Tim Maeckelberghe Pile Setup - The gain of pile capacity: A numerical study Academic year 2015-2016 Faculty of Engineering and Architecture Chair: Prof. dr. ir. Peter Troch Department of Civil Engineering Master of Science in Civil Engineering Master's dissertation submitted in order to obtain the academic degree of de Santa Catarina) Counsellor: Prof. Alysson Rodrigo Marques Gomes de Assis (Universidade de Federal Federal de Santa Catarina) Supervisors: Prof. dr. ir. Hans De Backer, Prof. Patricia Faria (Universidade de

Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

Tim Maeckelberghe

Pile Setup - The gain of pile capacity: A numerical study

Academic year 2015-2016Faculty of Engineering and ArchitectureChair: Prof. dr. ir. Peter TrochDepartment of Civil Engineering

Master of Science in Civil EngineeringMaster's dissertation submitted in order to obtain the academic degree of

de Santa Catarina)Counsellor: Prof. Alysson Rodrigo Marques Gomes de Assis (Universidade de Federal

Federal de Santa Catarina)Supervisors: Prof. dr. ir. Hans De Backer, Prof. Patricia Faria (Universidade de

Page 2: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

ii

Page 3: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

iii

The setup effect: Numerical approach to determine the soil state after

pile installation

Tim MAECKELBERGHE

Supervisor guest university: dr. ir. P. Faria

ir. A. De Assis

Supervisor home university: H. De Backer

UGent - Universidade Federal de Santa Catarina

Master of science in Civil Engineering

Faculty of Engineering and Architecture

Department of Civil Engineering

Year 2016

Page 4: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

Preface

It should be noted that the work got of slowly due to modelling difficulties. The early models

were build in the Plaxis Classic version, which has an extremely slow interface. Confusion

and wrong conclusions were the consequence of inequalities in results obtained with this older

version and other numerical software or versions. Finally the Plaxis 2015 version was applied

to produce the results presented in this study. The fact that the numerical modelling software

runs through to a VPN connection didn't improve the workability of the project either.

Before the start of the work I would also like to use this chapter to thank some people for their

contribution and support.

Firstly I would like to thank, from the guest university, ir. Alysson De Assis for the guidance

of the work and the time that he has put into the work. For the support and the questions.

Following I would like to thank dr. ir. Patricia Faria for the supervision of the work.

From the home university I would like to thank prof. dr. Hans De Backer, who is willing to

review this work after completion, and Ir. Hamzeh Ahmadi who helped me out with Plaxis

uncertainties and who provided the initial steps to that made working in the Plaxis 2015

version.

Finally I also want to thank mrs. Ann Vanoutryve who made this exchange possible. Without

her I wouldn't have had the opportunity to contribute to this educational, social and self

enriching experience.

Tim Maeckelberghe

Florianópolis, july 2016

Page 5: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

ii

Abstract

The bearing capacity of a pile foundations increases after installation due to the changes in

soil state, this phenomena is referred to as set up. Various empirical formulas are developed to

address the set up effect, however still a lot of uncertainties are presented in the outcomes of

the prediction model. The implementation of a larger safety factor will however counteract

the gain in capacity due to soil setup. This study applies numerical modelling to get more

insight in the behaviour of a cohesive soil after pile installation. An axisymmetric, Mohr

Coulomb model is built up in Plaxis and validated with the results from a study conducted in

Abaqus. The model simulates the stresses and excess pressures after pile installation with the

cavity expansion theory. The consolidation theory allows a dissipation of excess pressures

which lead to the increase in effective stress, this increase in stress contributes to the setup

effect. The gain in setup results in a gain in pile capacity, a method is proposed to simulate the

pile shaft capacity. Experimentally reported results allows a comparison of the outcome.

Finally a modulation methodology attempts to model the total bearing capacity of a case

study.

Keywords: Soil setup, Numerical modelling, Model influence, Pile installation, Bearing

capacity, Cavity expansion.

Page 6: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

iii

Content

Preface ................................................................................................................................... i

Abstract ................................................................................................................................. ii

Content ................................................................................................................................. iii

List of figures ....................................................................................................................... vi

List of tables ....................................................................................................................... viii

Introduction .......................................................................................................................... ix

State of the art ........................................................................................................................1

1 Introduction .................................................................................................................1

2 Pile design ...................................................................................................................1

2.1 Pile design methods ..............................................................................................1

2.2 Criticism ...............................................................................................................2

3 Pile setup .....................................................................................................................2

3.1 Mechanisms ..........................................................................................................2

3.2 Pore pressure dissipation .......................................................................................3

4 Pile load test ................................................................................................................5

5 Estimating pile setup: empirical relationships ...............................................................6

5.1 Skov and Denver's formula ...................................................................................6

5.2 Practical application ..............................................................................................7

Research .................................................................................................................................8

1 Introduction .................................................................................................................8

2 Soil pressure ................................................................................................................8

2.1 Strain Path method ................................................................................................8

2.2 Cavity expansion theory ........................................................................................9

3 Soil pressure analytical analysis ................................................................................. 11

3.1 Analytical analysis .............................................................................................. 11

Page 7: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

iv

3.2 Basic model ........................................................................................................ 13

3.2.1 Model characteristics ....................................................................................... 13

3.2.2 Model built up & validation............................................................................. 14

4 Numerical analysis ..................................................................................................... 17

4.1 Introduction ........................................................................................................ 17

4.2 Case study .......................................................................................................... 17

4.3 Model alterations ................................................................................................ 18

4.3.1 Expansion radii ............................................................................................... 18

4.3.2 Model length ................................................................................................... 20

4.3.3 Shear strength .................................................................................................. 21

4.3.4 Boundary conditions........................................................................................ 23

4.3.5 Interface .......................................................................................................... 23

4.3.6 Mesh ............................................................................................................... 24

4.4 Modulation ......................................................................................................... 24

4.5 Initial stress......................................................................................................... 25

4.6 Results ................................................................................................................ 27

4.6.1 Introduction ..................................................................................................... 27

4.6.2 Verification of model length and expansion radius .......................................... 27

4.6.3 Displacement................................................................................................... 28

4.6.4 Plastic failure .................................................................................................. 29

4.6.5 Pore pressures ................................................................................................. 31

4.6.6 Effective soil stresses ...................................................................................... 34

4.6.7 Total soil stress................................................................................................ 37

5 Soil water dissipation ................................................................................................. 38

5.1 Parameters .......................................................................................................... 38

5.2 Results ................................................................................................................ 39

Page 8: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

v

5.2.1 Pore pressure ................................................................................................... 39

5.2.2 Effective stress ................................................................................................ 41

6 Pile shaft capacity ...................................................................................................... 42

6.1 Introduction ........................................................................................................ 42

6.2 Modelling approach ............................................................................................ 42

6.3 Results ................................................................................................................ 43

7 Case study ................................................................................................................. 44

7.1 Introduction ........................................................................................................ 44

7.2 Model approach .................................................................................................. 44

7.3 Model input ........................................................................................................ 45

7.4 Model output ...................................................................................................... 46

7.4.1 Model (4.3) ..................................................................................................... 46

7.4.2 Extended model ............................................................................................... 49

8 Comments and future work ........................................................................................ 50

Conclusion ........................................................................................................................... 52

References ............................................................................................................................ 54

Page 9: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

vi

List of figures

Figure 1: Different phases during pore pressure dissipation (Komurka et al., 2003). ...............3

Figure 2: Difference pile load tests (Bezuijen A., 2015). .........................................................5

Figure 3: Cavity expansion theory (Brinkgreve et al., 2008) ................................................. 10

Figure 4: Reproduction of radial stress in function of radii, according to (Kok Shien Ng.,

2013). ................................................................................................................................... 12

Figure 5: Basic model lay-out ............................................................................................... 14

Figure 6: Validation of the model, plastic radius ................................................................... 15

Figure 7: Cavity expansion pressure ..................................................................................... 16

Figure 8: Relationship between cavity radius and pile radius (Kok Shien Ng., 2013) ............ 18

Figure 9: Influence of the initial radius (Kok Shien Ng, 2013) .............................................. 20

Figure 10: The influence of the correction layer (Kok Shien Ng., 2013) ................................ 21

Figure 11: Shear strength distribution - model ...................................................................... 22

Figure 12: The model as is applied in Plaxis ......................................................................... 23

Figure 13: Mesh ................................................................................................................... 24

Figure 14: Vertical initial stresses ......................................................................................... 25

Figure 15: Determination of K0 (Hadded et al., 2013) ........................................................... 26

Figure 16: Horizontal initial stresses ..................................................................................... 27

Figure 17: Radial effective stress - according to the rules of the basic model ........................ 28

Figure 18: Soil heap.............................................................................................................. 29

Figure 19: Displacement vectors ........................................................................................... 29

Figure 20: Plastic point ......................................................................................................... 30

Figure 21: Inaccurate points .................................................................................................. 31

Figure 22: Excess pore pressure after pile installation ........................................................... 31

Figure 23: Pore pressure distrubtion H = 3 m ........................................................................ 32

Figure 24: Normalised pore pressure .................................................................................... 33

Page 10: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

vii

Figure 25: Excess pore water pressure - Y - axis: height; X - axis: length ............................. 34

Figure 26: Effective stress increase after pile installation ...................................................... 35

Figure 27: Effective radial stress after pile installation .......................................................... 36

Figure 28: Effective stress after driving (Haddad et al., 2012) - Y - axis: height; X - axis:

length ................................................................................................................................... 36

Figure 29: Total radial stress ................................................................................................. 37

Figure 30: Comparison of the total stress between numerical and analytical.......................... 37

Figure 31: Excess pore water pressure distribution after 33 days (Haddad et al., 2012) ......... 39

Figure 32: Development of excess pore water pressure with time ......................................... 40

Figure 33: Pore pressure distribution after 95% dissipation of excess pore pressure .............. 40

Figure 34: Effective stress after 33 days - left Plaxis; right (Haddad et al., 2012) .................. 41

Figure 35: Increase in effective stress after consolidation, h = 4,6 m. .................................... 41

Figure 36: Increase in pile shaft capacity (Haddad et al., 2012) ............................................. 42

Figure 37: Vertical force displacement curve ........................................................................ 43

Figure 38: Soil strata ............................................................................................................ 44

Figure 39: Trendline of soil elasticity, black - soil test; blue - linear approximation ............. 45

Figure 40: Plastic radius ....................................................................................................... 47

Figure 41: Case study: Increase in effective stress - left, excess pore pressure - right ............ 47

Figure 42: Case study after 1 day: increase in effective stress - left, excess pore pressure -

right ...................................................................................................................................... 48

Figure 43: Case study after 31 days: increase in effective stress - left, excess pore pressure -

right ...................................................................................................................................... 48

Figure 44: Radial effective stress after cavity expansion - new model ................................... 49

Figure 45: Pile failure surface (Bezuijen A., 2014) ............................................................... 50

Page 11: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

viii

List of tables

Table 1: Factors dominating pore pressure rate .......................................................................4

Table 2: Input of the case study (Konrad, J. M. & Roy, M., 1987). ...................................... 17

Table 3: Soil model dimensions and cavity radii ................................................................... 19

Table 4: Increase in pile shaft capacity ................................................................................. 43

Table 5: Project data - pile information (De Assis A., 2016) ................................................. 44

Table 6: Cavity expansion parameters................................................................................... 46

Page 12: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

ix

Introduction Problem statement

Although applications of setup predictions with good results are available, a lot of scatter is

still present in the results. Large tolerances need to be accepted during prediction.

