Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
This program is registered with AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product.
Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation.
American Institute of Architects
Continuing Education Credit
Copyright© 2017 by RWDI. All rights reserved.
Boise Library! At Bown Crossing is a cutting-edge endeavor to implement the new LEED v4 BD+C rating system. Green Building Services invites you to explore the building design concepts and construction implementation, regarding both design and LEED in an in-depth case study analysis.
Abstract
Course Information
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
The project team chose to implement LEED v4 before the registration deadline was established, resulting in a truly pioneering effort to certify before most projects considered taking the plunge. This choice was a collaborative decision between the design team, construction team, and key stakeholders.
Abstract [continued]
Course Information
Copyright© 2017 by RWDI. All rights reserved.
In this course, lessons learned from this project pursuing LEED v4 BD+C: New Construction Silver Certification are analyzed to provide current and future project teams with best practices for implementing the new rating system effectively and efficiently.
Abstract [continued]
Course Information
Copyright© 2017 by RWDI. All rights reserved.
1. Identify challenges project team faced when pursuing Low-emitting materials credit
2. Examine how required Integrative Process credit effected the pre-design, design, and construction phases
Learning Objectives
Course Information
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
3. List Building Product Disclosure and Optimization credits that the project team chose to pursue during construction phase kick-off meeting
4. Apply best practice strategies identified in this course to future project(s)
Learning Objectives
Course Information
Copyright© 2017 by RWDI. All rights reserved.
ERIN LAUER
PRESENTER
AIA, LEED AP BD+C
Consultant
Copyright© 2017 by RWDI. All rights reserved.
Agenda
Module 1: Laying the Groundwork• Significant Changes in LEED v4
Module 2: The Bown Library!• Project Overview
• LEED v4 Financial Analysis
Module 3: The Bown Library! As a LEED v4 Case Study
• Pre-Design Phase
• Design Phase
Module 4: Construction Phase• Construction Phase
• Review: Lessons Learned, Summary
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
Laying the Groundwork
Copyright© 2017 by RWDI. All rights reserved.
Significant Changes in LEED v4
Copyright© 2017 by RWDI. All rights reserved.
Integrative Process Location & Transportation
Sustainable Sites
Indoor Environmental Quality
Water Efficiency Energy & Atmosphere
Materials & Resources Innovation Regional Priority
LEED v4
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
Integrative Process Location & Transportation
Sustainable Sites
Indoor Environmental Quality
Water Efficiency Energy & Atmosphere
Materials & Resources Innovation Regional Priority
LEED v4
Copyright© 2017 by RWDI. All rights reserved.
Integrative Process Location & Transportation
Sustainable Sites
Indoor Environmental Quality
Water Efficiency Energy & Atmosphere
Materials & Resources Innovation Regional Priority
LEED v4
Copyright© 2017 by RWDI. All rights reserved.
LEED FORHomes
LEED Homes: Single Family LEED Homes: Lowrise MultifamilyLEED Homes: Multifamily Midrise
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
Copyright© 2017 by RWDI. All rights reserved.
The Bown Library!
Copyright© 2017 by RWDI. All rights reserved.
Project Overview
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
Project Overview
Copyright© 2017 by RWDI. All rights reserved.
Project Overview
Copyright© 2017 by RWDI. All rights reserved.
Bown Library!Boise, Idaho
Rendering by FFA Architecture and InteriorsCopyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
Bown Library!
Design Goals:
Provide a sense of place
Motivate community participation
Provide a universally inspiring facility
Accommodate communication, collaboration, and self-service
Boise, Idaho
Provide spaces for active use and quiet contemplation
Provide for flexibility
Reflect the neighborhood’s history and environment
Build sustainably
Copyright© 2017 by RWDI. All rights reserved.Rendering by FFA Architecture and Interiors
Access and views
Design Concept Development
Project Overview
Copyright© 2017 by RWDI. All rights reserved.
Functional organization
Design Concept Development
Project Overview
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
History and materials
Design Concept Development
Project Overview
Copyright© 2017 by RWDI. All rights reserved.
Context and form
Design Concept Development
Project Overview
Copyright© 2017 by RWDI. All rights reserved.
