P&ID Dev Course (2015)

Embed Size (px)

Citation preview

  • 8/17/2019 P&ID Dev Course (2015)

    1/76

     I S S U E

     D  F O R

     P P R O

      V A L

     I S S U E

     D  F O R

     P P R O

      V A L

     I S S U E

     D  F O R

     P P R O

      V A L

     I S S U E

     D  F O R

     P P R O

      V A L

     I S S U E

     D  F O R

     P P R O  V A L

     I S S U E

     D  F O R

     P P R O

      V A L

     I S S U E

     D  F O R

     A S I C 

     D E S I G

     N

     I S S U E

     D  F O R

     A S I C 

     D E S I G

     N

     I S S U E D  F

     O R A S

     I C  D E

     S I G N

     I S S U E

     D  F O R

     A S I C 

     D E S I G

     N

     I S S U E

     D  F O R

     A S I C 

     D E S I G N

     I S S U E

     D  F O R

     A S I C 

     D E S I G

     N

     I S S U E

     D  F O R

     A S I C 

     D E S I G

     N

     I S S U E

     D  F O R

     A S I C 

     D E S I G

     N

     I S S U E

     D  F O R

     A S I C 

     D E S I G

     N

     I S S U E

     D  F O R

     A S I C 

     D E S I G

     N

     I S S U E D

      F O R

     A S I C 

     D E S I G

     N

     I S S U E

     D  F O R

     A S I C

      D E S I G

     N

     I S S U E

     D  F O R

     A S I C 

     D E S I G

     N

     I S S U E

     D  F O R

     A S I C 

     D E S I G

     N

     I S S U E

     D  F O R

     A S I C 

     D E S I G

     N

     I S S U E

     D  F O R

     A S I C 

     D E S I G

     N

     A P P R

     O  V E D

      F R  C

     O N S  T R U

     C

     I O N

     A P P R

     O  V E D

      F R  C

     O N S  T R U

     C

     I O N

     A P P R

     O  V E D  F

     R  C O N

     S  T R U

     C

     I O N

     A P P R

     O  V E D

      F R  C O

     N S  T R

     U C

     I O N

     A P P R

     O  V E D

      F R  C

     O N S  T R U C

     I O N

     A P P R

     O  V E D

      F R  C

     O N S  T R U

     C

     I O N

     A P P R

     O  V E D

      F R  C

     O N S  T R U

     C

     I O N

     A P P R

     O  V E D

      F R  C

     O N S  T R U

     C

     I O N

     A P P R

     O  V E D

      F R  C

     O N S  T R U

     C

     I O N

     A P P

     R O  V E

     D  F R  C

     O N S  T R U

     C

     I O N

     A P P R O  V E

     D  F R  C

     O N S  T R U

     C

     I O N

     A P P R

     O  V E D

      F R  C

     O N S  T R U

     C

     I O N

     A P P R

     O  V E D

      F R  C

     O N S  T R U C

     I O N

     A P P R

     O  V E D

      F R  C

     O N S  T R U

     C I O N

     A P P R

     O  V E D

      F R  C

     O N S  T R U

     C

     I O N

     A P P R

     O  V E D

      F R  C

     O N S  T R U

     C

     I O N

     A P P R

     O  V E D

      F R  C

     O N S  T R U

     C

     I O N

     A P P R

     O  V E D

      F R  C

     O N S  T R U

     C

     I O N

     A P P R O  V

     E D  F

     R  C O N

     S  T R U

     C

     I O N

     A P P R

     O  V E D

      F  R  C O

     N S  T R

     U C

     I O N

     A P P R

     O  V E D

      F R  C

     O N S  T R U C

     I O N

     A P P R

     O  V E D

      F R  C

     O N S  T R U

     C I O N

     A P P R

     O  V E D

      F R  C

     O N S  T R U

     C

     I O N

     A P P R

     O  V E D