Accumulation of uncertainties in the choice, application and results of the pile loading tests

till uncertainties in the applied prediction model are the cause of it. To take these uncertainties

into account a factor is implemented to insert a degree of safety in the predicted outcomes.

This will on their turn counteract the estimated gain of capacity due to setup.

(Komurka et al., 2003) suggested that future work concerning setup should perform large

scale tests to collect data from the subsurface on, to deep into the soil layers. The collection of

future data expanded with current data could lead to new correlations in setup predicting

formulas. Data must be collected with similar in-situ test equipment to make a comparison

possible. (Komurka et al., 2003) concluded that the SPT-Torque test resulted in a better field

test method to predict soil setup.

To get around the costly price tag associated with the gathering of new data, a numerical

analysis can be performed with a minimal of required data. A numerical study can lead to

deeper insides in the behaviour of the soil during setup and to the ability to predict the setup

phenomenon.

Objective and methodology

Rather few publications are available concerning the numerical analysis of the setup

phenomenon of pile foundations. (Haddad et al., 2012) created a model in Abaqus to simulate

the cavity expansion developed during pile driving and corresponding generation of excess

pore water pressure. The evaluation of the setup effects are made possible. The model was

validated using the results of a driven pile in cohesive strata. The study made a distinguish

possible between the effective stress-dependent and independent factors influencing setup.

The goal of this study is to investigate the influences of the model on the study outcomes. The

development of a model to predict the soil state after pile driving and after soil setup. This

concerns a proposal of a method to approach the prediction of pile capacity before and after

setup. The modelling software Plaxis is applied to perform the analysis.

Page 13: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

x

The setup phenomenon is a sequence of two individual processes: the pile installation can be

seen as the first process, while the second process can be seen as the consolidation of the

disturbed soil.

Overview

After this introduction, a selective literature review is presented concerning setup evaluations

and predictions. No attention was paid in this part to the already conducted numerical studies.

The methodology of some of the numerical studies are briefly explained throughout the work.

The research work starts with an appropriate chose of the soil pressure theory. The analytical

analysis according to the theory is reported, which allows an analytical verification.

Continuous the work is treated numerically. It is firstly composed of a simplified expansion

model which is been built and validated as a modelling start. Subsequently the real model

built up is discussed. The initial stresses are generated and the consecutive soil state of the

model after the cavity expansion is examined. The change in soil stress after a consolidation

analyses is reviewed. The outcomes of the model are regularly compared with the outcomes

of the Abaqus model. Afterwards a method to investigate the value of the shaft capacity is

introduced, this makes the comparison with an experimental case study possible.

Finally, a method to approach the bearing capacity is explained. This is tested on a case study,

however it should be noted that, due to a lack of time, this study didn't result in the required

outcomes. Too few parameters were also given to properly conduct the analysis.

At the end of the work a conclusion together with a prevision of future work is implemented.

Page 14: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical
Page 15: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

State of the art

1 Introduction

A pile foundation is a relatively long and slender structural foundation type which transfers

the loads from the superstructure to deeper located soil layers. It is used when soil conditions

are unsuitable for shallow foundations.

A pile is driven into the ground which leads to disturbance and displacement of the soil. After

driving, the remoulded soil will recover from the disturbance, which often leads to an increase

in capacity of the pile. This time dependent increase in capacity is referred to as pile setup.

Pile setup can lead to a significant increase in bearing capacity of the pile. Relaxation of the

soil is the opposite effect, a loss in bearing capacity in time. Relaxation is more seldom to

occur [(Komuraka et al., 2003); (Axelsson G., 2000)]. A precise estimation of the final

bearing capacity after pile setup or relaxation can economize pile production, leading to a

safer design and ultimately to tremendous cost savings for large projects.

2 Pile design

2.1 Pile design methods

In general, pile designs are based on local and empirical practices which calculate the ultimate

bearing capacity and apply a reduction factor allowing a certain level of safety in the design.

The ultimate bearing capacity of a pile is divided in the ultimate base resistance and the limit

shaft resistance. The capacity is obtained by respectively multiplying the base and shaft

resistance by the area of pile base and the area of the shaft layer. The shaft resistance depends

on the successive soil layers.

Two major empirical approaches can be found in the calculation of pile design: the soil

property based and the in-situ test based design. The soil property based design requires an

estimation of the effective stresses in the field which can be found by conducting a laboratory

or several in-situ tests. The in-situ test based design directly relates the in-situ obtained

parameters to the resistance. This is done by SPT or CPT tests (Kim et al., 2009).

Page 16: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

2

2.2 Criticism

Current pile design methods have some drawbacks. (Dias T. G. S., 2015) states that the

calculation processes are often simplified to homogeneous soil layers. All the design

approaches depend on local interpretations of a certain model describing a simplified version

of reality. The pile resistance will only be mobilized through a certain amount of

displacements, which is not directly incorporated in the calculation methodologies. The

current pile design method should be applied with care. (Dias T. G. S., 2015) proposed an

alternative framework for pile analysis which relates the relative displacements to the

mobilized forces. These forces can only be mobilized up to their corresponding resistance

which, when summed together leads to the ultimate bearing capacity. After the maximum

resistance is reached, settlements will occur.

A better understanding of the consequences of pile setup leads to a more accurate prediction

of the final bearing capacity. Which on their turn can lead to a more accurate model

applicable for pile design.

3 Pile setup

The installation process of driven piles results into soil displacement and soil disturbance.

After installation the soil will recover which varies the pile capacity. It has been recognized

that the pile capacity of driven piles increases with time in most soils, including clay, loose to

dense silt, sandy silt, silty sand and fine sand (Attar I. H. & Fakharian K., 2013). Results have

shown an increase in capacity with a factor 4 to 5 times the initial pile bearing capacity after a

period of 100 days.

3.1 Mechanisms

Earlier researches have clarified the responsible mechanisms for pile setup. The mechanisms

are generally understood but still poorly quantified. They are summarized as:

1. The dissipation of excess pore water pressure after driving. The displacement of the

soil during driving will lead to an increase of lateral effective stress. Depending on the

permeability coefficients of the soils this increase in stress will result in an increase of

excess pore water pressure.

Page 17: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

3

2. A time-dependent change in soil properties at a constant effective stress, referred to as

soil aging. The changes in behaviour is attributable to micro-structural rearrangements

of the sand grains and their contact in time. This is assumed to be a less-dominating

factor of soil setup (Chow et al., 1998).

3. Variations in the arching phenomenon, which is more likely to occur in sand as is

described later.

Setup effects are more defined in cohesive soils. Due to the dissipation of excess pore

pressure being the dominant factor affecting soils setup, results of soil setup are more

pronounced in cohesive soils.

3.2 Pore pressure dissipation

According to (Kormurka et al., 2003) pore pressure dissipates in three stages, Figure 1:

1. Nonlinear dissipation of pore pressure with respect to the log of time for some time

after driving;

2. Linear dissipation of pore pressure with respect to the log of time;

3. After dissipation of excess pore pressure additional setup may occur at constant stress

due to aging.

Figure 1: Different phases during pore pressure dissipation (Komurka et al., 2003).

Page 18: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

4

Two general factors dominate both the nonlinear and linear excess pore pressure rate, see

Table 1.

Table 1: Factors dominating pore pressure rate

The duration of the dissipation largely depends on the soil type. In clay or in mixtures of clay,

silt and fine sand, excessive pressure dissipate slowly. Some setup occurs during the nonlinear

logarithmic dissipation, while the most occurs during the linear dissipation. The nonlinear

logarithmic dissipation can continue for several hours, days or weeks in fine grained granular

soils, while the linear dissipation takes several weeks or months. The setup due to aging is

relatively small in these soils.

Pile setup for a pile installed in sand is mainly described to arching mechanisms. Arching, in

the case of axially loaded piles, means that load is not transferred along the shaft only through

simple shear but also by compression near the pile base. (Chow et al., 1998) quote that sand

creep weakens the arching mechanisms surrounding the pile shaft. It increases the horizontal

effective stress while also producing dilatation effects. (Axelsson, 1998) on the other hand

suggested that the arching effect deteriorates within time due to stress relaxation. Another

reason is that soil aging causes reorientation of particles leading to interlock. The setup effect

in non-cohesive soils can therefore briefly be explained by the soil particles interlocking and

stress relaxation which occurs after pile driving. In more coarse grained soils, dissipation

occurs rather fast. The excess pore pressure dissipation of the coarser grained soils are also

different: almost no nonlinear logarithmic dissipation is present, the linear dissipation is

present but only to a smaller extend, aging will therefore mostly determine the behaviour of

pile setup in sandy soils.

The two pile related factors affecting pore pressure dissipation are: pile type and thickness.

Setup has reported for all driven pile types, however studies indicated that displacement piles

show greater setup than small displacement piles. The more the soil is displaced, the more

setup will occur. The thickness determines the setup according to: the larger the pile diameter,

the more time needed for lateral consolidation leading to a decrease in time rate of setup.

(Long et al., 1999). Another factor influencing the pile setup was the number of piles driven

Soil

• Soil type

• Permeability

• Sensitivity

Pile

• Type

• Size

Page 19: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

5

around the tested pile. The more piles driven around the tested pile, the higher the setup factor

will be (Attar I. H. & Fakharian K., 2013).

The pile shaft is more exposed to the soil particles than the pile tip, more water can dissipate

around the shaft than the tip. A larger number of soil particles can be rearranged after driving

and influence a larger increase in effective stress after water dissipation. The shaft resistance

is therefore more variable to the setup phenomenon than the tip resistance. When the

resistance of the shaft and pile can be measured individually, the main focus of the setup

examination is located on the shaft. Proposed empirical relationships predicting the gain in

capacity, as presented later, are often only applied to predict the setup of the shaft resistance

(Attar I. H, Fakharian K., 2013).

4 Pile load test

There are 3 types of loading tests: static test, statnamic tests and dynamic loading test. They

differ in the way the load is applied. To test a pile a significant amount of weight is required

to reach the prescribed settlement linked to failure of bearing capacity. This can be referred as

the static test. Other tests differ the acceleration at which the load is applied. Depending on

the loading time a difference can be made between dynamic tests and statnamic test, see

Figure 2. A dynamic test is comparable with a drive of a pile, while the statnamic test relies

on a loading time longer than the time that a wave needs to propagate to the pile. However

some throwbacks accompany these dynamic method: due to the short loading time the load is

not constant during application and shock waves are generated in the pile. A back calculation

method relying on the wave energy propagating during the dynamic hit is applied to calculate

the capacity, this can also lead to erroneous results. Better results are therefore obtained with

the static test. Although these disadvantages, dynamic test are mostly used due to their short

duration of application and their cost effectiveness (Bezuijen A., 2015).