Riparian environment
Design Concept Development
Project Overview
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
Graphic by FFA Architecture and Interiors
Copyright© 2017 by RWDI. All rights reserved.
Rendering by FFA Architecture and Interiors
Copyright© 2017 by RWDI. All rights reserved.
Rendering by Jensen Belts Associates
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
Plantings
v4 Case Study Highlights
Project Overview
Copyright© 2017 by RWDI. All rights reserved.
Drainage
v4 Case Study Highlights
Project Overview
Copyright© 2017 by RWDI. All rights reserved.
Accessories
v4 Case Study Highlights
Project Overview
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
Hardscape
v4 Case Study Highlights
Project Overview
Copyright© 2017 by RWDI. All rights reserved.
Rendering by FFA Architecture and Interiors
Copyright© 2017 by RWDI. All rights reserved.
Bown Library!Boise, Idaho
Rendering by FFA Architecture and InteriorsCopyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
Rendering by FFA Architecture and InteriorsCopyright© 2017 by RWDI. All rights reserved.
LEED v4 Financial Analysis
Copyright© 2017 by RWDI. All rights reserved.
Key Considerations
LEED v4 Financial Analysis
LEED v3 LEED v4
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
LEED v4 Financial Analysis
Soft Costs Hard CostsVS
Copyright© 2017 by RWDI. All rights reserved.
LEED v4 Financial Analysis
Value
Copyright© 2017 by RWDI. All rights reserved.
LEED v4 Financial Analysis
Message
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
LEED v4 Financial Analysis
Rating System
Copyright© 2017 by RWDI. All rights reserved.
LEED v4 Financial Analysis
Timing +
Project Impacts
Copyright© 2017 by RWDI. All rights reserved.
LEED v4 Financial Analysis
Study Team
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
Option Additional Measures Incremental Capital Notes
Baseline v3 Gold Baseline $0
Boise Green Code: IgCC Baseline $0
v3 Platinum + $340,000 Geo-exchange and PV array
v4 Certified Similar to Baseline
v4 Silver + $100,000 This is the goal for the project
v4 Gold + $340,000 Geo-exchange and PV array
v4 Platinum Did not investigate
Net Zero Did not investigate
Bown Library! Financial Analysis
LEED v4 Financial Analysis
Copyright© 2017 by RWDI. All rights reserved.
Environmental Ethic
LEED v4 Financial Analysis
LEED v4 Silver
Copyright© 2017 by RWDI. All rights reserved.
The Bown Library! As a LEED v4 Case Study
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
Pre-Design Phase
Copyright© 2017 by RWDI. All rights reserved.
Copyright© 2017 by RWDI. All rights reserved.
Integrative Process
Pre-Design Phase
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
Simple box energy model
Water analysis
OPR and BOD
Integrative Process
Pre-Design Phase
Copyright© 2017 by RWDI. All rights reserved.
Simple box energy model
Water analysis
OPR and BOD
Integrative Process
Pre-Design Phase
Copyright© 2017 by RWDI. All rights reserved.
Design Phase
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
30 percent more energy is expended by commuting office workers than is consumed by the building itself!
For an average office building in the United States…
Location & Transportation
Copyright© 2017 by RWDI. All rights reserved.
LEED v3 LEED v4
Sustainable Sites
Location and Transportation
Design Phase
SSc1: Site Selection
SSc2: Development Density and Connectivity
Copyright© 2017 by RWDI. All rights reserved.
LEED v3 LEED v4
Sustainable Sites Location and Transportation
Location and Transportation
Design Phase
LT: LEED for Neighborhood Development
LT: Surrounding Density and Diverse Uses
SSc1: Site Selection
SSc2: Development Density and Connectivity
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
Diverse Uses
• 4 – 7 diverse uses located within ½ mile of the project’s entry (1 point)
• 8 or more diverse uses located within ½ mile of the project’s entry (1 point)
1-5 points total
Surrounding Density and Diverse Uses
Design Phase
Copyright© 2017 by RWDI. All rights reserved.
Shortest Path Analysis
Design Phase
Use TypeDistance (miles)
1 Bicycle Shop 0.1
2 Elementary School
0.2
3 Medical Clinic
0.1
4 Salon 0.1
5 Restaurant 0.01
Copyright© 2017 by RWDI. All rights reserved.
