10 th October 2018 Dear Sir/Madam, CHURCH LANE AND ST. MARY’S WALK, ACKLAM: POSSIBLE TRAFFIC MANAGEMENT OPTIONS You may recall that, in February and March 2015, Middlesbrough Council carried out an extensive public consultation exercise covering a number of potential highway improvements on roads in the vicinity of Acklam Hall. One of these improvements was the widening of Hall Drive at its junction with Acklam Road to create separate lanes for left and right turning traffic. This proposal was widely supported during the consultation, with 79% of the respondents voting in favour. Consequently, the decision was taken to progress this scheme, which was implemented this summer. Unfortunately there was no consensus regarding the potential options on Church Lane and St. Mary’s Walk, none of which were supported during the consultation. This was despite the fact that many respondents highlighted concerns regarding the speed and volume of traffic using both roads. Traffic surveys were carried out on both roads during the week commencing Monday 19 th February this year. The results of these surveys are summarised below: Church Lane, west of Fane Grove Average weekday two-way traffic flow: 3,043 vehicles Highest two-way hourly traffic flow: 282 vehicles (5 to 6 pm) Average vehicle speed: 26 mph St. Mary’s Walk, north of Ambleside Grove Average weekday two-way traffic flow: 3,156 vehicles Highest two-way hourly traffic flow: 324 vehicles (8 to 9 am) Average vehicle speed: 25 mph The Occupier Please ask for: Michael Lawton Contact Centre: (01642) 726001 Document Number: N/A e-mail: [email protected]

Please ask for: Michael Lawton Contact Centre: (01642 ......This proposal was widely supported during the consultation, with 79% of the respondents voting in favour. Consequently,

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

  • 10th October 2018

    Dear Sir/Madam,

    CHURCH LANE AND ST. MARY’S WALK, ACKLAM: POSSIBLE TRAFFIC MANAGEMENT OPTIONS

    You may recall that, in February and March 2015, Middlesbrough Council carried out an extensive public consultation exercise covering a number of potential highway improvements on roads in the vicinity of Acklam Hall.

    One of these improvements was the widening of Hall Drive at its junction with Acklam Road to create separate lanes for left and right turning traffic. This proposal was widely supported during the consultation, with 79% of the respondents voting in favour. Consequently, the decision was taken to progress this scheme, which was implemented this summer.

    Unfortunately there was no consensus regarding the potential options on Church Lane and St. Mary’s Walk, none of which were supported during the consultation. This was despite the fact that many respondents highlighted concerns regarding the speed and volume of traffic using both roads.

    Traffic surveys were carried out on both roads during the week commencing Monday 19thFebruary this year. The results of these surveys are summarised below:

    Church Lane, west of Fane Grove

    Average weekday two-way traffic flow: 3,043 vehicles Highest two-way hourly traffic flow: 282 vehicles (5 to 6 pm) Average vehicle speed: 26 mph

    St. Mary’s Walk, north of Ambleside Grove

    Average weekday two-way traffic flow: 3,156 vehicles Highest two-way hourly traffic flow: 324 vehicles (8 to 9 am) Average vehicle speed: 25 mph

    The Occupier

    Please ask for: Michael Lawton Contact Centre: (01642) 726001 Document Number: N/A e-mail: [email protected]

    mailto:[email protected]

  • The accident record on Church Lane and St. Mary’s Walk shows that there has been one recorded casualty in the last five years. This incident occurred in June 2015 on St. Mary’s Walk, just to the north of the bend adjacent to St. Mary’s Church, and involved a collision between a car and a pedal cycle. The cyclist suffered serious injury as a result of the collision.

    Given that the original consultation exercise was carried out over three years ago, a further public consultation exercise is being carried out to determine whether the views of local residents have changed in the intervening period. In order to simplify the consultation process, the number of potential traffic management options has been reduced from five to two, with only the options likely to deliver significant benefits in terms of reducing the speed and/or volume of traffic on Church Lane and St. Mary’s Walk being put forward for consideration.

    The potential options are:

    • Option 1 – Introduction of a series of round top road humps, positioned atapproximately 70 metre intervals along the full length of Church Lane and St. Mary’sWalk and designed to reduce the average vehicle speed to 20 mph, in line with thespeed limit in force on both roads. The road humps would be designed to comply withthe Highways (Road Humps) Regulations 1999, thereby maximising theireffectiveness in reducing vehicle speeds whilst minimising their impact on nearbyproperties in terms of noise and vibration.

