Pile Capacity Calculation (12!12!2011)

Embed Size (px)

Citation preview

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    1/36

    CALCULATIONS FOR

    Sec.

    I

    Length of Pile below Ground Level L = m

    Dia of Pile D = m

    Effective Unit weight of soil at Pile Tip = t/m3

    Bearing Capacity Factor Nq =

    Bearing Capacity Factor N =

    Depth of Pile Cap = m

    Area of Pile Ap = m2

    Earth Pressure Coefficient k =

    Overburden Considered for a depth of = times the dia of pile

    Overburden Pdi = t/m2

    Overburden Pd = 15.1 t/m2

    Angle of Internal Friction at toe = deg

    Depth Overa sub

    m Depth t/m3

    - 4 4 0.850 0 0 0.00 0

    I 1 5 0.780 0 0 0.00 0

    I 2.5 7.5 0.780 0 0 0.00 2.2

    I 6 13.5 0.800 0 0 0.00 2.2

    II 3 16.5 0.920 0 0 0.00 6

    II 1.5 18 0.920 0 0 0.00 6

    III 3 21 0.800 0 0 0.00 6

    IV 7 28 1.020 33 33 0.65 0

    IV 3 31 1.020 0 0 0.00 13

    V 0.5 31.5 0.820 33 33 0.65

    = %End Bearing Component for Sand layer = T

    Friction Bearing Component for Sand layer = T

    End Bearing Resistance for Clay Layer = T

    Friction Bearing Resistance for Clay Layer = T

    Total End Bearing Resistance = T

    Total Friction Bearing Resistance = T

    Total Bearing Resistance including both cohessive & granular soils = T

    Factor of safety =

    Safe Bearing Capacity = T

    Pile Cut Off level from GL = 2.5 m

    Length of Pile below Cut-off Level Level = 29.0 m

    11.31 0.00

    4.80 8.53 22.62 0.00

    276.71

    617.55

    3.79

    18.45

    15.07

    26.39

    0.00

    1.88

    15.07

    15.07

    422.23

    1055.57

    2.76

    2.40

    0

    161.31

    2.5

    617.55

    438.02

    5.65 0.00

    0.41 15.07

    7.14

    12.31

    1.38 14.38

    3.06

    276.71

    5.16

    11.31

    11.31

    0.00

    0.00

    258.26

    0.00

    Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshine

    tan () x Asilayer tan

    Pdi

    t/m2

    PROJECT RAIL VIKAS NIGAM LIMITED

    9.42

    3.40

    1.95

    0.78

    1.70

    C

    37.77

    K x Pdi x

    3.77 0.00

    15.08

    15

    t/m2

    m2

    As

    15.1

    33.00

    0

    1.1310

    1.2

    0.820

    35.00

    d*sub

    VERTICAL CAPACITY OF PILES

    31.5

    1

    S

    n

    i

    sidiqdpu CAAKPNPNDAQ

    1

    tan5.0

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    2/36

    Sec.

    Table: 1 PILE DIA. = 1.2 m COL = 2.5 m bgl

    -40.00

    -40.00

    -28.00

    -28.00

    -33.50

    -33.50

    -50.00 2

    -50.00 2

    -50.00

    -50.00

    31.00

    33.50 31.00- 27.81

    P 12

    P 19

    P 15

    P 16

    P 21

    P 22

    P 24

    P 20

    BH-T5 + 5.69

    BH-T5, ABH-7

    ABH-7

    ABH 7

    + 5.69

    P 23

    28.00

    ABH-6

    ABH-6, BH-T5

    Borehole Investigation in Progress

    -

    ABH-5

    BH-T3

    4

    P 17

    P 18

    28.00

    6 7 8

    25.50

    + 3.90 - 21.60 25.50

    Borehole Investigation in Progress

    + 3.90

    Borehole Investigation in Progress

    29.00

    29.00

    - 27.20+ 3.30

    23.00

    Cal. By

    Pier No.Ground

    Level (m)

    Pile Tip

    Level (m)

    Pile

    termination

    depth below

    EGL, (m)

    End of

    Sand Layer

    / Clay Layer

    Start Level

    (m)

    5

    Pile

    termination

    depth below

    COL, (m)

    Av

    S

    bel

    To

    1

    Decipline

    P 10

    VERTICAL CAPACITY OF PILE SUMMARY SHEETChkd. By

    P 08

    P 01

    P 02

    ABH-2

    ABH-3

    BH-T3

    Project

    Calculations for

    2 3

    RAIL VIKAS NIGAM LIMITED

    BH-T1

    BH-T1

    -

    31.50

    31.50

    23.00

    + 4.46 - 27.04

    Nearest

    Influencing

    Boreholes

    Critical

    Borehole

    ABH-1, BH-T2

    - 27.04BH-T2

    - 21.60

    ABH-2, ABH-3

    ABH-3

    - 27.20+ 3.30

    ABH-3, BH-T3

    BH-T1

    BH-T2

    ABH-1ABH-1

    BH-T1, ABH-2

    + 4.46

    ABH-1

    BH-T2

    ABH-1

    BH-T1

    P 06

    P 04

    BH-T4

    P 13

    P 14

    P 03

    P 05

    P 07

    P 11

    P 09

    27.50

    - 27.81

    27.50BH-T4

    ABH-4

    ABH-4

    ABH-4

    ABH-5

    BH-T5

    30.00

    30.00

    - 26.58

    - 26.58

    33.50

    + 3.42

    + 3.42

    BH-T4

    ABH 7

    30.50

    Borehole Investigation in Progress

    30.50BH-T3

    ABH-7

    BH-T3, BH-T4

    BH-T4

    BH-T4

    ABH-4

    ABH-5

    ABH-5, ABH-6

    ABH-6

    BH-T5

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    3/36

    Sec.

    Table: 1 PILE DIA. = 1.2 m COL = 2.5 m bgl

    4 6 7 8

    Cal. By

    Pier No.Ground

    Level (m)

    Pile Tip

    Level (m)

    Pile

    termination

    depth below

    EGL, (m)

    End of

    Sand Layer

    / Clay Layer

    Start Level

    (m)

    5

    Pile

    termination

    depth below

    COL, (m)

    A

    be

    1

    Deciplin

    VERTICAL CAPACITY OF PILE SUMMARY SHEETChkd. B

    Project

    Calculations for

    2 3

    RAIL VIKAS NIGAM LIMITED

    Nearest

    Influencing

    Boreholes

    Critical

    Borehole

    -50.45

    -50.45

    -36.00

    -36.00- 24.80

    30.50

    33.00 30.50

    Borehole Investigation in Progress

    + 8.20

    - 37.02 45.00 42.50

    42.50P 35

    Borehole Investigation in Progress

    + 7.98

    45.00

    BH-T13, ABH-11

    P 39

    ABH-11

    ABH-11

    ABH-12

    P 38

    P 37

    P 36

    P 40

    P 41

    ABH-12

    P 42

    P 45

    P 46

    P 43

    P 44

    P 49

    P 50 ABH-16

    ABH-16, BH-C18P 51

    ABH-15

    P 53

    P 54

    P 55

    P 56

    P 52

    ABH-14

    ABH-14

    ABH-14, ABH-15

    P 47

    P 48

    P 57 ABH-17

    BH-C18

    ABH-15

    ABH-16

    ABH-16

    + 8.20 - 24.80 33.00

    BH-C18, ABH-17

    ABH-17

    BH-C18

    BH-C18, ABH-17

    ABH-13

    ABH-13

    ABH-11

    ABH-14

    BH-T13

    -

    ABH-15

    ABH-16

    ABH-16

    -

    ABH-15

    ABH-16

    BH-C18

    -

    ABH-17

    ABH-17

    ABH-17

    + 7.98 - 37.02

    ABH-11

    ABH-12

    ABH-12

    BH-T13

    ABH-13

    BH-C18

    ABH-13

    ABH-14

    BH-T13

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    4/36

    Sec.

    Table: 1 PILE DIA. = 1.2 m COL = 2.5 m bgl

    4 6 7 8

    Cal.

