ARIZONA DEPARTMENT OF TRANSPORTATION
ROUTE
INTERMODAL TRANSPORTATION DIVISION
BRIDGE GROUP STRUCTURE DETAIL
DESIGN APPROVED
APPROVED FOR DISTRIBUTION
DRAWING NO.
NO
DA
TE
MA
DE
BY
DE
SC
RIP
TIO
N O
F R
EV
ISIO
NS
1
LOCATION
PROJECT NO. FA NO.
OF
SHEET NO.
2 3 4
G:\Bridge\CADD\Dev\Standards\SD_Sheets\1211_5.01-5.02\sd501_1112.dgn11/14/2012
Note t
o D
esigner:
Th
e in
fo
rm
atio
n p
resen
ted
in
th
is S
tan
dard
D
etail h
as b
een
p
rep
ared
in
acco
rd
an
ce w
ith
reco
gn
ized
en
gin
eerin
g p
rin
cip
les an
d is fo
r g
en
eral u
se. It sh
ou
ld
n
ot b
e u
sed
fo
r sp
ecific ap
plicatio
n w
ith
ou
t
com
petent p
rofessional e
xam
ination a
nd v
erification o
f i
ts s
uitability a
nd a
pplicability b
y a
licensed
pro
fessio
nal en
gin
eer. C
on
ten
ts w
ith
in
th
e in
ner b
ord
er lin
e sh
all n
ot b
e altered
.
Orig
in
al Issu
e
11-1
2S
.U.H
.
STRUCTURAL EXCAVATION
PAYMENT LIMITS
SD 5.01
TYPICAL ABUTMENT FOOTING PLAN
Limits of
Structural
Excavation
Abutment
Footing
Typ.
1!6
TYPICAL ABUTMENT SECTIONS
Original
Ground Line
1!6
1!6
Top of Berm
Roadway
Embankment
Original
Ground Line
Drilled
ShaftsFooting
WINGWALLS
1!6 1!6
Top of berm or
finished grade
shown on Plans
Original
Ground
Line
LEGEND
Structural Excavation
NOTES:
Abutment
CapAbutment
1!6
Roadway Embankment
Original
Ground Line
1!6 1!6
Original Ground Line
TYPICAL PIER ELEVATIONSTYPICAL PIER FOOTING PLAN
Limits of
Structural
Excavation Typ.
1!6
Roadway Excavation
Original Ground Line
1!6 Neat line
excavation
1!6
Finished grade
shown on Plans
Finished
grade
shown
on PlansFinished grade
shown on Plans
(Front face)
Roadway
Embankment
Original
Ground Line
1!6
Original
Ground Line
TYPICAL RETAINING WALL SECTIONS
No excavation payments for footings on piles
or drilled shafts (within Roadway Embankment).
PIER SECTION
Pier
Column
Pier
Footing
Formed
Pier
Column
1!6
Original
Ground Line
(Streambed)
Drilled
Shaft
Transition
Finished
Grade
Finished
Grade
Wingwall Footing
Constr
Joint
3!0
(min)
For structure foundations above original ground
line, construct roadway embankment to top of
berm or finished grade before strucural
excavation is made.
If no roadway excavation or embankment is
involved, structural excavation shall be
measured from the original ground line.
Constr
Joint