      F R  C

     O N S  T R U

     C

     I O N

     A P P R

     O  V E D

      F R  C

     O N S  T R U

     C

     I O N

     A P P R

     O  V E D

      F R  C

     O N S  T R U

     C

     I O N

      V E N

     D O R  D

     A  T I N C

     O R P O

     R A  T

     O N

      V E N D

     O R  D A  T

     I N C O R

     P O R A  T

     O N

      V E N D

     O R  D A  T

     I N C O R

     P O R A  T

     O N

      V E N D

     O R  D A  T

     I N C O R

     P O R A  T

     O N

      V E N D

     O R  D A  T

     I N C O R

     P O R A  T

     O N

      V E N D

     O R  D A  T

     I N C O R

     P O R A  T

     O N

      V E N D

     O R  D A  T

     I N C O R

     P O R A  T

     O N

      V E N D

     O R  D A  T

     I N C O R

     P O R A  T

     O N

      V E N D

     O R  D A  T

     I N C O R

     P O R A  T

     O N

     AS BUILT

     AS BUILT

     AS BUILT

     AS BUILT

     AS BUILT

     AS BUILT

    P&ID

    Piping and InstrumentDiagram

  • 8/17/2019 P&ID Dev Course (2015)

    2/76

    CONTENT 

    P&ID

    VALVE

    LINE

    VESSEL

    STORAGE TANK

    PUMP

    HEAT EXCHANGER

    COMPRESSOR

    PROCESS

    CONTROL

    PARAMETER

     ADVANCECONTROL SYSTEM

  • 8/17/2019 P&ID Dev Course (2015)

    3/76

  • 8/17/2019 P&ID Dev Course (2015)

    4/76

    VALVE

  • 8/17/2019 P&ID Dev Course (2015)

    5/76

    P&ID, VALVES

    Manual valves serve !ree "a#$r %un&'$ns 'n %lu'( !an(l'n) s*se"s+

    S$,,'n) an( sar'n) %l$-

    C$nr$ll'n) %l$- rae

    D'ver'n) %l$-

  • 8/17/2019 P&ID Dev Course (2015)

    6/76

    P&ID, VALVES

    T!e "a'n ,ara"eers &$n&erne( 'n sele&'n) a valve $r valves %$r a *,'&al )eneral

    serv'&e are+

    Flu'( $ .e !an(le(

    Fun&'$nal re/u're"ens

    O,era'n) &$n(''$ns

    Fl$- &!ara&er's'&s an( %r'&'$nal l$ss

    S'0e $% valve

     An* s,e&'al re/u're"ens1/u'&21

    $,en'n)3 %ree (ra'n'n)

  • 8/17/2019 P&ID Dev Course (2015)

    7/76

    P&ID, VALVES, GATE VALVE

    DUTY

    SERVICE

    S$,,'n) an( sar'n) %l$-

    In%re/uen $,era'$n

    Gases

    L'/u'(s

    Flu'(s -'! s$l'(s 'n sus,ens'$n

    Kn'%e )ae valve %$r slurr'es3

    %'.ers3 ,$-(ers3 an( )ranules

    Va&uu"

    Cr*$)en'&

    CORROSIVE3 TOXIC FLUID

    VALUABLE FLUID

    FRE4UENT OPERATION

    HIGH PRESSURE FLAMABLE

    FLUID

    SHOULD NOT BE USED

  • 8/17/2019 P&ID Dev Course (2015)

    8/76

    P&ID, VALVES, GLOBE VALVE, NEEDLE VALVE

    DUTY SERVICE

    C$nr$ll'n) %l$-

    S$,,'n) an( sar'n) %l$-

    Gases essen'all* %ree $% s$l'(s

    L'/u'(s essen'all* %ree $% s$l'(s

    Va&uu"

    Cr*$)en'&

    SHOULD NOT BE USED

    L$- ,ressure serv'&e

    Flu'(s -'! s$l'(s 'n sus,ens'$nL$- $ "$(erae %l$- rae

    V's&$se %lu'(F$r sa",l'n) &$nne&'$n

    Greaer !an 56 s'0e

    Fre/uen valve $,era'$n

    DUTY

  • 8/17/2019 P&ID Dev Course (2015)

    9/76

    P&ID, VALVES, BALL VALVE

    DUTY

    SERVICE

    S$,,'n) an( sar'n) %l$-

    M$(erae !r$l'n)

    Gases

    L'/u'(s

    N$n1a.ras've slurr'es

    Va&uu"

    Cr*$)en'&

    SHOULD NOT BE USED

    Sea" serv'&e

    Fl$- ('vers'$n

  • 8/17/2019 P&ID Dev Course (2015)

    10/76

    P&ID, VALVES, BUTTERFLY VALVE

    DUTY SERVICE

    S$,,'n) an( sar'n) %l$-

    C$nr$ll'n) %l$-

    Gases

    L'/u'(s

    Slurr'es

    P$-(er

    Granules

    SHOULD NOT BE USEDVa&uu"