    • Option 2 – Introduction of a full road closure at the corner of Church Lane and St.Mary’s Walk, preventing vehicles from travelling between Green Lane and AcklamRoad via this route.

    • Option 3 – ‘Do Nothing’. No change to the existing road layout.

    The attached plans illustrate Options 1 and 2. Please note that the layouts shown on both plans are indicative only. Copies of these plans can also be viewed or downloaded from the Middlesbrough Council website at https://www.middlesbrough.gov.uk/parking-roads- and-footpaths/roads-and-highways/consultations.

    As the occupier of one of the properties that would be directly affected by any changes to the existing traffic management arrangements, I would welcome your views on the potential options. I would, therefore, be grateful if you could complete the attached Reply Form and return it in the reply paid envelope provided by Monday 12th November 2018. The results of the public consultation exercise will be instrumental in determining the course of action thereafter.

    I look forward to hearing from you. Should you have any queries about any of the potential options, please contact me at [email protected].

    Yours faithfully

    MICHAEL LAWTON Transport Planning Officer, Transport & Infrastructure

    Encs. Copies to: Councillor Shamal Biswas

    Councillor Sheila Dean

    https://www.middlesbrough.gov.uk/parking-roads-and-footpaths/roads-and-highways/consultationshttps://www.middlesbrough.gov.uk/parking-roads-and-footpaths/roads-and-highways/consultationsmailto:[email protected]

  • CHURCH LANE AND ST. MARY’S WALK, ACKLAM: POSSIBLE TRAFFIC MANAGEMENT OPTIONS

    REPLY FORM (please tick as appropriate)

    Option Description For Against

    1. Option One:

    Introduction of a series of round top speed humps, positioned at approximately 70 metre intervals along the full length of Church Lane and St. Mary’s Walk. (Potentially incorporating the existing chicanes, dependent on detailed design feasibility)

    2. Option Two:

    Introduction of a full road closure at the corner of Church Lane and St. Mary’s Walk. (Potentially removing the existing chicanes)

    3. Option Three:

    ‘Do Nothing’.

    Comments (If any):

    ……………………………………………………………………………………………………………………

    ……………………………………………………………………………………………………………………

    ……………………………………………………………………………………………………………………

    ……………………………………………………………………………………………………………………

    Name……………………………………………………………………………………………………………

    Address…………………………………………………………………………………………………………

    Telephone / e-mail…………………………………………….…………………….………………………..

    Thank you for taking the time to reply. The closing date for responses is Monday 12th November 2018.

    For the attention of Michael Lawton, Transport Planning Officer, Transport & Infrastructure

  • 1 to 1 9

    12.8m

    14.9m S t Mary's Hall

    Bayberr y M ews

    St M ar y' s M e ws

    11 to 20

    LB

    14.0m

    14.3 m

    S t Marys Court

    El Sub Sta

    Sp or ts C our t

    W ROXTON AVENUE

    13.1m

    13.7m

    1 to 3 1

    U nd er w o od C o ur t

    14.6m

    1 to 4 6

    Tr u e ma n C o ur t

    15.2m

    Tank

    Green Lane Primary School

    TC B

    13.4m

    LB

    Pavilion

    El Su b St a Terr aces

    Tan k

    El Sub Sta

    M as t

    16.2m

    14.3m

    Sports Ground

    Acklam Park ( Mi ddl esbr o ug h R U FC an d C C )

    14.3m

    Mill Hill Recreation Ground

    14.6m

    Jack Hatfield Sports Club

    Bo wl i ng Gr ee n

    LB

    Library

    14.9m

    16.5m

    Pavilion

    North W ood

    15.2m

    El

    Su b

    Sta

    LB

    17.4m

    17.7m

    18.3m

    16.8m

    TC Bs

    LB

    17.4m

    East W

    18.6m

    El

    Su b St a

    El Sub Sta

    18.6m

    St Mary's Church

    1 to 6 Anchor age

    C ourt

    18.9m Par k Vi ew

    H or ton- Le a

    Al der syd e

    Southcote

    Acklam Hall Cottages 21

    El Sub Sta

    N ur si ng H o m e

    18.9m

    52

    Acklam Court

    El Su b Sta S t Mary 's

    V icarage

    Acklam Hall

    PO 22

    LB

    W hite House

    19.8m

    Master Coop er ( PH )

