8
IN THE KINGDOM OF CAMBODIA JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) TITLE SCALE DATE DRAWING NO. MINISTRY OF PUBLIC WORKS AND TRANSPOT PLAN (3) & (4) 1:2000 PLAN (3) PLAN (4) THE PROJECT FOR CONSTRUCTION OF NEAK LOEUNG BRIDGE

PLAN (3) - JICA

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PLAN (3) - JICA

IN THE KINGDOM OF CAMBODIA

JAPAN INTERNATIONALCOOPERATION AGENCY (JICA)

TITLE SCALE DATE DRAWING NO.MINISTRY OF PUBLIC WORKS

AND TRANSPOT PLAN (3) & (4) 1:2000

PLAN (3)

PLAN (4)

THE PROJECT FOR CONSTRUCTION OF NEAK LOEUNG BRIDGE

Page 2: PLAN (3) - JICA

IN THE KINGDOM OF CAMBODIA

JAPAN INTERNATIONALCOOPERATION AGENCY (JICA)

TITLE SCALE DATE DRAWING NO.MINISTRY OF PUBLIC WORKS

AND TRANSPOT PLAN (5) & (6) 1:2000

PLAN (5)

PLAN (6)

THE PROJECT FOR CONSTRUCTION OF NEAK LOEUNG BRIDGE

Page 3: PLAN (3) - JICA

IN THE KINGDOM OF CAMBODIA

JAPAN INTERNATIONALCOOPERATION AGENCY (JICA)

TITLE SCALE DATE DRAWING NO.MINISTRY OF PUBLIC WORKS

AND TRANSPOT PLAN (7) & (8) 1:2000

PLAN (7)

PLAN (8)

THE PROJECT FOR CONSTRUCTION OF NEAK LOEUNG BRIDGE

Page 4: PLAN (3) - JICA

Sta.0+

755.0

22, C

ross

ingwith

Ex.W3

Planne

d Road,

EL=

Sta.0+

836.3

00, C

ross

ingwith

W3

HWL=7.93

Planne

d Road,

EL=9.4

24

Sta.0+

240.8

40, In

terse

ction with

W1&

2

EL=3.0

0

Sta.0+

373,

BoxCulv

ertB2.0

xH2.0

HWL=7.93

THE PROJECT FOR CONSTRUCTION OF NEAK LOEUNG BRIDGE

IN THE KINGDOM OF CAMBODIA

JAPAN INTERNATIONALCOOPERATION AGENCY (JICA)

TITLE SCALE DATE DRAWING NO.MINISTRY OF PUBLIC WORKS

AND TRANSPOT PROFILE - MAIN (1)V 1:400

H 1:2,000

Page 5: PLAN (3) - JICA

-15

-20

-10

LWL=0.43

HWL=7.93

Navigation Clearance

Navigation Clearance

IN THE KINGDOM OF CAMBODIA

JAPAN INTERNATIONALCOOPERATION AGENCY (JICA)

TITLE SCALE DATE DRAWING NO.MINISTRY OF PUBLIC WORKS

AND TRANSPOT PROFILE - MAIN (2)V 1:400

H 1:2,000

THE PROJECT FOR CONSTRUCTION OF NEAK LOEUNG BRIDGE

Page 6: PLAN (3) - JICA

HWL=7.93

LWL=0.43

HWL=7.93

Sta.2+

498.2

81, In

terse

ction with

NR-11

-15

-20

-10

HWL=8.36

Navigation Clearance

Navigation Clearance

IN THE KINGDOM OF CAMBODIA

JAPAN INTERNATIONALCOOPERATION AGENCY (JICA)

TITLE SCALE DATE DRAWING NO.MINISTRY OF PUBLIC WORKS

AND TRANSPOT PROFILE - MAIN (3)V 1:400

H 1:2,000

THE PROJECT FOR CONSTRUCTION OF NEAK LOEUNG BRIDGE

Page 7: PLAN (3) - JICA

HWL=8.36

EL=2.0

3

Sta.3+

377,

BoxCulv

ertB6.5

xH6.7

HWL=8.36

IN THE KINGDOM OF CAMBODIA

JAPAN INTERNATIONALCOOPERATION AGENCY (JICA)

TITLE SCALE DATE DRAWING NO.MINISTRY OF PUBLIC WORKS

AND TRANSPOT PROFILE - MAIN (4)V 1:400

H 1:2,000

THE PROJECT FOR CONSTRUCTION OF NEAK LOEUNG BRIDGE

Page 8: PLAN (3) - JICA

EL=2.0

0

Sta.4+

410,

BoxCulv

ertB6.5

xH6.7

Existin

g Road, S

ta.4+

436.5

19,

Sta.4+

436.5

00, B

oxCulv

ertB6.0

xH3.6

EL=2.7

0

Sta.4+

692

EL=5.1

00

EL=2.1Sta.

4+86

1,Box

Culvert

B6.5xH

6.7

Planne

d Road,

EL=9.9

959

Sta.5+

198.9

50, In

terse

ction

withE1

IN THE KINGDOM OF CAMBODIA

JAPAN INTERNATIONALCOOPERATION AGENCY (JICA)

TITLE SCALE DATE DRAWING NO.MINISTRY OF PUBLIC WORKS

AND TRANSPOT PROFILE - MAIN (5)V 1:400

H 1:2,000