evaluation should consider that some add-on treatment options could provide incidental improvements in overall effluent quality. Improvements in BOD and TSS in addition to ammonia were of particular interest in to the MOECC. The MOECC indicated that they do not anticipate giving credit to the effluent quality improvements that the constructed wetland may provide.

MNRF – The Ministry of Natural Resources and Forestry (MNRF) provided general

information on the databases available. It was also noted that any expansions of the existing infrastructure should not be placed within the Provincially Significant Wetland (adjacent to the engineered wetland). A site assessment was also recommended to identify the presence of any Species at Risk and/or their habitat.

A mandatory Public Information Centre (PIC) will be held in advance of finalizing this Phase 2 Report. The PIC will solicit additional input for consideration in establishing the final preferred alternative.

Page 98: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MunicipalBrighton W

J. L. Richa

4.0 ADD

Phase 1 relevant properly Some adoutlined

Trea4.1

The wasevaluatioClass EAlagoon isincrease

The exisThe MOEDuring theffect asfocus onphosphoforward isome inccorrespo

Table 4-

CBO

Tota

Amm

Tota

Note** fro

ity of BrightonWastewater T

ards & Assoc

DITIONAL C

of the Clasexisting conidentified a

dditional key below.

ated Effluen

tewater treaon of projectA and baseds anticipatedto the ECA

ting ECA coECC was cohis consulta part of this addressingrous. The Minto prelimincidental imp

ondence with

1 Existing E

Para

OD5

al Suspended

monia + Amm

al Phosphoru

es: * from Maom Novemb

n Treatment Sys

ciates Limited

CONDITIONS

ss EA involvnditions and nd evaluateconditions a

nt Requirem

atment systeed growth w

d on this evad to be lessrated capac

ompliance reonsulted neation, it was

s undertakingg the issues

MOECC indicnary design,provements h the MOECC

Effluent Com

ameter

d Solids

monium Nitr

us

ay 01 to Octer 01 to Apr

stem Class E

1

S AND CON

ved problemconstraints

ed in considand constra

ments

em is rated fwithin the sealuation, the s than the ccity during th

equirementsar the end of

confirmed tg. It was no associated

cated that du consideratiin the trea

C is provide

mpliance Li

Conin

30

40

ogen 1417.

1

tober 30 ril 30

A

12

NSTRAINTS

m/opportunityto ensure th

deration of aints were als

for an Averarvice area w20-year des

current ratehis time perio

s for the treaf Phase 1 anthat the cur

oted by the Mwith ammo

uring the evaion should batment of Td in the Con

imits – Was

ncentration Effluent

0.0 mg/L

0.0 mg/L .0 mg/L * 0 mg/L ** .0 mg/L

y definition,hat feasible all of the prso confirmed

age Day Flowas undertaksign average

ed capacity od.

atment systend early on irrent ECA reMOECC thaonia removaaluation of obe given to

TSS and cBnsultation Su

ste Stabiliza

Loading iEffluent

138.0 kg/d

184.0 kg/d64.4 kg/da78.2 kg/day

4.6 kg/da

Phase 2

which includalternative s

roject specifd early on in

ow (ADF) of ken as part e day raw sand there is

em are outliinto Phase 2equirementsat enhancedal and to a lptions in Phalternatives

BOD5. Docuummary (Ap

ation Pond

in t Non-

day Annu

day Annuay * y ** Mont

ay Mont

2 Report (DRA

JLR 2

ded identifysolutions cofic circumstan Phase 2 an

4,600 m3/daof Phase 1 ewage flow s no need

ined in Tabl2 of the Class are to rem treatment sesser extenase 2 and m

s that can pmentation opendix A).

-compliance

ual Average

ual Average

thly Average

thly Average

AFT)

27271

ing all uld be ances. nd are

ay. An of this to the for an

le 4-1. ss EA.

main in should nt total moving rovide of this

e

e

Page 99: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MunicipalBrighton W

J. L. Richa

Rece4.2

Based onthe ratedwas deem

5.0 IDEN

Eval5.1

The maisolutionssolutionswastewaIt is also “generalitypically developeClass EA

In order transpare

In D S

The first those altalternativ

Based oconducteexperienconducte

N E S F

ity of BrightonWastewater T

ards & Assoc

eiving Wate

n the aboved capacity ismed not to b

NTIFICATIO

uation and

n objective s to the probs to the probter projects important to

zed solutionfurther exp

ed during a pA process an

to facilitate ent and logic

nitial screeniDetailed evalSelection of a

evaluation sternatives thves are not c

on the initiaed. Evaluatioce on simila

ed using crite

Natural EnvirEngineering aSocial and Co

inancial Imp

n Treatment Sys

ciates Limited

er Assessm

e-noted conss not requirebe required.