Figure 2: Difference pile load tests (Bezuijen A., 2015).

Page 20: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

6

Pile setup is examined by investigating the bearing capacity of a pile at different moments

after driving. This demonstrates the grow in capacity of the pile. Due to the high costs and

waiting time, static tests are seldom been executed. However examining setup with static tests

implies various practical weaknesses. A static test needs a ballast frame, a certain time is

needed to build up this frame, this initial time is crucial for the setup phenomenon. A

difference also needs to be made between a bottom-loaded and a top-loaded static test. A

bottom-loaded test which fails in shaft resistance will lead to the most accurate results of

examining the shaft capacity on different moments after driving (Komurka et al., 2003).

Various research concerning setup is based on a few static test and multiple dynamic tests.

Different results are obtained from these tests conducted at equivalent soil conditions (Attar I.

H. & Fakharian K., 2013). Due to the scarcity of accurate data, research relies on these data to

examine the effect of setup. Different formulas to predict setup are based on regression fitting

of the scattered data.

5 Estimating pile setup: empirical relationships

Several empirical formulas are been proposed by different authors (Huang 1988; Svinkin,

1996; Guang-Yu, 1988; Skov & Denver, 1988; Svinkin & Skov, 2000). Each of them are

based on a thought-through regression fit of personal measurements of bearing capacities. The

bearing capacity at the end of driving is compared with the bearing capacity after a certain

time, this is plot in a graph and the trend line bets fitting the results can predict the setup of

piles in similar soil conditions. A disadvantage of this technique is that several in-situ tests are

needed to examine the soil deposit on a construction site and several load bearing tests are

needed to make an estimation possible of the total capacity of the other piles for a certain soil

deposit. The number of tests makes the prediction of setup costly and only beneficial for large

projects.

5.1 Skov and Denver's formula

A literature review conducted by (Komurka et al., 2003) revealed that the most popular

applied approach is the one proposed by (Skov R. & Denver H., 1988). Their empirical

logarithmic relationship describes setup as:

Page 21: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

7

The variables are described by:

: the axial capacity at time t after driving A: a constant depending on the soil type

: the axial capacity after time t0 t0: an empirical value measured in days

The variable A needs to be determined out of the measured pile capacities. The variable t0

corresponds to time at which the rate of excess pore water pressure dissipation becomes linear

with respect to the log of time. Therefore A and t0 will dependent on the soil type and pile size

(Bullock, 1999). Different researches suggested different intervals for A and t0 ranging from

0,01 to 2 days for t0 and 0,2 to 0,8 for the constant A (Lee et al., 2010). Both variables are

independent of each other, however alternating the value of t0 will result in a different value

of A.

Various researches have been conducted to find Skov and Denver's variables for different soil

types. The values led to a broad interval depending on the soil type. The variable t0 can be

chosen, it will affect the magnitude of the other variables, which is one of the causes of the

broad interval. On the other hand, these intervals allow preliminary estimations of the soil

setup for research studies. Various studies made use of earlier calculated variables to make a

thoughtful estimation of t0, to result in a comparable result of A.

5.2 Practical application

(Attar I. H, Fakharian K., 2013) examined the differences in measurements from static and

dynamic loading tests performed at the test site. From the results of approximately 15 piles, it

is noticed that SLT tests resulted in larger values than DLT ones. Both load tests were

executed at the same time, before the pile setup completely was finished. Due to the duration

of the static test, the soil had more time to recover before the pile reached the required

settlements corresponding to failure. To compensate for the difference in test times, the skin

friction of the DLT was predicted using the Skov and Denver regression formula from the

DLT measurements. The total bearing resistance is divided in shaft and toe resistance. Taking

into account the gain in shaft resistance due to setup for the time interval between the DLT

and static test, resulted in a bearing capacity of the DLT which only differs 8% from bearing

capacity of the SLT. This result is much more acceptable in comparison to the initial results

which have a difference of 32%. This proves that results from both tests can lead to similar

results, if they are interpreted with care. Also the reliability of the Skov and Denver formula is

justified.

Page 22: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

8

Research

1 Introduction

The setup phenomenon is a sequence of two individual processes. The pile installation can be

seen as the first process. Soil displacement takes place which leads to a disturbance of the soil

particles and to an increase in soil pressures. Various theories exist, describing the soil

displacement during pile driving as accurate as possible. The second process can be seen as

the consolidation of the disturbed soil. This process can be presented by the consolidation

theory.

2 Soil pressure

During pile installation, pore pressures change as a result of two components. First, an

increase in pore water pressures in the soil around the pile occurs due to the increase in total

mean stress when the pile is forced into the ground. Second, shearing and remoulding of the

soil can cause an increase or decrease in the shear-induced pore pressure. This behaviour

depends on the contracting or dilating tendency of the soil during shearing. Contracting is

more likely to occur leading to an increase in pore water pressures. After the generation of the

excess pore water pressures, the consolidation phase begins (Haddad et al., 2012).

Two methods are most often applied to calculate the soil pressures after pile driving, without

performing a dynamical analysis: the cavity expansion theory and the strain path method.

Both methods however neglect the contribution of shearing to the stress during pile

installation.

2.1 Strain Path method

The Strain Path Method (SPM) provides a framework for predicting pile foundation

behaviour and approaches deep geotechnical problems in a consistent and rational manner. It

visualizes the strain patterns produced in a soil mass by an indenting object. The key

conceptual assumption of the SPM is that the deformation and strain fields caused during the

penetration processes are strongly kinematically constrained, which is most likely in

undrained penetration of clays, and can be estimated independently from the actual

constitutive properties of the surrounding soil (Gill D. R. & Lehane B. M., 2000). The

deformations and strains are independent of the shearing resistance of the soil

Page 23: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

9

(Baligh M., 1985). SPM treats the soil as a viscous fluid, which results in one of the weakness

of SPM which is the fact that sandy soils cannot be modelled (Komurka et al., 2003).

The estimation of the effective stresses after driving need to be calculated in three sequential

steps: the strain fields induced in the soil around the pile need to be estimated, the effective

stress paths for these soil particles need to be determinated and finally the equilibrated

effective stresses and pore pressures at the end of pile installation can be achieved (Haddad et

al., 2012).

2.2 Cavity expansion theory

The displacement of soil during pile installation can be described by the cylindrical cavity

expansion theory. The cavity expansion theory formulates the cavity expansion during

installation taking into account the different stress-strain behaviour of the soil, finite or

infinite boundaries, zero or non-zero initial radii, loading and unloading condition and large

strain and small strain relationship between cavity pressure and displacement. The theory is

based on four fundamental equations: conservation of mass, quasi-static equilibrium, the yield

condition and the elastic or plastic flow rule. This theory allows to predict the increase in

horizontal stress and pore pressure in the soil.

A purely claly soil is assumed to calculate the pressures with the cavity expansion theory.

This assumption is commonly done because the theory lacks applicability in other soils. An

elastic perfectly plastic stress strain behaviour can describe a claly soil behaviour (Randolph

et al., 1979). An undrained cavity expansion theory as is described by Gibson and Anderson's

(Gibson R. E. & Anderson W. F., 1961) formulates the soil as: a zone of soil near the cavity

expansion which turns into a plastic state and a zone beyond which remains in an elastic state,

see Figure 3. The soil is characterised by a Young's modulus, Poisson ratio and an undrained

shear strength.

Page 24: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

10

Figure 3: Cavity expansion theory (Brinkgreve et al., 2008)

Since the Cavity Expansion Methods is based on conditions of radial symmetry, it restrict the

dependence of field variables to the radial coordinate only (Baligh M., 1985). Although the

Cavity Expansion Theory assumes purely claly soils, recent studies (Salgado R. & Prezzi M.,

2006) extend the CEM framework for cone penetration tests until sandy soils, taking into

account the dilatancy behaviour. Due to the numerous applications of the CEM, which reflects

the applicability of the theory, the CEM will be applied to further calculate the pressures in

the soil after driving.

However lately, attempts are been made to extend the cavity expansion theory from clay to

different soils. (Salgado R. & Prezzi M., 2007) proposed a cavity expansion theory for the

calculation of cone penetration resistance in sand soils. Through the application of linear

equivalent values of Young's modulus, Poisson's ratio and friction and dilatancy angles for the

sand soil, the linear elastic, perfectly plastic soil response which is normally used in the cavity

expansion theory can still be applied. Charts are proposed which gives the equivalent values

as a function of the relative density, stress state, and critical-state friction angle.

Page 25: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

11

3 Soil pressure analytical analysis

The cavity expansion method is used to calculate the soil pressures after pile driving. The

CEM will be calculated with a simplified analytical method and modelled by the use of a

finite element method. The software packet Plaxis is used to perform the numerical analysis.

The analytical analysis is described first.

3.1 Analytical analysis

The cavity expansion theory was first well described by (Randolph et al., 1979). The soil

displacement process is midway between the displacement process associated with the

expansion of a spherical cavity and those associated with the expansion of cylindrical cavity.

Relying on earlier performed research about soil displacement of a cone, Carter and Worth

stated that it is reasonable to expect that the stress changes in the soil, over much of the length

of the pile shaft, will be similar to those produced by the expansion of a cylindrical cavity,

ignoring the residual shear stresses on the interface between the pile and soil.

By formulating the stress equality on the boundary of the plastic and elastic zone a

dependency of the plastic and the initial radii to the shear strength and stiffness can be found

(Bezuijen A., 2015), the stress changes around the pile can be described by basic parameters.

The stress changes will dependent on the OCR ratio of the soil. However defining the shear

modulus G dependent on the OCR ratio, the excess pore pressures and stress changes become

relative insensitive to differing OCR (Randolph et al., 1979).

With the assumptions the pore pressures and stresses can be described for an elastic perfectly

plastic material by adopting Gibson and Anderson's theory on undrained cavity expansion.

The soil is characterised with a Young's modulus, Poisson ratio and an undrained shear

strength, which is the case for pure clay [(Haddad et al., 2012) & (Randolph et al., 1979)].

Page 26: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

12

Randoplh & Worth give another solution which made use of the interpretation of pressure

meter tests in estimating the stress changes within the plastic zone after the undrained cavity

expansion for pile driving in clay (Randolph M. & Wroth C., 1979).

The parameters are:

Radial stress [kN/m²] Undrained shear strenght [kN/m²]

Shear modulus [kN/m²] Plastic radius [m]

Final cavity radius [m] : Distance to borehole [m]

Excess pore water pressure [kN/m²]

Both formulas will lead to the same result, the latter avoids calculations of the plastic radius

and is therefore more application friendly, it is however only valid within the plastic zone.