Diverse Uses
• Daycares
• Parks
• Salons
• Medical offices
• Places of worship
• Exercise facilities
• Laundry mats
Shortest Path Analysis
Design Phase
• Restaurants• Commercial retail spaces• Etc. Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
Energy & Atmosphere
Buildings accounted for 72 percent of total U.S. electricity consumption in 2006 and this number will rise to 75% by 2025.
Copyright© 2017 by RWDI. All rights reserved.
Significant Changes
Reference standard• Updated ASHRAE standard, lower LEED threshold
Renewable energy = more stringent
New Cx options
Energy & Atmosphere
Design Phase
Copyright© 2017 by RWDI. All rights reserved.
LEED v3 LEED v4
New Prerequisites and Credits
Energy & Atmosphere
Design Phase
EA Prerequisite: Building-Level Energy Metering
EA: Demand Response
EA: Advanced Energy Metering
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
Materials & Resources
Building-related construction and demolition debris totals approximately 160 million tons per year, accounting for nearly 26 percent of total non-industrial waste generation in the U.S.
Copyright© 2017 by RWDI. All rights reserved.
LEED v3 LEED v4
Materials & Resources
Design Phase
MRc3: Material Reuse
MRc4: Recycled Content
MRc5: Regional Materials
MRc6: Rapidly Renewable Materials
MRc7: Certified Wood
Copyright© 2017 by RWDI. All rights reserved.
LEED v3 LEED v4
New BPDO Credits
Materials & Resources
Design Phase
MRc3: Material Reuse
MRc4: Recycled Content
MRc5: Regional Materials
MRc6: Rapidly Renewable Materials
MRc7: Certified Wood
MR: BPDO: Environmental Product Declaration
MR: BPDO: Sourcing of Raw Materials
MR: BPDO: Material Ingredients
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
Materials and Resources credits now include MEP!
Mechanical, Electrical, Plumbing
Design Phase
Copyright© 2017 by RWDI. All rights reserved.
Sufficiently research products!
• MR BPDO: Environmental Product Declarations (EPD’s)
• MR BPDO: Health Product Declarations (HPD’s)
Specifications
Design Phase
Copyright© 2017 by RWDI. All rights reserved.
Indoor Environmental Quality
Americans spend 90% of our time indoors.
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
LEED v3 LEED v4
Indoor Environmental Quality
Design Phase
IEQc4.2: Paints & Coatings
IEQc4.3: Flooring Systems
IEQc4.4: Composite Wood
IEQc4.5: Furniture & Furnishings
IEQc4.6: Ceilings & Wall Systems
IEQc4.1: Adhesives & Sealants
LEED v4 ID+C
Copyright© 2017 by RWDI. All rights reserved.
LEED v3 LEED v4
Indoor Environmental Quality
Design Phase
IEQc4.2: Paints & Coatings
IEQc4.3: Flooring Systems
IEQc4.4: Composite Wood
IEQc4.5: Furniture & Furnishings
IEQc4.6: Ceilings & Wall Systems
IEQc4.1: Adhesives & Sealants
EQ Credit: Low Emitting Materials
Copyright© 2017 by RWDI. All rights reserved.
EQ Low-Emitting Materials
Design Phase
Category Threshold Emissions and Content Requirements
Paints & Coatings 90% emissions by volume and 100% VOC content
General Emissions EvaluationVOC Content requirements
Adhesives and Sealants 90% emissions by volume and 100% VOC content
General Emissions EvaluationVOC Content requirements
Flooring 100% emissions General Emissions Evaluation
Composite Wood 100% emissions Composite Wood Evaluation
Ceilings, Walls, thermal and acoustic insulation
100% emissions General Emissions Evaluation
Furniture (if in scope) 90% emissions by cost Furniture Evaluation
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
EQ Low-Emitting Materials
Design Phase
Copyright© 2017 by RWDI. All rights reserved.
EQ Low-Emitting Materials
Design Phase
Copyright© 2017 by RWDI. All rights reserved.
Emissions evaluations
EQ Low-Emitting Materials
Design Phase
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
LT Surrounding Density and Diverse Uses
Don’t Make Assumptions
Design Phase
Copyright© 2017 by RWDI. All rights reserved.
