The New Locks of the Panama Canal The New Locks of the Panama Canal Juan Wong H. Project Manager Third Set of Locks Pacific Panama Canal Authority 16 October, 2009 Juan Wong H. Project Manager Third Set of Locks Pacific Panama Canal Authority 16 October, 2009 PIANC Workshop Innovation in Navigation Lock Design PIANC Workshop Innovation in Navigation Lock Design The Panama Canal Expansion Program The Panama Canal Expansion Program The Panama Canal Market and Capacity Expansion Program Third Set of Locks Contracting New Locks Features Project Management The Panama Canal Market and Capacity Expansion Program Third Set of Locks Contracting New Locks Features Project Management

PIANC Workshop Innovation in Navigation Lock Design 15 16 10 2009... · PIANC Workshop Innovation in Navigation Lock Design The Panama Canal Expansion Program The Panama Canal Market

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PIANC Workshop Innovation in Navigation Lock Design 15 16 10 2009... · PIANC Workshop Innovation in Navigation Lock Design The Panama Canal Expansion Program The Panama Canal Market

The New Locks of the Panama CanalThe New Locks of the Panama Canal

Juan Wong H.Project Manager Third Set of Locks Pacific

Panama Canal Authority16 October, 2009

Juan Wong H.Project Manager Third Set of Locks Pacific

Panama Canal Authority16 October, 2009

PIANC WorkshopInnovation in Navigation Lock

Design

PIANC WorkshopInnovation in Navigation Lock

Design

The Panama Canal Expansion Program The Panama Canal Expansion Program

The Panama Canal Market and Capacity

Expansion Program

Third Set of Locks Contracting

New Locks Features

Project Management

The Panama Canal Market and Capacity

Expansion Program

Third Set of Locks Contracting

New Locks Features

Project Management

Page 2: PIANC Workshop Innovation in Navigation Lock Design 15 16 10 2009... · PIANC Workshop Innovation in Navigation Lock Design The Panama Canal Expansion Program The Panama Canal Market

The Panama CanalThe Panama Canal

Gatun LakeAtlantic Ocean Pacific OceanMiraflores

Lake

Gatun Locks

Pedro Miguel Locks

Miraflores Locks

� The Panama Canal opened in August 15, 1914� This waterway is approx. 50 miles (80 km) long betw een the Atlantic and

Pacific Oceans� Gatun Lake is 85 feet (26 m) above sea level� The water used to raise and lower vessels in each s et of locks comes from

Gatun Lake by gravity (approx. 52 million of gallons per transits)

� The Panama Canal opened in August 15, 1914� This waterway is approx. 50 miles (80 km) long betw een the Atlantic and

Pacific Oceans� Gatun Lake is 85 feet (26 m) above sea level� The water used to raise and lower vessels in each s et of locks comes from

Gatun Lake by gravity (approx. 52 million of gallons per transits)

YantianYantian

KwangyangKwangyang

Hong KongHong Kong

KeelungKeelung

WilmingtonWilmingtonPusanPusan

ManzanilloManzanillo

NJ/NYNJ/NYLe HavreLe Havre

HalifaxHalifax

FelixstoweFelixstowe

SavannahSavannahLos AngelesLos Angeles

BremerhavenBremerhaven

KaohsiungKaohsiung

CharlestonCharleston

NagoyaNagoya

OaklandOakland

SeattleSeattleTokyoTokyo

ColomboColombo

ShanghaiShanghai

YokohamaYokohama

Newport NewsNewport News

HakataHakataManzanillo (Mx)Manzanillo (Mx)

MiamiMiamiEvergladesEverglades

RotterdamRotterdam

KobeKobe

BaltimoreBaltimore

OsakaOsaka HamburgHamburg

ShimizuShimizuPort SaidPort Said

Colon ContainerTerminal

Colon ContainerTerminal

ZeebruggeZeebrugge

ChabangChabang

TahitiTahiti

AucklandAuckland

DoniamboDoniambo

BrisbaneBrisbane

SydneySydney

MelbourneMelbourne

Tanjung PriokTanjung Priok

SingaporeSingapore

MarseillesMarseilles

La SpeziaLa Spezia

TilburyTilbury

DunkerqueDunkerque

VeracruzVeracruzNew OrleansNew Orleans

QingdaoQingdao

BuenaventuraBuenaventura

GuayaquilGuayaquilCallaoCallao

AricaArica

CoquimboCoquimbo

San AntonioSan Antonio

San VicenteSan Vicente

.....

