1 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS PLC and LTE Interconnect for State Estimation in Distribution Grids Radovan Sernec, Uros Droftina, Telekom Slovenije Jurij Jurse, Elektro Primorska Ziga Hribar, Bojan Milicic, Elektroservisi Nermin Suljanovic, University of Tuzla

PLC and LTE Interconnect for State Estimation in Distribution Grids

  • Upload
    buithu

  • View
    220

  • Download
    1

Embed Size (px)

Citation preview

Page 1: PLC and LTE Interconnect for State Estimation in Distribution Grids

1 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

PLC and LTE Interconnect for State

Estimation in Distribution Grids

Radovan Sernec, Uros Droftina, Telekom Slovenije

Jurij Jurse, Elektro Primorska

Ziga Hribar, Bojan Milicic, Elektroservisi

Nermin Suljanovic, University of Tuzla

Page 2: PLC and LTE Interconnect for State Estimation in Distribution Grids

2 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

… or …

Why do we need advancedPLC comms in future

distribution smart grids?

Page 3: PLC and LTE Interconnect for State Estimation in Distribution Grids

3 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

Outline

1. Problem statement and objectives

2. State estimation background information

3. Measurements

4. Proposals & conclusion

Page 4: PLC and LTE Interconnect for State Estimation in Distribution Grids

4 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

Problem statement

1. Environment: distribution smart grid.

2. Configuration: dense network of distributedenergy generators (PV, wind, CHP) and activeconsumers (prosumers).

3. Current state: Virtually no real time measurabledata in distribution grid. Real time measurementmostly in main MV supply substations.

4. Goal: Observe whole (MV and LV) distributionpower grid behaviour in real time.

5. Solutions: Use state estimation as a tool towardsgoal.

Page 5: PLC and LTE Interconnect for State Estimation in Distribution Grids

5 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

Objectives

O2.1: Evaluation of existing DSO smart distribution grid communication solutions for converged networking in NAN/WAN with utility & telecom.

O2.2: Use of PLC comms and find optimal combinationwith other communication technologies for stateestimation in distribution grids.

O2.3: Aggregation of measured data via cellular/mobile 4G - LTE comms network.

Page 6: PLC and LTE Interconnect for State Estimation in Distribution Grids

6 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

State estimation for observability

Page 7: PLC and LTE Interconnect for State Estimation in Distribution Grids

7 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

Observability requirements

1. High number of phasor measurement units - PMU WAMS nodes is required for observable, distribution smart grid.

2. Alternatively, lower number of PMU WAMS nodes coupled with pseudo measurements from smart meters.

3. Reporting period from smart meters: 1 to 15 min.

4. At least 10 measurement quantities (9 + 1 event)

Page 8: PLC and LTE Interconnect for State Estimation in Distribution Grids

8 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

Need for pseudo measurements?

1. PMU (phasor measurement units) are expensive. All measurements time synchronised < 1 sec reporting period

2. Smart meters are already or pending deployment. At consumer / customer node in power grid Low reporting period: several hours

3. Much lower operating costs for utility to achieve goals.

4. But… Require good enough high speed PLC communication.

Page 9: PLC and LTE Interconnect for State Estimation in Distribution Grids

9 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

Field trial setup: Observability at tr.st. level

Page 10: PLC and LTE Interconnect for State Estimation in Distribution Grids

10 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

New use for enhanced smart meter

1. Decrease reporting period in real time 15 min, 1 min

2. Combine measuremenets in central PLC concentrator.

3. Relay in real time pseudo measurements via mobilenetwork, 4G LTE to utility network management.

Page 11: PLC and LTE Interconnect for State Estimation in Distribution Grids

11 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

Measurement setup

1. Lab tests

2. Equipment 34 smart meters (Landis+Gyr, IskraEmeco) PLC concentrator, G3 (Landis+Gyr) LTE modem/router (RUT550) Spectrum analyser (Tektronix)