LT Green Vehicles
Don’t Make Assumptions
Design Phase
Copyright© 2017 by RWDI. All rights reserved.
SS Site Development –Protect and Restore Habitat
Don’t Make Assumptions
Design Phase
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
EQ – Daylight
Spatial daylight autonomy (SDA)
(without blinds in operation)
Is 85.6%• … of all regularly occupied area is at
or above 300 Lux for at least 50% of the occupied hours of the year.
Don’t Make Assumptions
Design Phase
Copyright© 2017 by RWDI. All rights reserved.
EQ – Daylight
Spatial daylight autonomy (SDA)
(without blinds in operation)
• 55% SDA for 2 points
• 75% SDA for 3 points
• ASE must be 10% or less
Don’t Make Assumptions
Design Phase
Copyright© 2017 by RWDI. All rights reserved.
EQ – Daylight
At September 21, 9:00 AM
• 56.7% between 300 Lux and 3000 Lux
• 75% required for 1 point
• 90% required for 2 points
Don’t Make Assumptions
Design Phase
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
EQ – Views
Non-regularly occupied area
Regularly occupied area w/o view
Regularly occupied area w/o view where more than 75% of the space has a view
Don’t Make Assumptions
Design Phase
Copyright© 2017 by RWDI. All rights reserved.
CHOOSE ONE
A. As the crow flies
B. Vehicle pathway analysis
C. Pedestrian walkways
D. Shortest Path Analysis
Copyright© 2017 by RWDI. All rights reserved.
What term is used to define measuring a safe accessible and comfortable distance from the project entry to diverse uses, transit stations, or a bicycle network?
Location and Transportation
ANSWERCHOOSE ONE
A. As the crow flies
B. Vehicle pathway analysis
C. Pedestrian walkways
D. Shortest Path Analysis
Copyright© 2017 by RWDI. All rights reserved.
What term is used to define measuring a safe accessible and comfortable distance from the project entry to diverse uses, transit stations, or a bicycle network?
Location and Transportation
D
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
CHOOSE ONE
A. 10
B. 8
C. 4
D. 2
Copyright© 2017 by RWDI. All rights reserved.
How many diverse uses must be located within ½ mile of the project entry in order to receive 1 point?
Location and Transportation
ANSWERCHOOSE ONE
A. 10
B. 8
C. 4
D. 2
Copyright© 2017 by RWDI. All rights reserved.
How many diverse uses must be located within ½ mile of the project entry in order to receive 1 point?
Location and Transportation
C
CHOOSE ONE
A. True
B. False
Copyright© 2017 by RWDI. All rights reserved.
True or False: Mechanical, electrical and plumbing [MEP] products are included in the Materials and Resources Building Product Declaration and Optimization (BPDO) credits?
Materials & Resources
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
ANSWERCHOOSE ONE
A. True
B. False
Copyright© 2017 by RWDI. All rights reserved.
True or False: Mechanical, electrical and plumbing [MEP] products are included in the Materials and Resources Building Product Declaration and Optimization (BPDO) credits?
Materials & Resources
A
CHOOSE ONE
A. Low-emitting certificates of compliance
B. Emissions evaluations
C. 3rd party on-site verifications
D. Health Product Declaration or HPD
Copyright© 2017 by RWDI. All rights reserved.
For EQ credit Low-Emitting Materials, the requirement for low-emitting materials includes Total VOC content and which one of the following?
Indoor Environmental Quality
ANSWERCHOOSE ONE
A. Low-emitting certificates of compliance
B. Emissions evaluations
C. 3rd party on-site verifications
D. Health Product Declaration or HPD
Copyright© 2017 by RWDI. All rights reserved.
For EQ credit Low-Emitting Materials, the requirement for low-emitting materials includes Total VOC content and which one of the following?
Indoor Environmental Quality
B
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
Construction Phase
Copyright© 2017 by RWDI. All rights reserved.
What credits will be pursued and how including:
• Which option?
• Which path?
Calculators • Supply contractor with all
calculators
• Construction Waste Management (CWM)
Construction Kickoff
Construction Phase
Copyright© 2017 by RWDI. All rights reserved.