The result of a case study on a stone column to 'validate' the formulas is shown in Figure 4,

the same graph can be noticed in the article (Kok Shien Ng., 2013).

Figure 4: Reproduction of radial stress in function of radii, according to (Kok Shien Ng., 2013).

0

10

20

30

40

50

60

70

0 2 4 6 8 10

σr [k

N/m

²]

r/r0

Stress after cavity expansion

Wroth 1979

Gibson and Anderson

Page 27: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

13

3.2 Basic model

The Plaxis software is applied to model the cavity expansion theory. A model is created

which calculate the stresses after expansion. Before the model can be built up, a basic model

needs to be validated. For the validation and the build up of this basic model the methodology

of the articles (Kok Shien Ng., 2013; Brinkgreve et al., 2008) are used as a reference.

3.2.1 Model characteristics

The soil is modelled using a Mohr-Coulomb model. The linear elastic perfectly-plastic model

is a first order model that includes only a limited number of features that soil behaviour show

in reality. It is however an often applied simplification in numerical studies leading to

satisfying results. The advantage of this model in Plaxis is that the increase of stiffness with

depth can be taken into account. In general it can be said that the effective stress state at

failure are quite well described using the Mohr-Coulomb failure criterion with a zero friction

angle and a cohesion set to cu for undrained materials. However the model does not

automatically include the increase of shear strength with consolidation

(Brinkgreve et al., 2008).

In the numerical study a correcting layer needs to be added to the perimeter of the mesh to

simulate an infinite boundary. The solution of the cavity expansion analysis is also based on

an infinite continuum. The properties of the correcting layer are described in (Randolph et al.,

1979). The correcting layer involves an area going from the outer soil boundary until a

distance of two times the length of the outer soil boundary. A good solution is presented by a

correction layer with a parameters: and . The length of the soil model

equals 64 times the initial radius, the edge of the outer boundary layer is located at 128 times

the initial radius.

(Kok Shien Ng., 2013) examined a theoretical case study with and without the correction

layer. The results with and without the layer coincides both very well with the analytical

solution. Kok Shien Ng. stated that the application of the correction layer only leads to a

negligible gain in precision, justifying omission of the layer.

Page 28: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

14

3.2.2 Model built up & validation

The model consists of a cylindrical cavity of an initial radius a0 = 0,5 m which is expanded to

a radius a = 2,0 m by a prescribed displacement force. The soil assumed to be incompressible

with a friction angle equal to zero and a cohesion cu = 10,0 kN/m². The model is considered as

axisymmetric, with a mesh refinement near the cavity. Top and bottom were fixed vertically

while the right boundary was fixed horizontally. The ratio of shear modulus to cohesion was

chosen to be and Poisson's ratio . The initial stress is taken as zero. No

increase in stiffness with depth is taken into account in the basic model.

An undrained analysis was carried out. In Plaxis it is modelled as an undrained type B

analysis: an undrained effective stress analysis with effective stress stiffness and undrained

strength parameters. The undrained shear strength is an input parameter.

Figure 5: Basic model lay-out

(Brinkgreve et al., 2008; Kok Shien Ng., 2013) applied a different analytical calculation

method, than the one described here above, to compare the numerical model with an

analytical solution. The method, which is still based on the cavity expansion theory, is

obtained from Sagaseta through personal communication as is described in the source of the

theory. The theory describes a small displacement and a large displacement solution. Since

the cavity expansion generates large strains, it is necessary to conduct the large displacement

solution. To attain a large displacement solution, the mesh will need to be updated in the

model. By doing so, the Lagrangian formulation in the model will be updated.

Page 29: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

15

The pressure limit and the radius of the plastic zone is calculated according to Sagasetas:

With:

: the radius after expansion;

: the initial radius;

The analytical analysis of the plastic radius, as calculated with formulas (3.7) and (3.10),

results in 19,2 m. As can be seen in Figure 6, the plastic radius from the numerical model

results in 19,4 m. The numerical software gives a good solution.

Figure 6: Validation of the model, plastic radius

The pressure needed to expand the cavity from the initial till the final radius is calculated

analytically with the formulas from Sagaseta and numerically. The results from both

calculation methods respond well, as can be seen in Figure 7. A similar graph is obtained in

(Kok Shien Ng., 2013).

Page 30: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

16

Figure 7: Cavity expansion pressure

0

1

2

3

4

5

6

0 0,5 1 1,5 2 2,5 3 3,5

p/c

u

r/r0

Cavity expansion pressure

Numerical

Analytical

Page 31: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

17

4 Numerical analysis

4.1 Introduction

The case study is based on (Haddad et al., 2012). This paper modelled the setup phenomenon

of a pile foundation by the application of Abaqus, the paper describes furthermore a

comparison with the instrumented data and the outcome of the model. Performing the analysis

in Plaxis allows a comparison from the results obtained with Abaqus and Plaxis to the

outcomes of an instrumented case. Again the pile installation process is simplified to an

expansion problem, the effects of pile shaft penetration are not considered.

4.2 Case study

(Haddad et al., 2012) based his study on a field investigation earlier described by (Konrad, J.

M. & Roy, M., 1987). Here a close toe steel pipe pile of 219 mm thick is driven 7,6 m into the

soil on a site located west of Quebec city, Canada. The soil profile is mainly described as soft

silty marine clay. An undrained shear strength of the soil is measured by a vane shear test

which resulted in a value of 10 kPa at 2 m depth and 30 kPa at 8 m depth, in between these

values a linear increase is assumed. The input of the analysis is summarized in Table 2. The

pile is assumed to be an elastic isotropic cylindrical pile with radius of 109,5 mm.

Table 2: Input of the case study (Konrad, J. M. & Roy, M., 1987).

Soil 7.6 19 5 0,3 6.10-6

2,5.10-10

10-30 0

Pile 7.6 24 20000 0,2 - - - -

The test performed at location resulted in an ultimate skin friction of the pile measured after 4,

8, 20 and 33 days and 2 years from initial drive of respectively 46, 63, 71, 74,4 and 77 kN. A

static axial load test has been applied during the study. Pore water pressures variations with

time are measured at depths of 3; 4,6 and 6,10 m.

Page 32: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

18

4.3 Model alterations

4.3.1 Expansion radii

A pile installation process creates a cavity starting from an undisturbed soil going till a cavity

equal to the pile diameter, the initial radius therefore equals zero. However a numerical

calculation must begin with a finite cavity radius a0 in order to retain its finite circumference

strain. (Radolph et al., 1979) however stated that assuming an initial finite radius doesn't lead

to inconsistent results. It is suggested that an expansion of the cavity from a0 to 2.a0 can give

adequate approximations in comparison of a soil expansion from a zero radius till a finite

radius of r0. The relationship between a0 and r0 is:

Due to the gap between r0 and 2.a0 the model cannot obtain stress results for the zone in

between both radii. Stresses must be extrapolated for the region between r0 and 2.a0, see

Figure 8.

(Castro J. & Karstunen M., 2010) examined the solutions in Plaxis from a study with a final

radius equal to two times and four times the initial cavity radius. Both solutions gave almost

identical results, verifying that the comments made from elastic-perfectly plastic models are

also applicable to more advanced models as cam-clay types. Another study performed by

(Burd H. J. & Soulsby G. T., 1990) lead to equivalent results.

Figure 8: Relationship between cavity radius and pile radius (Kok Shien Ng., 2013)

Page 33: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

19

The basic model considers a cavity expansion from 0,5 to 2 m, this can correspond to the

expansion of a stone column. The cavity expansion of the pile will have smaller dimensions,

the application of the formula (4.1) allows to calculate the initial and final cavity interface.

Afterwards the length of the soil model and correction layer can be calculated with the rule of

thumb. The dimension can be found in Table 3.

Table 3: Soil model dimensions and cavity radii

Initial cav. int. Pile int. Final cav. int. Soil layer Correct. layer

Length - 1 [m] 0, 0632 0,1095 0,1264 4,046 8,092

Length - 2 [m] 0,02 0,1095 0,11 10 -

The radii corresponds to the minimal radius as calculated with the rule. In the model however,

other values are implemented. An initial value of 0,02 m is assumed which will be expanded

to 0,11 m. Note that the value, which agrees with the final cavity, is taken equal to the pile

radius. As (Castro J. & Karstunen M., 2010) noted in their work, the actual rule is based on

the following formula.

By creating a cavity from 0,02 m up to 0,11 m instead of 0,1113, an

error is introduced of 0,0013 m on the initial pile radius. This range of error can be assumed

as negligible. Also the difference of the cavity along a real pile shaft will be of a higher

magnitude. By taking the value of the final cavity expansion closer to the real pile radius, the

gap in between real and final modelled pile radius, as is visually presented in Figure 8, will be

small. Since the gap in between 0,1095 m and 0,11 m can assumed to be negligible, a final

interpolation can be avoided.

(Kok Shien Ng., 2013) examined the influence of the initial radius in his study by adopting

different initial radii. All of the radii were chosen equal or smaller than the radius calculated

with the rule as described in formula (4.1). The final radius was taken equal to the column

radius, 0,5 m. 3 different initial radii were examined which are respectively: 0,289 m, 0,1 m

and 0,02 m. The result of his study is displayed in Figure 9. It illustrates the negligible

difference in the outcome of the horizontal stress with varying initial radius smaller than the

one calculated according to formula (4.1). For the sake of completeness, the horizontal

Page 34: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

20

stresses corresponding to a cavity expansion with the data of the first and the second row from

Table 3 are presented in respectively Figure 17 and Figure 27.

Figure 9: Influence of the initial radius (Kok Shien Ng, 2013)

The pile installation process of the case study is described as a cavity expansion of the soil

from a zero initial radius up to the pile diameter, 109,5 mm (Haddad et al., 2012). No further

information is available about how the cavity is expanded. Other cavity expansion methods as

for example an expansion with constant stress, applied at the cavity wall, instead of a

prescribed displacement force are also possible (Satibi et al., 2007).

4.3.2 Model length

The model in Abaqus assumes a soil volume surrounding the cavity of a radius of 2 m.

Previously performed Plaxis calculations however took into account a layer with the length of

64 times the initial diameter and a subsequent boundary layer of equal length in the build up

of the model. (Castro et al., 2013) however performed a parametric study to check the desired

width of the model to have a negligible influence of the outer boundary. The parametric study

resulted in a width of 15 m for the cavity expansion of a stone column with an initial radius of

0,1 m till an outer radius of 0,41 m. No boundary layer is assumed in the study by Castro et al

and the width of the modelled soil exceeds the rule of thumb described earlier in formula

(4.1).

(Kok Shien Ng., 2013) also investigated the influence of the correction layer. The study

compared 3 different models with an analytical result as seen in Figure 10. The model with

and without boundary layer resembles well for small cavity expansions, while for larger

cavity expansions it deviates more from the result presented with a boundary layer. However

Page 35: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

21

according to (Kok Shien Ng., 2013), implementing a larger soil layer would results more in a

solution resembling the analytical one for larger cavity expansions. The decision of

implementing a larger cavity expansion, and therefore assuming a smaller initial radius in the

model, will results in a solution which agrees more with the analytical one, as is concluded

out of the results of the work done by (Kok Shien Ng., 2013).

