1
ARIZONA DEPARTMENT OF TRANSPORTATION ROUTE INTERMODAL TRANSPORTATION DIVISION BRIDGE GROUP STRUCTURE DETAIL DESIGN APPROVED APPROVED FOR DISTRIBUTION DRAWING NO. NO DATE MADE BY DESCRIPTION OF REVISIONS 1 LOCATION PROJECT NO. FA NO. OF SHEET NO. 2 3 4 G:\Bridge\CADD\Dev\Standards\SD_Sheets\1211_5.01-5.02\sd501_1112.dgn 11/14/2012 Note to Designer: The information presented in this Standard Detail has been prepared in accordance with recognized engineering principles and is for general use. It should not be used for specific application without competent professional examination and verification of its suitability and applicability by a licensed professional engineer. Contents within the inner border line shall not be altered. Original Issue 11-12 S.U.H. STRUCTURAL EXCAVATION PAYMENT LIMITS SD 5.01 TYPICAL ABUTMENT FOOTING PLAN Limits of Structural Excavation Abutment Footing Typ. 1!6 TYPICAL ABUTMENT SECTIONS Original Ground Line 1!6 1!6 Top of Berm Roadway Embankment Original Ground Line Drilled Shafts Footing WINGWALLS 1!6 1!6 Top of berm or finished grade shown on Plans Original Ground Line LEGEND Structural Excavation NOTES: Abutment Cap Abutment 1!6 Roadway Embankment Original Ground Line 1!6 1!6 Original Ground Line TYPICAL PIER ELEVATIONS TYPICAL PIER FOOTING PLAN Limits of Structural Excavation Typ. 1!6 Roadway Excavation Original Ground Line 1!6 Neat line excavation 1!6 Finished grade shown on Plans Finished grade shown on Plans Finished grade shown on Plans (Front face) Roadway Embankment Original Ground Line 1!6 Original Ground Line TYPICAL RETAINING WALL SECTIONS No excavation payments for footings on piles or drilled shafts (within Roadway Embankment). PIER SECTION Pier Column Pier Footing Formed Pier Column 1!6 Original Ground Line (Streambed) Drilled Shaft Transition Finished Grade Finished Grade Wingwall Footing Constr Joint 3!0 (min) For structure foundations above original ground line, construct roadway embankment to top of berm or finished grade before strucural excavation is made. If no roadway excavation or embankment is involved, structural excavation shall be measured from the original ground line. Constr Joint

Planos Subestructura

Embed Size (px)

DESCRIPTION

planos de una subestructura

Citation preview

  • ARIZONA DEPARTMENT OF TRANSPORTATION

    ROUTE

    INTERMODAL TRANSPORTATION DIVISION

    BRIDGE GROUP STRUCTURE DETAIL

    DESIGN APPROVED

    APPROVED FOR DISTRIBUTION

    DRAWING NO.

    NO

    DA

    TE

    MA

    DE

    BY

    DE

    SC

    RIP

    TIO

    N O

    F R

    EV

    ISIO

    NS

    1

    LOCATION

    PROJECT NO. FA NO.

    OF

    SHEET NO.

    2 3 4

    G:\Bridge\CADD\Dev\Standards\SD_Sheets\1211_5.01-5.02\sd501_1112.dgn11/14/2012

    Note t

    o D

    esigner:

    Th

    e in

    fo

    rm

    atio

    n p

    resen

    ted

    in

    th

    is S

    tan

    dard

    D

    etail h

    as b

    een

    p

    rep

    ared

    in

    acco

    rd

    an

    ce w

    ith

    reco

    gn

    ized

    en

    gin

    eerin

    g p

    rin

    cip

    les an

    d is fo

    r g

    en

    eral u

    se. It sh

    ou

    ld

    n

    ot b

    e u

    sed

    fo

    r sp

    ecific ap

    plicatio

    n w

    ith

    ou

    t

    com

    petent p

    rofessional e

    xam

    ination a

    nd v

    erification o

    f i

    ts s

    uitability a

    nd a

    pplicability b

    y a

    licensed

    pro

    fessio

    nal en

    gin

    eer. C

    on

    ten

    ts w

    ith

    in

    th

    e in

    ner b

    ord

    er lin

    e sh

    all n

    ot b

    e altered

    .

    Orig

    in

    al Issu

    e

    11-1

    2S

    .U.H

    .

    STRUCTURAL EXCAVATION

    PAYMENT LIMITS

    SD 5.01

    TYPICAL ABUTMENT FOOTING PLAN

    Limits of

    Structural

    Excavation

    Abutment

    Footing

    Typ.

    1!6

    TYPICAL ABUTMENT SECTIONS

    Original

    Ground Line

    1!6

    1!6

    Top of Berm

    Roadway

    Embankment

    Original

    Ground Line

    Drilled

    ShaftsFooting

    WINGWALLS

    1!6 1!6

    Top of berm or

    finished grade

    shown on Plans

    Original

    Ground

    Line

    LEGEND

    Structural Excavation

    NOTES:

    Abutment

    CapAbutment

    1!6

    Roadway Embankment

    Original

    Ground Line

    1!6 1!6

    Original Ground Line

    TYPICAL PIER ELEVATIONSTYPICAL PIER FOOTING PLAN

    Limits of

    Structural

    Excavation Typ.

    1!6

    Roadway Excavation

    Original Ground Line

    1!6 Neat line

    excavation

    1!6

    Finished grade

    shown on Plans

    Finished

    grade

    shown

    on PlansFinished grade

    shown on Plans

    (Front face)

    Roadway

    Embankment

    Original

    Ground Line

    1!6

    Original

    Ground Line

    TYPICAL RETAINING WALL SECTIONS

    No excavation payments for footings on piles

    or drilled shafts (within Roadway Embankment).

    PIER SECTION

    Pier

    Column

    Pier

    Footing

    Formed

    Pier

    Column

    1!6

    Original

    Ground Line

    (Streambed)

    Drilled

    Shaft

    Transition

    Finished

    Grade

    Finished

    Grade

    Wingwall Footing

    Constr

    Joint

    3!0

    (min)

    For structure foundations above original ground

    line, construct roadway embankment to top of

    berm or finished grade before strucural

    excavation is made.

    If no roadway excavation or embankment is

    involved, structural excavation shall be

    measured from the original ground line.

    Constr

    Joint