.Puerto LimónPuerto Limón

IquiqueIquique

MantaManta

AntofagastaAntofagastaValparaísoValparaíso

AntwerpAntwerp

BalboaBalboa

Long BeachLong Beach

ThamesportThamesport

KingstonKingston

37 Liners Services employing Container utilize the Panama Canal in 2008

37 Liners Services employing Container utilize the Panama Canal in 2008

Source: Compair DataSource: Compair Data

UNCTAD: “Panama is the country of Latin America that offers more connectivity”

Page 3: PIANC Workshop Innovation in Navigation Lock Design 15 16 10 2009... · PIANC Workshop Innovation in Navigation Lock Design The Panama Canal Expansion Program The Panama Canal Market

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

50,000

191

6

192

3

193

0

193

7

194

4

195

1

195

8

196

5

197

2

197

9

198

6

199

3

200

0

200

7

0

50

100

150

200

250

300

350

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

50,000

191

6

192

3

193

0

193

7

194

4

195

1

195

8

196

5

197

2

197

9

198

6

199

3

200

0

200

7

0

50

100

150

200

250

300

350

PCUMS Tonnage in millions

PCUMS Tonnage in millions

PCUMS Tonnage of Comercial TransitsPCUMS Tonnage of Comercial Transits

Transits vs Tonnage PCUMS FY1915 - FY2006

Transits vs Tonnage PCUMS FY1915 - FY2006

Transits

Transits

PCUMS 312.7PCUMS 312.7

Transits 14,661

Transits 14,661

AF 1955AF 1955

4,832

AF1975AF1975

9,931

AF 1995AF 1995

18,940

AF 2007AF 2007

23,561

Fiscal YearFiscal Year

PCUMS Tonnage = 2.83 meters cubicPCUMS Tonnage = 2.83 meters cubic

Segments 2006 2007

Containers $503M 49% $682M 56%

Dry bulk 170M 17% 163M 13%

Car Carriers 100M 10% 106M 9%

Liquid bulk 91M 9% 107M 9%

Others 59M 6% 61M 5%

Refrigerated 53M 5% 57M 5%

Passengerships

26M 3% 26M 2%

GeneralCargo

25M 2% 25 2%

Market Segments Market Segments

Page 4: PIANC Workshop Innovation in Navigation Lock Design 15 16 10 2009... · PIANC Workshop Innovation in Navigation Lock Design The Panama Canal Expansion Program The Panama Canal Market

Modernization and Enhancement Investment ProgramModernization and Enhancement Investment Program

20002000 20012001 20022002 20032003 20042004 20052005 20062006

113113

1,3461,346

20072007

DredgingDredging

LocomotivesLocomotives

Hydraulic SystemHydraulic System

TechnologyTechnology Rail SystemRail System Tug-BoatsTug-Boats

Accumulated Investment

(in millions of US Dollars)

Accumulated Investment

(in millions of US Dollars)

113 142 126 207 115 144 233 266

Per yearPer year

Capital expenditures on enhancement program have been executed on time and within budget (2000-2006)

Page 5: PIANC Workshop Innovation in Navigation Lock Design 15 16 10 2009... · PIANC Workshop Innovation in Navigation Lock Design The Panama Canal Expansion Program The Panama Canal Market

The Panama Canal Expansion ProgramThe Panama Canal Expansion Program

Improvements to the water supplyImprovements to the water supply

The investment of each component includes contingen cyThe investment of each component includes contingen cy

New locksNew locks Water saving basinsWater saving basins

820820

620620

2,7302,730

530530

260260

290290

5,2505,250

Inflation during construction

Inflation during construction

Total investmentTotal investment

Access channel for new locksAccess channel for new locks

Capital Expenditures ($ millions)Capital Expenditures ($ millions)

Improvements to the existing navigational channel

New LocksNew Locks

Existing LocksExisting Locks

12,600 TEUs12,600 TEUs

Page 6: PIANC Workshop Innovation in Navigation Lock Design 15 16 10 2009... · PIANC Workshop Innovation in Navigation Lock Design The Panama Canal Expansion Program The Panama Canal Market