    F$r )ases 's unusual

    I%

    lea2a)e 's '",$ran

    San'ar* !an(l'n) $% ,!ar"a&e1

    u'&als an( %$$( su%%s

  • 8/17/2019 P&ID Dev Course (2015)

    11/76

    P&ID, VALVES, PLUG VALVE, CHECK VALVE

    DUTY SERVICE

    S$,,'n) an( sar'n) %l$-

    M$(erae !r$l'n)

    Gases

    L'/u'(s

    N$n1a.ras've slurr'es

     A.ras've slurr'es

    S'&2* %lu'(s

    San'ar* !an(l'n) $% ,!ar"a&e1

    u'&al an( %$$( su%%s

     A.ras've slurr'es

    Va&uu"

    Fl$- ('vers'$n

    DUTYO,en -'! %$r-ar( %l$- an( &l$se

    a)a'ns reverse %l$-

  • 8/17/2019 P&ID Dev Course (2015)

    12/76

    P&ID, VALVES, CONTROL VALVE

    763 89:;

    FC3TS

    O

    BLOCK

    VALVE

    BLOCK

    VALVE

    BLEE

    D

    VALVEBLEED

    VALVE

    FAIL CLOSED

    MOST OF PROCESS CONTROL VALVES

    STEAM3 FUEL GAS SUPPLY

    FAIL OPENED

    COOLING 6

    SEAL CLASS

    USUALLY BET

  • 8/17/2019 P&ID Dev Course (2015)

    13/76

    P&ID, VALVES, REGULATOR

    LIMITATION

    PCVS CAN REDUCE PRESSURE UP TO HALF

    OF UPSTREAM PRESSURE

    USUALLY USED FOR UTILITY SERVICE LINE ANDUNCHANGED OPERATING CONDITION

    IT IS AN OPEN CONTROL SYSTEM SO HAVE A POOR

     ACCURACY

    IT IS A LOCAL CONTROL SYSTEM CONTROL IS NOT

    POSSIBLE FROM CONTROL ROOM

    DISADVANTAGE

  • 8/17/2019 P&ID Dev Course (2015)

    14/76

    P&ID, VALVES, ON/OFF VALVE

    763 89:;

    FC3TSO

    LIMIT S

  • 8/17/2019 P&ID Dev Course (2015)

    15/76

    VESSEL

  • 8/17/2019 P&ID Dev Course (2015)

    16/76

    P&ID, VESSEL, VERTICAL/HORIZONTAL

    GAS OUTLET

    BLOCKISOLATIONVALVE

    VORTEX BRAKER

    SHOULD BE

    INSTALED

    DEMISTER PAD SHOULD BEINSTALED

    STEAM OUT OR UTILITYCONNECTION

    VANE OR OTHER SUITABLE

    INTERNAL

    INLET STREAM

    LIQUID OUTLET

    PSV

    CONNECTION

    PSV CONNECTIONMUST BE TAKEN

    BELO<DEMISTER PAD

    LI4UID LEVELS +LLLL3 LLL3 NLL3

    HLL3 HHLL

    ELEVATION

  • 8/17/2019 P&ID Dev Course (2015)

    17/76

    P&ID, VESSEL, VERTICAL/HORIZONTAL

    INLET STREAM

    BLOCKISOLATION

    VALVE

    VORTEX BRAKER SHOULD

    BE INSTALED

    DEMISTER PAD SHOULD BEINSTALED

    STEAM OUT OR UTILITY

    CONNECTION

    GAS OUTLET

    LIQUID OUTLET

    PSVCONNECTION

    PSV

    CONNECTION

    LI4UID LEVELS +LLLL3 LLL3 NLL3

    HLL3 HHLL

    ELEVATION

  • 8/17/2019 P&ID Dev Course (2015)

    18/76

    P&ID, VESSEL, VERTICAL/HORIZONTAL

    PSVCONNECTION

  • 8/17/2019 P&ID Dev Course (2015)

    19/76

    P&ID, VESSEL, VERTICAL/HORIZONTAL

  • 8/17/2019 P&ID Dev Course (2015)

    20/76

    P&ID, VESSEL, VERTICAL/HORIZONTAL

    Three Ph!e Se"r#$r %S"''$(er Wer)