ON OF WAST

Selection M

of Phase 2blem(s) (andblem(s), incgenerally reo note that tn” to the proplored as papreliminary and referred to

the evaluatcal three par

ng of alternauation of scr

a preferred a

stage considhat fully addcarried forwa

al screeningon criteria w

ar assessmeerion in the f

ronment andand Technicommunity W

pacts

stem Class E

1

ent

sultation withed for this p

TEWATER

Methodolog

of a Class/or opportunluding the ‘

esult in the idthe objectiveoblem and art of Phasand detailedo as Implem

tion and selrt assessme

atives; reened alteralternative.

ders the overess the proard to a more

g, a detailewere developents and in cfollowing fou

Archeologycal Considera

Well Being

A

13

h the MOECparticular und

TREATMEN

gy

s EA is to idnities) identifDo Nothing’dentification e of Phase not necessa

se 3 of a Sd design stagmentation).

lection of thnt process w

rnatives; and

erall feasibilitoblem stateme detailed ev

ed assessmped based onconsultation ur major crite

y ations

CC and givedertaking, a

NT ALTERN

dentify and fied in Phas’ option, areand review 2 is to focusarily all of thSchedule C ge (i.e. inclu

he preferredwas establis

d

ty of the potment. This valuation sta

ment of the n a review owith Munici

eria categori

Phase 2

en the fact tha receiving w

NATIVES

evaluate pose 1. All reae consideredof a broad rs on a deterhe intricate

Class EA uded as part

solutions dhed. This p

tential solutistep ensure

age.

short list of the backgripal staff. Thies:

2 Report (DRA

JLR 2

hat an increwater asses

ossible alterasonable pod. Class EArange of solurmining an odetails whicand then fof Phase 5

during Phaserocess inclu

ons and idees that unre

of alternativround informhe evaluatio

AFT)

27271

ase in sment

rnative otential As for utions. overall ch are further of the

e 2, a uded:

entifies ealistic

ves is mation, on was

Page 100: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MunicipalBrighton W

J. L. Richa

Once thalternativa preferre

Initia5.2

Several asupport a

Table 5-

Option 1

1) Do no

Option 2

2A) Remcells

2B) Optimupgrade/

2C) Modvolume a

ity of BrightonWastewater T

ards & Assoc

he detailed ve(s) was ideed alternativ

al Screening

alternatives a recommen

1 Descriptio

Alternativ

: Do nothing

thing

: Optimize/M

move sludge

mize baffle d/refurbish ex

ify lagoon opand/or aerati

n Treatment Sys

ciates Limited

evaluation entified for pve.

g of Alterna

are presentendation to eit

on and Prel

ve

g

Modify Curre

from lagoon

design and xisting baffle

perating on

stem Class E

1

was compresentation

atives

ed in Table 5ther carry the

liminary Eva

ReviewenvironmECA limThis optaddressRecomm

nt Lagoon O

n Reviewaddressshould oRecommto be co

s Review(Cell Noown but improvinnot meeonly conRecommto be coReviewsystem identifiedof the otAdding aassociatRecomm

A

14

pleted, a n to stakehol

5-1 along wie alternative

aluation of

Re

: This optionment as efflu

mits and couldtion has not s the problemmendation:

Operations : Sludge rem

s the identifieonly be consmendation:onsidered in: Optimizing

o. 2) will not ait should pro

ng lagoon reeting ECA rensidered in cmendation:onsidered in: Previous uhave provend problems. ther options additional lated with ammmendation:

recommendlders and to

ith a summae forward for

Wastewate

eview/Recom

n would haveuent would lid also resultbeen carried

m. Do not car

moval has pred issues onsidered in co Carry forwn combinat

g baffle desigaddress all t

rovide some etention timeequirements.combination Carry forwn combinat

upgrades to tn not to be e

A new aerabeing carrie

agoon volummonia treatm Do not car

Phase 2

ded preferreo solicit input

ary of the revr further eva

er Treatmen

mmendation

e a negativeikely continut in fines to td forward as

rry forward

roven in the n its own. Thombination wward but onltion with othgn in the stathe identifiedadditional tr

e and reduce. This alternawith other o

ward but onltion with oththe existing

effective in adation systemed forward (se will not ad

ment. rry forward

2 Report (DRA

JLR 2

ed alternatit prior to fina

view carried luation or no

t Alternativ

n

e effect on thue to exceedthe Municipas it does not

past to not his alternativewith other oply as an opther alternatbilization pod problems oreatment by e overall riskative should

options. ly as an opther alternatlagoon aeraddressing th is part of sosee below). ddress the is

AFT)

27271

ve or alizing

out to ot.

ves

he d the ality.

e ptions. tion tives

ond on its

ks in be

tion tives

ation he ome

ssues

Page 101: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Municipality of Brighton Brighton Wastewater Treatment System Class EA Phase 2 Report (DRAFT)

J. L. Richards & Associates Limited JLR 27271 15

2D) Optimize alum dosage for phosphorous removal

Review: Optimizing alum dosage will not address all of the identified problems on its own but should help to resolve the issues with periodic phosphorous exceedances from the lagoon. Recommendation: Carry forward but only as an option to be considered in combination with other alternatives

2E) Upgrade/refurbish the constructed wetland

Review: Refurbishing the wetland is not anticipated to address all of the identified issues on its own. Initial conversations with the MOECC suggest that the effluent objects on the wetland are for data collection purposes only. Refurbishing the wetland, however, may provide some additional treatment and reduce overall risks in not meeting ECA requirements. Recommendation: Carry forward but only as an option to be considered in combination with other alternatives

1F) Investigate and divert any identified high strength waste streams away from the lagoon system

Review: As part of the preferred alternative, the Municipality should continue to work with its ICI customers in the community to assess options for reducing high strength sewage discharges to the collection system. Reducing the strength of the influent loading to the lagoon system will assist in mitigating risks of impacts to the existing treatment system (and any new systems) and the resulting treated effluent concentrations. Recommendation: Carry forward but only as an option to be considered in combination with other alternatives

Option 3: Install Specialized Treatment System to Complement the Existing Lagoon System