    Bowling Green

    The El wyn

    The Ivor y

    Pond

    19.2m

    Sto ne 20.4m

    A

    Sports Ground

    SAFETY HEALTH AND ENVIRONMENTAL ISSUES IN ADDITION TO THE RISKS AND HAZARDS, NORMALLY ASSOCIATED WITH THE TYPES OF WORK DETAILED ON THIS DRAWING, YOUR ATTENTION IS DRAWN TO THE FOLLOWING RESIDUAL RISKS Rev Date Description

    COPYRIGHT: ALL RIGHTS RESERVED. THIS DRAWING MUST NOT BE REPRODUCED WITHOUT PERMISSION. DO NOT SCALE. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING DIMENSIONS WHICH ARE IN MILLIMETRES UNLESS OTHERWISE STATED.

    Any material contained in this drawing, which has been based on Ordnance Survey Mapping, is with the permission of the Controller of Her Majesty's Stationary Office. © Crown Copyright reserved. Middlesbrough Council, P.O.Box 65 Gurney Street, Middlesbrough TS1 1QP. Licence Number. LA 100023413, 2015.

    Project CHURCH LANE & ST. MARY'S WALK, ACKLAM: POSSIBLE TRAFFIC MANAGEMENT OPTIONS

    Drawing Consultation Middlesbrough Council

    David Carter Head of Transport & Infrastructure P.O. Box 504, 1st Floor Civic Centre, Middlesbrough TS1 9FY www.middlesbrough.gov.uk

    File Ref Drg no Revision

    Date 05/10/2018

    Drawn ML

    Scale NTS A4

    Tender Reference Number

    4

    GR

    OV

    E

    52 5

    4

    10

    15

    21

    11

    1

    2

    15

    84

    8

    2

    80

    74

    72

    66

    56

    40

    26

    20

    10

    8

    5 10

    Option 1: Round Top Road Humps Positioned at approx. 70 metre intervals

    St Marys W

    alk

    Church Lane

    Green Lane

    Ack

    lam

    Roa

    d

    - Position of Proposed Round Top Road Humps- Indicative Existing Chicanes

    Green Lane Primary Academy

    Acklam Shops

    Acklam Hall

    http://www.middlesbrough.gov.uk/

  • 17.4m

    El Sub Sta

    St Mary's Church

    SAFETY HEALTH AND ENVIRONMENTAL ISSUES IN ADDITION TO THE RISKS AND HAZARDS, NORMALLY ASSOCIATED WITH THE TYPES OF WORK DETAILED ON THIS DRAWING, YOUR ATTENTION IS DRAWN TO THE FOLLOWING RESIDUAL RISKS Rev Date Description

    ♥ COPYRIGHT: ALL RIGHTS RESERVED. THIS DRAWING MUST NOT BE REPRODUCED WITHOUT PERMISSION.DO NOT SCALE. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING DIMENSIONS WHICH ARE IN MILLIMETRES UNLESS OTHERWISE STATED.

    Any material contained in this drawing, which has been based on Ordnance Survey Mapping, is with the permission of the Controller of Her Majesty's Stationary Office. © Crown Copyright reserved. Middlesbrough Council, P.O.Box 65 Gurney Street, Middlesbrough TS1 1QP. Licence Number. LA 100023413, 2011.

    Project CHURCH LANE & ST. MARY'S WALK, ACKLAM: POSSIBLE TRAFFIC MANAGEMENT OPTIONS

    Drawing Option 2: Full road closure Middlesbrough Council David Carter Head of Transport & Infrastructure P.O. Box 504, 1st Floor Civic Centre, Middlesbrough TS1 9FY www.middlesbrough.gov.uk

    R:\2011 Template\2011 mbc logo.jpg

    R :\201 1 Te m pl ate\ 20 11 In ves tor .b m p R:\2011 Template\2011 Beacon Council.JPG

    File Ref Drg no Revision

    Date 05/10/2018

    Drawn Scale NTS A4

    Tender Reference Number

    Option 2:

    Full Road Closure

    Introduction of a full road closure at the corner of Church Lane and St. Mary’s Walk.