5
PO Box 145, Delta Junction, AK 99737, USA 3204 International St, Fairbanks, AK 99701, USA Tel +1 907 895 2500 | Fax +1 907 895 2866 Level 1, 388 Hay Street, Subiaco 6008, Western Australia Tel: +61 8 6188 2100 | Fax: +61 8 6188 2111 Email: [email protected] Web: www.nsrltd.com December 18, 2018 Kyle Moselle Department of Natural Resources Office of Project Management and Permitting 400 Willoughby street Juneau, AK 99801-01019 Dear Mr. Moselle, PLAN OF OPERATIONS MINOR MODIFICATION POGO MINE STRIP VEIN EXPLORATION Northern Star (Pogo) LLC requests a minor modification to the Plan of Operations (F20189500 - approved on May 24, 2018 and amended November 6, 2018) to support exploration infrastructure development across the Goodpaster River. Northern Star (Pogo) LLC requests approval to extend the underground Strip Vein headings below the Goodpaster River into the area represented by claim blocks ADL Pogo 1647, 1648, 1649,1547, 1548, 1549, 1447, and 1448. The area represented by the claim blocks is shown on the attached Figure 1 – Strip Vein Exploration. The planned exploration drift and cross section of the exploration area is shown in Figure 2 – Plan View Showing Cross-Section Location and Figure 3 – Cross-Section of Proposed Exploration Drift, respectively. Exploration activities will be performed concurrent with production activities to facilitate safe and efficient mining practices. All waste rock will be characterized as PAF or non-PAF material and hauled to the DSTF for containment or staged in above ground stockpiles, respectively. All ore generated from the exploration and production activities will be transported to the mill and processed. All material handling actions will follow the waste and ore management procedures outlined in the approved Plan of Operations and the Waste Management Permit (approved May 24, 2018 and amended November 1, 2018). Activities will be conducted from the portals located within the current Uplands Mining Lease (ADL 674057) and Millsite Lease (ADL 416949). All actions will be conducted in accordance with the current Plan of Operations (F20189500) and all Pogo Mine permits, including the APDES (AK0053341), Air Quality (AQ0406MSS07 and AQ0406TVP02), and MSGP (AKR060000), and WMP (2018DB0001). If you have any questions, please contact me at 907-895-2879 or via email at [email protected]. Sincerely, Jillian Ladegard, PE Pogo Mine Environmental Manager Northern Star (Pogo) LLC

PLAN OF OPERATIONS MINOR MODIFICATION POGO MINE …dnr.alaska.gov/mlw/mining/largemine/pogo/pdf2019/... · Northern Star (Pogo) LLC requests a minor modification to the Plan of Operations

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PLAN OF OPERATIONS MINOR MODIFICATION POGO MINE …dnr.alaska.gov/mlw/mining/largemine/pogo/pdf2019/... · Northern Star (Pogo) LLC requests a minor modification to the Plan of Operations

PO Box 145, Delta Junction, AK 99737, USA 3204 International St, Fairbanks, AK 99701, USA

Tel +1 907 895 2500 | Fax +1 907 895 2866 Level 1, 388 Hay Street, Subiaco 6008, Western Australia

Tel: +61 8 6188 2100 | Fax: +61 8 6188 2111 Email: [email protected] Web: www.nsrltd.com

December 18, 2018 Kyle Moselle Department of Natural Resources Office of Project Management and Permitting 400 Willoughby street Juneau, AK 99801-01019 Dear Mr. Moselle, PLAN OF OPERATIONS MINOR MODIFICATION POGO MINE STRIP VEIN EXPLORATION Northern Star (Pogo) LLC requests a minor modification to the Plan of Operations (F20189500 - approved on May 24, 2018 and amended November 6, 2018) to support exploration infrastructure development across the Goodpaster River. Northern Star (Pogo) LLC requests approval to extend the underground Strip Vein headings below the Goodpaster River into the area represented by claim blocks ADL Pogo 1647, 1648, 1649,1547, 1548, 1549, 1447, and 1448. The area represented by the claim blocks is shown on the attached Figure 1 – Strip Vein Exploration. The planned exploration drift and cross section of the exploration area is shown in Figure 2 – Plan View Showing Cross-Section Location and Figure 3 – Cross-Section of Proposed Exploration Drift, respectively. Exploration activities will be performed concurrent with production activities to facilitate safe and efficient mining practices. All waste rock will be characterized as PAF or non-PAF material and hauled to the DSTF for containment or staged in above ground stockpiles, respectively. All ore generated from the exploration and production activities will be transported to the mill and processed. All material handling actions will follow the waste and ore management procedures outlined in the approved Plan of Operations and the Waste Management Permit (approved May 24, 2018 and amended November 1, 2018). Activities will be conducted from the portals located within the current Uplands Mining Lease (ADL 674057) and Millsite Lease (ADL 416949). All actions will be conducted in accordance with the current Plan of Operations (F20189500) and all Pogo Mine permits, including the APDES (AK0053341), Air Quality (AQ0406MSS07 and AQ0406TVP02), and MSGP (AKR060000), and WMP (2018DB0001). If you have any questions, please contact me at 907-895-2879 or via email at [email protected]. Sincerely,