  • 8/17/2019 P&ID Dev Course (2015)

    21/76

    P&ID, VESSEL, VERTICAL/HORIZONTAL

    Three Ph!e Se"r#$r %F*e+ Wer)

  • 8/17/2019 P&ID Dev Course (2015)

    22/76

    P&ID, VESSEL, VERTICAL/HORIZONTAL

    Three Ph!e B-.e# & Wer 

  • 8/17/2019 P&ID Dev Course (2015)

    23/76

    P&ID, VESSEL, VERTICAL/HORIZONTAL

    B-.e# + R!er 

  • 8/17/2019 P&ID Dev Course (2015)

    24/76

    T0"-' Pr$+-#$ Se"r#$r 

    P&ID, VESSEL, VERTICAL/HORIZONTAL

  • 8/17/2019 P&ID Dev Course (2015)

    25/76

    P&ID, VESSEL, VERTICAL/HORIZONTAL

  • 8/17/2019 P&ID Dev Course (2015)

    26/76

    STORAGE

  • 8/17/2019 P&ID Dev Course (2015)

    27/76

    P&ID, STORAGE TANKS

    INLET STREAM

    LIQUID OUTLET

    VENT WITH

    BIRD SCREEN

  • 8/17/2019 P&ID Dev Course (2015)

    28/76

    P&ID, STORAGE TANKS

    PRODUCTION

    TANK

    INLET STREAM

    BLANKETINGGAS OUTLET

    PSV & VACUMM

    BRAKER CONNECTION

    LIQUID OUTLET

    LI4UID LEVELS +LLLL3 LLL3 NLL3

    HLL3 HHLL

  • 8/17/2019 P&ID Dev Course (2015)

    29/76

    PUMP

  • 8/17/2019 P&ID Dev Course (2015)

    30/76

    P&ID, PUMPS, TYPES AND APPLICATION

    PUMPS

    KINETICPOSITIVE

    DISPLACEMENT

    CENTRIFUGAL AXIAL ROTARY RECIPROCATING

  • 8/17/2019 P&ID Dev Course (2015)

    31/76

    P&ID, PUMPS, TYPES AND APPLICATION1 IPS2E2PR2345, GPSA

  • 8/17/2019 P&ID Dev Course (2015)

    32/76

    STRAINER

    1 Y TYPE UP TO 361 T TYPE FOR 46 AND ABOVE

    P&ID, PUMPS, MINIMUM FLOW, WARM UP, COOL DOWN

    DISCHARGE HEADER

    SUCTION HEADER

    >6WARM UP, COOL

    >6

    MINIMUM FLOW

    MINIMUM FLOW

    MINIMUMFLO< TO

    PUMPSUCTION

    MINIMUM FLO<TO SUPPLY

    RESERVOIR

    ISOLATION VALVE

    DOWN BY2PASSCHECK VALVE

    1 LIFT CHECK VALVE UP TO 361 SWING CHECK VALVE 46

    AND ABOVE

  • 8/17/2019 P&ID Dev Course (2015)

    33/76

    P&ID, PUMPS, CHECK VALVE

  • 8/17/2019 P&ID Dev Course (2015)

    34/76

    P&ID, PUMPS, STRAINER

  • 8/17/2019 P&ID Dev Course (2015)

    35/76

    HEAT EXCHANGER

  • 8/17/2019 P&ID Dev Course (2015)

    36/76

    P&ID, HEAT E7CHANGERS

    SHELL AND TUBE HE7

    SELECTION OF SHELL OR TUBE

    SIDE FOR THE FLUIDS

    TUBE SIDE SHELL SIDE

    HIGHER VISCOSITY

    EVAPORATION3 REBOILING

    LO

  • 8/17/2019 P&ID Dev Course (2015)

    37/76

    P&ID, HEAT E7CHANGERS

    DOUBLE PIPE HE7 IS AN ALTERNATIVE

    FOR SHELL AND TUBE HE7 WHEN8

    LO< FLO< RATES

    LARGE TEMPERATURE CROSS

    DUTY IS LESS THAN 9::K<

    NO OF TUBE PER PASS ?:SHELL DIAMETER ::""

    TUBE OUTLET

    TUBE INLET

    SHELL OUTLET

    SHELL INLET

  • 8/17/2019 P&ID Dev Course (2015)

