9
Oliver Kester I3 EURONS Plan for the extension of 12 month for JRA03 * Double frequency operation of PHOENIX at LPSC (chamber is now available, simpler setup than 28 GHz operation) * Further exploration of charge state manipulation and comparison with the new simulation tool CBSIM. * Efficiency exploration with BNL EBIS (can only be done in 2008) * Continuation of molecule break up and capture of decay products, which opens new possible beam development

Plan for the extension of 12 month for JRA03

Embed Size (px)

DESCRIPTION

Plan for the extension of 12 month for JRA03. * Double frequency operation of PHOENIX at LPSC (chamber is now available, simpler setup than 28 GHz operation) * Further exploration of charge state manipulation and comparison with the new simulation tool CBSIM. - PowerPoint PPT Presentation

Citation preview

Page 1: Plan for the extension of 12 month for JRA03

Oliver KesterI3 EURONSPlan for the extension of 12

month for JRA03

* Double frequency operation of PHOENIX at LPSC (chamber is now available, simpler setup than 28 GHz operation)

* Further exploration of charge state manipulation and comparison with the new simulation tool CBSIM.

* Efficiency exploration with BNL EBIS (can only be done in 2008)

* Continuation of molecule break up and capture of decay products, which opens new possible beam development

Page 2: Plan for the extension of 12 month for JRA03

Oliver KesterI3 EURONSTask 4: High-frequency exploration of ECRIS

4.1 Improving of breeding time of ECRISalready seen, to be measured systematically before interpratation4.2 High frequency (14-28 GHz) exploration28 GHz might be difficult before end 20084.3 Influence of ECRIS plasma volumeDouble frequency (14+18 GHz will be a good test)

Modifications of the booster under fabrication, will installed by the end of September 2007

Present PHOENI X Breeder Magnetic plug, Higher Binj, Less dissymmetry

UHV tech. and moveable grounded tubeTwo f requency plasma chamber

Page 3: Plan for the extension of 12 month for JRA03

Oliver KesterI3 EURONSECRIS charge breeders pulsed

LPSCECR charge breeding time

0 2 4 6 8 10 12Time (ms)

Inte

nsit

y (m A

) Ar3+

Ar4+

Ar6+

Ar7+

Ar8+

Ar9+

Ar2+ Microwave pulse

0

800

Steady state Ar9+: 5 ms

Preglow

Afterglow

18 GHz, 950 W 28 GHz, 3600 W

Steady states reached at 3 ms for all charges !!

0 2 4 6 8 10 12Time (ms)

Inte

nsit

y (m A

) Ar3+

Ar4+

Ar6+

Ar7+

Ar8+

Ar9+

Ar2+Microwave pulse

300

0T. Thuillier et al., ICIS’07

In ECR Charge state increase can be very fast ! -> But trapping very long !

0

200

400

600

-800 -600 -400 -200 0

Time (ms)

IRb

15+

(nA

)

End of Rb1+ injection

RF power cancellationRF Power

RB1+ injection Rb15+ Afterglow

Here 520 ms for Rb15+

N. Chauvin et al., Nucl. Instrum. Meth. A, Vol 419, nb. 1, 1998

Charge breeding time is a result of the ECRIS compromise, RF, B, Gas

Page 4: Plan for the extension of 12 month for JRA03

Oliver KesterI3 EURONSShift of the charge state spectra to

higher charge states

* In Bari rf-excitation (BRIC)* MAXEBIS reduced barrier* Uni Frankfurt fast variation of electron beam current

Can be done by fast removalof hot low charged ions cooling effect

Page 5: Plan for the extension of 12 month for JRA03

Oliver KesterI3 EURONSCharge state manipulation

methods?

Using atomic shell structure: Beneficial only for heavy ions until now (REXEBIS) Very high abundance in on charge states in EBIT, but at the expense of low efficiency

Using DR resonances: In principle possible (shown at Heidelberg EBIT), but efficiency spoiled by energy spread of the electron beam.

Cooling of highly charged ions: Works for medium heavy and heavy elements survey required

Page 6: Plan for the extension of 12 month for JRA03

Oliver KesterI3 EURONS Simulation tool: CBSIM

Included so far:

Collision physics:

Stepwise ionisation,charge exchange, RR

Collision and trap physics:

electron-ion-heating,ion-ion cooling

Without charge exchange and recombination, but ion losses

With charge exchange and recombination

Included so far:

Trap physics:

space charge neutralisation andion losses

Soon: atomic data tables

Page 7: Plan for the extension of 12 month for JRA03

Oliver KesterI3 EURONS

TOF out of the REXTRAP for stable SeCO beam injected

* Molecular sideband beams from ISOLDE to avoid isobaric contamination* e.g. 70SeCO to avoid 70Ge* Keep molecules inside trap, break them in EBIS (or break inside trap with different trap potential settings)

Results

* ~50% SeCO out of trap* 6.5% SeCO+ to Se19+ in EBIS (58 ms breeding time)

* Problems inside the EBIS: ions with high electro-negative values escape the electron beam

* Also tried SrF, BaF, AlF (>16% total efficiency for Al7+)

Molecule breakup (EBIS)

Page 8: Plan for the extension of 12 month for JRA03

Oliver KesterI3 EURONS 61Mn trapping and ejection

Measurement cycle:

1. RF on, plasma ignited

2. 61Mn injected into the ECR

3. RF is kept on for a time that can be varied (0s, 800ms…)

4. Ejection of the ions as a pulse

0.71s

5.98m

1.65hFrom TOI, R.B. Firestone

Gamma spectrum, 800ms trapping, 61Mn12+ and 61Fe12+ extracted

FeMn

Fe FeMn

Fe Fe Fe

Energy (keV)

cnts

Page 9: Plan for the extension of 12 month for JRA03

Oliver KesterI3 EURONS Emittance measurements ECRIS

Two 1+ and two n+ identical emittancemeters are setup in the beamLine of LPSC and are working RMS emittances absolute (20 kV*q)

Xplane: 84Kr15+ Y plane: 84Kr15+ Xplane: 84Kr1+ Y plane: 84Kr1+

norm. ~0.015 mm mrad norm ~0.06 mm mrad