1
PROPOSED 20" PIPELINE 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 33+38 HDD ENTRY/EXIT N39.893592 W75.431051 SE PENNSYLVANIA RR N39.897363 W75.434522 GLEN RIDDLE ROAD N39.895916 W75.433190 SUNOCO EASEMENT LIMITS - NOT LOD PROPOSED 16" PIPELINE GEOTECH SB-03 GEOTECH SB-04 -100 0 100 200 300 -100 0 100 200 300 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 1247' STA. 29+47 EL. 31' HDD ENTRY/EXIT 33+38 EL.69' 10°' 60' 43' R=2000' L=347' S=349' EXISTING TELEPHONE 19+86 GLEN RIDDLE ROAD 23+00 EXISTING SEWERLINE 26+42 UNDERGROUND ELECTRICAL 26+90 EXISTING WATERLINE 26+34 UNDERGROUND ELECTRICAL 23+56 EXISTING WATERLINE 23+24 EXISTING SEWERLINE 23+08 EXISTING GAS LINE 22+76 EXISTING WATERLINE 21+90 OVERHEAD ELECTRIC 22+81 EDGE OF WETLAND I1 CL STREAM S-I2 32+36 EDGE OF WETLAND I1 14' STA. 32+95 EL. 62' APPROXIMATE BEDROCK GEOTECH SB-03 18+62, 57' RT GEOTECH SB-04 29+68, 112' RT APPROXIMATE BEDROCK -INCH HORIZONTAL DIRECTIONAL DRILL REF. DRAWING EROSION & SEDIMENT PLAN AERIAL SITE PLAN PLAN VIEW PROFILE VIEW NO. DESCRIPTION DATE BY CHK DATE REVISIONS DATE APP NOTES Sunoco Logistics Partners L.P. SUNOCO PIPELINE, L.P. 1. ALL COORDINATES SHOWN ARE IN LATITUDE AND LONGITUDE. ALL MSL ELEVATIONS ARE NAD83 2. STATIONING IS BASED ON HORIZONTAL DISTANCES. 3. ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE, LP ARE NOT RESPONSIBLE FOR LOCATION OF FOREIGN UTILITIES SHOWN IN PLOT PLAN OR PROFILE. THE INFORMATION SHOWN HEREON IS FURNISHED WITHOUT LIABILITY ON THE PART OF ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE, LP, FOR ANY DAMAGES RESULTING FROM ERRORS OR OMISSIONS THEREIN. 4. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES. CONTACT ONE CALL AT 811 PRIOR TO DIGGING. 5. SUNOCO EMERGENCY HOTLINE NUMBER IS #1-800-786-7440. PENNSYLVANIA PIPELINE PROJECT DESIGN AND CONSTRUCTION: 1. CONTRACTOR SHALL FIELD VERIFY DEPTH OF ALL EXITING UTILITIES SHOWN OR NOT SHOWN ON THIS DRAWING. 2. THE MINIMUM SEPARATION DISTANCE FROM EXISTING SUBSURFACE UTILITIES SHALL NOT BE LESS THAN 10 FEET AS MEASURED FROM THE OUTSIDE EDGE OF THE UTILITY TO OUTSIDE OF PROPOSED PIPELINE. 