3. No noise environment to establish comms upperbound

4. Noise environment, with Z = 0, to establish comms capabilities under poor SNR conditions

Page 12: PLC and LTE Interconnect for State Estimation in Distribution Grids

12 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

Measurement setup: S.m. - PLC c. II PMU WAMS - LTE

Page 13: PLC and LTE Interconnect for State Estimation in Distribution Grids

13 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

PLC comms setup

1. Up to 34 smart meters per single PLC concentrator

2. 10 measurement quantities

3. Reporting periods 15 min 10 min 5 min 3 min < 3 min not successful

Page 14: PLC and LTE Interconnect for State Estimation in Distribution Grids

14 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

Lab setup: Smart meters - PLC concentrator

Page 15: PLC and LTE Interconnect for State Estimation in Distribution Grids

15 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

Lab setup: PLC over LTE

Page 16: PLC and LTE Interconnect for State Estimation in Distribution Grids

16 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

Low noise environment

Page 17: PLC and LTE Interconnect for State Estimation in Distribution Grids

17 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

Low noise environment: PLC = ON

Page 18: PLC and LTE Interconnect for State Estimation in Distribution Grids

18 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

PLC comms preliminary results

1. Theoretically acheivable 1 min reporting period

2. Reality: > 2 min, for 34 meters Control sw overhead

3. High success rate on 1st transmission > 99 % (based on a sample of > 20.000 transmissions) 0,4 % in 2nd and 0,5 % in 3rd > 20.000 transmissions

Page 19: PLC and LTE Interconnect for State Estimation in Distribution Grids

19 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

Conclusions: PLC over LTE

1. LTE has enough bw for PLC concentrator uplink.

2. Ethernet port on PLC c. is used for modem/router-PLC c. interconnect.

3. Traffic from many PLC c. can be aggregated via singleLTE modem/router.

Page 20: PLC and LTE Interconnect for State Estimation in Distribution Grids

20 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

Conclusions: PLC for low reporting periods

1. Viable communication option

2. Needs sw adjustments in smart meter, PLC c., management sw

3. Sw was not designed for such purposes

4. Can be used for gathering real time pseudomeasurements for distribution grid state estimation.

5. New services will emerge that require real time PLC communication, e.g. 1 min gathering of gridobservability measurements.

Example: Per transformer station 200 smart meters for billing& 10 smart meters for 1 min grid observability reporting.

Page 21: PLC and LTE Interconnect for State Estimation in Distribution Grids

21 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

Proposals for enhanced PLC comms in smart meters

1. Reliable low reporting period communication << 1 min

2. Compound data packet of several measurementquantities

U, I, P, Q, cos, U, energy

3. Time stamp compound data packet

4. Allow for frequent time synchronisation NTPv4, IEEE1588v2 GPS option

Page 22: PLC and LTE Interconnect for State Estimation in Distribution Grids

22 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

We need something like this, but in PLC(Line coupling not included)

1. WiFi hot spot

2. MIMO capable (.n)

3. ARM processor integrated + 10 bit ADC + PWM + IO

4. < 3 € subsystem in low qty.

NOTE: WiFi Phy & MAC processing >> compute DSP mathintensive compared to post G3 PLC!

Page 23: PLC and LTE Interconnect for State Estimation in Distribution Grids

23 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

Acknowledgements

The laboratory and field trials are supported also by

Landis&Gyr smart meters and PLC equipment.

Their help and technical discussions is fully appreciated.

Page 24: PLC and LTE Interconnect for State Estimation in Distribution Grids

24 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

PLC and LTE Interconnect for State

Estimation in Distribution Grids

Uros Droftina, Radovan Sernec, [email protected]

Jurij Jurse, [email protected]

Ziga Hribar, Bojan Milicic, [email protected]

Nermin Suljanovic, [email protected]

Page 25: PLC and LTE Interconnect for State Estimation in Distribution Grids

25 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

Q & A

Page 26: PLC and LTE Interconnect for State Estimation in Distribution Grids

26 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

BACKUP SLIDES

Page 27: PLC and LTE Interconnect for State Estimation in Distribution Grids

27 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

Distribution power grid: Today

Page 28: PLC and LTE Interconnect for State Estimation in Distribution Grids

28 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

Smart distribution grid 1: Denser tomorrow

Page 29: PLC and LTE Interconnect for State Estimation in Distribution Grids

29 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

Smart distribution grid 2: Observability

Page 30: PLC and LTE Interconnect for State Estimation in Distribution Grids

30 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

Comms requirements: Protocols

1. IPv4 and IPv6

2. MPLS, GRE

3. Remote management: SNMPv3

4. IEC 61850-90-5 (Synchrophasor per IEEE C37.118)

5. Transparent to other IEC 61850 protocols

6. Clock synchronisation options, hw + sw solutions SNTPv4 In PMU today NTPv4 IEEE 1588v2 (IEC 61588) MAC must support it GPS

Page 31: PLC and LTE Interconnect for State Estimation in Distribution Grids

31 WSPLC15 PLC-LTE, 21.9.2015, Klagenfurt, Austria Project Grant agreement number: 619437 Radovan Sernec, TS

Time synchronisation: NTP realities

1. Jitter per node > 1 ms (example at Kromberk location). Max > 19 ms during 4 week observation

2. May influence WAMS node measurement errors.

3. Other approaches: IEEE1588v2, GPS.