    Pier No.Ground

    Level (m)

    Pile Tip

    Level (m)

    Pile

    termination

    depth below

    EGL, (m)

    End of

    Sand Layer

    / Clay Layer

    Start Level

    (m)

    5

    Pile

    termination

    depth below

    COL, (m)

    1

    Decip

    VERTICAL CAPACITY OF PILE SUMMARY SHEETChkd

    Project

    Calculations for

    2 3

    RAIL VIKAS NIGAM LIMITED

    Nearest

    Influencing

    Boreholes

    Critical

    Borehole

    -46.50

    -46.50

    -42.00

    -33.50

    -33.50

    -33.00

    -33.00

    -33.00

    -33.00

    -35.50

    -35.50

    -35.50

    + 9.00

    P 77

    P 78

    P 79

    P 80

    P 76

    P 85

    P 86

    P 87

    P 88

    P 81

    P 82

    P 83

    P 84

    P 93

    P 94

    P 89

    P 90

    P 91

    P 92

    + 5.00

    BH-C9

    ABH-24

    - 24.40

    P 95

    P 96

    P 97

    P 98

    BH-C4, BH-C5 - 25.00

    BH-C4

    BH-C9

    BH-C6

    Bridge

    + 5.00 27.50

    37.00

    30.00

    + 8.80

    Bridge

    - 30.50 39.50

    27.50

    Bridge

    30.00

    29.00

    40.00

    Borehole Investigation in Progres

    30.00 27.50

    + 8.80

    Borehole Investigation in Progres

    - 24.30

    27.50

    - 24.40

    - 31.20 40.00 37.50

    + 4.60

    + 4.60

    BH-C3

    26.50

    + 5.70 - 24.30 30.00

    - 24.40 29.00 26.50BH-C1, BH-C2

    BH-C19, BH-C2

    - 25.00

    + 5.50 - 24.50

    + 4.60

    BH-C4

    ABH-23

    BH-C19, ABH-24

    BH-C2

    BH-C1

    BH-C1

    ABH-23

    ABH-23, BH-C4

    BH-C3

    BH-C3, ABH-24

    BH-C12

    BH-C10

    BH-C10

    BH-C9

    BH-C6

    BH-C10

    BH-C9

    BH-C6

    BH-C13

    BH-C13BH-C13

    - 31.20

    + 5.70

    37.50

    29.00

    + 4.60 - 25.40

    27.5030.00

    30.00 27.50

    26.50

    BH-C4

    ABH-23

    BH-C3

    BH-C3

    BH-C12

    BH-C10

    BH-C13

    BH-C6

    BH-C2

    BH-C1

    BH-C1

    BH-C1

    ABH-24

    ABH-24

    -

    BH-C19

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    5/36

    CALCULATIONS FOR

    Sec.

    I

    Length of Pile below Ground Level L = m

    Dia of Pile D = m

    Effective Unit weight of soil at Pile Tip = t/m3

    Bearing Capacity Factor Nq =

    Bearing Capacity Factor N =

    Depth of Pile Cap = m

    Area of Pile Ap = m2

    Earth Pressure Coefficient k =

    Overburden Considered for a depth of = times the dia of pile

    Overburden Pdi = t/m2

    Overburden Pd = 15.5 t/m2

    Angle of Internal Friction at toe = deg

    Depth Overa sub

    m Depth t/m3

    - 5 5 0.820 0 0 0.00 0 0

    I 1.5 6.5 0.820 0 0 0.00 2.25 0.7

    II 2.5 9 0.800 0 0 0.00 1.8 0.7

    II 3 12 0.850 0 0 0.00 1.8 0.7

    III 3 15 0.920 0 0 0.00 5.8 0.5

    III 3 18 0.960 0 0 0.00 5.8 0.5

    III 0.5 18.5 0.960 0 0 0.00 5.8 0.5

    IV 7 25.5 0.850 33 33 0.65

    = %

    End Bearing Component for Sand layer = T

    Friction Bearing Component for Sand layer = T

    End Bearing Resistance for Clay Layer = TFriction Bearing Resistance for Clay Layer = T

    Total End Bearing Resistance = T

    Total Friction Bearing Resistance = T

    Total Bearing Resistance including both cohessive & granular soils = T

    Factor of safety =

    Safe Bearing Capacity = T

    Pile Cut Off level from GL = 2.5 m

    Length of Pile below Cut-off Level Level = 23.0 m

    403.28

    1008.20

    106.09

    2.5

    636.13

    372.07

    265.97

    15.52

    636.13

    265.97

    0.000.48

    0

    1.88

    layer tan

    Pdi

    Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.

    tan () x Asi

    0.00

    C

    37.77

    4.10

    1.23

    d*sub

    t/m2

    0.00

    18.85

    4.72 5.65

    2.05

    K x Pdi x

    15

    15.5

    33.00

    VERTICAL CAPACITY OF PILES

    0

    t/m2 m2

    As

    1.2

    0.850

    35.00

    1

    PROJECT RAIL VIKAS NIGAM LIMITED

    1.1310

    25.5

    14.08

    5.95 15.52 26.39 265.97

    0.00

    2.55 8.61 11.31 0.00

    11.312.88

    2.76 11.26 11.31 0.00

    2.00 6.33 9.42 0.00

    n

    i

    diqdpu KPNPNDAQ

    15.0

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    6/36

    CALCULATIONS FOR

    Sec.

    I

    Length of Pile below Ground Level L = m

    Dia of Pile D = m

    Effective Unit weight of soil at Pile Tip = t/m3

    Bearing Capacity Factor Nq =

    Bearing Capacity Factor N =

    Depth of Pile Cap = m

    Area of Pile Ap = m2

    Earth Pressure Coefficient k =

    Overburden Considered for a depth of = times the dia of pile

    Overburden Pdi = t/m2

    Overburden Pd = 15.1 t/m2

    Angle of Internal Friction at toe = deg

    Depth Overal sub

    m Depth t/m3

    - 4 4 0.850 0 0 0.00 0 0

    I 1 5 0.780 0 0 0.00 0 0

    I 2.5 7.5 0.780 0 0 0.00 2.2 0.7

    I 6 13.5 0.800 0 0 0.00 2.2 0.7

    II 3 16.5 0.920 0 0 0.00 6 0.4

    II 1.5 18 0.920 0 0 0.00 6 0.4

    III 3 21 0.800 0 0 0.00 6 0.4

    IV 7 28 1.020 33 33 0.65 0 0

    IV 3 31 1.020 0 0 0.00 13 0.3

    V 0.5 31.5 0.820 33 33 0.65

    = %

    End Bearing Component for Sand layer = TFriction Bearing Component for Sand layer = T

    End Bearing Resistance for Clay Layer = T

    Friction Bearing Resistance for Clay Layer = T

    Total End Bearing Resistance = T

    Total Friction Bearing Resistance = T

    Total Bearing Resistance including both cohessive & granular soils = T

    Factor of safety =

    Safe Bearing Capacity = T

    Pile Cut Off level from GL = 2.5 m

    Length of Pile below Cut-off Level Level = 29.0 m

    d*sub

    VERTICAL CAPACITY OF PILES

    31.5

    1.1310

    1.2

    0.820

    35.00

    K x Pdi x

    3.77 0.00

    15.08

    1

    0

    37.77

    15

    t/m2 m2

    As

    15.1

    33.00

    Pdi

    t/m2

    PROJECT RAIL VIKAS NIGAM LIMITED

    9.42

    3.40

    1.95

    0.78

    1.70

    C

    Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.

    tan () x Asilayer tan

    276.71

    258.26

    3.06 15.07

    5.16

    11.31

    11.31

    0.00

    5.65 0.00

    422.23

    1055.57

    2.76

    2.40

    0

    161.31

    2.5

    617.55

    438.02

    276.71

    3.79

    18.45

    15.07

    26.39

    0.00

    1.88

    15.07

    0.00

    15.07

    12.31

    4.80 8.53 22.62 0.00

    617.55

    0.41

    7.14

    1.38 14.38

    11.31 0.00

    0.00

    n

    i

    diqdpu KPNPNDAQ

    15.0

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    7/36

    CALCULATIONS FOR

    Sec.