3. DESIGNED IN ACCORDANCE WITH CFR 49 195 & ASME B31.4 4. CROSSING PIPE SPECIFICATION: HDD HORZ. LENGTH (L=): HDD PIPE LENGTH (S=): 20" x 0.456" W.T., X-65, API5L, PSL2, ERW, BFW COATING: 14-16 MILS FBE WITH 30-35 MIL ARO (POWERCRETE R95) 5. INTERNAL DESIGN PRESSURE 1480 PSIG (SEAM FACTOR 1.0, DESIGH FACTOR 0.50). 6. INSTALLATION METHOD: HORIZONTAL DIRECTIONAL DRILL (HDD). 7. PIPELINE WARNING MARKERS SHALL BE INSTALLED ON BOTH SIDES OF ALL ROAD, RAILWAY, AND STREAM CROSSINGS. 8. CARRIER PIPE NOT ENCASED. 9. PIPE / AMBIENT TEMPERATURE MUST BE NO LESS THAN 30°F DURING PULLBACK WITHOUT PRIOR WRITTEN APPROVAL FROM THE ENGINEER. 10. CONDUCT 4-HOUR PRE-INSTALLATION HYDROTEST OF HDD PIPE STRING TO MINIMUM 1850 PSIG. 11. SEE SUNOCO PENNSYLVANIA PIPELINE PROJECT ESRI WEBMAP FOR ACCESS ROAD ALIGNMENT. LEGEND PERMANENT ROW TEMPORARY CONSTRUCTION ROW TEMPORARY WORKSPACE TEMPORARY ACCESS ROAD PERMANENT ACCESS ROAD SPOIL SPACE ONLY PROPOSED HDD PROPOSED 20" PIPELINE PROPOSED 16" PIPELINE HDD ENTRY-EXIT PEM WETLANDS PSS WETLANDS PFO WETLANDS 12. SUNOCO PIPELINE, L.P.'S HORIZONTAL DIRECTIONAL DRILL INADVERTENT RETURN CONTINGENCY PLAN WILL BE IMPLEMENTED AT ALL TIMES. 13. SUNOCO PIPELINE, L.P.'S EROSION AND SEDIMENTATION CONTROL PLAN WILL BE IMPLEMENTED AT ALL TIMES. TO TO DWG NO DWG NO DESCRIPTION 20 03/27/15 09/30/16 02/26/16 05/10/16 GLEN RIDDLE RD, SOUTHEASTERN PENNSYLVANIA RR 1"=200' PA-DE-0100.0000-RRb DELAWARE COUNTY, PENNSYLVANIA - UPPER CHICHESTER TOWNSHIP S3-0620 A ISSUED FOR REVIEW JAM RMB AAW 03/27/15 08/31/15 03/27/15 EP2 REVISED PER PADEP COMMENTS RECEIVED 09-06-16 DLM RMB AAW 09/30/16 07/31/15 09/30/16 EP1 REVISED PER PADEP COMMENTS MRS RMB AAW 05/10/16 ES-6.18 05/10/16 EP MRS RMB AAW 02/26/16 SHEET 13 02/26/16 C ISSUED FOR BID / DESIGN CHANGE MRS RMB AAW 08/31/15 ES-6.20 08/31/15 B ISSUED FOR BID DLM RMB AAW 07/31/15 SHEET 12 07/31/15 3338' 3373' 0 FEET 100 100 200 STA 17+00 GRADE PULLBACK ALONG ROW EXISTING SUNOCO PIPELINES PA-DE-0103.0001 GLEN RIDDLE RD SEE PA-DE-0100.0000-RRa NOTE: REFER TO TEST BORING LOG S3-0620 FOR COMPLETE SOIL MATERIAL DESCRIPTION -NG EL. 127' GEOTECH SB-03 -TOPSOIL (0' - 0.5') -COMPLETION DEPTH EL. 86' -GROUNDWATER (28.0') -SM (0.5' - 31.0') -WEATHERED GNEISS (28.0' - 41.0') -SC (0.1' - 4.0') -NG EL. 72' GEOTECH SB-04 -TOPSOIL (0' - 0.1') -CL (4.0' - 6.5') -COMPLETION DEPTH EL. 60' -WEATHERED GNEISS (12.0' - 12.3') -GROUNDWATER (4.0') -SM (6.5' - 12.0')

