Click here to load reader
Upload
christopher-irvine
View
219
Download
0
Embed Size (px)
Citation preview
8/9/2019 Piping Solutions - Non Welded
http://slidepdf.com/reader/full/piping-solutions-non-welded 1/6
Complete Piping Solutions Featuring the Parange ® F37 Non-Welded System
8/9/2019 Piping Solutions - Non Welded
http://slidepdf.com/reader/full/piping-solutions-non-welded 2/6
Robust technology is the foundation ofParker CPS. Parflange F37 non-weldedpiping systems utilize standard SAE Code61/62, ISO 6162 and ISO 6164 flange inter-faces. Parflange F37 is fully complemented with Parker’s fabrication equipment and abroad range of interconnect components, valves, clamps and seamless tubes.
Parker’s Parflange F37 product rangeincludes certified components capable ofproviding non-welded piping systems up
to 273 mm with wall thicknesses to 25 mm(10" x 1").
The Parflange F37 system utilizes two coreconnection technologies to achieve leak-free non-welded connections: F37 Flareand F37 Retaining Ring. The Flare Flangeproduces a smooth, clean, high-strengthflared tube end that is fitted with a softsealed tube insert. For higher-pressuresystems, Parker’s F37 Retaining Ring Flangesystem utilizes a retaining ring for flangeretention along with a highly engineered
seal carrier for leak-free performance. Forlow-pressure applications, Parker offersan F37 RR Light Duty series retaining ringflange system specifically designed for weight and space savings, while providingcomparable non-welded piping systemadvantages.
Parflange ® F37 Non-Welded Flange System Reduces Total Installed Piping System Cost
• Reduces dependency uponwelding piping up to 273 mm/10"
• Heat code traceable components (HCT )• Reduces system flushing time dueto inherently clean piping with noweld-induced contaminants
• Minimizes concerns of stresscorrosion cracking of weld joints
• Chrome-6 free carbon steelproducts for corrosion protection
• Full range of accessories (seamlesstube, clamps, adapters, flange
components) required for a morecomplete non-welded system
• Compliant with SAE/ISO 6162-1/2and ISO 6164 dimensions andflange patterns
• DNV and ABS type approvedsystem
Key F37 Features and Advantages:
Non-Welded Technology
Flare Flange
Retaining Ring
Light Duty
Why Non-WeldedPiping and Prefabricated
Assemblies from Parker:
A comparison of three approachesto a 2" – 4" piping system:
Welded System• Welds: 6• Elbow Fittings: 2• Welding Fabrication Time: High• System Flushing Time: High• Flow Characteristics: Abrupt• Total Installed Cost: High
Parange F37 System
• Welds: 0• Block Elbow Fitting: 1• Swept Elbow Fitting: 1• Welding Fabrication Time: N/A • System Flushing Time: Low• Flow Characteristics: Moderate• Installation Time: Lower• Total Installed Cost: Moderate
Parker CPS System withCold Bent 90• Welds: 0• Elbow Fittings: 0• Cold bends: 2• Welding Fabrication Time: N/A• System Flushing Time: Low• Flow Characteristics: Best• Installed Time: Lowest• Total Installed Cost: Lowest
Summary: Parker’s Parange F37System reduces installed cost by reducingwelding and fabrication time. Since noweld contaminants are introduced to the
system, ushing time can be dramatically reduced as well. Combining this with ParkerCPS center’s cold bending capabilities,
additional improvements in installation time and ow characteristics are evident.
8/9/2019 Piping Solutions - Non Welded
http://slidepdf.com/reader/full/piping-solutions-non-welded 3/6
Complete Piping Solutions (CPS )
Moving the technology forward
Parker is the worldwide leaderin tube fitting and adaptertechnology. Numerous connectorinnovations and advancementsare attributed to our engineeringand customer-centric collabora-tions. Our Parflange® F37 systemis the proven alternative to time-consuming and costly welding, and we continue to expand this productrange to solve new customerchallenges.
The Gulf Coast facility in Houston, Texas, is one of ve Parker CPS
centers located worldwide.