    38/76

    P&ID, HEAT E7CHANGERS

    AIR VERSUS WATER COOLING

     AVALABILITY OF COOLANT

    CHOICE OF PLANT LOCATION

    CHOICE OF COOLER LOCATION

    SPACE3 FOR COOLER ONLY

    SPACE3 FOR COMPLETE COOLING

    SYSTEM

    EFFECT OF

  • 8/17/2019 P&ID Dev Course (2015)

    39/76

    P&ID, HEAT E7CHANGERS

    AIR VERSUS WATER

    COOLING

    PROCESS FLUID OUTLET

    TEMPERATURE

    PO

  • 8/17/2019 P&ID Dev Course (2015)

    40/76

    P&ID, HEAT E7CHANGERS

    FORCED AIR COOLER INDUCED AIR COOLER

    FORCED OR INDUCED DRAFT

    AIR AT LOWER AVAILABLE TEMPERATURE IN FORCED DRAFT, CAUSES LOWER POWER REQUIREMENT1

    ACCESSIBILITY TO MOTOR AND DRIVER ARE BETER ON FORSED1 LOWER STRUCTURAL AND

    MAINTENANCE COSTS1

    POSIBILITY WITH FORST DRAFT OF HOT AIR RECIRCULATING INTO SUCTION OF FAN THEREBY REDUCING

    EFFICIENCY1

    INDUCED DRAFT GIVES BETTER AIR DISTRIBUTION DUE TO LOWER INLET VELOCITY WITH LESS CHANCE

    OF RECIRCULATING OF HOT AIR1

    INDUCED DRAFT COOLERS CAN BE EASILY INSTALLED ABOVE PIPERACKS OR OTHER EQUIPMENT1

  • 8/17/2019 P&ID Dev Course (2015)

    41/76

    P&ID, HEAT E7CHANGERS

    PLATE AND FRAME VERSUS

    SHELL AND TUBE

    PLAT AND FRAME HE7HIGH THERMAL EFFICIENCY

    FLEXIBLE3 LO< FOULINGTNDENCY

    COMPACT3 LO<

  • 8/17/2019 P&ID Dev Course (2015)

    42/76

    COMPRESSOR

  • 8/17/2019 P&ID Dev Course (2015)

    43/76

  • 8/17/2019 P&ID Dev Course (2015)

    44/76

    P&ID, COMPRESSORS, TYPES & APPLICATION

  • 8/17/2019 P&ID Dev Course (2015)

    45/76

    P&ID, COMPRESSORS, P&ID

    ANTI SURGE LINE

    TRAIN

    SECOND

    TRAIN

    INLET STREAM

    HOT

    SURGE

    LINE

    STEAM OUT

    PSVCONNECTION

    LIQUID OUTLET

    PSV

    CONNECTION

  • 8/17/2019 P&ID Dev Course (2015)

    46/76

    PRESSURE SAFETY

    VALVE

  • 8/17/2019 P&ID Dev Course (2015)

    47/76

    P&ID, PRESSURE SAFETY VALVE

    PRESSURE SAFETY VALVE

    CONVENTIONAL

    BALANCE TYPE

    PILOT OPERATED

    VACUMM BRACKER

    BREATHING VALVE

  • 8/17/2019 P&ID Dev Course (2015)

    48/76

    P&ID, PRESSURE SAFETY VALVE

    ONE SET PSV

    NC

    LOFB

    LOFB

    96

    96

    FLARE SUBHEADERTO FLARE HEADER

  • 8/17/2019 P&ID Dev Course (2015)

    49/76

    PROCESS CONTROL

    SYSTEM

  • 8/17/2019 P&ID Dev Course (2015)

    50/76

    P&ID, PROCESS CONTROL SYSTEM

    PROSESS CONTROL PARAMETERS

    PRESSURE

    TEMPERATURE

    FLOW RATE

    LEVEL

    OTHER

    COMPONENT

    COMPOSITIONPH CONDUCTIVITY TURBIDITY

  • 8/17/2019 P&ID Dev Course (2015)

    51/76

    P&ID, PROCESS CONTROL SYSTEM, PRESSURE INSTRUMENTS

    PRESSURE INSTRUMENTS

    GAUGE

    INDICATOR

    SWITCH

    TRANSMITTER

    RECORDING SWITCHING ALARMING CONTROL

    HIGH HIGH HIGH LOW LOW LOW

    INDICATING

  • 8/17/2019 P&ID Dev Course (2015)