Figure 10: The influence of the correction layer (Kok Shien Ng., 2013)

Since the implementation of a correction layer only leads to a small contribution, it is chosen

to eliminate the correction layer out of the model. Instead the boundary layer of the soil will

be extended. A larger soil volume will however result in a larger calculation time. (Castro et

al., 2013) used a soil width of 15 m in his study. The dimension of the soil in this study is also

taken equal to 15 m. This is still bigger than the 64 times the radius. Since the height and the

extension of the cavity in (Castro et al., 2013) is based on larger values, a reduction of the soil

model will be possible. For the sake of completeness the horizontal stresses are presented for

a cavity expansion corresponding to the first and the second row of Table 3, which

demonstrates the model with an without correction layer, see respectively Figure 17 and

Figure 27.

4.3.3 Shear strength

The increase in shear strength in function of depth can be applied in Plaxis. This is done in the

parameter description with the following expression (Plaxis manual).

Page 36: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

22

As reported by (Konrad J. M. & Roy M., 1987) the undrained shear strength is 10 kPa at 2 m

and 30 kPa at 8 m. In between 2 and 8 m, a linear increase is assumed. No clear description

was presented in the paper concerning the soil in between the surface and a depth of 2 m. In

general, the shear strength of the soil can be expected to increase in depth. Top soil layers can

however often be disturbed and deviate from this rule. Considering a linear increase from the

bottom of the soil to the surface will result in a su - value of 3,33 kPa at the soil surface. To

avoid the appliance of this rather low value at the surface, a constant value of 10 kPa is

considered in the top layer.

The origin of the program coincides with the left corner of the soil model, the soil surface is

located at a height of 7,6 m. The reference level at a depth of 2 m, where the linear increase of

shear strength start, is set to 5,6 m. With the data of the shear strength in a second point,

30 kPa at a depth of 8 m which coincide with - 0,4 m in the model, the increase factor ,

can be calculated. Figure 11 visualises the shear strength distribution in the model.

Figure 11: Shear strength distribution - model

Page 37: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

23

4.3.4 Boundary conditions

The basic model as described in 3.2, considers a cavity expansion of a slice of soil from a soil

layer. The new model describes the behaviour of a complete soil layer, the boundary

conditions will have to be adjusted. The top of the layer equals the soil surface, this is possible

to move freely, no boundary conditions are applied at the top. The other boundary conditions

are to chosen as roller supports. The model with the boundary conditions is presented in

Figure 12.

Figure 12: The model as is applied in Plaxis

The basic model also didn't have a phreatic water level. The water level will be assumed to be

at the top of the soil model. The untreated clay underneath the pile foundation is not

modelled, this is due to the fact that the installation effects underneath the pile are not

particularly significant (Castro J. & Karstunen M., 2010). Furthermore the modulation of the

tip of the pile may lead to some numerical instabilities (Castro et al., 2013).

4.3.5 Interface

An interface element is added to allow proper modelling of the thin zone of intensely shearing

at the area between the cavity and the soil. The virtual thickness of the interface is taken as the

default value of 0,1. This virtual thickness is used to define the amount of elastic deformation

that are generated in the thin zone. Interface elements are supposed to generate very little

elastic deformations - certainly in this case, since the first zone of elements will completely be

plasticized - the virtual thickness should therefore be taken small, however too small values

can lead to numerical ill-conditioning (Plaxis manual).

Page 38: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

24

4.3.6 Mesh

The basic model presumes a linear increase of the elements sizes from the cavity to the

boundary layer. The zone of interest of the analyses will be located close to the cavity

expansion, here a smaller mesh is advised. The size of the elements is limited by the Plaxis

software and however also by the available calculation memory.

Due to the interface element the soil stresses near the cavity will modelled better. A medium

global coarse size mesh will be taken and refined mesh elements are been set close to the

boundary, linearly increasing elements are been applied. The mesh is shown in Figure 13.

4.4 Modulation

As in the basic model, the cavity will be expanded by the application of an internal pressure

enforced as a prescribed displacement loading function. (Kirsch F., 2006) state that a

prescribed displacement superior is to other expansion possibilities due to its numerical

stability. The mesh and the prescribed displacement force - purple - can be seen in Figure 13.

Figure 13: Mesh

No initial stresses were calculated in the initial phase for the basic model. This was done by

setting the total multiplier for the weight material equal to 0. The material weight was

therefore not taken into account. According to the reference manual, the material weight

remains at its default value of 1. In certain situations the factor can be adjusted. The

modulation of simplified soil tests is one of them, here self weight can be disregarded since

the stresses are dominated by external loads rather than material weight (Plaxis manual).

Page 39: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

25

In the new model the material weight factor is used to investigate the pressure only due to

cavity expansion by setting the material weight factor to 0 and the distortion of the initial

pressure field due to cavity expansion by assuming the coefficient 1.

The basic model is based on a cavity expansion of 0,5 m till a radius of 2,0 m. Since this will

lead to large strains, the large displacement method is used to calculate the stresses by

updating the mesh. Different other papers as for example (Satibi et al., 2007) stated that

strains due to pile driving also are classified as large strains. The application of the large strain

technique is therefore also justified in this situation.

4.5 Initial stress

Before the cavity expansion can be performed, the correct initial stresses must be generated.

The initial stresses will be calculated in the initial phase. The result of the initial stresses can

easily analytically be verified. Since the phreatic water level is assumed to be at the top of the

soil layer, the saturated density weight has to be used. The vertical, initial stresses will linear

increase from 0 till the following values:

The initial modelled stresses are shown in Figure 14, it agrees with the analytical results. Note

that due to the sign convention compression stresses are presented by Plaxis with a negative

value.

Figure 14: Vertical initial stresses

Page 40: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

26

The horizontal effective stress, which corresponds with the radial effective stress for a

axisymmetric model, depends on the coefficient of lateral earth pressure, K.

(Hadded et al., 2012) did not directly describe an initial K coefficient in his study. However

from Figure 15 the K0 coefficient could be conducted from the initial stress condition. This

results in a value of .

Figure 15: Determination of K0 (Hadded et al., 2013)

From the resulted K0 value, it can be concluded that the Mohr-Coulomb is used for gravity

loading. Due to gravity loading, a one dimensional compression is applied. The later

coefficient of earth pressure corresponds with the same value as calculated with the following

formula (Plaxis material model manual).

The gravity loading in Plaxis resulted in bit lower initial stresses as is presented in Figure 15.

A displacement with an order of a cm was also noticed. To avoid staggering errors, the initial

stresses are generated with an K0 procedure, with a value K0 = 0,445. The stresses are

displayed in Figure 16.

Page 41: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

27

Figure 16: Horizontal initial stresses

4.6 Results

4.6.1 Introduction

Cavity expansion in fine soils will increase the total stress in the surrounding soil. Due to the

soil structure, the water in between the soil grains is not allowed to dissipate when the load is

applied. Time is needed to dissipate the pore water. It describes the undrained behaviour of

the soil. The water in between the grains will carry the load and excess pore water pressures

are generated. After pore water dissipation the excess pore water pressures decrease and the

effective stress in the soil increase, this increase in effective stress with time will increase the

capacity of the pile and is referred to the setup phenomena in fine graded soils.

Graphs related to the development of forces and displacement of a point can be generated

with the Plaxis output menus. The output of Plaxis however does not allow the generation of

stress curves at a reference level. Data extracted from tables needs to be fitted with Matlab

calculations to make presentable features.

4.6.2 Verification of model length and expansion radius

(Kok Shien Ng., 2013) concluded that the omission of the correction layer as is described in

(Randolph et al., 1979) will lead to similar results as can be achieved without the correction

layer. The same work and the work performed by (Castro J. & Karstunen M., 2010) stated

that a cavity expansion with a radius lower than the one calculated with the formula of (4.1)

will lead to equal models if the ratio of the initial and final cavity can be described by formula

(4.2). For the sake of completeness these conclusions are verified by comparing the radial

effective stresses calculated with both models, see Figure 17 and Figure 27. It should be noted

Page 42: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

28

that the model from Figure 17 is built corresponding to the parameters of the first row in

Table 3.

It can be noticed both figures lead to equivalent stress results. The magnitude of the difference

is low, the difference can therefore be assumed to be negligible. The biggest difference in

stress is notable when the correction layer is omitted and at the same time the soil layer is

extended. Which is also reported in (Kok Shien Ng., 2013). It justifies the model approach

which is further used in the calculations.

Figure 17: Radial effective stress - according to the rules of the basic model

4.6.3 Displacement

The displacement after cavity expansion is displayed in Figure 18. It is notable that the cavity

radius after expansion corresponds with a radius of 0,11 m in the model, which agrees with

the required final radius. Due to the free boundary at the top, soil movement can occur freely.

A soil heap with a height of 0,035 m near to the expanded cavity is formed after cavity

expansion. Furthermore a small increase and a consequent decrease of soil is notable across

the top boundary.

Page 43: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

29

Figure 18: Soil heap

Figure 19 shows the displacement of the soil particles. The layer in the vicinity of the pile will

exhibit a large horizontal displacement, while the section thereafter also exhibits a small

vertical displacement.

Figure 19: Displacement vectors

4.6.4 Plastic failure

(Plaxis manual) describes a failure point as an indication where the stress lies on the surface

of the failure envelope, it also verifies if the size of the mesh is sufficient for calculations. An

insufficient mesh occurs when the zone of plasticity reaches a mesh boundary.

Figure 20 displays the plastic failure points of the model. No failure points are notable close

to the boundary of the soil layer. This proves that the width of the soil model is sufficient for

model calculations.

Page 44: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

30

Figure 20: Plastic point

The plastic radius can be calculated with the formula (3.4), which results in a plastic radius of

for until a depth of and for at a

depth of . From the figure it can be seen that the plastic radius as presented in Plaxis

agrees very well with this results. At the bottom a value of , while at a depth of

a value of are achieved from the calculations. In general an increase in

depth of the plastic radius is noticed, this is due to the increase in undrained shear strength as

can be seen in the formula (3.4).

(Kok Shien Ng., 2013) mentioned that the analytical solution is based on infinite conditions of

the soil model, which takes into account the boundary conditions. He stated that it can be

noted that any solution, based on infinite conditions, may not give good results for soil near to

the top. This can prove the fluctuating plastic radius in the upper layer with a constant

undrained shear strength.

It can be concluded that the plastic radius calculated by Plaxis resembles very well with the

results from the analytical solution.

In the vicinity of the soil heap, the Plaxis model resulted in inaccurate calculations. This is

visualized in Figure 21. The results presented by these nodes will lead to incorrect values,

which needs to ignored in analyses.