3A) Install complete mix activated sludge process upstream of existing lagoons (e.g. Biolac Treatment System)

Review: These options (Option 3) have all been reviewed based on information received from technology providers and all have the potential to meet the current effluent criteria and address the key issues in the problem statement. Recommendation: Carry forward

3B) Upgrade aeration in the existing aeration cell and install submerged aerated bio-film reactors in the existing stabilization pond (e.g. WCS Bio-Shell)

3C) Upgrade/expand aeration in the existing cells and install an attached growth reactor following the existing stabilization pond (e.g. SAGR)

3D) Add pre-screening and install a fixed film biological treatment process upstream of the existing lagoons (e.g. SMBR, MBBR)

Page 102: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Municipality of Brighton Brighton Wastewater Treatment System Class EA Phase 2 Report (DRAFT)

J. L. Richards & Associates Limited JLR 27271 16

3E) Upgrade aeration in the existing aeration cell and install a fixed film biological treatment process downstream of the existing lagoons (e.g. SMBR, MBBR)

3F) Add pre-screening and install a bioreactor with activated sludge process and membrane technology upstream of the existing lagoons (e.g. MBR)

Option 4: New Mechanical Treatment Plant

4) Replace lagoon completely with a new mechanical treatment plant

Review: This option has the proven ability to meet the current effluent criteria and address the key issues in the problem statement; however, the costs are anticipated to be much higher than the other options and significant changes to the site and operations would be required making it unaffordable to the Municipality. Costs are estimated to be $15M to $25M with annual operating costs in the $750,000 range. Recommendation: Do not carry forward

Page 103: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MunicipalBrighton W

J. L. Richa

Deta5.3

5.3.1 P

An Opiniaccuracythat havesimilar pr

5.3.2 P

Based ofacilities,summariassumedoperationphospho

ity of BrightonWastewater T

ards & Assoc

ailed Evalua

Probable Co

on of Probay was develoe not fully berojects, profe

Table 5

Option 2: O 2a. Rem 2b. Upg 2d. Opt 2e. Ref 2f. DiveOption 3: In 3a. Com 3b. Sub 3c. Sub 3d. Fixe 3e. Fixe 3f. ActivNotes:

1. Esti2. Inclu

des3. Inclu4. Inclu

Probable Co

on the cost the annua

zed in Tabd that the tns staff and rous remova

n Treatment Sys

ciates Limited

ation of Was

osts - Capita

ble Construcoped for eaceen developessional jud

5-2 Total Es

Optimize/Modmove sludgegrade/refurbiimize alum durbish the coert high strennstall Speciamplete Mix Abmersible Aebmerged Attaed Film Bioloed Film Biolovated Sludge

mated cost oudes compuign and newudes aeratioudes upgrad

osts – Lifecy

of existing al operating

ble 5-3. Fortreatment syelectricity co

al system an

stem Class E

1

stewater Tre

al Costs

ction Costs ch of the alteped. The OPgment, and

stimated Co

Option

dify Current e from lagoonish existing bdosage (studonstructed wngth waste s

alized TreatmActivated Sluerated Bio-Fached Growtogical Proceogical Procee with Memb

of full desludutational flu

w, as well as on upgrades ded/expande

ycle Costs

operations g costs of r the purpoystem is oposts for blow

nd equipmen

A

17

eatment Alt

(OPCC) withernates and PCC’s were equipment c

ost of Treatm

Lagoon Open cells 1. baffles 2. dy componewetland streams ment Systemudge Procesilm Reactorsth Reactor 4ss – upstreass – downst

brane Techn

dging of aeraid dynamicsmodified bain existing a

ed aeration i

and informaeach parti

ses of estaperating at wers and punt replaceme

ternatives

h a Class ‘Dincludes alldeveloped

costs provide

ment Altern

erations

ent only)

m to the Exisss s 3. 4. am tream 3. nology

ation and stas (CFD) mo

affles in the saeration celln both exist

ation from scular treatm

ablishing opits ECA ramps. Chem

ent costs hav

Phase 2

D’ (Indicative owances fobased on paed by suppli

natives (201

EstimatedCost (20

$ 1,000$ 300,$ 30,0$150,0

No on-sitting Lagoon

$4.5$4.5$7.0$4.5$3.0

$10.0

abilization podelling to stabilization . ing cells.

suppliers anment alternperational coated capacitical costs asve not been

2 Report (DRA

JLR 2

Estimate) ler design eleast experieniers.

17 $)

d Capital 017 $)

0,000 000

000 000 te cost System

5M 5M

M 5M

M 0M

ond. optimize pond.

nd similarly ative have osts it has ty. Costs inssociated wincluded.

AFT)

27271

evel of ments

nce on

sized been been

nclude ith the

Page 104: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Municipality of Brighton Brighton Wastewater Treatment System Class EA Phase 2 Report (DRAFT)

J. L. Richards & Associates Limited JLR 27271 18

Table 5-3 Estimated Annual Operational Costs of Treatment Alternatives (2017 $)

Option Estimated Operations Cost ($/year)

3a. Complete Mix Activated Sludge Process $200,000 3b. Submersible Aerated Bio-Film Reactors $200,000 3c. Submerged Attached Growth Reactor $300,000 3d. Fixed Film Biological Process - upstream $200,000 3e. Fixed Film Biological Process - downstream $200,000 3f. Activated Sludge with Membrane Technology Info not provided by supplier

5.3.3 Evaluation Overview

Table 5-5 summarizes the detailed evaluation of the screened alternatives for the treatment system. Each option was assigned an evaluation impact level (refer to Table 5-4) for each evaluation criteria. This method provides an overall assessment of the positive and negative impacts of each alternative. This method was used as it is recognized that there could be more than one option or technology that can address the problem and that additional consideration of these technologies could be undertaken either as part of a Phase 3 (i.e. Schedule C continuation of this Class EA) or as part of a pre-design stage. For the detailed evaluation refer to Appendix B.