    52/76

    P&ID, PROCESS CONTROL SYSTEM, PRESSURE INSTRUMENTS

    PAH PAL

    PALL

    PSLL

    PSHH

    PAHH

    PT

    PI

    PAHHPAH

    PAL

    PALL

    PT

    LOCAL

    INDICATING

    PI

    PSH

    PSL

    PIR

    PAHHPAH

    PAL

    PALL

    SWITCHING

    TRANSMITTING

  • 8/17/2019 P&ID Dev Course (2015)

    53/76

    P&ID, PROCESS CONTROL SYSTEM, PRESSURE INSTRUMENTS

    A PRESSURE CONTROL

    LOOP IN A PFD

    PC

    763 89:;FC

    NC

    >6 >6

    PIT

    PAHH

    PIRC PAH

    PV

    PAL

    PALLA PRESSURE CONTROL

    LOOP IN A PID

    PI

  • 8/17/2019 P&ID Dev Course (2015)

    54/76

    P&ID, PROCESS CONTROL SYSTEM, TEMPERATURE INSTRUMENTS

    TEMPERATURE INSTRUMENTS

    GAUGE

    INDICATOR

    SWITCH

    TRANSMITTER

    RECORDING SWITCHING ALARMING CONTROL

    HIGH HIGH HIGH LOW LOW LOW

    INDICATING

  • 8/17/2019 P&ID Dev Course (2015)

    55/76

    P&ID, PROCESS CONTROL SYSTEM, TEMPERATURE INSTRUMENTS

    TAH TAL

    TALL

    TSLL

    TSHH

    TAHH

    TT

    TI

    TAHHTAH

    TAL

    TALL

    TT

    LOCAL

    INDICATING

    TI

    TSH

    TSL

    TIR

    TAHHTAH

    TAL

    TALL

    SWITCHING

    TRANSMITTING

  • 8/17/2019 P&ID Dev Course (2015)

    56/76

    P&ID, PROCESS CONTROL SYSTEM, TEMPERATURE INSTRUMENTS

    TC

    A TEMPERATURE

    CONTROL LOOP IN A PFD

    CWS

    PROCESS IN

    CWR

    PROCESS OUT

  • 8/17/2019 P&ID Dev Course (2015)

    57/76

    763 89:;FC

    NC

    >6 >6

    TIT

    TIRC

    TALTALL

    TAHHTAH

    TI

    FACING

    CWS

    P&ID, PROCESS CONTROL SYSTEM, TEMPERATURE INSTRUMENTS

    PROCESS IN

    A TEMPERATURE

    CONTROL LOOP IN A PID

    TV

    CWR

    PROCESS OUT

  • 8/17/2019 P&ID Dev Course (2015)

    58/76

    P&ID, PROCESS CONTROL SYSTEM, TEMPERATURE INSTRUMENTS

    763 89:;FC

    NC

    TI

    FACING

    >6 >6

    TIT

    TIRC

    TALTALL

    A TEMPERATURE

    CONTROL LOOP IN A PID

    TV

    TAHHTAH

    LPS

    PROCESS IN

    LPC

    PROCESS OUT

  • 8/17/2019 P&ID Dev Course (2015)

    59/76

    P&ID, PROCESS CONTROL SYSTEM, FLOW INSTRUMENTS

    FLOW INSTRUMENTS

    GAUGE

    INDICATOR

    SWITCH

    TRANSMITTER

    RECORDING SWITCHING ALARMING CONTROL

    HIGH HIGH HIGH LOW LOW LOW

    INDICATING

  • 8/17/2019 P&ID Dev Course (2015)

    60/76

    P&ID, PROCESS CONTROL SYSTEM, FLOW INSTRUMENTS

    FLOW MEASUREMENT

    DIFFERENTIAL PRESSURE

    INSTRUMENTS

    VARIABLE AREA

    FLOWMETER

    FORCE OR TARGET

    FLOWMETER

    TURBINE FLOWMETER

    POSITIVE DISPLACEMENT

    FLOWMETER

    VORTE7 FLOWMETER

    SONIC FLOWMETER

    VENTURI

    TUBE

    ORIFICE

    PLATEFLO< TUBE

    FLO<

    NO==LEPITOT TUBE

  • 8/17/2019 P&ID Dev Course (2015)

