1
VERTICAL INSTALLATION INSTALLATION STANDARDS IAPMO IS 5-2006 AND 9-2006 : THERMAL EXPANSION AND CONTRACTION MAY BE CONTROLLED BY OFFSETS, EXPANSION JOINTS , OR RESTRAINTS. REGARDLESS OF THE METHOD UTILIZED, THE FOLLOWING CONDITIONS MUST BE MET: 1. SUPPORT, BUT DO NOT RIGIDLY RESTRAIN PIPING AT CHANGES OF DIRECTION . 2. DO NOT ANCHOR PIPE RIGIDLY IN WALLS. 3. HOLES THROUGH FRAMING MEMBERS MUST BE ADEQUATELY SIZED TO ALLOW FOR FREE MOVEMENT. 30 FEET 30 FEET HORIZONTAL INSTALLATION 30 FEET r I I I / I t 24 INCHES CLEANOUT (1YPICAL) ABOVE GROUND HORIZONTAL PIPES MUST BE SUPPORTED AT EACH HORIZONTAL BRANCH CONNECTION . RESTRAINT FITTINGS OR A MINIMUM 24-INCH OFFSET USING 45 DEGREE FITTINGS SHOULD BE PROVIDED EVERY 30 FEET. 24 INCHES A CLEANOUT MUST BE PROVIDED IN A DRAINAGE PIPE FOR EACH AGGREGATE HORIZONTAL CHANGE OF DIRECTION EXCEEDING 135 DEGREES (SEE M. R., CHAPTER 4714, SECTION 707.4) . APPROVED EXPANSION JOINTS / INSTALLED PER MANUFACTUR~ CLEANOUTS AND EXPANSION JOINTS MUST BE INSTALLED INSTALLATION INSTRUCTIONS IN AN ACCESSIBLE LOCATION (SEE M.R., CHAPTER 4714, SECTIONS 705 .10.2 AND 707.8) . ii DEPARTMENT OF I LABOR AND INDUSTRY Plastic Pipe Installation - Expansion and Contraction 2118 Telephone: (651) 284-5063 www.dli.mn.gov/ccld/planplumbing.asp

Plastic Pipe Installation -Expansion and Contraction · 2018-05-29 · thermal expansion and contraction may be controlled by offsets, expansion joints, or restraints, regardless

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Plastic Pipe Installation -Expansion and Contraction · 2018-05-29 · thermal expansion and contraction may be controlled by offsets, expansion joints, or restraints, regardless

VERTICAL INSTALLATION

INSTALLATION STANDARDS IAPMO IS 5-2006 AND 9-2006: THERMAL EXPANSION AND CONTRACTION MAY BE CONTROLLED BY OFFSETS, EXPANSION JOINTS, OR RESTRAINTS.

REGARDLESS OF THE METHOD UTILIZED, THE FOLLOWING CONDITIONS MUST BE MET: 1. SUPPORT, BUT DO NOT RIGIDLY RESTRAIN PIPING AT CHANGES OF DIRECTION. 2. DO NOT ANCHOR PIPE RIGIDLY IN WALLS. 3. HOLES THROUGH FRAMING MEMBERS MUST BE ADEQUATELY SIZED TO ALLOW

FOR FREE MOVEMENT.

30 FEET 30 FEETHORIZONTAL INSTALLATION

30 FEETr ~ I

I I / I t24 INCHES CLEANOUT (1YPICAL) ~I~ ABOVE GROUND HORIZONTAL PIPES MUST BE SUPPORTED AT EACH HORIZONTAL BRANCH CONNECTION . RESTRAINT FITTINGS OR A MINIMUM 24-INCH OFFSET USING 45 DEGREE FITTINGS SHOULD BE PROVIDED EVERY 30 FEET.

24 INCHES A CLEANOUT MUST BE PROVIDED IN A DRAINAGE PIPE FOR EACH AGGREGATE HORIZONTAL CHANGE OF DIRECTION EXCEEDING 135 DEGREES (SEE M.R., CHAPTER 4714, SECTION 707.4) .

APPROVED EXPANSION JOINTS / INSTALLED PER MANUFACTUR~CLEANOUTS AND EXPANSION JOINTS MUST BE INSTALLED INSTALLATION INSTRUCTIONS

IN AN ACCESSIBLE LOCATION (SEE M.R., CHAPTER 4714, SECTIONS 705.10.2 AND 707.8) .

ii DEPARTMENT OFI LABOR AND INDUSTRY

Plastic Pipe Installation - Expansion and Contraction 2118

Telephone: (651) 284-5063 www.dli.mn.gov/ccld/planplumbing.asp