More than a superiorcomponent supplier, Parker is
positioned globally as a system partner for non-welded piping systems. We have combined
the innovative Parflange F37 non-welded piping system with
a broad array of piping services in Parker’s Complete Piping
Solutions (CPS). For industries ranging from energy and
mining to metals processing,testing systems and more,
Parker CPS tailors piping solutions to maximize our
customers’ profitability.
The complete services advantage
By coupling the best non-welded pipingsystem with a complete engineeredpiping services package, CPS offersincomparable assurance, efficiency and value for our customers. Our ParflangeF37 technology is supported withengineering consultation , design ,state-of-the art piping fabrication facilities and on-site installation. Currently, Parker operates five CPScenters located worldwide withadditional centers opening soon.
Parker’s CPS team is on the jobsite providing the necessary expertisethroughout the entire piping project.
Application Specic Piping Solutions
Some projects may require signi cant consultation and design services, while others mayonly need prefabricated pipe assemblies from a customer supplied print. Customers havethe ability to choose from the breadth of services provided through the Parker CPS center –whether this is prefabricated piping assemblies delivered to the jobsite, on-site pipingfabrication or a more turnkey approach including installation.
8/9/2019 Piping Solutions - Non Welded
http://slidepdf.com/reader/full/piping-solutions-non-welded 4/6
Consultation and Design
Consultation and DesignThe Parker CPS team of engineersoffers expert consultation and
design services.
During consultation, thecustomer’s project requirementsare reviewed with the CPSengineering team to determinethe best-suited services. Technicaland commercial requirements are
reviewed. Line sizing, clampingrequirements, routing, andenvironmental and safety
concerns are considered duringthis early stage, as well as earlycommercial options.
Parker’s CPS team providesa tailored proposal to matchthe customer’s technical andcommercial requirements whether the project is a lineexpansion, retrofit of existingpiping system or for OEMpiping assemblies. This keycollaborative planning providesa solid foundation for subsequentdesign work, as well as forfabrication of piping assembliesat a CPS center or on site.
As the project enters thedesign stage, Parker’s engineer-to-engineer collaboration withthe customer ensures that alltechnical requirements are met.
Depending on the scope of work,piping assemblies are designedeither on the jobsite or at
the CPS center. Our pipingdesigners are experts in on-sitemeasurement/surveying,development or modificationof detailed piping drawings,and steadfast review of customertechnical specifications andapplicable standards.
The hull of this offshore service vessel (left) incorporates hydraulic control lines with SAE/ISO 6162 FlareFlange system while the larger plumbing on the hydraulic winch system (right) relies on ISO 6164 RetainingRing Flange system. Both hydraulic systems utilize Parker’s Par ange F37 non-welded technology. ParkerCPS center fabricated and delivered these piping assemblies to the customer, saving days of on-site fabrication.
A Parker CPS engineer designspiping assemblies either on the
jobsite or at the CPS center.
A Parker CPS engineer discussesthe framework of the pipingproject on site.
8/9/2019 Piping Solutions - Non Welded
http://slidepdf.com/reader/full/piping-solutions-non-welded 5/6
Prefabricated Assembliesand InstallationsParker’s CPS team migratesthe upfront piping engineeringto factory prefabricated pipeassemblies with severalinstallation options.
With state-of-the-art CNC large- andsmall-capacity bending equipment,as well as all complementary pipeend finishing equipment, the CPSteam expertly manufactures prefabricated piping assemblies.
By using cold drawn seamlesstubes, the non-welded ParflangeF37 system is inherently cleanerthan welded piping systems,providing the benefit of reducedsystem flushing time. The CPScenter employs Parker filtration andcondition monitoring technologiesto bring piping cleanliness todocumented customer require-ments. On-site leak-proof testingservices can also be specified.
Parker delivers fabricated pipeassemblies to the worksite. Thesepipe assemblies will be protected,labeled and ready for installationby the customer or Parker.