    61/76

    P&ID, PROCESS CONTROL SYSTEM, FLOW INSTRUMENTS

    VARIABLE AREA FLOWMETER8 Var'a.le area %l$-"eers are n$r"all* use(

    -!en l$&al 'n('&a'$n $nl* 's re/u're(

    FI

    FG

    DIFFERENTIAL PRESSURE/ORIFICE PLATE FLOWMETER8 Or'%'&e ,las are

    use( 'n 'nsalla'$ns -!ere !')!er ,ressure (r$, &$n .e $lerae(

  • 8/17/2019 P&ID Dev Course (2015)

    62/76

    P&ID, PROCESS CONTROL SYSTEM, FLOW INSTRUMENTS

    DIFFERENTIAL PRESSURE/ FLOW NOZZLE8 Fl$- n$00les are use( 'n

    'nsalla'$ns -!ere !')!er vel$&'* an( "$(erael* .eer ,ressure re&$ver*are re/u're( !an are $.a'na.le -'! an $r'%'&e ,lae

    DIFFERENTIAL PRESSURE/ VENTURI TUBE8 Venur' u.es are use( 'n

    'nsalla'$ns -!ere !')! &a,a&'* an( )$$( ,ressure re&$ver* are re/u're($r -!ere !e "easure( srea" &$na'ns s$"e s$l'(s

    DIFFERENTIAL PRESSURE/ POITOT TUBE, ANNUBAR8 Generall*3 ,'$ u.es

    are use( 'n 'nsalla'$ns -!ere n$ a,,re&'a.le ,ressure (r$, &an .e $lerae(

    $n !')!1v$lu"e %l$-s3 su&! as $n &$$l'n) -aer

  • 8/17/2019 P&ID Dev Course (2015)

    63/76

    P&ID, PROCESS CONTROL SYSTEM, FLOW INSTRUMENTS

    FORCE OR TARGET FLOWMETER8 F$r&e $r ar)e %l$- "eers "easure %l$-

    'n%eren'all* .* "easur'n) !e %$r&e (evel$,e( a a ('s21s!a,e( ar)e

    sus,en(e( 'n !e %l$- ,a! Tar)e "eers are use( %$r "easur'n) !e %l$- $%v's&$us !*(r$&ar.$n srea"s

    TURBINE FLOWMETER8 Tur.'ne "eers "easure %l$- %r$" !e r$a'$n

    ,r$(u&e( .* !e %l$- ,as a ur.'ne $r ,r$,eller O&&as'$nall*3 ur.'ne

    "eers are use( %$r ,r$&ess %l$- "easure"en -!ere !')!l* a&&urae3 -'(eran)e "easure"en $% ver* s"all %l$- raes 's re/u're(

    POSITIVE DISPLACEMENT8 T!'s "eer "easures %l$- .* 's$la'n)3 &$un'n)3

    an( $al'n) se)"ens $% 2n$-n v$lu"e as !e* are ('s,la&e( !r$u)! 's

    .$(* P$s''ve ('s,la&e"en "eers are use( .e&ause !e* are a&&urae$ver a -'(e %l$- ran)e T!e* are $%en use( %$r &us$(*rans%er3 ,ar'&ularl*

    %$r !eav* $r v's&$us %lu'(s

  • 8/17/2019 P&ID Dev Course (2015)

    64/76

    P&ID, PROCESS CONTROL SYSTEM, FLOW INSTRUMENTS

    VORTE7 FLOWMETER8 V$re7 "eers are $s&'lla$r* %l$-"eers !a u'l'0e

    !e v$re7 ra'n )enerae( .* an $.sru&'$n ,la&e( 'n a %lu'( srea" T!e*

    "easure %l$- .* &$un'n) !e v$r'&es V$re7 "eers are use( ,r'"ar'l*

    .e&ause $% !e'r -'(e ran)ea.'l'* an( a&&ura&* In &era'n &ases3 !e'rrela'vel* l$- &$s "a* als$ ('&ae !e'r use

  • 8/17/2019 P&ID Dev Course (2015)

    65/76

    P&ID, PROCESS CONTROL SYSTEM, FLOW INSTRUMENTS

    FAH FAL

    FALL

    SWITCHINGFSH

    FSL

    FSLL

    FSHH

    FAHH

    FT

    FI

    FAHHFAH

    FAL

    FALL

    FT

    FIR

    FAHHFAH

    FAL

    FALL

    TRANSMITTING

  • 8/17/2019 P&ID Dev Course (2015)