    I

    Length of Pile below Ground Level L = m

    Dia of Pile D = m

    Effective Unit weight of soil at Pile Tip = t/m3

    Bearing Capacity Factor Nq =

    Bearing Capacity Factor N =

    Depth of Pile Cap = m

    Area of Pile Ap = m2

    Earth Pressure Coefficient k =

    Overburden Considered for a depth of = times the dia of pile

    Overburden Pdi = t/m2

    Overburden Pd = 14.3 t/m2

    Angle of Internal Friction at toe = deg

    Depth Overa sub

    m Depth t/m3

    - 1.5 1.5 0.800 0 0 0.00 0 0

    I 3.5 5 0.800 0 0 0.00 0 0

    I 1.5 6.5 0.780 0 0 0.00 2.3 0.7

    I 3 9.5 0.780 0 0 0.00 2.3 0.7

    I 3 12.5 0.820 0 0 0.00 2.3 0.7

    II 5.5 18 0.780 31 31 0.60 0 0

    II 3 21 0.950 31 31 0.60 0 0

    III 5.5 26.5 0.950 0 0 0.00 8 0.3

    IV 4 30.5 0.840 33 33 0.65

    = %

    End Bearing Component for Sand layer = T

    Friction Bearing Component for Sand layer = TEnd Bearing Resistance for Clay Layer = T

    Friction Bearing Resistance for Clay Layer = T

    Total End Bearing Resistance = T

    Total Friction Bearing Resistance = T

    Total Bearing Resistance including both cohessive & granular soils = T

    Factor of safety =

    Safe Bearing Capacity = T

    Pile Cut Off level from GL = 2.5 m

    Length of Pile below Cut-off Level Level = 28 m

    1.1310

    30.5

    d*sub

    VERTICAL CAPACITY OF PILES

    K x Pdi x

    13.19 0.00

    C

    0.00

    t/m2

    PROJECT RAIL VIKAS NIGAM LIMITED

    5.65

    1.20

    1.17

    2.80

    t/m2 m2

    As

    Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.

    tan () x Asilayer tan

    Pdi

    387.49

    139.65

    150.94

    4.59

    5.65

    20.73

    2.60

    0.60

    0.00

    427.51

    1068.77

    2.5

    4.29

    3.36

    0

    95.28

    14.26 15.08

    12.12

    586.00

    1.2

    0.840

    35.00

    1

    37.77

    0

    8.74 11.31 0.00

    15

    586.00

    482.77

    14.3

    33.00

    387.49

    2.85 14.26 11.31 96.90

    2.34 6.34 11.31 0.00

    2.46

    5.23 14.26 20.73 0.00

    n

    i

    diqdpu KPNPNDAQ

    15.0

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    8/36

    CALCULATIONS FOR

    Sec.

    I

    Length of Pile below Ground Level L = m

    Dia of Pile D = m

    Effective Unit weight of soil at Pile Tip = t/m3

    Bearing Capacity Factor Nq =

    Bearing Capacity Factor N =

    Depth of Pile Cap = m

    Area of Pile Ap = m2

    Earth Pressure Coefficient k =

    Overburden Considered for a depth of = times the dia of pile

    Overburden Pdi = t/m2

    Overburden Pd = 14.6 t/m2

    Angle of Internal Friction at toe = deg

    Depth Overa sub

    m Depth t/m3

    - 0.75 0.75 0.800 0 0 0.00 0 0

    I 4.25 5 0.800 0 0 0.00 0 0

    I 4 9 0.780 0 0 0.00 3.1 0.5

    I 4.5 13.5 0.830 0 0 0.00 3.1 0.5

    II 4.5 18 0.830 30 30 0.58 0 0

    II 12 30 0.840 33 33 0.65 0 0

    = %

    End Bearing Component for Sand layer = T

    Friction Bearing Component for Sand layer = T

    End Bearing Resistance for Clay Layer = T

    Friction Bearing Resistance for Clay Layer = T

    Total End Bearing Resistance = T

    Total Friction Bearing Resistance = T

    Total Bearing Resistance including both cohessive & granular soils = T

    Factor of safety =

    Safe Bearing Capacity = T

    Pile Cut Off level from GL = 2.5 m

    Length of Pile below Cut-off Level Level = 27.5 m

    1

    15

    599.06

    602.91

    14.6

    553.24

    599.06

    480.79

    1201.97

    0

    49.67

    2.5

    14.59

    0.30

    12.72

    2.83

    2.30

    10.08 45.24

    553.24

    124.61

    428.63

    Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.

    tan () x Asilayer tan

    Pdi

    t/m2

    PROJECT RAIL VIKAS NIGAM LIMITED

    16.96

    0.60

    3.74

    3.40

    t/m2 m2

    As K x Pdi x

    16.02 0.00

    C

    0.00

    33.00

    d*sub

    VERTICAL CAPACITY OF PILES

    1.1310

    30.0

    37.77

    0

    1.2

    0.840

    35.00

    3.74 8.99 16.96 0.00

    3.12 5.56 15.08 0.00

    n

    idiqdpu KPNPNDAQ

    15.0

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    9/36

    CALCULATIONS FOR

    Sec.

    I

    Length of Pile below Ground Level L = m

    Dia of Pile D = m

    Effective Unit weight of soil at Pile Tip = t/m3

    Bearing Capacity Factor Nq =

    Bearing Capacity Factor N =

    Depth of Pile Cap = m

    Area of Pile Ap = m2

    Earth Pressure Coefficient k =

    Overburden Considered for a depth of = times the dia of pile

    Overburden Pdi = t/m2

    Overburden Pd = 13.1 t/m2

    Angle of Internal Friction at toe = deg

    Depth Overa sub

    m Depth t/m3

    - 2.5 2.5 0.000 0 0 0.00 0 0

    I 2.5 5 0.820 0 0 0.00 0 0

    I 3 8 0.820 0 0 0.00 3.3 0.5

    I 3 11 0.820 0 0 0.00 3.3 0.5

    II 4 15 0.820 0 0 0.00 10 0.5

    III 3 18 0.950 0 0 0.00 10 0.3

    III 3 21 0.920 0 0 0.00 9 0.3

    IV 11 32 0.830 33 33 0.65

    = %

    End Bearing Component for Sand layer = T

    Friction Bearing Component for Sand layer = T

    End Bearing Resistance for Clay Layer = T

    Friction Bearing Resistance for Clay Layer = T

    Total End Bearing Resistance = T

    Total Friction Bearing Resistance = T

    Total Bearing Resistance including both cohessive & granular soils = T

    Factor of safety =

    Safe Bearing Capacity = T

    Pile Cut Off level from GL = 2.5 m

    Length of Pile below Cut-off Level Level = 29.5 m

    d*sub

    VERTICAL CAPACITY OF PILES

    1.1310

    32.0

    K x Pdi x

    9.42 0.00

    Ct/m2

    PROJECT RAIL VIKAS NIGAM LIMITED

    11.31

    0.00

    2.46

    2.05

    t/m2 m2

    As

    Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.

    tan () x Asilayer tan

    Pdi

    0.00

    352.79

    0.00

    0.00

    0.00

    352.79

    0.00

    3.28

    13.10

    9.42

    41.47

    15.08

    11.68

    1.03

    427.92

    1069.80

    3.28

    9.13

    0

    177.19

    11.31

    2.5

    8.61

    539.82

    15

    539.82

    529.97

    13.1

    33.00

    352.79

    1.2

    0.830

    35.00

    1

    37.77

    0

    2.76 13.10 11.31 0.00

    2.46 5.74 11.31 0.00

    2.85

    n

    i

    dqdpu KPNPNDAQ

    15.0

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    10/36

    CALCULATIONS FOR

    Sec.