Table 5-4 Evaluation Impact Level

Evaluation Impact Level Indicator Potential for Positive Impact +1

No Anticipated Impact 0

Potential for Negative Impact -1

Appendix C contains conceptual layouts of each of the technologies and how they could be integrated into the existing site.

Page 105: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Municipality of Brighton Brighton Wastewater Treatment System Class EA Phase 2 Report (DRAFT)

J. L. Richards & Associates Limited JLR 27271 19

Table 5-5 Summary Evaluation Matrix M

AJO

R C

RIT

ERIA

MINOR CRITERIA

OPT

3A

C

OM

PLET

E M

IX

AC

TIVA

TED

SL

UD

GE

PRO

CES

S

OPT

3B

SU

BM

ERSI

BLE

A

ERA

TED

BIO

-FI

LM R

EAC

TOR

S

OPT

3C

SU

BM

ERG

ED

ATT

AC

HED

G

RO

WTH

R

EAC

TOR

O

PT 3

D

FIXE

D F

ILM

B

IOLO

GIC

AL

PRO

CES

S (U

PSTR

EAM

) O

PT 3

E FI

XED

FIL

M

BIO

LOG

ICA

L PR

OC

ESS

(DO

WN

STR

EAM

) O

PT 3

F A

CTI

VATE

D

SLU

DG

E W

ITH

M

EMB

RA

NE

TEC

HN

OLO

GY

NA

TUR

AL

ENVI

RO

NM

ENT

AN

D

AR

CH

AEO

LOG

Y

Effect on Fish and Aquatic Habitat +1 +1 +1 +1 +1 +1

Effect on Wetlands, Woodlands, Wildlife

Habitat 0 0 -1 0 0 0

Effect on Archeological

Potential Impacts 0 0 0 0 0 0

ENG

INEE

RIN

G A

ND

TEC

HN

ICA

L C

ON

SID

ERA

TIO

NS

Proven Cold Weather

Installations +1 -1 +1 +1 +1 -1

Ability to Meet Effluent Criteria +1 0 +1 +1 +1 +1

Degree of Process Control +1 -1 -1 +1 +1 +1

Ease of Operation -1 +1 +1 0 0 -1

Capability with existing site +1 +1 -1 +1 0 +1

Opportunities for Future Expansion +1 -1 -1 +1 +1 +1

SOC

IAL/

CO

MM

UN

ITY

WEL

L B

EIN

G

Impacts During Construction 0 0 -1 0 0 0

Compatibility with Surrounding Land

Use and Visual Impact

0 0 -1 0 0 0

Noise and Odour Effects during

Operation +1 +1 +1 +1 +1 +1

Maintenance (Short Term and Long Term Requirements)

-1 -1 0 -1 +1 -1

Capital Cost 0 0 -1 0 +1 -1

TOTAL 5 0 -2 6 8 2

Page 106: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MunicipalBrighton W

J. L. Richa

6.0 PRE

Desc6.1

Based oSpecializoverall nredundanconstructidentifiedoverall ptechnologrefurbishparticulaprocess overall be

The main

P A C E M

In additiohas seve

C P M

m

Opin6.2

An OpiniaccuracyAllowanc

ity of BrightonWastewater T

ards & Assoc

EFERRED S

cription of t

on the evaluzed Treatmeet benefit toncy and to tated wetland

d in Option 2referred solgy implemening the conr specialize(3A) and thenefit to the

n benefits of

Proven full scAbility to meeControlled proEasily expandModerate upf

on, the fixederal added be

ComparativelPotential for rManufacturermeasuremen

nion of Prob

on of Probay was deveces for desig

n Treatment Sys

ciates Limited

OLUTION

the Preferre

uation methent System too the Municipake advanta), this optio

2 – Optimizinutions. This ntation, upg

nstructed weed treatmenthe fixed filmMunicipality

f each of the

cale Canadiaet current effocess that cdable procesfront capital

d film biologenefits for co

ly lower capreduced necr’s warrantet point)

bable Cost f

ble Construceloped for fgn elements

stem Class E

2

ed Alternativ

hodology utio Complemepality. In ord

age of existinn should be

ng and Modiincludes a rading baffleetland, and t system to

m biological y based on i

preferred so

an and cold fluent criteriacan be adjusss with minimcosts and o

gical processonsideration

ital cost invecessity to upee on effl

for Preferre

ction Costs full implemes that have

A

20

ve

lized, it waent the Exisder to mitigang facilities/ie completedfying Currenvery thorouges in the stadiverting hi

o be selecteprocess (3Dnformation a

olutions in O

weather insta, with qualitsted to achiemal capital cngoing oper

s located don by the mun

estment grade aeratiuent qualit

ed Solution

(OPCC) withentation of not fully bee

as determineting Lagoon

ate risk and nfrastructure

d in combinant Lagoon Ogh de-sludgabilization poigh waste sed, the comD or 3E) apavailable at t