    66/76

    763 89:;FC

    NC

    >6 >6

    FV

    A FLOW CONTROL

    LOOP IN A PID

    PROCESSLINE

    FIT

    FAL

    FALL

    P&ID, PROCESS CONTROL SYSTEM, FLOW INSTRUMENTS

    A FLOW CONTROL

    LOOP IN A PFD

    FC

    FAHH

    FIRC FAH

  • 8/17/2019 P&ID Dev Course (2015)

    67/76

    P&ID, PROCESS CONTROL SYSTEM, LEVEL INSTRUMENTS

    LEVEL INSTRUMENTS

    GAUGE

    INDICATOR

    SWITCH

    TRANSMITTER

    RECORDING SWITCHING ALARMING CONTROL

    HIGH HIGH HIGH LOW LOW LOW

    INDICATING

  • 8/17/2019 P&ID Dev Course (2015)

    68/76

    P&ID, PROCESS CONTROL SYSTEM, LEVEL INSTRUMENTS

    LG

    LSH

    LAH

    LSH

    LAH

    LT

    LIR

    LAHHLAH

    LAL

    LALL

  • 8/17/2019 P&ID Dev Course (2015)

    69/76

    P&ID, PROCESS CONTROL SYSTEM, LEVEL INSTRUMENTS

    LC

    A FLOW CONTROL

    LOOP IN A PFD

  • 8/17/2019 P&ID Dev Course (2015)

    70/76

    P&ID, PROCESS CONTROL SYSTEM, LEVEL INSTRUMENTS

    LT

    LIRC

    LAHHLAH

    LAL

    LAL

    L

    763 89:;FC

    NC

    >6 >6

    LV

    A FLOW CONTROLLOOP IN A PID

  • 8/17/2019 P&ID Dev Course (2015)

    71/76

    P&ID, PROCESS CONTROL SYSTEM, LEVEL INSTRUMENTS

    LT

    LIRC

    LAHHLAH

    LAL

    LAL

    L

    763 89:;FC

    NC

    >6 >6

    >6

    LV

    LG

    >6

    & C CO O S S S G S

  • 8/17/2019 P&ID Dev Course (2015)

    72/76

    P&ID, ADVANCE CONTROL SYSTEM, SIGNALS

    CONTROL SIGNALS

    ELECTRIC SIGNAL

     

    ELECTRONIC SIGNAL

    HYDRAULIC SIGNAL

    P&ID ADVANCE CONTROL SYSTEM CASE STUDY

  • 8/17/2019 P&ID Dev Course (2015)

    73/76

    P&ID, ADVANCE CONTROL SYSTEM, CASE STUDY

    LT

    LI

    763 89:;>6 FC

    NC

    >6

    XV

    LG

    >6

    >6

    LSL

    LSH

    I ON/OF

    LAL

    LAH

    P&ID ADVANCE CONTROL SYSTEM CASE STUDY

  • 8/17/2019 P&ID Dev Course (2015)

    74/76

    P&ID, ADVANCE CONTROL SYSTEM, CASE STUDY

    PI

    PT

    PAL

    PI

    PDT

    PDI

    PDAH

    FIT

    FIC

    FAL

    LV

    PI

    PT

    PAHPI

    763 89:;FO

    NC

    >6

    P&ID ADVANCE CONTROL SYSTEM CASE STUDY

  • 8/17/2019 P&ID Dev Course (2015)

    75/76

    P&ID, ADVANCE CONTROL SYSTEM, CASE STUDY1

    LT

    LI

    763 89:;>6 FC

    NC

    >6

    XV

    LG

    >6

    >6

    LSLL

    LSHH

    IOPEN

    LALL

    CLOSELAH

    LAL

    I LAHH

    ESD

    P&ID ADVANCE CONTROL SYSTEM CASE STUDY

  • 8/17/2019 P&ID Dev Course (2015)

    76/76

    P&ID, ADVANCE CONTROL SYSTEM, CASE STUDY

    LT

    LIC

    763 89:;>6 FC

    NC

    >6

    LV

    LG

    >6

    >6

    LSLL

    LSHH

    I

    LALL

    LAH

    LAL

    I LAHH

    ESD

    SV