SENSORS AND INSTRUMENTATION

PLC ASSIGNMENT

THINES RAO A/L SOMANAIDU 0806398 MH

RAVIKUMAR A/L SUBRAMANIAM 1106371 MH

Page 2: PLC Assignment OLD

INPUT

Start I:1/0 Stop I:1/1Proximity sensor I1 I:1/2Proximity sensor I2 I:1/3Proximity sensor I3 I:1/4Proximity sensor I4 I:1/5Proximity sensor I5 I:1/6Thermocouple I:1/7

OUTPUT

Motor 1 O:2/0Motor 2 O:2/1Motor 3 O:2/2Motor 4 O:2/3Motor 5 O:2/4Door 1 open O:2/5Door 2 open O:2/6Door 3 open O:2/7Door 4 open O:2/8Pump 1 O:2/9Pump 2 O:2/10Blower O:2/11Heater O:2/12Buzzer O:2/13

Page 3: PLC Assignment OLD
Page 4: PLC Assignment OLD
Page 5: PLC Assignment OLD
Page 6: PLC Assignment OLD

The numbers of packages processed by the machine which are counted by the counter are 15-17. We neglect the time consume for the package to travel from one terminal to another. A buzzer was added into the system to alert the labour to collect the package. When the thermocouple senses high temperature from heater the system/production will stop automatically. Emergency stop button added into the system if there is any malfunction occurs.