PLAN VIEW PROFILE VIEW - files.dep.state.pa.usfiles.dep.state.pa.us/ProgramIntegration/PA Pipeline Portal... · se pennsylvania rr n39.897363 w75.434522 glen ... existing telephone

Embed Size (px)

Citation preview

PROPOSED 20" PIPELINE

10+

00

11+

00

12+

00

13+

00

14+

00

15+

00

16+

00

17+

00

18+

00

19+

00

20+

00

21+

00

22+

00

23+

00

24+

00

25+

00

26+

00

27+

00

28+

00

29+

00

30+

00

31+

00

32+

00

33+

00

33+

38

HDD ENTRY/EXIT

N39.893592

W75.431051

SE PENNSYLVANIA RR

N39.897363

W75.434522

GLEN RIDDLE ROAD

N39.895916

W75.433190

SUNOCO EASEMENT

LIMITS - NOT LOD

PROPOSED 16" PIPELINE

GEOTECH SB-03

GEOTECH SB-04

-100

0

100

200

300

-100

0

100

200

300

17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00

1247'

STA. 29+47

EL. 31'

HD

D E

NT

RY

/E

XIT

33+

38

EL.69'

10°'

60'

43'

R=2000'

L=347'

S=349'

EX

IS

TIN

G T

ELE

PH

ON

E

19+

86

GLE

N R

ID

DLE

R

OA

D

23+

00

EX

IS

TIN

G S

EW

ER

LIN

E

26+

42

UN

DE

RG

RO

UN

D E

LE

CT

RIC

AL

26+

90

EX

IS

TIN

G W

AT

ER

LIN

E

26+

34

UN

DE

RG

RO

UN

D E

LE

CT

RIC

AL

23+

56

EX

IS

TIN

G W

AT

ER

LIN

E

23+

24

EX

IS

TIN

G S

EW

ER

LIN

E

23+

08

EX

IS

TIN

G G

AS

LIN

E

22+

76

EX

IS

TIN

G W

AT

ER

LIN

E

21+

90

OV

ER

HE

AD

E

LE

CT

RIC

22+

81

ED

GE

O

F W

ET

LA

ND

I1

CL S

TR

EA

M S

-I2

32+

36

ED

GE

O

F W

ET

LA

ND

I1

14'

STA. 32+95

EL. 62'

APPROXIMATE

BEDROCK

GE

OT

EC

H S

B-03

18+

62, 57' R

T

GE

OT

EC

H S

B-04

29+

68, 112' R

T

APPROXIMATE

BEDROCK

-INCH HORIZONTAL DIRECTIONAL DRILL

REF. DRAWING

EROSION & SEDIMENT PLAN

AERIAL SITE PLAN

PLAN VIEW

PROFILE VIEW

NO. DESCRIPTION DATEBY CHK DATE

REVISIONS

DATEAPP

NOTES Sunoco LogisticsPartners L.P.

SUNOCO PIPELINE, L.P.

1. ALL COORDINATES SHOWN ARE IN LATITUDE AND LONGITUDE. ALL MSL ELEVATIONS ARE NAD83

2. STATIONING IS BASED ON HORIZONTAL DISTANCES.

3. ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE, LP ARE NOT RESPONSIBLE FOR LOCATION

OF FOREIGN UTILITIES SHOWN IN PLOT PLAN OR PROFILE. THE INFORMATION SHOWN HEREON IS

FURNISHED WITHOUT LIABILITY ON THE PART OF ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE,

LP, FOR ANY DAMAGES RESULTING FROM ERRORS OR OMISSIONS THEREIN.

4. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES. CONTACT ONE CALL AT 811 PRIOR TO

DIGGING.

5. SUNOCO EMERGENCY HOTLINE NUMBER IS #1-800-786-7440.

PENNSYLVANIA PIPELINE PROJECT

DESIGN AND CONSTRUCTION:

1. CONTRACTOR SHALL FIELD VERIFY DEPTH OF ALL EXITING UTILITIES SHOWN OR NOT SHOWN ON

THIS DRAWING.

2. THE MINIMUM SEPARATION DISTANCE FROM EXISTING SUBSURFACE UTILITIES SHALL NOT BE LESS

THAN 10 FEET AS MEASURED FROM THE OUTSIDE EDGE OF THE UTILITY TO OUTSIDE OF PROPOSED

PIPELINE.

3. DESIGNED IN ACCORDANCE WITH CFR 49 195 & ASME B31.4

4. CROSSING PIPE SPECIFICATION:

HDD HORZ. LENGTH (L=):

HDD PIPE LENGTH (S=):

20" x 0.456" W.T., X-65, API5L, PSL2, ERW, BFW

COATING: 14-16 MILS FBE WITH 30-35 MIL ARO (POWERCRETE R95)

5. INTERNAL DESIGN PRESSURE 1480 PSIG (SEAM FACTOR 1.0, DESIGH FACTOR 0.50).

6. INSTALLATION METHOD: HORIZONTAL DIRECTIONAL DRILL (HDD).

7. PIPELINE WARNING MARKERS SHALL BE INSTALLED ON BOTH SIDES OF ALL ROAD, RAILWAY, AND

STREAM CROSSINGS.

8. CARRIER PIPE NOT ENCASED.

9. PIPE / AMBIENT TEMPERATURE MUST BE NO LESS THAN 30°F DURING PULLBACK WITHOUT PRIOR

WRITTEN APPROVAL FROM THE ENGINEER.