Option 3 are

tallations; ty that is bet

eve consistencost to increarational costs

ownstream onicipality:

ion equipmety (with ef

(including

h a Class ‘Dall element

en develope

Phase

ed that Optn System pro

ensure appe (i.e. the exation with s

Operations asing programond, optimizstreams. Witmplete mix ppear to prthis time.

the following

tter than curnt effluent quase treatmes.

of the stabil

ent in Cell 1 ffluent at

lifecycle up

D’ (Indicative ts of the ped are includ

e 2 Report (DR

JLR 2

tion 3 - Insovided the hropriate treaxisting lagoo

some of the s being part

m prior to anzing alum doth regardsactivated s

ovide the h

g:

rent ECA limuality;

ent capacity;

lization pond

ECA comp

pgrades)

Estimate) lepreferred soded. The OP

RAFT)

27271

stall a highest atment on and

items of the y new

osage, to the sludge highest

mits;

and

d (3E)

pliance

evel of olution. PCC’s

Page 107: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

Municipality of Brighton Brighton Wastewater Treatment System Class EA Phase 2 Report (DRAFT)

J. L. Richards & Associates Limited JLR 27271 21

were developed based on past experience on similar projects, professional judgment, and equipment costs provided by suppliers.

Table 6-1 Opinion of Probable Cost for Preferred Solution

Component Estimated Capital

Cost (2017 $) (Option 3E)

Install Specialized Treatment System $3,000,000 Remove sludge from lagoon cells $1,000,000 Upgrade/refurbish existing baffles $ 300,000 Optimize alum dosage (study component only) $ 30,000 Refurbish the constructed wetland $ 150,000 Complete Lifecycle Upgrades at SPS and Lagoon $ 500,000

Sub-Total $4,980,000 Engineering and Contingency (30%) $ 1,500,000

Grand Total (rounded) $ 6,500,000

7.0 CONCLUSIONS AND NEXT STEPS

A Public Information Centre will be held to inform the general public, project stakeholders, and review agencies of the preliminary findings of the Phase 1 and Phase 2 reports and to obtain input on the recommendation of the preferred alternative. In addition, the Phase 2 report will be circulated to the MOECC for comment. Following the public meeting, receipt of comments from affected parties and review agencies, and confirmation of a preferred alternative, the Municipality will be in a position to post the Class EA Project File that documents the Class EA process. After the 30-day period for comment closes the Municipality will be in a position to implement the preferred option and proceed directly into preliminary design. The design would be based on the analysis presented within this Schedule B and the conceptual layouts for the preferred alternatives identified in Phase 2 that take the environmental factors into consideration (e.g. potential impacts to the constructed wetland, etc.).

Alternatively, the Municipality may elect to further define the technologies presented as part of Option 3 (each of which would meet the treatment level criteria) by undertaking a Schedule C Class EA.

Page 108: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

J. L. Richards & Associates Limited JLR 27271 Appendix A

Appendix A

Public Consultation Summary

Page 109: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

J. L. Richards & Associates Limited JLR 27271 Appendix B

Appendix B

Detailed Treatment Technology Evaluation

Page 110: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MAJOR C

NATUENVIRO

ANARCHAE

ENGINEAND TEC

CONSIDE

CRITERIA

URAL ONMENT ND EOLOGY

E

E

EERING CHNICAL RATIONS

D

E

MINOR CRITE

Effect on FishAquatic Hab

Effect on WetlaWoodlands

Wildlife Habi

Effect on Archeologic

Potential Impa

Proven ColWeather

Installation

Ability to MeEffluent Crite

Degree of ProControl &

Availability Performanc

Guarantee

Ease of Opera

Capability wexisting site HGL, electricservicing, et

ERIA COM

h and itat

POSITdischaimprov

ands, s, itat

NO IMoccur wetlan

cal acts

NO IMpotent

ld

ns

POSITand cohowevenviro

eet eria

POSITbe proECA liAmmomg/L.

cess &

of ce e

POSITprocescontrorequirewould storag

ation NEGAmay reinput.

with (i.e. cal tc)

POSITbuildinfor RAelectricupgrad

OPT 3MPLETE MIX

SLUDGE PR

TIVE: Quality oarged to surfaceve.

MPACT: No conin the engineer

nd.

MPACT: No arctial has been id

TIVE: Numerouold weather insver, process sunmental condit

TIVE: High quaoduced that is bmits for all par

onia will be in th

TIVE: There aress variables thaolled. The existied for treatmenbe used for slue/stabilization.

ATIVE: Automaequire more reg

TIVE: No new tngs are requireAS would be bycal servicing wding.

3A X ACTIVATEDROCESS

of effluent e water will

nstruction will red or natural

cheological dentified on site

us Canadian/ stallations, ubject to extremtions.

ality effluent wilbetter than the rameters. he range of <5

e a number of at can be ing lagoon is nnt; however, it udge

ted process thagular operator

tankage or d; flow except

y gravity. Site would need

D SUBMEF

POSITIVdischargeimprove.

NO IMPAoccur in twetland.

e. NO IMPApotential

me

NEGATIVinstallatiocold weat

l

NO IMPAmeet the

ot

NEGATIVaerated bhigher delagoon alcontrol is be slow to

at POSITIVrequired o

POSITIVbuildings continue electrical upgrading

OPT 3BERSIBLE AERFILM REACT

E: Quality of efed to surface w

ACT: No constrthe engineered

ACT: No archeohas been iden

VE: No full scalons and limited ther installation

ACT: The efflueECA limits.