Page 45: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

31

Figure 21: Inaccurate points

4.6.5 Pore pressures

Due to the pile installation, the cavity will expand leading to an increase in total stress. The

consistency of clay does not allow immediate pore water dissipation, excess pore water

pressures will be generated. The excess pore water pressures calculated by the model are seen

in Figure 22.

Figure 22: Excess pore pressure after pile installation

Page 46: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

32

A local extreme value of -143 kN/m² is reached at the bottom of the cavity expansion. In

general it can be seen that the excess pore pressure increases with increasing undrained shear

strength with depth. The increase of excess pore pressures with depth has also been measured

in field tests (Castro, J., 2008).

Due to the varying pore water pressure with depth, the pressure needs to be presented at a

certain depth. Figure 23 shows the pore water pressures at a depth of h = 3 m compared with

the earlier described analytical method by Worth. The undrained shear strength corresponding

to the appropriate depth is used in the formula of Worth. A cluster of values close to the pile

diameter is noted for the Plaxis solution. The pressures from Plaxis correspond vary well with

the values obtained with the analytical solution. A small difference is notable due to the

difference in plastic radius. The same conclusions can be drawn for the other pore pressures at

different depths.

Figure 23: Pore pressure distrubtion H = 3 m

To allow for a direct comparison between the pore pressures of different depths the pressures

can be normalised. Instead of normalising the pressures with their initial value, the pressures

are normalised with their undrained shear strength as been done in (Castro J. & Karstunen M.,

2010). It demonstrates the dependency of the pore pressure on the undrained shear strength.

The normalised values of the excess pore pressures agree well for all depths as seen in Figure

24.

-5

5

15

25

35

45

55

65

75

0 0,5 1 1,5 2

∆u

[k

N/m

²]

r [m]

PLAXIS

Randolph and Worth, 1979

Page 47: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

33

Figure 24: Normalised pore pressure

The area affected by the pile installation varies slightly with depth, depending on the

undrained shear strength. The influence zone is in this case around 0,8 - 1,3 m away of the

column radius, which corresponds to 7,3 - 12 times the column radius. (Castro J. & Karstunen

M., 2010) stated that in their research the zone of influence is around 13,5 times the column

radius for a stone column, which corresponds to the same order of magnitude as the presented

pile installation.

(Castro J. & Karstunen M., 2010) stated that the radius of influence depends on the rigidity

index Ir, this is the ratio of shear modulus to undrained shear strength. This value depends in

this case on the depth due to the dependency of the undrained shear strength with depth and

due to the fact that the elasticity modulus is taken equal along the pile. Due to the relation

with Ir it is said that radius of influence where excess pore pressures develop coincides with

the extension of the plastic zone R, this can also be concluded from Figure 24. The influence

zone of the soil layer at h = 6,1 m is smaller than the one from h = 3 m.

(Castro J. & Karstunen M., 2010) also describes the pore pressure as a steep decrease close to

the column and a nearly linear decrease at a distance of about five column radii. The same

trend can be noticed but the behaviour is so little that is not worth to draw a conclusion from.

The remark should be made that the work from (Castro J. & Karstunen M., 2010) is based on

a more complex soil model.

-0,5

0,5

1,5

2,5

3,5

4,5

5,5

0 0,5 1 1,5

∆u

/cu [

m]

r [m]

H=3

H=4.6

H=6.1

Page 48: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

34

The magnitude of the excess pore pressures generated with Plaxis are from the same order as

the one with Abaqus (Haddad et al., 2012), however Plaxis predicts higher values of the pore

pressures, see Figure 22 and Figure 25. These higher values are only very locally, in general it

can be seen that the results of the pore pressure are of the same magnitude. Due to the lack of

axis information of the results of (Haddad et al., 2012) no well-based conclusions can be

made concerning the influence zone. If the distance presented on the horizontal axis agrees

with the length of his model, which corresponds to 2 m, larger influence zones are obtained in

the work of Haddad. It should also been noticed that a study made by (Satibi et al., 2007) also

obtained different influence zones with smaller models.

Figure 25: Excess pore water pressure - Y - axis: height; X - axis: length

4.6.6 Effective soil stresses

After pile installation the effective stress in the soil will increase. The increase in effective

stress is however limited by the trapped pore water. The generated increase in radial effective

stress after pile installation is visualised in Figure 26. An increase in effective stresses can be

noticed with depth. The increase with depth mainly occurs in the influence zone around the

pile. Outside of this zone, the stresses drop drastically and slightly continues to decrease to

zero. The influence zone of the effective stress is however bigger than the one for the pore

pressures.

Page 49: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

35

Figure 26: Effective stress increase after pile installation

The maximum increase of effective stress corresponds to a value of 43,7 kN/m² and is located

at the bottom of the model. A higher cu-value in this point leads to a higher stress. The

effective radial stress after pile driving can be visualised in Figure 27. The increase in

effective stress is rather limited in comparison to the increase in pore water pressure.

Primarily studies performed in an older Plaxis model, Plaxis Classic, resulted in different

effective stresses due to a different sign convention. The stress due to the expansion was

opposite in sign in comparison to the initial stress. The same trend is noticed in the work of

(Satibi et al., 2007).

The model made in (Haddad et al., 2012) obtains slightly higher absolute effective stresses

than the Plaxis model. The total stress due to cavity expansion is distributed between the

effective stress and the excess pore water pressure, since Plaxis generates higher pore water

pressure, lower effective stresses are expected. The difference in models is still small.

Page 50: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

36

Figure 27: Effective radial stress after pile installation

Figure 28: Effective stress after driving (Haddad et al., 2012) - Y - axis: height; X - axis: length

Page 51: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

37

4.6.7 Total soil stress

The total soil stress is the sum of the water pressures and the effective stress, Figure 29. The

same conclusions from the pore water pressures and effective stresses can be made. It should

be marked that due to its smaller value the effective stresses are hardly notable in this graph.

Figure 29: Total radial stress

Figure 30 displays the results obtained from Plaxis and the analytical method as described in

3.1. The analytical solution represents well with the results from Plaxis. In general it can be

said that the Plaxis solutions correspond well with the analytical and Abaqus solutions.

Figure 30: Comparison of the total stress between numerical and analytical

30

50

70

90

110

130

0 1 2 3 4 5 6

σto

t [k

N/m

²]

r [m]

Plaxis

Analytical

Page 52: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

38

5 Soil water dissipation

The consolidation after pile installation is discussed in (Randolph et al., 1979). Based on field

measurements it is shown that the major pore pressure gradients are radial over most of the

length of the pile, consolidation takes place primarily by radial flow of pore water and radial

movement of soil particles.

However, it should be noted that these findings are relevant for a specific problem. In general,

the dissipation time will depend on site specific characteristics. The soil consistency and the

pile will determine the dissipation time. For example the dissipation time is proportional to

the square of the diameter of the pile. Larger piles will therefore require longer consolidations

times (Komurka et al., 2003).

5.1 Parameters

As is seen in Table 2 the consolidation analyse will be conducted with the horizontal and

vertical permeability parameters, these are the only parameters necessary to conduct a

consolidation analysis. The difference between the horizontal and vertical permeability

parameter is large. The unit of the permeability parameters as presented in the work of

(Haddad et al., 2012) and displayed in Table 2 are incorrect. The unit m/s is noted while

typical permeability values for silty clay are more likely to correspond with 5,5.10-6

cm/s

(Pfeifer H., 2014). In the calculations the units cm/s are applied for the permeability.

Note that the model shows a simplified solution, the model does not include the increase of

shear strength with consolidation. Also the change of permeability during a consolidation

phase is not taking into account due to the lack of parameter information. The pile boundary is

simplified as an impermeable boundary. The upper boundary as an open boundary.

A consolidation calculations in Plaxis is simulated through the application of forces which

decrease linearly with time. A consolidation analyses will consequently be presented as a

linear consolidation in Plaxis. As is stated earlier, research have shown that pore water

dissipates first non-linearly according to the log of time and afterwards linearly, see Figure 1.

The non-linear decrease cannot be presented in Plaxis. A stepwise linear approximation could

be used to present the initial non-linear decrease. However this is not implemented due to the

lack of parameters and the strong dependency of this initial period on the case study and their

soil.

Page 53: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

39

As it is noted in (Sabetamal et al., 2016) it is necessary to use very small time steps at the

beginning of a consolidation analyses due to the high appearing pore pressure gradients.

5.2 Results

The consolidation analyses is conducted for a time period of 33 days, the same period is used

in (Haddad et al., 2012), this allows a comparison of the results. The pore pressure

distribution and the effective stress will be discussed.

5.2.1 Pore pressure

In general it can be said that a decrease in pore water pressure is noticed after consolidation,

as is expected. After a time period of 33 days no excess pore water pressure are notable in

Plaxis, this while initial higher excess pore pressure was established. The excess pore pressure

according to Abaqus, as seen in Figure 31, are also from a negligible amplitude.

Figure 31: Excess pore water pressure distribution after 33 days (Haddad et al., 2012)

The results from Plaxis show a faster consolidation process. The report noted that after

2 years from initial drive 95% of excess pore water pressure has been dissipated. And after 5

days the majority of the excess pore pressure are been dissipated. These values are reached

earlier with the calculations performed in Plaxis. This can be seen in Figure 32.

Page 54: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

40

Figure 32: Development of excess pore water pressure with time

It can be concluded that the pore water pressure is dissipated after a short time period.

According to (Plaxis reference manual) a consolidation analysis after of an undrained B

model can lead to erroneous results. An axisymmetric test run, conducted with the same soil

parameters, for circular footing resulted in equal consolidation times.

However Figure 33 shows the pore pressure distribution after 95 % of the pore water pressure

has been dissipated. The influence zone of the pore water pressure increase while the pressure

decreases, this is due to the dissipation of excess pore water to the surrounding soil mass. The

same trend as seen in Figure 31 has been noticed.

Figure 33: Pore pressure distribution after 95% dissipation of excess pore pressure

35

45

55

65

75

85

95

105

115

125

135

0 0,5 1 1,5 2

u [

kP

a]

r [m]

0.01 day

1 day

Page 55: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

41

5.2.2 Effective stress

After the consolidation analyses an increase in effective stress is observed. The increase in

effective stress with time results in an increase in pile capacity as is described as the setup

effect. The results obtained with both programs are from the same magnitude. Abaqus

presents slightly higher stresses as is been noticed earlier.

Figure 34: Effective stress after 33 days - left Plaxis; right (Haddad et al., 2012)

Figure 35 displays the effective stress after pile installation and after consolidation for a depth

of 4,60 m. An increase of 65 kN/m² is noted in the vicinity of the pile.

Figure 35: Increase in effective stress after consolidation, h = 4,6 m.