    I

    Length of Pile below Ground Level L = m

    Dia of Pile D = m

    Effective Unit weight of soil at Pile Tip = t/m3

    Bearing Capacity Factor Nq =

    Bearing Capacity Factor N =

    Depth of Pile Cap = m

    Area of Pile Ap = m2

    Earth Pressure Coefficient k =

    Overburden Considered for a depth of = times the dia of pile

    Overburden Pdi = t/m2

    Overburden Pdi = 15.3 t/m2

    Angle of Internal Friction at toe = deg

    Depth Overal sub

    m Depth t/m3

    - 5 5 0.820 0 0 0.00 0 0

    I 1 6 0.810 0 0 0.00 3.5 0.5

    II 4.5 10.5 0.820 0 0 0.00 2.3 0.5

    II 3 13.5 0.820 0 0 0.00 2.3 0.5

    II 2.5 16 0.820 0 0 0.00 2.3 0.5

    II 0.5 16.5 1.820 0 0 0.00 6.5 0.4

    II 1.5 18 0.880 0 0 0.00 6.5 0.4

    II 1 19 0.880 0 0 0.00 2.5 0.4

    III 11 30 0.900 33 33 0.65 0 0

    = %

    End Bearing Component for Sand layer = T

    Friction Bearing Component for Sand layer = TEnd Bearing Resistance for Clay Layer = T

    Friction Bearing Resistance for Clay Layer = T

    Total End Bearing Resistance = T

    Total Friction Bearing Resistance = T

    Total Bearing Resistance including both cohessive & granular soils = T

    Factor of safety =

    Safe Bearing Capacity = T

    Pile Cut Off level from GL = 2.5 m

    Length of Pile below Cut-off Level Level = 27.5 m

    1.32 13.77 5.65 0.00

    0.88 15.34 3.77 0.00

    9.90 15.34 41.47 413.11

    1

    15

    630.29

    486.44

    15.3

    413.11

    630.29

    2.05

    6.76

    18.85

    4.51

    446.69

    1116.72

    0

    73.32

    2.5

    Pdi

    0.00

    413.11

    As

    Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.

    tan () x Asilayer tan

    33.00

    t/m2

    PROJECT RAIL VIKAS NIGAM LIMITED

    16.96

    4.10

    3.69

    0.81

    t/m2 m2

    K x Pdi x

    3.77 0.00

    C

    0.00

    35.00

    d*sub

    VERTICAL CAPACITY OF PILES

    2.46 9.83 11.31 0.00

    1.1310

    30.0

    37.77

    0

    1.2

    0.900

    0.91 13.57 1.88 0.00

    2.05 12.09 9.42 0.00

    n

    i

    diqdpu KPNPNDAQ

    15.0

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    11/36

    CALCULATIONS FOR

    Sec.

    I

    Length of Pile below Ground Level L = m

    Dia of Pile D = m

    Effective Unit weight of soil at Pile Tip = t/m3

    Bearing Capacity Factor Nq =

    Bearing Capacity Factor N =

    Depth of Pile Cap = m

    Area of Pile Ap = m2

    Earth Pressure Coefficient k =

    Overburden Considered for a depth of = times the dia of pile

    Overburden Pdi = t/m2

    Overburden Pd = 14.7 t/m2

    Angle of Internal Friction at toe = deg

    Depth Overa sub

    m Depth t/m3

    - 3.5 3.5 0.800 0 0 0.00 0 0

    I 1.5 5 0.810 0 0 0.00 0 0

    I 1 6 0.820 0 0 0.00 3.7 0.5

    I 3 9 0.820 0 0 0.00 3.7 0.5

    I 3 12 0.800 0 0 0.00 3.7 0.5

    I 2 14 0.800 0 0 0.00 3.7 0.5

    II 4 18 0.860 0 0 0.00 5.5 0.3

    II 26 44 0.970 0 0 0.00 12.4 0.3

    II 1 45 0.820 33 33 0.65 0 0

    = %

    End Bearing Component for Sand layer = T

    Friction Bearing Component for Sand layer = T

    End Bearing Resistance for Clay Layer = T

    Friction Bearing Resistance for Clay Layer = T

    Total End Bearing Resistance = T

    Total Friction Bearing Resistance = T

    Total Bearing Resistance including both cohessive & granular soils = T

    Factor of safety =

    Safe Bearing Capacity = T

    Pile Cut Off level from GL = 2.5 mLength of Pile below Cut-off Level Level = 42.5 m

    7.54 0.00

    36.07

    36.07

    0.00

    15.08 0.00

    45.0

    0

    d*sub

    VERTICAL CAPACITY OF PILES

    1.1310

    K x Pdi x

    5.65 0.00

    C

    37.77

    0.00

    0.00

    t/m2

    PROJECT RAIL VIKAS NIGAM LIMITED

    1.2

    0.820

    35.00

    1

    15

    14.7

    t/m2

    2.80

    2.40

    1.22

    3.77

    14.74

    1.40

    8.50

    25.22

    1.60 10.50

    0.82 4.43

    3.44 13.02

    Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.

    tan () x Asilayer tan

    Pdi

    604.29

    0.82

    437.06

    1092.64

    0

    452.28

    2.5

    604.29

    488.35

    36.07

    33.00

    3.77

    3.41

    14.74

    11.31

    98.02

    13.19

    m2

    As

    0.00

    2.46 6.07 11.31 0.00

    n

    i

    diqdpu KPNPNDAQ

    1

    5.0

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    12/36

    CALCULATIONS FOR

    Sec.

    I

    Length of Pile below Ground Level L = m

    Dia of Pile D = m

    Effective Unit weight of soil at Pile Tip = t/m3

    Bearing Capacity Factor Nq =

    Bearing Capacity Factor N =

    Depth of Pile Cap = m

    Area of Pile Ap = m2

    Earth Pressure Coefficient k =

    Overburden Considered for a depth of = times the dia of pile

    Overburden Pdi = t/m2

    Overburden Pd = 14.3 t/m2

    Angle of Internal Friction at toe = deg

    Depth Overa sub

    m Depth t/m3

    4.5 4.5 0.846 0 0 0.00 0 0

    I 0.5 5 0.629 0 0 0.00 0 0

    II 7 12 0.629 0 0 0.00 2.2 0.5

    IIIA 4 16 0.969 0 0 0.00 9 0.4

    IIIB 2 18 0.946 0 0 0.00 7.5 0.4

    IIIB 3 21 0.986 0 0 0.00 10.5 0.4

    IV 7.5 28.5 0.965 33 33 0.65 0 0

    IV 0.5 29 1.020 33 33 0.65 0 0

    End Bearing Component for Sand layer = T

    Friction Bearing Component for Sand layer = T

    End Bearing Resistance for Clay Layer = T

    Friction Bearing Resistance for Clay Layer = T

    Total End Bearing Resistance = T

    Total Friction Bearing Resistance = T

    Total Bearing Resistance including both cohessive & granular soils = T

    Factor of safety =

    Safe Bearing Capacity = T

    Pile Cut Off level from GL = 2.5 m

    Length of Pile below Cut-off Level Level = 26.5 m

    VERTICAL CAPACITY OF PILES

    d*sub Pdi

    29.0

    1.2

    1.020

    14.3

    33.00

    0

    1.1310

    37.77

    tan

    35.00

    layer t/m

    2m

    2C

    1

    PROJECT RAIL VIKAS NIGAM LIMITED

    Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.

    0.00

    0.00

    0.00

    tan () x Asi

    K x Pdi x

    0.00

    0.00

    279.93

    591.90

    433.36

    591.90

    279.93

    11.31

    0.00

    153.44

    28.27 262.43

    2.5

    410.10

    1025.26

    3.81

    3.88

    2.96

    0

    0.31 3.96

    14.29

    17.50

    15

    4.40 6.32 26.39

    1.90 16.96

    1.88

    t/m2

    As

    10.46

    1.89 13.35 7.54

    15.08

    0.51 14.29 1.88

    7.24 14.29

    n

    i

    diqdpu KPNPNDAQ

    1

    5.0

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    13/36

    CALCULATIONS FOR

    Sec.