VE: The submebio-film reactorsegree of controone, however, limited and theo respond.

E: Limited opeonce establish

E: No new tankrequired, flow to be by gravitservicing woul

g.

RATED BIO-TORS

ffluent water will

ruction will d or natural

ological tified on site.

le Canadian number of ns generally.

ent quality will

ersible s have a l then a process e system may

rator input is ed.

kage or would y. Site ld need

SUBMEGROW

POSITIVE: Qdischarged timprove.

NEGATIVE: reduce the eby approxim

NO IMPACTpotential has

POSITIVE: Nand cold weahowever, suenvironment

POSITIVE: Hbe producedECA limits foAmmonia wimg/L.

NEGATIVE: growth reactdegree of coalone, howelimited and tto respond.

POSITIVE: Lrequired onc

NEGATIVE: Pumping maon the locatielectrical serupgrading.

OPT 3CRGED ATTAWTH REACT

Quality of efflueto surface wate

New treatmenengineered wetately 50%.

T: No archeologs been identifie

Numerous Canather installatiobject to extremtal conditions.

High quality effd that is better tor all parametell be in the rang

Submerged attors have a higontrol then a lagver, process cohe system may

Limited operatoce established.

New cells are ay be required don of reactor crvicing would n

ACHED TOR

ent er will

Pdim

t cells will tland area

Now

gical ed on site.

Np

nadian/ ons,

me

Pahe

fluent will than the

ers. ge of <5

PbEAra

ttached her goon ontrol is y be slow

Pfafihfo

or input is Nthin

required. depending ells. Site

need

Pbceu

OFIXED FILPROCESS

POSITIVE: Quadischarged to smprove.

NO IMPACT: Noccur in the engwetland.

NO IMPACT: Npotential has be

POSITIVE: Numand cold weathehowever, subjecenvironmental c

POSITIVE: Goobe produced thaECA limits for aAmmonia will beange.

POSITIVE: Theactors that canixed film biolog

however, the laor treatment.

NO IMPACT: Ahat may requirenput.

POSITIVE: No buildings are recontinue to be belectrical servicupgrading.

OPT 3DM BIOLOGICS (UPSTREA

ality of effluent urface water w

o construction gineered or nat

o archeologicaeen identified o

merous Canadier installationsct to extreme conditions.

od quality efflueat is better than

all parameters. e in the 5 – 15

ere are a numb be controlled

gical process; goon is still req

Automated proce periodic oper

new tankage oequired; flow woby gravity. Sitecing would need

CAL AM)

FP

will POSdiscimp

n will tural

NO newouts

al on site.

NO pote

ian/ s,

POSandhowenv

ent will n the

5 mg/L

POSbe pECAAmmrang

ber of in the

quired

POSfactfixedhowfor t

cess rator

NO thatinpu

or ould

e d

NO tankhavelecupg

OPTFIXED FILM ROCESS (DO

SITIVE: Qualitycharged to surfrove.

IMPACT: Miniw treatment cellside of the cons

IMPACT: No aential has been

SITIVE: Numer cold weather i

wever, subject tironmental con

SITIVE: Good qproduced that iA limits for all pmonia will be inge.

SITIVE: There ors that can bed film biologica

wever, the lagootreatment.

IMPACT: Autot may require put.

IMPACT: Newkage and a blowe a minimal foo

ctrical servicingrading.

T 3EBIOLOGICAOWNSTREA

y of effluent face water will

mal footprint ofl could be placestructed wetlan

archeological n identified on s

rous Canadianinstallations, to extreme nditions.

quality effluents better than th

parameters. n the 5 – 15 mg

are a number oe controlled in tal process; on is still requir

omated processperiodic operato

w downstream wer building wootprint. Site g may not need

L M)

ACTMEM

POSITdischaimprov

f ed nd.

NO IMoccur iwetland

site. NO IMpotenti

/ NEGATweathetemperC.

t will he

g/L

POSITbe prodECA limAmmomg/L.

of the

red

POSITprocescontrolexistingtreatme

s or

NEGATprocestime oprequire

ould

d

POSITbuildingfor RASelectricupgrad

OPT 3TIVATED SLUMBRANE TEC

IVE: Quality of rged to surfacee.

PACT: No consn the engineered.

PACT: No archal has been ide

TIVE: Limited ner installations, rature must be

IVE: High qualduced that is bemits for all parania will be in th

IVE: There ares variables thaled in this procg lagoon is not ent.

TIVE: A technics that may requperator input. M regular cleani

IVE: No new tags are requiredS would be by gcal servicing woing.

FUDGE WITH CHNOLOGY

effluent e water will

struction will ed or natural

heological entified on site.

number of cold influent above 9 deg.

ity effluent will etter than the

ameters. e range of <5

a number of t can be ess. The required for

cally advanced uire full/part

Membranes ng.

ankage or d; flow except gravity. Site ould need

.

d

Page 111: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

MAJOR CRITERIA MINOR CRITERIA OPT 3A

COMPLETE MIX ACTIVATED SLUDGE PROCESS

OPT 3BSUBMERSIBLE AERATED BIO-

FILM REACTORS

OPT 3CSUBMERGED ATTACHED

GROWTH REACTOR

OPT 3DFIXED FILM BIOLOGICAL PROCESS (UPSTREAM)

OPT 3EFIXED FILM BIOLOGICAL

PROCESS (DOWNSTREAM)

OPT 3FACTIVATED SLUDGE WITH MEMBRANE TECHNOLOGY

Opportunities for Future Expansion

POSITIVE: If a treatment capacity increase is required additional aeration tubes can be added to the modules without the need for additional basins.