0

20

40

60

80

100

120

0 1 2 3 4 5

Eff

str

ess

[kN

/m²]

r [m]

Before consolidation

After consolidation

Page 56: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

42

6 Pile shaft capacity

6.1 Introduction

(Haddad et al., 2012) reports the increase in pile shaft capacity by comparing the increase in

effective stress before and after pore water dissipation. These results are normalized by the

ultimate pile shaft capacity obtained by experimental tests as seen in Figure 36. The numerical

results also under predict the pile capacity, the work reports that higher values are

experimentally obtained due to aging effects of the soil. A reduction factor of = 0,125 is

implemented in the interface parameters after 4 days of pore water dissipation, the value is

obtained by matching the experimental and numerical ones.

Figure 36: Increase in pile shaft capacity (Haddad et al., 2012)

6.2 Modelling approach

The method to measure this pile shaft capacity is not described in (Haddad et al., 2012).

Therefore another approach is applied based on the work of (Satibi et al., 2007). Here the pile

capacity is determined by adapting a prescribed displacement force at the top of the pile, the

value of the displacement is set to coincide with the failure of the pile. Only values of the pile

shaft capacity are taken into account in the article. A small prescribed displacement force on

the top of the pile is used to modelled the shaft capacity. It is considered that the force which

results in the first displacement of the pile coincides with the shaft capacity. A new

calculation fase before and after consolidation is deducted. Since the results of the

consolidation process at different time intervals of Plaxis does not agree with the results from

Abaqus, no other time intervals are analysed for consolidation.

Page 57: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

43

6.3 Results

The results of the displacement of a point on the other side of the pile in relation to the force

is presented in Figure 37. It should be noted that the force is presented in [kN/rad] in Plaxis,

to obtain the correct value the results are been multiplied with . First the displacement is

restrained due to the shear strength between the pile and soil, afterwards the shear strength is

exceeded leading to a sudden displacement. Continues the pile will experience the friction

along the pile shaft until eventually the soil is disturbed and no extra force is needed to

displace the pile.

Figure 37: Vertical force displacement curve

The results from the graph, the experimental research and (Haddad et al., 2012) are presented

in Table 4. It can be seen that the force after cavity expansion agrees well with the

experimental results, however after consolidation the both numerical models under estimate

the bearing capacity. The cause of the different outcomes can be due to model uncertainties,

experimental uncertainties or due to the so-called aging effect which is not implemented in

the models.

Table 4: Increase in pile shaft capacity

Plaxis - Fshaft [kN] Abaqus - Fshaft [kN] Experimental - Fshaft [kN]

Before consolid 49,6 29,3 46

After consolid 57,2 50,1 77

6

7

8

9

10

11

12

13

14

15

16

0 0,002 0,004 0,006 0,008 0,01

F y [

kN

/ra

d]

uy [m]

After consol

Before consol

Page 58: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

44

7 Case study

7.1 Introduction

The model is applied on a case study from (De Assis A., 2016). The purpose is to calculate

the capacity of one pile out of a pile group. A vertical pile where PDA-tests in different time

spans were performed on, is selected from the group. The project data applied in this study is

briefly summarized in Table 5 and Figure 38. Note that the pile capacity tests are performed

after 1 and 31 days.

Two details were missing to be able to conduct an analysis: the pile type and the amount of

pile settlement corresponding to failure.

Table 5: Project data - pile information (De Assis A., 2016)

Length [m] Diameter [m] PDA 1 [kN] PDA 31 [kN] kx = ky [cm/s]

37,50 0,50 1415 2450 1.10-5

Figure 38: Soil strata

7.2 Model approach

In this chapter, the method to model the bearing capacity of the pile as described in (Satibi et

al., 2007) is discussed. (Józefiak et al., 2015) did not model the cavity expansion but assumed

an equivalent technique to test the bearing capacity, however both studies were conducted for

a sandy soil and did not take into account undrained behaviour.

To model the bearing capacity of a pile the soil underneath the pile needs to be taken into

account. As is described earlier, modelling the soil underneath the pile can result into

numerical instabilities.

Page 59: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

45

The bearing capacity is calculated by assuming a fase, after soil consolidation, where the pile

is loaded until failure. Loading until failure will be performed using a displacement controlled

function. The settlement corresponding to failure is described in the local norms. The rule

0,2D is assumed to correspond to failure in this study, it equals to s = 0,035 m. The failure

force will result in the modelled combined pile capacity.

During pile installation a pressure field is generated underneath the pile. To simulate this

pressure, (Satibi et al., 2007) applied the weight of the pile, , at the bottom of the cavity

during cavity expansion. The approach would however only be valid for certain bored

displacement piles. A pile driving process will create larger pressures at the pile tip.

7.3 Model input

The soil strata concerns different soil layers which each of their parameters displayed in

Figure 38. In the model, the soil is simplified as one layer to avoid numerical instabilities

around adjacent soil layers. To model the case study, the associated soil strata will need to be

presented by one single layer. From the data of the soils strata it can be seen that the values of

the passion ratio, the undrained shear strength, the friction angle and the unit soil weight show

little variation. It could be approximated by one single value. Only the claly, silty sand layer,

which is in Portuguese noted as 'Argila Ar. Silt' deviates. The thickness of this layer is merely

3 m in comparison to other soil strata. The elasticity modulus diverges more, simplified

values are obtained by implementing a function in Plaxis. The solution of a soil strata would

be a complex function, a soil boring test tries to obtain discrete values of constant soil profile.

An undrained A model is used in Plaxis to be able to implement a friction angle.

Figure 39: Trendline of soil elasticity, black - soil test; blue - linear approximation

0

20

40

60

80

100

120

140

0 10 20 30 40

E [

MP

a]

depth [m]

Page 60: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

46

Plaxis only allows the application of linear varying input data with a constant start. The first

layer can be implemented as constant, further on a linear increasing in elasticity modulus is

assumed. By applying weight factors, depending on the thickness of the soil layer, the

coordinates of the linear function are calculated and show in Figure 39. Other software allow

the implementation of more complex functions.

It should be noted that the first two meters of soil layer consecutive have been excavated and

have been filled up. The filling soil material is assumed to be disturbed, the contribution to the

pile capacity will not be taken into account. The excavated soil is not present in the data of the

soil strata, however the pile length still need to be reduced with 2 m.

The cavity expansion is calculated as stated above, the parameters can be found in Table 6.

Again a different initial radius is taken to avoid the stress correction. The length of the model

is taken equal to 20 m.

Table 6: Cavity expansion parameters

Theory 0,144 0,288 0,25 - 0,25

Applied 0,05 0,25 0,2445 0,005 0,25

7.4 Model output

7.4.1 Model (4.3)

The model as described in 4.3 is first applied to the case study to display the soil stresses and

pressures. It should be noted that the cavity is expanded to the right radius leading to a large

soil heap of 0,22 m. The following figures are made with a 6-Node model, the accuracy will

be lower. It should also be noticed that the soil weight is not taken into account, no

information about the initial ground conditions was given.

Page 61: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

47

Figure 40: Plastic radius

As presented earlier, the plastic radius described by the analytical solution doesn't agree with

the modelled results from the top layer. The analytical radius predicts for a

plastic radius of . Furthermore an increase in plastic radius is noticed due to the

increase in elasticity modulus, this is also present in formula (3.4). The formula only predicts

a higher plastic radius for , The influence zone for ,

corresponds to 40 times the pile radius. The plastic zone touches the boundary as can be seen

in Figure 40, this shows the incorrect model length. The model is enlarged until 40 m.

Figure 41: Case study: Increase in effective stress - left, excess pore pressure - right

An increase in effective stress is noticed with depth. The increase remains however small for

pile intrusion of 50 cm. Excess pore pressure is noticed after pile installation. The order of

Page 62: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

48

magnitude will be around 60 kN/m² around the pile cavity, locally the values can be more, but

due to the bigger mesh, the stresses in the vicinity of the pile cannot be distributed. The

analytical solution results in an excess pore water pressure for of .

Figure 42 and Figure 43 presents the stress and pore pressure after respectively 1 day of

consolidation and 31 days of consolidation. It can be noticed that the end pore pressure

dissipation almost is achieved after 31 days, a negligible amount of pore pressure is still

present. Although the same program was applied, the consolidation time resulted in more

realistic values for fine grained soils.

Figure 42: Case study after 1 day: increase in effective stress - left, excess pore pressure - right

Figure 43: Case study after 31 days: increase in effective stress - left, excess pore pressure - right

Page 63: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

49

7.4.2 Extended model

The model from (4.3) was extended with soil underneath the model. To verify the result, it is

first been conducted for the parametric study as handled in (4.3). Also the interfaces around

the pile tip are extended deeper in the soil model to present a more continuous stress pattern,

as is been described in (Plaxis manual). As can been the stress due to cavity expansion are

still correctly displayed in the extended model, see Figure 27 and Figure 44. The stress

underneath the pile tip are noted in Plaxis with a different sign and are of a smaller magnitude

in comparison to the expansion created stresses. Only a small downwards load, corresponding

to the weight of the pile, is taken into account.

Figure 44: Radial effective stress after cavity expansion - new model

After the intrusion of the pile, the movement of the prescribed pile load at the pile top resulted

in numerical instabilities. The instability and the lack of time stopped the progress of the

work.

Page 64: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

50

8 Comments and future work

The stress underneath the pile is created by the application of a downward load taken equal to

the weight of the pile. The resulting stress patterns deviates from a typical stress failure

pattern for driven piles as is noted in the methods of Koppejan and De Beer for the calculation

of the pile bearing capacity, see Figure 45. The method of (Satibi et al, 2007) is however

based on a bored pile, no large stresses are generated underneath the pile for bored piles.

Figure 45: Pile failure surface (Bezuijen A., 2014)

To facilitate the installation process, the pile shape is practical applications accommodated

with a triangular shaped bottom. The intrusion of this bottom part will change the stress field

around the pile. The effects of the pile tip on calculations was investigated in (Sturm, H. &

Andresen, L., 2010).

The pile driving installation process is described in this work with a cavity expansion

problem. Pile driving installations are however more complex processes. Soil disturbance will

not only occur due to the creation of the cavity but also due to the downward movement of the

pile. (Sabetamal et al., 2016) developed an algorithm to predict the installation and setup

effects of a dynamically penetrating anchor in a clayly seabed. The penetration of the anchor

in the soil layer occurs due to self weight and the dynamically energy as a result from a drop

height near sea level. In this example the pile intrusion occurs regularly.

Nevertheless a driving process cannot be assumed as a continuous pile driving movement. It

is characterised by a driving hammer, creating impulsive forces in the pile. During the

impulses, settlement is created and excess pore pressures are generated locally around the

pile. These access pore pressures reduces the shear force in the soil which contributes to the

penetration of the pile in the soil. A work performed by Plaxis (Plaxis tuturial) gives a

Page 65: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

51

simplified approach to model the settlements during pile driving. Here the dynamical driving

forces are implemented as a harmonic function. This method allows the modulation of the

downwards propagating compression waves in the pile. A more accurate solution needs to

take into account as well the Rayleigh damping.