MR BPDO EPD• Option 1: 20 different products from 5 different manufacturers
MR BPDO Sourcing of Raw Materials• Option 2: Leadership Extraction Practices
Construction Kickoff
Construction Phase
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
MR BPDO Material Ingredients• Option 1: HPDs 20 different products from 5 different
manufacturers
IEQ Low-Emitting Materials: Path and allowable certificates• Provide TVOC + General Emissions Evaluations
• Identify the categories being achieved
Construction Kickoff
Construction Phase
Copyright© 2017 by RWDI. All rights reserved.
Obtain EPD and HPD for:• Each concrete mix
• Each steel submittal
EPD’s and HPD’s
Construction Phase
Copyright© 2017 by RWDI. All rights reserved.
No tobacco products are permitted
EQ Tobacco Smoke Control and EQ Construction Indoor Air Quality Management Plan
Construction Phase
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
Emissions evaluations = increased LEED submittal reviews for contractor
EQ Low-emitting Materials
Construction Phase
Copyright© 2017 by RWDI. All rights reserved.
Timeline: February in Boise
• Flush-out (pre-occupancy)
vs
• IAQ testing
EQ Indoor Air Quality Assessment
Construction Phase
Copyright© 2017 by RWDI. All rights reserved.
Requires a 5-year commitment
EA Green Power
Construction Phase
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
O+M pilot credits
Innovation
Construction Phase
Copyright© 2017 by RWDI. All rights reserved.
Green Cleaning Policy
Innovation
Construction Phase
Copyright© 2017 by RWDI. All rights reserved.
Green Building Education
Innovation
Construction Phase
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
Integrated Pest Management
Innovation
Construction Phase
Copyright© 2017 by RWDI. All rights reserved.
Lamps – Purchasing Policy
Innovation
Construction Phase
Copyright© 2017 by RWDI. All rights reserved.
WE - Outdoor Water Use Reduction
SS - Rainwater Management
EA - Green Power & Carbon Offsets
SS - Site Assessment
WE - Cooling Tower Water Use
LT - Reduced Parking Footprint
Regional Priority Credits
Construction Phase
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
CHOOSE ONE
A. True
B. False
True or False: Tobacco smoke is allowed on the project site during construction but not during operations.
Indoor Environmental Quality
Copyright© 2017 by RWDI. All rights reserved.
ANSWERCHOOSE ONE
A. True
B. False
True or False: Tobacco smoke is allowed on the project site during construction but not during operations.
Indoor Environmental Quality
B
Copyright© 2017 by RWDI. All rights reserved.
CHOOSE ONE
A. 2
B. 3
C. 4
D. 5
In order to receive the EA credit Green Power and Carbon Offsets, a Green-e certified renewable energy certificate (REC) must be purchased for a minimum of how many years?
Energy and Atmosphere
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
ANSWERCHOOSE ONE
A. 2
B. 3
C. 4
D. 5
In order to receive the EA credit Green Power and Carbon Offsets, a Green-e certified renewable energy certificate (REC) must be purchased for a minimum of how many years?
Energy and Atmosphere
D
Copyright© 2017 by RWDI. All rights reserved.
Review: Lessons Learned
Copyright© 2017 by RWDI. All rights reserved.
• Increased design time and fees
• Integrated design process
• Specifications
• LEED construction kickoff meeting
• Submittal process
Bown Library! LEED v4 Case Study
Lessons Learned
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
Agenda
Module 1: Laying the Groundwork• Significant Changes in LEED v4
Module 2: The Bown Library!• Project Overview
• LEED v4 Financial Analysis
Module 3: The Bown Library! As a LEED v4 Case Study
• Pre-Design Phase
• Design Phase
Module 4: Construction Phase• Construction Phase
• Review: Lessons Learned, Summary
Copyright© 2017 by RWDI. All rights reserved.
ERIN LAUER
THANK YOU!
AIA, LEED AP BD+C
Consultant
Copyright© 2017 by RWDI. All rights reserved.
LOOKING FOR MORE?
Copyright© 2017 by RWDI. All rights reserved.
Pioneering LEED v4The Bown Library! Case Study
Copyright© 2017 by RWDI. All rights reserved.
RWDI.COM KNOWLEDGE LEARNING LAB Copyright© 2017 by RWDI. All rights reserved.
Copyright© 2017 by RWDI. All rights reserved.