With the largest CNC cold bendingcapabilities in the industry, Parker’sCPS team specializes in the factoryfabrication of pre-bent pipingassemblies. These assembliesreduce much of the on-site designand fabrication and allow for themost efficient installation on the jobsite. When the project doesnot allow for prefabrication ofassemblies, Parker’s CPS techni-cians dispatch these capabilitiesto the job.
Parker is fully engaged in the on-siteinstallation of piping assemblies. A Parker CPS project manager leadsthe team of trained installers tomaximize installation throughputand quality of installation work.Parker’s lead role in overseeing theproject from start to finish, and inensuring that the installed piping
system meets all requirements,instills a high degree of customerconfidence.
The on-site piping installationservice also enables quick reactionto unforeseen project obstaclesor design changes. Costly projectdelays and downtime aredramatically minimized.
Parker provides best-in-class non-welded piping systems.Whether the scope of the
project requires the complete redesign of a welded piping system or the fabrication anddelivery of a pre-engineered
non-welded piping assembly,Parker CPS will engineer
a solution to maximizecustomer value.
The Parker Tracking System (PTS ) is employed to provide traceabilitythroughout the pipe assembly’slife cycle.
CPS Houston has invested in
large-diameter CNC cold bendingtechnology providing the cleanestand quickest-to-install prefabricatedpiping assemblies in the business.
Parker’s CPS centers maintaina high-level of seamless tube,flange components, clamps and
accessory components for pipeassembly fabrication and tosupport installation.
Prefabricated Assemblies and Installation
8/9/2019 Piping Solutions - Non Welded
http://slidepdf.com/reader/full/piping-solutions-non-welded 6/6
© 2011 Parker Hannin Corporation 4300 CPS 5/2011Parange is a registered trademark of Parker Hannin Corporation.
Parker Hannin CorporationTube Fittings Division3885 Gateway Blvd.Columbus, OH 43228phone 614 279 7070fax 614 279 7868e-mail [email protected]
Your complete source forquality tube ttings, hose& hose ttings, brass &composite ttings, quick-disconnect couplings, valvesand assembly tools, locallyavailable from a worldwidenetwork of authorizeddistributors.
Fittings: Available in inch and metricsizes covering SAE, BSP,DIN, GAZ, JIS and ISO threadcongurations, manufacturedfrom steel, stainless steel,brass, aluminum, nylon andthermoplastic.
Hose, Tubing and Bundles: Available in a wide variety ofsizes and materials includingrubber, wire-reinforced,thermoplastic, hybrid andcustom compounds.
Worldwide Availability:
Parker operates FluidConnectors manufacturinglocations and sales ofcesthroughout North America,South America, Europe and
Asia-Pacic.
For information, call toll free...
1-800-C-PARKER(1-800-272-7537)
Parker Fluid Connectors GroupNorth American Divisions & Distribution Service Centers
North American Divisions
Energy Products DivisionStafford, TXphone 281 566 4500fax 281 530 5353
Fluid System ConnectorsDivisionOtsego, MIphone 269 694 9411fax 269 694 4614
Hose Products DivisionWickliffe, OHphone 440 943 5700fax 440 943 3129
Industrial Hose DivisionStrongsville, OHphone 440 268 2120fax 440 268 2230
Parex DivisionRavenna, OHphone 330 296 2871fax 330 296 8433
Quick Coupling DivisionMinneapolis, MNphone 763 544 7781fax 763 544 3418
Tube Fittings DivisionColumbus, OHphone 614 279 7070fax 614 279 7685
Distribution Service Centers
Buena Park, CA phone 714 522 8840fax 714 994 1183
Conyers, GA phone 770 929 0330fax 770 929 0230
Lakeville, MNphone 952 469 5000fax 952 469 5729
Louisville, KY phone 502 937 1322fax 502 937 4180
Portland, ORphone 503 283 1020fax 503 283 2201
Toledo, OHphone 419 878 7000fax 419 878 7001fax 419 878 7420
(FCG Kit Operations)
CanadaGrimsby, ONTphone 905 945 2274fax 905 945 3945(Contact Grimsby for otherService Center locations.)