    I

    Length of Pile below Ground Level L = m

    Dia of Pile D = m

    Effective Unit weight of soil at Pile Tip = t/m3

    Bearing Capacity Factor Nq =

    Bearing Capacity Factor N =

    Depth of Pile Cap = m

    Area of Pile Ap = m2

    Earth Pressure Coefficient k =

    Overburden Considered for a depth of = times the dia of pile

    Overburden Pdi = t/m2

    Overburden Pd = 14.4 t/m2

    Angle of Internal Friction at toe = deg

    Depth Overal sub

    m Depth t/m3

    - 2.5 2.5 0.800 0 0 0.00 0 0

    I 2.5 5 0.843 0 0 0.00 0 0

    I 1 6 0.843 0 0 0.00 2.9 0.5

    II 4.5 10.5 0.650 0 0 0.00 2.2 0.5

    IIIA 3 13.5 0.872 0 0 0.00 6.65 0.4

    IIIA 1.5 15 0.978 0 0 0.00 6.65 0.4

    IIIB 3 18 0.805 30 30 0.58 0 0

    IIIB 7.5 25.5 0.805 30 30 0.58 0 0

    IV 4.5 30 0.965 33 33 0.65 0 0

    = %

    End Bearing Component for Sand layer = T

    Friction Bearing Component for Sand layer = T

    End Bearing Resistance for Clay Layer = T

    Friction Bearing Resistance for Clay Layer = T

    Total End Bearing Resistance = T

    Total Friction Bearing Resistance = T

    Total Bearing Resistance including both cohessive & granular soils = T

    Factor of safety =

    Safe Bearing Capacity = T

    Pile Cut Off level from GL = 2.5 m

    Length of Pile below Cut-off Level Level = 27.5 m

    tan

    37.77

    11.31 0.00

    11.31 85.97

    0.00

    tan () x Asi

    PROJECT RAIL VIKAS NIGAM LIMITED

    Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.

    VERTICAL CAPACITY OF PILES

    234.64

    158.35

    478.96

    28.27

    C K x Pdi x

    0.00

    3.77

    16.96

    593.69

    0.00

    0.00

    2.62 9.18

    2.42 13.17

    0.84

    2.93

    layer t/m

    2m

    2t/m

    2

    d*sub Pdi As

    33.00

    1

    15

    14.4

    14.374.34

    6.04

    4.53

    6.41

    14.37

    30

    1.2

    0.965

    35.00

    0

    1.1310

    9.42

    2.5

    456.76

    1141.91

    0

    69.25

    593.69

    548.21

    478.96

    16.96

    1.47 11.23 5.65 0.00

    9.422.00 1.00

    2.11 3.05

    n

    i

    diqdpu KPNPNDAQ

    1

    5.0

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    14/36

    CALCULATIONS FOR

    Sec.

    I

    Length of Pile below Ground Level L = m

    Dia of Pile D = m

    Effective Unit weight of soil at Pile Tip = t/m3

    Bearing Capacity Factor Nq =

    Bearing Capacity Factor N =

    Depth of Pile Cap = m

    Area of Pile Ap = m2

    Earth Pressure Coefficient k =

    Overburden Considered for a depth of = times the dia of pile

    Overburden Pdi = t/m2

    Overburden Pd = 15.0 t/m2

    Angle of Internal Friction at toe = deg

    Depth Overal sub

    m Depth t/m3

    - 2.5 2.5 0.800 0 0 0.00 0 0

    I 2.5 5 0.840 0 0 0.00 0 0

    I 2 7 0.840 0 0 0.00 2.9 0.5

    II 5.5 12.5 0.723 0 0 0.00 2.6 0.5

    IIIA 4 16.5 0.940 0 0 0.00 6.6 0.4

    IIIB 1.5 18 0.960 0 0 0.00 8.5 0.4

    IIIB 3 21 0.960 0 0 0.00 8.5 0.4

    IIIB 4.5 25.5 1.030 0 0 0.00 15 0.4

    IV 4.5 30 1.020 33 33 0.65 0 0

    = %

    End Bearing Component for Sand layer = T

    Friction Bearing Component for Sand layer = T

    End Bearing Resistance for Clay Layer = T

    Friction Bearing Resistance for Clay Layer = T

    Total End Bearing Resistance = T

    Total Friction Bearing Resistance = T

    Total Bearing Resistance including both cohessive & granular soils = T

    Factor of safety =

    Safe Bearing Capacity = T

    Pile Cut Off level from GL = 2.5 m

    Length of Pile below Cut-off Level Level = 27.5 m

    2.5

    401.94

    164.77

    237.17

    9.42 0.00

    20.73

    0

    0.00

    164.77

    164.77

    7.54

    15.08

    408.05

    1020.12

    0.00

    layer tant/m

    2m

    2

    618.18

    2.00

    3.98

    2.10 3.05

    1.68

    1.00

    7.77

    4.94

    14.96

    4.59 14.96

    618.18

    16.96

    4.64

    0.00

    0.00

    0.00

    0.00

    9.42

    16.96

    PROJECT RAIL VIKAS NIGAM LIMITED

    d*sub Pdi

    1.020

    35.00

    1

    15

    37.77

    0

    Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.

    VERTICAL CAPACITY OF PILES

    Ctan () x Asit/m

    2

    15.0

    33.00

    3.76 11.64

    As K x Pdi x

    1.1310

    30.0

    1.2

    2.88 14.96 11.31 0.00

    1.44 14.24 5.65

    n

    i

    diqdpu KPNPNDAQ

    1

    5.0

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    15/36

    CALCULATIONS FOR

    Sec.

    I

    Length of Pile below Ground Level L = m

    Dia of Pile D = m

    Effective Unit weight of soil at Pile Tip = t/m3

    Bearing Capacity Factor Nq =

    Bearing Capacity Factor N =

    Depth of Pile Cap = m

    Area of Pile Ap = m2

    Earth Pressure Coefficient k =

    Overburden Considered for a depth of = times the dia of pile

    Overburden Pdi = t/m2

    Overburden Pd = 14.8 t/m2

    Angle of Internal Friction at toe = deg

    Depth Overal sub

    m Depth t/m3

    - 2.5 2.5 0.800 0 0 0.00 0 0

    I 2.5 5 0.840 0 0 0.00 0 0

    I 1 6 0.840 0 0 0.00 2.9 0.7

    II 7 13 0.724 0 0 0.00 2.5 0.5

    IIIA 3.5 16.5 0.958 0 0 0.00 8 0.4

    IIIB 1.5 18 0.950 0 0 0.00 8 0.4

    IIIB 1.5 19.5 0.950 0 0 0.00 8 0.4

    IIIB 1.5 21 1.030 0 0 0.00 15 0.4

    IV 9 30 1.010 33 33 0.65 0 0

    = %

    End Bearing Component for Sand layer = T

    Friction Bearing Component for Sand layer = T

    End Bearing Resistance for Clay Layer = T

    Friction Bearing Resistance for Clay Layer = T

    Total End Bearing Resistance = T

    Total Friction Bearing Resistance = T

    Total Bearing Resistance including both cohessive & granular soils = T

    Factor of safety =

    Safe Bearing Capacity = T

    Pile Cut Off level from GL = 2.5 m

    Length of Pile below Cut-off Level Level = 27.5 m

    d*sub

    VERTICAL CAPACITY OF PILES

    1.1310

    30.0

    C

    0.00

    t/m2

    PROJECT RAIL VIKAS NIGAM LIMITED

    3.77

    2.00

    0.84

    2.10

    t/m2

    m2

    As

    Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.

    tan () x Asilayer tan

    Pdi

    325.79

    325.79

    9.42

    5.65

    26.39

    9.42 0.00

    1.55 14.79

    3.35 11.68

    1.43

    1.00

    4.52

    14.07

    3.05

    435.98

    1089.95

    5.07

    1.43

    9.09 14.79

    0

    152.98

    13.19

    2.5

    611.18

    478.78

    14.8

    33.00

    325.79

    611.18

    0.00

    1.2

    1.010

    35.00

    1

    37.77

    0

    15

    K x Pdi x

    0.00

    33.93

    0.00

    7.47 0.00

    0.00

    5.65 0.00

    14.79 5.65

    n

    i

    diqdpu KPNPNDAQ

    1

    5.0

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    16/36

    CALCULATIONS FOR

    Sec.