NEGATIVE: The number of units can be increased; however, the level of effort to install would be similar to a new installation.

NEGATIVE: The number of process cells could be increased; however, the level of effort would be relatively high and additional land would be required.

POSITIVE: If a treatment capacity increase is required the quantity of the media in the basin can be increased at a low cost and without the need for additional basins.

POSITIVE: If a treatment capacity increase is required the quantity of the media in the basin can be increased at a low cost without the need for additional basins.

POSITIVE: If a treatment capacity increase is required the number of membrane modules can be increased, however, these are relatively high cost.

SOCIAL/ COMMUNITY WELL

BEING

Impacts During Construction

NO IMPACT: Construction is limited to the existing lagoon site and impacts to neighboring properties would be minimal.

NO IMPACT: Construction is limited to the existing lagoon site and impacts to neighboring properties would be minimal.

NEGATIVE: Construction activities will take place in the wetland and may be disruptive to users of this area.

NO IMPACT: Construction is limited to the existing lagoon site and impacts to neighboring properties would be minimal.

NO IMPACT: Construction is limited to a small footprint and impacts to the area during construction would cause minimal disruption.

NO IMPACT: Construction is limited to the existing lagoon site and impacts to neighboring properties would be minimal.

Compatibility with Surrounding Land

Use and Visual Impact

NO IMPACT: All changes will be in existing lagoon, visible changes will be minor.

NO IMPACT: All changes will be in existing lagoon, visible changes will be minor.

NEGATIVE: Changes in the wetland may not be compatible with current recreational use.

NO IMPACT: All changes will be in existing lagoon, visible changes will be minor.

NO IMPACT: Minimal footprint outside of the constructed wetland would be expected..

NO IMPACT: All changes will be in existing lagoon, visible changes will be minor.

Noise and Odour Effects during

Operation

POSITIVE: Noise and odour will be similar the current operations. May be minor odour improvements due to enhanced treatment.

POSITIVE: Noise and odour will be similar the current operations. May be minor odour improvements due to enhanced treatment.

POSITIVE: Noise and odour will be similar the current operations. May be minor odour improvements due to enhanced treatment.

POSITIVE: Noise and odour will be similar the current operations. May be minor odour improvements due to enhanced treatment.

POSITIVE: Noise and odour will be similar the current operations. May be minor odour improvements due to enhanced treatment.

POSITIVE: Noise and odour will be similar the current operations. May be minor odour improvements due to enhanced treatment.

Page 112: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

J. L. Richards & Associates Limited JLR 27271 Appendix C

Appendix C

Conceptual Layouts

Page 113: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

(COUNTY ROAD 64)

PRINCE EDWARD STREET

APPL

EWOO

D DR

IVE

HARBOUR STREET

DRAWING NO.:

DESIGN:

CHECKED:

DRAWN:

DRAWING:

PROJECT:

www.jlrichards.ca

JLR NO:This drawing is copyright protected and maynot be reproduced or used for purposes

other than execution of the described workwithout the express written consent of

J.L. Richards & Associates Limited.

JWKTK

27271

BRIGHTON WASTEWATER TREATMENT SYSTEM CLASS EAMUNICIPALITY OF BRIGHTON, ONTARIO

COMPLETE MIX ACTIVATED SLUDGE

OPTION 3ASSFile L

ocati

on: K

:\270

00\27

271 -

Brigh

ton La

goon

\JLR

DWG\

Plan\2

7271

Opti

on 3A

.mxd

Plot D

ate: A

pril 1

1, 20

17 3:

15:12

PM

¯

0 100 200 30050Meters

Note: Wastewater Treatment System property limits are approximate only. Not a legal survey.

New Blowers inExisting Building

New Treatment Tanks inExisting Cell #1

New Pre-ScreeningEquipment

StabilizationLagoon(Cell 2)

EngineeredWetland

Page 114: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

(COUNTY ROAD 64)

PRINCE EDWARD STREET

APPL

EWOO

D DR

IVE

HARBOUR STREET

DRAWING NO.:

DESIGN:

CHECKED:

DRAWN:

DRAWING:

PROJECT:

www.jlrichards.ca

JLR NO:This drawing is copyright protected and maynot be reproduced or used for purposes

other than execution of the described workwithout the express written consent of

J.L. Richards & Associates Limited.

JWKTK

27271

BRIGHTON WASTEWATER TREATMENT SYSTEM CLASS EAMUNICIPALITY OF BRIGHTON, ONTARIO

SUBMERSIBLE AERATED BIO-FILM REACTORS

OPTION 3BSSFile L

ocati

on: K

:\270

00\27

271 -

Brigh

ton La

goon

\JLR

DWG\

Plan\2

7271

Opti

on 3B

.mxd

Plot D

ate: A

pril 1

0, 20

17 2:

01:48

PM0 100 200 30050

MetersNote: Wastewater Treatment System property limits are approximate only. Not a legal survey.