Jillian Ladegard, PE Pogo Mine Environmental Manager Northern Star (Pogo) LLC

Page 2: PLAN OF OPERATIONS MINOR MODIFICATION POGO MINE …dnr.alaska.gov/mlw/mining/largemine/pogo/pdf2019/... · Northern Star (Pogo) LLC requests a minor modification to the Plan of Operations

Page 2

Encls: Figure 1 – Strip Vein Exploration Figure 2 – Plan View Showing Cross-Section Location

Figure 3 – Cross-Section of Proposed Exploration Drift Cc: Brent Martellaro, ADNR [email protected] Carolyn Curley, ADNR [email protected] Tim Pilon, ADEC Pilon, ADEC [email protected] Chris Kennedy, NSR [email protected] Shaun McLoughney, NSR [email protected] Guy Singleton, NSR [email protected] Hilary Macdonald, NSR [email protected]

Page 3: PLAN OF OPERATIONS MINOR MODIFICATION POGO MINE …dnr.alaska.gov/mlw/mining/largemine/pogo/pdf2019/... · Northern Star (Pogo) LLC requests a minor modification to the Plan of Operations

Strip VeinsGoodpaster

Prospect

POGO 6003 POGO 6002POGO 6004

POGO 1243 POGO 1246POGO 1244 POGO 1245

POGO 1743 POGO 1744

POGO 1548

POGO 1448

POGO 1651 POGO 1652

POGO 1446

POGO 1746 POGO 1748POGO 1747 POGO 1749

POGO 1343 POGO 1344 POGO 1345

POGO 1445POGO 1444POGO 1443

POGO 1545POGO 1544POGO 1543

POGO 1346

POGO 1546

POGO 1447

POGO 1745

POGO 1547

POGO 1750

POGO 1549

POGO 1751 POGO 1752

POGO 1643 POGO 1644POGO 1649POGO 1648POGO 1646POGO 1645 POGO 1647 POGO 1650

POGO 6001

POGO 1147POGO 1146POGO 1145POGO 1144POGO 1143

POGO 1749APOGO 1748APOGO 1747APOGO 1746A POGO 1750A

POGO 1844POGO 1843 POGO 1846POGO 1845 POGO 1847 POGO 1848

POGO 1744A

POGO 1849

POGO 1745APOGO 1743A

POGO 1850 POGO 1851 POGO 1852

POGO 1653

POGO 1753

POGO 1553

POGO 1353

POGO 1453

POGO 1242

POGO 6005

POGO 1342

POGO 1442

POGO 1542

POGO 1642

POGO 1742

POGO 1142

POGO 1853

144°54'0"W

144°54'0"W

144°54'30"W

144°54'30"W

144°55'0"W

144°55'0"W

144°55'30"W

144°55'30"W

144°56'0"W

144°56'0"W

144°56'30"W

144°56'30"W

144°57'0"W

144°57'0"W

144°57'30"W

144°57'30"W

144°58'0"W

144°58'0"W

64°28'30"N

64°28'30"N

64°28'0"N

64°28'0"N

64°27'30"N

64°27'30"N±

Mine2015Strip VeinsProposed AdditionPogo_Claims_2012Mine Lease BoundaryMill Lease BoundaryExploration Roads

Figure 1. Strip Vein Exploration

Claims: POGO 1647,1648,1649,1548,1549,1447,1448

Plan of Operations Minor Modifacation

0 0.1 0.2 0.3 0.40.05Miles

1:10,000±

Coordinate System: NAD 1983StatePlane Alaska 3 FIPS 5003 ft.Projection: Transverse_MercatorFalse_Easting: 1640416.666667Central_Meridian: -146.0Latitude_Of_Origin: 54.0Author: Jeremiah Drewel

Page 4: PLAN OF OPERATIONS MINOR MODIFICATION POGO MINE …dnr.alaska.gov/mlw/mining/largemine/pogo/pdf2019/... · Northern Star (Pogo) LLC requests a minor modification to the Plan of Operations

A

A’

Strip Veins

Figure 2. Plan View Showing Cross-Section Location

Page 5: PLAN OF OPERATIONS MINOR MODIFICATION POGO MINE …dnr.alaska.gov/mlw/mining/largemine/pogo/pdf2019/... · Northern Star (Pogo) LLC requests a minor modification to the Plan of Operations

A’A Looking NE

538 ft. amsl

804

ft. b

elow

gr

ound

sur

face

Figure 3. Cross-Section of Proposed Exploration Drift