    I

    Length of Pile below Ground Level L = m

    Dia of Pile D = m

    Effective Unit weight of soil at Pile Tip = t/m3

    Bearing Capacity Factor Nq =

    Bearing Capacity Factor N =

    Depth of Pile Cap = m

    Area of Pile Ap = m2

    Earth Pressure Coefficient k =

    Overburden Considered for a depth of = times the dia of pile

    Overburden Pdi = t/m2

    Overburden Pd = 14.4 t/m2

    Angle of Internal Friction at toe = deg

    Depth Overal sub

    m Depth t/m3

    - 3 3 0.800 0 0 0.00 0 0

    I 2 5 0.853 0 0 0.00 0 0

    II 6 11 0.853 0 0 0.00 3.4 0.5

    IIIA 5 16 0.661 0 0 0.00 2.2 0.5

    IIIA 2 18 0.927 0 0 0.00 5.9 0.5

    IIIB 12 30 0.927 0 0 0.00 5.9 0.5

    IIIB 1.5 31.5 0.970 0 0 0.00 9.5 0.4

    IIIB 4.5 36 1.030 0 0 0.00 15 0.4

    IV 3 39 1.010 33 33 0.65 0 0

    = %

    End Bearing Component for Sand layer = T

    Friction Bearing Component for Sand layer = T

    End Bearing Resistance for Clay Layer = T

    Friction Bearing Resistance for Clay Layer = T

    Total End Bearing Resistance = T

    Total Friction Bearing Resistance = T

    Total Bearing Resistance including both cohessive & granular soils = T

    Factor of safety =

    Safe Bearing Capacity = T

    Pile Cut Off level from GL = 2.5 mLength of Pile below Cut-off Level Level = 36.5 m

    1.2

    1.010

    35.00

    1

    15

    VERTICAL CAPACITY OF PILES

    d*sub

    1.1310

    39.0

    37.77

    0

    t/m2

    PROJECT RAIL VIKAS NIGAM LIMITED

    22.62

    2.40

    5.12

    1.71

    t/m2

    m2

    As

    Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.

    tan () x Asilayer tan

    Pdi

    105.64

    0.00

    105.64

    0.00

    1.20

    6.67

    0.005.65

    18.85

    0.00

    7.54 0.00

    11.31

    14.38

    3.25

    415.61

    1039.02

    2.5

    595.22

    443.80

    10.88

    105.64

    595.22

    3.31

    1.46

    0

    338.16

    3.03 14.38 11.31

    4.64 14.38 16.96

    11.12 14.38 45.24

    1.85 13.46 7.54

    14.4

    33.00

    0.00

    0.00

    K x Pdi xC

    0.00

    n

    i

    diqdpu KPNPNDAQ

    1

    5.0

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    17/36

    CALCULATIONS FOR

    Sec.

    I

    Length of Pile below Ground Level L = m

    Dia of Pile D = m

    Effective Unit weight of soil at Pile Tip = t/m3

    Bearing Capacity Factor Nq =

    Bearing Capacity Factor N =

    Depth of Pile Cap = m

    Area of Pile Ap = m2

    Earth Pressure Coefficient k =

    Overburden Considered for a depth of = times the dia of pile

    Overburden Pdi = t/m2

    Overburden Pd = 15.3 t/m2

    Angle of Internal Friction at toe = deg

    Depth Overa sub

    m Depth t/m3

    - 4.5 4.5 0.800 0 0 0.00 0 0

    I 0.5 5 0.870 0 0 0.00 0 0

    I 3.5 8.5 0.870 0 0 0.00 4.2 0.5

    I 2.5 11 0.885 0 0 0.00 4.2 0.5

    II 3 14 0.715 0 0 0.00 2.6 0.5

    IIIA 4 18 0.959 0 0 0.00 7.6 0.5

    IIIA 13.5 31.5 0.959 0 0 0.00 7.6 0.5

    IIIB 4.5 36 0.965 0 0 0.00 12 0.4

    IIIB 1.5 37.5 1.030 0 0 0.00 12 0.4

    IV 2.5 40 1.000 33 33 0.65 0 0

    = %

    End Bearing Component for Sand layer = T

    Friction Bearing Component for Sand layer = T

    End Bearing Resistance for Clay Layer = T

    Friction Bearing Resistance for Clay Layer = T

    Total End Bearing Resistance = T

    Total Friction Bearing Resistance = T

    Total Bearing Resistance including both cohessive & granular soils = T

    Factor of safety =

    Safe Bearing Capacity = T

    Pile Cut Off level from GL = 2.5 m

    Length of Pile below Cut-off Level Level = 37.5 m

    4.34 15.27 16.96 0.00

    3.05 5.56 13.19 0.00

    15.3

    33.00

    12.95 15.27 50.89

    3.84 13.36 15.08

    2.15

    3.82

    1.55

    0

    421.48

    2.50 15.27 9.42

    15.27

    10.37 0.00

    1.80

    8.19

    458.07

    1145.18

    2.5

    630.22

    514.96

    0.005.65

    11.31

    93.48

    630.22

    93.48

    0.00

    93.48

    0.00

    0.00

    Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.

    tan () x Asilayer tan

    Pdi

    PROJECT RAIL VIKAS NIGAM LIMITED

    9.42

    3.60

    2.21

    0.44

    t/m2

    m2

    As

    0.00

    1.88 0.00

    C

    16.96

    t/m2

    K x Pdi x

    VERTICAL CAPACITY OF PILES

    d*sub

    1.1310

    40.0

    37.77

    0

    1.2

    1.000

    35.00

    1

    15

    n

    i

    diqdpu KPNPNDAQ

    1

    5.0

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    18/36

    CALCULATIONS FOR

    Sec.

    I

    Length of Pile below Ground Level L = m

    Dia of Pile D = m

    Effective Unit weight of soil at Pile Tip = t/m3

    Bearing Capacity Factor Nq =

    Bearing Capacity Factor N =

    Depth of Pile Cap = m

    Area of Pile Ap = m2

    Earth Pressure Coefficient k =

    Overburden Considered for a depth of = times the dia of pile

    Overburden Pdi = t/m2

    Overburden Pd = 14.8 t/m2

    Angle of Internal Friction at toe = deg

    Depth Overal sub

    m Depth t/m3

    - 6 6 0.800 0 0 0.00 0 0

    I 3 9 0.839 0 0 0.00 3.8 0.5

    I 3 12 0.902 0 0 0.00 3.8 0.5

    II 3 15 0.700 0 0 0.00 2 0.7

    IIIA 3 18 0.877 0 0 0.00 3.8 0.5

    IIIA 3.5 21.5 0.877 0 0 0.00 8.5 0.5

    IIIA 10.5 32 0.926 0 0 0.00 8.5 0.5

    IIIA 3 35 0.956 0 0 0.00 8.5 0.5

    IIIB 3 38 0.959 0 0 0.00 12 0.4

    IIIB 1.5 39.5 1.030 0 0 0.00 12 0.4

    IV 3 42.5 0.980 33 33 0.65 0 0

    = %

    End Bearing Component for Sand layer = T

    Friction Bearing Component for Sand layer = T

    End Bearing Resistance for Clay Layer = T

    Friction Bearing Resistance for Clay Layer = T

    Total End Bearing Resistance = T

    Total Friction Bearing Resistance = T

    Total Bearing Resistance including both cohessive & granular soils = T

    Factor of safety =

    Safe Bearing Capacity = T

    Pile Cut Off level from GL = 2.5 m

    Length of Pile below Cut-off Level Level = 40.0 m

    2.88 14.75 11.31 0.00

    1.55 14.75 5.65 0.00

    3.07 14.75 13.19 0.00

    2.71 8.67 11.31 0.00

    VERTICAL CAPACITY OF PILES

    42.5

    0

    PROJECT RAIL VIKAS NIGAM LIMITED

    11.31

    11.31

    4.80

    2.10

    2.52

    t/m2

    m2

    Aslayer tan

    Pdi K x Pdi xC

    d*sub

    Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.

    tan () x Asi

    11.31 0.00

    0.00

    1.1310

    11.31

    0.00

    0.00

    108.36

    0.00

    0.00

    108.36

    2.40

    11.07

    14.75

    22.62

    11.31

    39.58

    2.94 14.75

    6.06

    460.64

    1151.61

    2.63

    2.87

    0

    434.11

    2.5

    9.72 14.75

    1.2

    0.980

    35.00

    1

    15

    13.44

    t/m2

    37.77

    609.14

    542.47

    14.8

    33.00

    108.36

    609.14

    n

    i

    dqdpu KPNPNDAQ

    1

    5.0

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    19/36

    CALCULATIONS FOR

    Sec.