Most pile models are executed in a single layered soil. Only a handful of parameters are

applied to describe a soil. These parameters are however a simplification of the results of soil

tests. The test are performed, if lucky in the vicinity of the tested pile foundation. Afterwards

a model is validated with pile capacity tests, which on their turn needs to be handled with the

required sensibility. Scatter will be presented in the outcomes.

Models give the freedom to describe a problem more accurate than an analytical analyses.

Still no models are available which are accurately able to describe the pile driving installation

with their different processes. Future work can provide more complex models which will

allow a better description of the pile driving problem. However these models will need to be

build with accurate soil information and validated proper field measurements.

Page 66: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

52

Conclusion

An axisymmetric model is applied to investigate the stress and pressure state of the soil after

pile driving with the cavity expansion theory. Afterwards a consolidation analysis allows pore

water pressure to dissipate. The basic cavity expansion model as is given in (Brinkgeve et al.,

2008), is elaborated to a model able to predict the stress and pressure state of the soil after

expansion. The outcomes of the model is tested by introducing a comparison of the plastic

radius, effective and total soil stress and excess pore water pressures with an Abaqus model.

The length of the model from (Haddad et al., 2012) corresponds to 2 m, which not satisfies

the rules of thumbs as described in (Randolph et al., 1979). Other reports (Kok Shien Ng.,

2013) and (Castro and Karstunen, 2010) excluded the correction layer and implemented a

model length of the same magnitude as described in (Randolph et al., 1979). The application

of a model length taken equal as is shown in the study of (Castro and Karstunen, 2010) results

in a sufficient mesh length.

The model results in a plastic radius dependent on the undrained shear strength, which is also

seen in the analytical solution of the cavity expansion theory. The numerical outcomes of the

plastic radius resembles well with the analytical solutions, only deflections are noticed more

to the top surface. It should however been noted that the analytical solution is based on an

infinite boundary layer, alternations with a real finite boundary layer are expected.

The model shows an increase in pore water pressure in the vicinity of the cavity expansion,

the influence zone of the of the pore pressure resembles very well with the plastic radius. Also

an increase in effective stress is noticed after cavity expansion, however the increase is small

in comparison to the increase in effective stress.

Both the results of the pore water pressure and stress after expansion are well described by the

analytical solution of the cavity expansion theory which is founded on the work of (Randolph

et al., 1979). However the same hypotheses is made in the cavity expansion model: an elastic-

perfectly plastic material. (Castro and Karstunen) work based on more complex soil models

resulted in remarkable deviations from the logarithmical curves presented by the solutions for

elastic-perfectly plastic models.

The results also showed good agreements with the Abaqus model from (Haddad et al., 2012).

Rather small diversities are noted in the results from both calculation software. However no

Page 67: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

53

well founded conclusions could be made about the influence zone of the stress after expansion

due to a lack of dimension on the graphs presented in the original work.

The consolidation analysis conducted by Plaxis led to erroneous results of the consolidation

time. As is noted in the (Plaxis manual), a consolidation process should be analysed with care.

Besides the false results in time, the analysis perfectly presented the stresses after

consolidation. It should also be noticed that the permeability parameters, as given in the report

of (Haddad et al., 2012), possible were of the wrong order of magnitude.

Due to a lack of description in the original article, a method is proposed to simulate the shaft

capacity. According to this method the initial capacity after cavity expansion agrees more

with the results from the experimental study, however a smaller increase in shaft capacity is

numerically obtained than predicted in the report. A similar gap in final shaft capacity is

obtained with the results from the Abaqus analysis. However the work from (Haddad et al.,

2012) links this to inability of the model to predict the aging occur in the soil.

The model allows the prediction of the soil stresses before and after consolidation of the

cavity expansion. A tempt is been conducted to predict the bearing capacity based on the

work by (Sabeti et al., 2007). This however didn't lead to appropriate result. It should be noted

that (Sabeti et al., 2007) assumes a sandy soil and doesn't take into account the undrained

behaviour.

Page 68: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

54

References

Axelsson, G. (2000). "Long-Term Set-up of Driven Piles in Sand", Ph.D. Thesis, Royal Institute of

Technology, Stockholm, Sweden, 194 p.

Attar I. H, Fakharian K. "Influence of soil setup on shaft resistance variations of driven piles, Case

study". International Journal of Civil Engineering, Transaction B: Geotechnical Engineering, 2013,

Vol. 11, No. 2, 4-5

Baligh, M. (1985) "Strain Path Method" Journal of Geotechnical Engineering, Vol. 111(9), pp. 1108-

1136.

Bezuijen, A. (2015). "Geotechnical Engineering, Part 1". Lecture Notes, UGent University.

Brinkgreve, R., Broere, W., and Waterman, D. (2008) "PLAXIS-2D (Version 9.0)", Delft University

of Technology and PLAXIS bv., The Netherlands.

Bullock, P. J. (1999). "Pile friction freeze: A field and laboratory study". Ph.D. Dissertation,

Departement of Civil Engineering, University of Florida, Gainesville, Fla.

Burd, H. J & Houlsby G. T. (1990). "Finite element analysis of two cylindrical expansion problems

involving nearly incompressible material behaviour". International journal for numerical and

analytical methods in geomechanics. Vol14(5), pp. 351-366.

Castro, J. (2008). "Análisis teórico de la consolidación y deformación alrededor de columnas de

grava". PhD Thesis, University of Cantabria, Santander, Spain.

Castro, J. & Karstunen, M. (2010). "Numerical simulations of stone column installation", Canadian

Geotechnical Journal, Vol. 47(10), pp 1127-1138.

Castro, J., Karstunen, M., Sivasithamparam, N. & Sagaseta C. (2013). "Numerical analyses of stone

column installation in Bothkennar clay". Proc. International Conference on Installation Effects in

Geotechnical Engineering, Rotterdam, NL, 23-27 March 2013.

Chow, F. C., Jardine, R. J., Brucy, F., and Nauroy, J. F. (1998). "Effects of Time on Capacity of Pipe

Piles in Dense Marine Sand", Journal of Geotechnical and Geoenvironmental Engineering, 124(3), pp.

254-264.

De Assis, A. (2016). Transmission of data through personal communication.

Dias, T. G. S. (2015). "Pile settlements & An alternative framework for pile analysis", Guest Lecture

Presentation, UGent University.

Gibson, R. E. & Anderson, W. F. (1961). "In situ measurement of soil properties with the

pressuremeter", Civil Engineering and Public Works. Vol. 56, pp. 615-618.

Page 69: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

55

Gill, D. R. & Lehane B. M. (2000). "Extending the strain path method analogy for modelling

penetrometer installation" International Journal for Numerical and Analytical Methods in

Geomechanics, Vol. 24 pp. 477-489.

Haddad, H., Fakharian, K., and Hosseinzadeh Attar, I. (2012). “Numerical Modeling of Setup Effects

on Pile Shaft Capacity and Comparison with an Instrumented Case”. The 9th International Conference

on Testing and Design Methods for Deep Foundations, 18-20 September, 2012, Kanazawa, Japan.

Józefiak K., Zbiciak A., Maslakowski M. and Piotrowski, T. (2015). "Numerical modelling and

bearing capacity of pile foundation". Procedia Engineering Vol. 111, pp. 356-363

Kim, D., Bica, A. V. D., Salgado, R., Prezzi, M., and Lee, W. (2009). “Load testing of a closed-ended

pipe pile driven in multilayered soil.” J. Geotech. Geoenviron. Eng., Vol.135(4), pp. 463–473.

Kirsch, F. (2006). "Vibro stone column installation and its effect on ground improvement".

Proceedings of Numerical Modelling of Construction Processes in Geotechnical Engineering for

Urban Environment, Bochum, Germany. pp. 115-124.

Kok Shien, Ng. (2013). "Cavity Expansion Approach In Modelling Stone Column Installation Effect."

International Journal of Advances in Engineering, Science and Technology, Vol.2(2), pp.252-260.

Komurka, V. E., Wagner, A. B., and Edil, T. B. (2003). “Estimating soil/pile set-up.” Final Rep. 0305,

Wagner Komurka Geotechnical Group, Inc. and Univ. of Wisconsin–Madison, Madison, WI.

Konrad, J. M. & Roy, M. (1987). "Bearing capacity of friction piles in marine clay". Geotechique.

Vol. 37 (2), pp. 163-175.

Lee, W., Kim, D., Salgado, R., Zaheer, M. (2010). "Setup of driven piles in layered soil". Sois and

foundations Vol.50(5). pp. 585-598.

Long, J. H., Kerrigan, J. A., and Wysockey, M. H. (1999). "Measured time effects for axial capacity of

driving piling". Transportation Research Record 1663, Transportation Research Board, Washington,

DC, pp. 8-15.

Pfeifer H. (2014). "Groundwater and contaminant flow". Lecture Notes, UGent University.

Plaxis manual, "PLAXIS 2D 2015 reference manual, anniversary edition".

Plaxis material models manual, "PLAXIS 2D 2015 Material models manual".

Plaxis tutorials, "PLAXIS 2D 2015, tutorial 13: Pile driving".

Randolph, M. F. & Wroth, C. P. (1979). "An analytical solution for the consolidation around a driven

pile", International Journal for Numerical and Analytical Methods in Geomechanics, Vol. 3(3), 1979,

pp. 217-229.

Page 70: Pile Setup - The gain of pile capacity: A numerical study ...lib.ugent.be/fulltxt/RUG01/002/300/942/RUG01-002300942_2016_0001_AC.pdf · Pile Setup - The gain of pile capacity: A numerical

56

Randolph, M. F., Carter, J. P. & Wroth, C. P. (1979). "Driven piles in clay - the effects of installation

and subsequent consolidation". Geotechnique 29, No. 4, 361-393.

Sabetamal H., Carter J.P., Nazem M. and Sloan S.W. (2016). "Coupled analysis of dynamiccaly

penetrating anchors". Computers and Geotechnics Vol. 77, pp. 26-44.

Salgado, R., & Prezzi, M. 2006. “Computation of cavity expansion pressure and cone penetration

resistance in sands.” Int. J. Geomech., in press.

Satibi S., Abed A., Yu C., Leoni M. & Vermeer P. A. (2007) "FE simulation of installation and

loading of a tube installed pile." Institutsbericht 29 des Instituts für Geotechnik, Universität Stuttgart.

Skov, R. & Denver, H. (1988). "Time-dependence of Bearing Capacity of Piles". Proc., 3rd Int. Conf.

on the Application Stress-Wave Theory to Piles, BiTech Publishers (Vancouver BC.)

Sturm, H. & Andresen, L. (2010). "Large deformation analysis of the installation of dynamic anchor."

In: In the porceedings of 7th European conference on numerical methods in geotechnical engineering.

p. 255-60.

Svinkin, M. R. & Skov, R. (2000). "Setup effects of cohesive soils in pile capacity". Proc. 6th

International Conference on Application of Stress-Wave Theory to Piles, Sao Paulo, Brazil, Balkema,

pp. 107-111.

Svinkin, M. R. (1996). "Setup and Relaxation in Glacial Sand - Discussion", Journal of geotechnical