10. CONDUCT 4-HOUR PRE-INSTALLATION HYDROTEST OF HDD PIPE STRING TO MINIMUM 1850 PSIG.

11. SEE SUNOCO PENNSYLVANIA PIPELINE PROJECT ESRI WEBMAP FOR ACCESS ROAD ALIGNMENT.

LEGEND

PERMANENT ROW

TEMPORARY CONSTRUCTION ROW

TEMPORARY WORKSPACE

TEMPORARY ACCESS ROAD

PERMANENT ACCESS ROAD

SPOIL SPACE ONLY

PROPOSED HDD

PROPOSED 20" PIPELINE

PROPOSED 16" PIPELINE

HDD ENTRY-EXIT

PEM WETLANDS

PSS WETLANDS

PFO WETLANDS

12. SUNOCO PIPELINE, L.P.'S HORIZONTAL DIRECTIONAL DRILL INADVERTENT RETURN CONTINGENCY PLAN

WILL BE IMPLEMENTED AT ALL TIMES.

13. SUNOCO PIPELINE, L.P.'S EROSION AND SEDIMENTATION CONTROL PLAN WILL BE IMPLEMENTED AT ALL

TIMES.

TO

TO

DWG NO DWG NO DESCRIPTION

20

03/27/15

09/30/16

02/26/16

05/10/16

GLEN RIDDLE RD, SOUTHEASTERN PENNSYLVANIA RR

1"=200'

PA-DE-0100.0000-RRb

DELAWARE COUNTY, PENNSYLVANIA - UPPER CHICHESTER TOWNSHIP

S3-0620

A ISSUED FOR REVIEWJAM RMB AAW03/27/15

08/31/15

03/27/15

EP2 REVISED PER PADEP COMMENTS RECEIVED 09-06-16 DLM RMB AAW09/30/16

07/31/15

09/30/16

EP1 REVISED PER PADEP COMMENTSMRS RMB AAW05/10/16

ES-6.18

05/10/16

EP MRS RMB AAW02/26/16

SHEET 13

02/26/16

C ISSUED FOR BID / DESIGN CHANGE MRS RMB AAW08/31/15

ES-6.20

08/31/15

B ISSUED FOR BIDDLM RMB AAW07/31/15

SHEET 12

07/31/15

3338'

3373'

0

FEET

100 100 200

STA 17+00

GRADE

PU

LLB

AC

K A

LO

NG

RO

W

EXISTING SUNOCO PIPELINES

PA-DE-0103.0001

GLE

N R

ID

DLE

R

D

SEE PA-DE-0100.0000-RRa

NOTE: REFER TO TEST BORING LOG S3-0620

FOR COMPLETE SOIL MATERIAL DESCRIPTION

-NG EL. 127'

GEOTECH SB-03

-TOPSOIL (0' - 0.5')

-COMPLETION

DEPTH EL. 86'

-GROUNDWATER (28.0')

-SM (0.5' - 31.0')

-WEATHERED GNEISS

(28.0' - 41.0')

-SC (0.1' - 4.0')

-NG EL. 72'

GEOTECH SB-04

-TOPSOIL (0' - 0.1')

-CL (4.0' - 6.5')

-COMPLETION

DEPTH EL. 60'

-WEATHERED GNEISS

(12.0' - 12.3')

-GROUNDWATER (4.0')

-SM (6.5' - 12.0')

AutoCAD SHX Text
LIGHT STAND
AutoCAD SHX Text
LIGHT STAND
AutoCAD SHX Text
LIGHT STAND
AutoCAD SHX Text
CLEANOUT
AutoCAD SHX Text
S
AutoCAD SHX Text
SEWER CLEANOUT
AutoCAD SHX Text
S
AutoCAD SHX Text
SEWER CLEANOUT
AutoCAD SHX Text
S
AutoCAD SHX Text
SEWER CLEANOUT
AutoCAD SHX Text
S
AutoCAD SHX Text
SEWER CLEANOUT
AutoCAD SHX Text
S-I1S-I1
AutoCAD SHX Text
S-I3S-I3
AutoCAD SHX Text
S-I2S-I2
AutoCAD SHX Text
S-I4S-I4
AutoCAD SHX Text
S-I6S-I6
AutoCAD SHX Text
W-I2W-I2
AutoCAD SHX Text
W-I1W-I1
AutoCAD SHX Text
W-I1W-I1
AutoCAD SHX Text
W-I1W-I1
AutoCAD SHX Text
(303) 792-5911