    I

    Length of Pile below Ground Level L = m

    Dia of Pile D = m

    Effective Unit weight of soil at Pile Tip = t/m3

    Bearing Capacity Factor Nq =

    Bearing Capacity Factor N =

    Depth of Pile Cap = m

    Area of Pile Ap = m2

    Earth Pressure Coefficient k =

    Overburden Considered for a depth of = times the dia of pile

    Overburden Pdi = t/m2

    Overburden Pd = 14.9 t/m2

    Angle of Internal Friction at toe = deg

    Depth Overa sub

    m Depth t/m3

    - 3 3 0.800 0 0 0.00 0 0

    I 2 5 0.833 0 0 0.00 0 0

    I 4 9 0.833 0 0 0.00 3.8 0.5

    I 6 15 0.896 0 0 0.00 3.8 0.5

    II 3 18 0.716 0 0 0.00 2.5 0.5

    II 1.5 19.5 0.716 0 0 0.00 2.5 0.5

    IIIA 6 25.5 0.943 0 0 0.00 7.3 0.5

    IIIA 13.5 39 0.969 0 0 0.00 7.3 0.4

    IIIB 4.5 43.5 0.960 0 0 0.00 12 0.3

    IIIB 1.5 45 1.030 0 0 0.00 12 0.3

    IV 1.5 46.5 0.980 33 33 0.65 0 0

    End Bearing Component for Sand layer = T

    Friction Bearing Component for Sand layer = T

    End Bearing Resistance for Clay Layer = T

    Friction Bearing Resistance for Clay Layer = T

    Total End Bearing Resistance = T

    Total Friction Bearing Resistance = T

    Total Bearing Resistance including both cohessive & granular soils = T

    Factor of safety =

    Safe Bearing Capacity = T

    Pile Cut Off level from GL = 2.5 m

    Length of Pile below Cut-off Level Level = 44.0 m

    5.65 0.00

    4.32 14.92 16.96 0.00

    11.31 0.00

    C tan

    22.62 0.00

    PROJECT RAIL VIKAS NIGAM LIMITED

    Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar

    t/m

    2 tan () x Asi

    K x Pdi x

    VERTICAL CAPACITY OF PILES

    15.08 0.00

    0.00

    5.65

    5.66

    13.08 14.92

    1.47 14.92

    14.92

    2.15

    1.07

    14.92

    54.80

    0.005.65

    50.89

    22.62 0.00

    1.55

    layert/m

    2

    1.20

    3.33 5.73

    d*sub Pdi

    5.38 10.09

    615.79

    m2

    13.85

    14.92

    615.79

    54.80

    0

    405.44

    2.5

    460.23

    430.41

    1076.02

    As

    1.67 3.23

    2.40 11.31

    7.54

    37.77

    0

    1.1310

    1

    46.5

    1.2

    0.980

    35.00

    15

    54.80

    14.9

    33.00

    0.00

    0.00

    n

    i

    qdpu KPNPNDAQ

    1

    5.0

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    20/36

    CALCULATIONS FOR

    Sec.

    I

    Length of Pile below Ground Level L = m

    Dia of Pile D = m

    Effective Unit weight of soil at Pile Tip = t/m3

    Bearing Capacity Factor Nq =

    Bearing Capacity Factor N =

    Depth of Pile Cap = m

    Area of Pile Ap = m2

    Earth Pressure Coefficient k =

    Overburden Considered for a depth of = times the dia of pile

    Overburden Pdi = t/m2

    Overburden Pd = 14.8 t/m2

    Angle of Internal Friction at toe = deg

    Depth Overal sub

    m Depth t/m3

    - 7.5 7.5 0.800 0 0 0.00 0 0

    I 6 13.5 0.851 0 0 0.00 5.3 0.4

    I 1.5 15 0.944 0 0 0.00 5.3 0.4

    II 3 18 0.750 0 0 0.00 2.8 0.5

    II 2.5 20.5 0.750 0 0 0.00 2.8 0.5

    IIIA 2 22.5 0.890 0 0 0.00 11.2 0.3

    IIIA 12 34.5 0.956 0 0 0.00 11.2 0.3

    IIIA 6 40.5 0.980 0 0 0.00 11.2 0.3

    IIIB 6 46.5 1.030 0 0 0.00 15 0.3

    IV 1 47.5 0.920 33 33 0.65 0 0.3

    = %

    End Bearing Component for Sand layer = T

    Friction Bearing Component for Sand layer = T

    End Bearing Resistance for Clay Layer = T

    Friction Bearing Resistance for Clay Layer = T

    Total End Bearing Resistance = T

    Total Friction Bearing Resistance = T

    Total Bearing Resistance including both cohessive & granular soils = T

    Factor of safety =

    Safe Bearing Capacity = T

    Pile Cut Off level from GL = 2.5 m

    Length of Pile below Cut-off Level Level = 45.0 m

    11.47 14.77 45.24 0.00

    1.42 11.81 5.65 0.00

    435.43

    1088.58

    6.00

    0.92 14.77 3.77

    0

    444.10

    608.32

    6.18

    5.11

    2.25

    1.88

    1.78 14.77

    14.77

    5.88 14.77

    3.00

    8.55

    13.65

    14.77

    2.5

    480.26

    608.32

    36.16

    22.62

    9.42

    22.62

    0.00

    0.00

    0.00

    36.16

    0.00

    36.16

    0.00

    C tan

    PROJECT RAIL VIKAS NIGAM LIMITED

    33.00

    K x Pdi x

    tan () x Asi

    14.8

    t/m2

    m2

    d*sub

    37.77

    0

    Pdi

    t/m2

    As

    7.54

    0.00

    0.00

    22.62

    11.31

    28.27

    VERTICAL CAPACITY OF PILES

    layer

    Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.

    15

    1.1310

    1

    47.5

    1.2

    0.920

    35.00

    n

    i

    diqdpu KPNPNDAQ

    1

    5.0

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    21/36

    CALCULATIONS FOR

    Sec.

    I

    Length of Pile below Ground Level L = m

    Dia of Pile D = m

    Effective Unit weight of soil at Pile Tip = t/m3

    Bearing Capacity Factor Nq =

    Bearing Capacity Factor N =

    Depth of Pile Cap = m

    Area of Pile Ap = m2

    Earth Pressure Coefficient k =

    Overburden Considered for a depth of = times the dia of pile

    Overburden Pdi = t/m2

    Overburden Pd = 14.9 t/m2

    Angle of Internal Friction at toe = deg

    Depth Overal sub

    m Depth t/m3

    - 4.5 4.5 0.800 0 0 0.00 0 0

    I 0.5 5 0.821 0 0 0.00 0 0

    I 5.5 10.5 0.821 0 0 0.00 3.6 0.5

    I 4.5 15 0.903 0 0 0.00 3.6 0.5

    II 3 18 0.762 0 0 0.00 2.8 0.5

    IIIA 9 27 0.937 0 0 0.00 7.6 0.4

    IIIA 6 33 0.973 0 0 0.00 7.6 0.4

    IIIB 7.5 40.5 1.011 0 0 0.00 12 0.3

    IV 1.5 42 1.000 33 33 0.65 0 0

    = %

    End Bearing Component for Sand layer = T

    Friction Bearing Component for Sand layer = T

    End Bearing Resistance for Clay Layer = T

    Friction Bearing Resistance for Clay Layer = T

    Total End Bearing Resistance = T

    Total Friction Bearing Resistance = T

    Total Bearing Resistance including both cohessive & granular soils = T

    Factor of safety =

    Safe Bearing Capacity = T

    Pile Cut Off level from GL = 2.5 m

    Length of Pile below Cut-off Level Level = 39.5 m

    22.62 0.00

    7.58 14.88 28.27 0.00

    4.52 6.27 20.73 0.00

    K x Pdi xC

    37.77

    0

    1.1310

    42.0

    PROJECT RAIL VIKAS NIGAM LIMITED

    Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.

    VERTICAL CAPACITY OF PILES

    0.00

    0.00

    tan () x Asi

    11.31

    16.96

    0.00

    1.50

    10.56

    13.73

    14.88

    5.84 14.88

    1.80

    0.41 3.81

    3.60

    0.00

    4.06

    2.29

    0.00

    layer tant/m

    2

    d*sub Pdi As

    t/m2

    410.59

    1026.48

    614.46

    54.63

    0

    357.39

    2.5

    614.46

    412.02

    1.2

    1.000

    35.00

    1.88

    16.96

    15

    14.9

    33.00

    m2

    1

    54.63

    8.43

    5.65

    14.88 33.93

    54.63

    n

    i

    diqdpu KPNPNDAQ

    1

    5.0

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    22/36

    CALCULATIONS FOR

    Sec.