¯

New Blowers inExisting Building

Upgrade Existing Aerationin Existing Cell # 1

New Treatment Systemin Existing Cell # 2

StabilizationLagoon(Cell 2)

EngineeredWetland

Page 115: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

(COUNTY ROAD 64)

PRINCE EDWARD STREET

APPL

EWOO

D DR

IVE

HARBOUR STREET

DRAWING NO.:

DESIGN:

CHECKED:

DRAWN:

DRAWING:

PROJECT:

www.jlrichards.ca

JLR NO:This drawing is copyright protected and maynot be reproduced or used for purposes

other than execution of the described workwithout the express written consent of

J.L. Richards & Associates Limited.

JWKTK

27271

BRIGHTON WASTEWATER TREATMENT SYSTEM CLASS EAMUNICIPALITY OF BRIGHTON, ONTARIO

SUBMERGED ATTACHED GROWTH REACTOR

OPTION 3CSSFile L

ocati

on: K

:\270

00\27

271 -

Brigh

ton La

goon

\JLR

DWG\

Plan\2

7271

Opti

on 3C

.mxd

Plot D

ate: A

pril 1

1, 20

17 4:

05:24

PM

0 100 200 30050Meters

Note: Wastewater Treatment System property limits are approximate only. Not a legal survey.

¯

New Blowers inExisting Building

New Aeration Equipmentin Cell # 1

Two New Treatment Cellsin Engineered Wetland( Covered in Peat or Mulch )

StabilizationLagoon(Cell 2)

EngineeredWetland

New Supplemental AerationEquipment in Cell # 2

Page 116: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

(COUNTY ROAD 64)

PRINCE EDWARD STREET

APPL

EWOO

D DR

IVE

HARBOUR STREET

DRAWING NO.:

DESIGN:

CHECKED:

DRAWN:

DRAWING:

PROJECT:

www.jlrichards.ca

JLR NO:This drawing is copyright protected and maynot be reproduced or used for purposes

other than execution of the described workwithout the express written consent of

J.L. Richards & Associates Limited.

JWKTK

27271

BRIGHTON WASTEWATER TREATMENT SYSTEM CLASS EAMUNICIPALITY OF BRIGHTON, ONTARIO

FIXED FILM BIOLOGICAL PROCESS (UPSTREAM)

OPTION 3DSSFile L

ocati

on: K

:\270

00\27

271 -

Brigh

ton La

goon

\JLR

DWG\

Plan\2

7271

Opti

on 3D

.mxd

Plot D

ate: A

pril 1

0, 20

17 3:

32:20

PM

¯

0 100 200 30050Meters

Note: Wastewater Treatment System property limits are approximate only. Not a legal survey.

New Blowers inExisting Building

New Treatment Tanks inPart of Existing Call #1

New Pre-ScreeningEquipment

StabilizationLagoon(Cell 2)

EngineeredWetland

Page 117: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

(COUNTY ROAD 64)

PRINCE EDWARD STREET

APPL

EWOO

D DR

IVE

HARBOUR STREET

DRAWING NO.:

DESIGN:

CHECKED:

DRAWN:

DRAWING:

PROJECT:

www.jlrichards.ca

JLR NO:This drawing is copyright protected and maynot be reproduced or used for purposes

other than execution of the described workwithout the express written consent of

J.L. Richards & Associates Limited.

JWKTK

27271

BRIGHTON WASTEWATER TREATMENT SYSTEM CLASS EAMUNICIPALITY OF BRIGHTON, ONTARIO

FIXED FILM BIOLOGICAL PROCESS (DOWNSTREAM)

OPTION 3ESSFile L

ocati

on: K

:\270

00\27

271 -

Brigh

ton La

goon

\JLR

DWG\

Plan\2

7271

Opti

on 3E

.mxd

Plot D

ate: A

pril 1

1, 20

17 3:

29:17

PM

0 100 200 30050Meters

Note: Wastewater Treatment System property limits are approximate only. Not a legal survey.

¯

New Treatment Tankand Blower Building

Upgrade Existing Aeration inExisting Cell #1 (Optional)

StabilizationLagoon(Cell 2)

EngineeredWetland

Page 118: PLEASE NOTE: BID REGISTRATION€¦ · Preliminary and Final Design Services MBBR Addition Brighton Wastewater Treatment System PLEASE NOTE: BID REGISTRATION Bid Registration is provided

(COUNTY ROAD 64)

PRINCE EDWARD STREET

APPL

EWOO

D DR

IVE

HARBOUR STREET

DRAWING NO.:

DESIGN:

CHECKED:

DRAWN:

DRAWING:

PROJECT:

www.jlrichards.ca

JLR NO:This drawing is copyright protected and maynot be reproduced or used for purposes

other than execution of the described workwithout the express written consent of

J.L. Richards & Associates Limited.

JWKTK

27271

BRIGHTON WASTEWATER TREATMENT SYSTEM CLASS EAMUNICIPALITY OF BRIGHTON, ONTARIO

ACTIVATED SLUDGE WITH MEMBRANE

OPTION 3FSSFile L

ocati

on: \\

kgdc

01\P

rojec

ts\27

000\2

7271

- Brig

hton L

agoo

n\JLR

DWG

\Plan

\2727

1 Opti

on 3F

.mxd

Plot D

ate: A

pril 1

0, 20

17 3:

29:04

PM

¯

0 100 200 30050Meters

Note: Wastewater Treatment System property limits are approximate only. Not a legal survey.

New Blowers inExisting Building

New Treatment Tank inPart of Existing Call #1

New Pre-ScreeningEquipment

StabilizationLagoon(Cell 2)

EngineeredWetland