    I

    Length of Pile below Ground Level L = m

    Dia of Pile D = m

    Effective Unit weight of soil at Pile Tip = t/m3

    Bearing Capacity Factor Nq =

    Bearing Capacity Factor N =

    Depth of Pile Cap = m

    Area of Pile Ap = m2

    Earth Pressure Coefficient k =

    Overburden Considered for a depth of = times the dia of pile

    Overburden Pdi = t/m2

    Overburden Pd = 15.1 t/m2

    Angle of Internal Friction at toe = deg

    Depth Overa sub

    m Depth t/m3

    - 3 3 0.800 0 0 0.00 0 0

    I 2 5 0.839 0 0 0.00 0 0

    I 4 9 0.839 0 0 0.00 4.4 0.5

    I 3 12 0.922 0 0 0.00 4.4 0.5

    II 4 16 0.766 0 0 0.00 2.9 0.5

    IIIA 2 18 0.911 0 0 0.00 7 0.4

    IIIA 1 19 0.911 0 0 0.00 7 0.4

    IIIA 2 21 0.961 0 0 0.00 7 0.4

    IIIB 7.5 28.5 0.993 0 0 0.00 11.5 0.4

    IV 5 33.5 0.900 32.5 32.5 0.64 0 0

    = %

    End Bearing Component for Sand layer = T

    Friction Bearing Component for Sand layer = T

    End Bearing Resistance for Clay Layer = T

    Friction Bearing Resistance for Clay Layer = T

    Total End Bearing Resistance = T

    Total Friction Bearing Resistance = T

    Total Bearing Resistance including both cohessive & granular soils = T

    Factor of safety =

    Safe Bearing Capacity = T

    Pile Cut Off level from GL = 2.5 m

    Length of Pile below Cut-off Level Level = 31.0 m

    3.36 5.76 15.08 0.00

    0.91 15.09 3.77

    2.5

    404.56

    1011.41

    33.5

    1.2

    0.900

    32.00

    35.22

    0

    1.1310

    443.92

    layer tant/m

    2m

    2

    d*sub Pdi As

    567.49

    8.82

    11.73

    14.18

    11.31

    15.08

    18.85

    0

    262.76

    0.00

    15.09

    4.50 15.09

    2.40

    1.68 3.24

    7.45

    7.54

    0.00

    181.16

    567.49

    181.16

    181.16

    0.00

    0.00

    0.00

    0.00

    0.00

    PROJECT RAIL VIKAS NIGAM LIMITED

    7.54

    28.27

    1.92

    2.77

    3.06

    1.82

    Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.

    t/m2

    Ctan () x Asi

    VERTICAL CAPACITY OF PILES

    32.50

    1

    15

    15.1

    1.20

    K x Pdi x

    15.09

    11.31

    0.00

    7.54

    n

    i

    diqdpu KPNPNDAQ

    1

    5.0

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    23/36

    CALCULATIONS FOR

    Sec.

    I

    Length of Pile below Ground Level L = m

    Dia of Pile D = m

    Effective Unit weight of soil at Pile Tip = t/m3

    Bearing Capacity Factor Nq =

    Bearing Capacity Factor N =

    Depth of Pile Cap = m

    Area of Pile Ap = m2

    Earth Pressure Coefficient k =

    Overburden Considered for a depth of = times the dia of pile

    Overburden Pdi = t/m2

    Overburden Pd = 14.5 t/m2

    Angle of Internal Friction at toe = deg

    Depth Overa sub

    m Depth t/m3

    - 3 3 0.800 0 0 0.00 0 0

    I 2 5 0.851 0 0 0.00 0 0

    I 2.5 7.5 0.851 0 0 0.00 2.6 0.7

    II 4.5 12 0.600 0 0 0.00 2.4 0.7

    IIIA 4 16 0.909 0 0 0.00 5.1 0.5

    IIIB 2 18 0.953 0 0 0.00 8.3 0.4

    IIIB 1 19 0.953 0 0 0.00 8.3 0.4

    IV 1 20 0.927 31 31 0.60 0 0

    IV 4 24 0.950 33 33 0.65 0 0

    IV 6 30 1.000 33 33 0.65 0 0

    = %

    End Bearing Component for Sand layer = T

    Friction Bearing Component for Sand layer = T

    End Bearing Resistance for Clay Layer = T

    Friction Bearing Resistance for Clay Layer = T

    Total End Bearing Resistance = T

    Total Friction Bearing Resistance = T

    Total Bearing Resistance including both cohessive & granular soils = T

    Factor of safety =

    Safe Bearing Capacity = T

    Pile Cut Off level from GL = 2.5 m

    Length of Pile below Cut-off Level Level = 27.5 m

    13.52

    11.31

    0.00

    7.54

    1.20

    K x Pdi x

    14.5

    layer

    3.77

    1.91

    2.13

    2.70

    3.64

    Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.

    t/m2

    Ctan () x Asi

    VERTICAL CAPACITY OF PILES

    0.00

    0.00

    0.00

    0.00

    PROJECT RAIL VIKAS NIGAM LIMITED

    15.08

    33.00

    1

    15

    0.00

    14.47

    6.00

    2.40

    1.70 3.25

    0.95

    7.54

    0.00

    7.58

    10.75

    9.42

    16.96

    22.62 212.58

    387.07

    t/m2

    m2

    d*sub Pdi As

    5.17

    0

    1.1310

    508.73

    0

    121.66

    598.47

    598.47

    387.07

    tan

    3.77 32.78

    2.5

    442.88

    1107.20

    30.0

    1.2

    1.000

    35.00

    37.77

    14.47

    3.80 14.47 15.08 141.72

    0.93 14.47

    n

    i

    diqdpu KPNPNDAQ

    1

    5.0

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    24/36

    CALCULATIONS FOR

    Description

    Checked By

    Sec.

    II Grade of Concrete of Pile fck = 35 N/mm2

    Grade of Steel of Pile fy = 500 N/mm2

    Dia of Pile d = 1.2 m

    Young's Modulus of Pile Material E = kg/cm2

    Moment of Inertia of Pile Cross Section I = cm4

    UNCONFINED COMPRESSIVE STRENGTH =

    K2 = 28.58 kg/cm2 The K2 value has been cons

    Appendix C of IS 2911 Par

    Depth of Fixity The code is silent for K2 va

    For Piles Embedded in Dense Sand R = cm hence linear interpretation h

    Free Length of Pile in Soil L1 = 0 cm

    L1

    =

    R

    For Free Head Piles Lf = 1.6

    R

    Hence, Length of Fixity for a free head pile Lf = cm

    For Fixed Head Piles Lf = 1.95

    R

    Hence, Length of Fixity for a fixed head pile Lf = cm

    Pile Head Deflection/Lateral Capacity of Pile

    Lateral Capacity of Pile (load in kg reqd for 0.5cm deflection) Y = 0.5 cm

    For a free head pile Q (free head) = 5.96 T

    For a fixed head pile Q (fixed head) = 13.18 T

    1110.96

    295804.0

    10178760

    0.61

    569.72

    0.00

    911.56

    LATERAL CAPACITY OF PILES

    PROJECT RAIL VIKAS NIGAM LIMITED

    Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.

    Cal By

    EILLQY

    f

    3

    3

    1

    4

    2K

    EIR

    EI

    LLQY

    f

    12

    3

    1

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    25/36

    ANNEXURE - 1

    SOIL REPORT -

    BORE HOLE DAT

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    26/36

    ANNEXURE - 4

    TEST PILE DESIGN

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    27/36

    ANNEXURE - 2

    GEOTECH PROFILE

    OF BORELOGS

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    28/36

    ANNEXURE - 5

    GA & RC DRAWING OF TEST PILE

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    29/36

    CAPACITY CALCULATIONS

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    30/36

    ANNEXURE - 3

    TYPICAL LOAD ON PILE

    CALCULATION

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    31/36

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    32/36

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    33/36

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    34/36

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    35/36

  • 7/29/2019 Pile Capacity Calculation (12!12!2011)

    36/36