Deepening & widening of the Atlantic entrance

Deepening & widening of the Atlantic entrance

Atlantic Post Panamax Locks

Atlantic Post Panamax Locks

Increase the Maximum Operating Level of Gatún Lake

Pacific Post Panamax Locks

Pacific Post Panamax Locks

15.8 M m315.8 M m3

26.7 m 26.7 m 27.1 m 27.1 m

Deepening & widening of the Gatun lake & Culebra Cut navigational channels

Deepening & widening of the Gatun lake & Culebra Cut navigational channels

Post Panamax Locks Pacific Access Channel

48 M m3

Deepening & widening of the Pacific entrance

Deepening & widening of the Pacific entrance

9.1 M m39.1 M m3

Expansion Program Components$5.25Billion investment over a 7 year periodExpansion Program Components$5.25Billion investment over a 7 year period

Atlantic Ocean

Pacific Ocean

Projects UnderwayPacific Access Channel - Phase 1Projects UnderwayPacific Access Channel - Phase 1

12

Programmed

Current 95%

Borinquen Road 3.4 Km.

Borinquen Road 3.4 Km.

Borinquen Road

Borinquen Road

Contract Scope: 7.4 Mm 3 of earth removal, cleanup of 146 hectares of UXO disposal area and relocation of 3.4 km of Borinquen Road

Awarded : July 17, 2007

Amount: $40,431,196.00

Pending: drainage system work, asphaltic cap, erosion control and guttering work.

OriginalOriginal

Original

July 15, 2009

July 15, 2009

136 m136 m

46 m46 m

7.4 M m3 excavated7.4 M m3 excavated0% 10% 20% 30% 40% 50% 60% 70% 80% 90%100%

UXO 1146 Ha Cleared

UXO 1146 Ha Cleared

93%93%

Page 7: PIANC Workshop Innovation in Navigation Lock Design 15 16 10 2009... · PIANC Workshop Innovation in Navigation Lock Design The Panama Canal Expansion Program The Panama Canal Market

Projects Underway

Pacific Access Channel - Phase 2

Projects Underway

Pacific Access Channel - Phase 2

13PAC - 2PAC - 2

Cocoli RiverCocoli River

Borinquen Road

Borinquen Road

Cocoli River DiversionCocoli River DiversionExcavation

Project Scope: Excavation of 7.5 M m 3, Relocation of 1.3 Km road, 3.5 Km Cocoli River diversion.

Awarded: November 27, 2007.

Project Scope: Excavation of 7.5 M m 3, Relocation of 1.3 Km road, 3.5 Km Cocoli River diversion.

Awarded: November 27, 2007.

6.7 M m3 excavated6.7 M m3 excavated 0 10 20 30 40 50 60 70 80 90 100

79%

92%92%Programmed

Current

0+175 0+675 1+175 1+675 2+175 2+675 3+175 3+675 4+175 4+675 5+175 5+675 6+175 6+675 7+175

ELE

VA

CIO

N

140

- 40

- 10

20

50

80

110

140

- 40

- 10

20

50

80

110

PAC- 3PAC- 3

UXO 2190 Ha

UXO 2190 Ha

PAC-1PAC-1

PAC-2PAC-2

PAC 3PAC 3

Projects Underway

Pacific Access Channel - Phase 3Projects Underway

Pacific Access Channel - Phase 3Awarded: December 16, 2008

Company: Constructora MECO, S.A.

Excavation: 8.0 M m3

Clearing 190 ha of UXO area

0 10 20 30 40 50 60 70 80 90 100

Programmed

Current 26%

16%16%

1.034 M m3 excavated1.034 M m3 excavated178 hectares cleared178 hectares cleared

Page 8: PIANC Workshop Innovation in Navigation Lock Design 15 16 10 2009... · PIANC Workshop Innovation in Navigation Lock Design The Panama Canal Expansion Program The Panama Canal Market

Projects UnderwayPacific Entrance Deepening and Widening (9.1 M m 3)Projects UnderwayPacific Entrance Deepening and Widening (9.1 M m 3)

Breydel Hopper DredgeBreydel Hopper Dredge

Awarded: April 1, 2008

Company: Dredging International

Amount: $ 177,500,676.78

Dredging Amount: 9.1 M m3

4.04 M m3 dredged4.04 M m3 dredged

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Programmed

Current 41%41%

37%37%

Drilling & Blasting BargeYuan Dong 007

Projects UnderwayGatun Lake & Culebra Cut Dredging AreasProjects UnderwayGatun Lake & Culebra Cut Dredging Areas

Barro ColoradoBarro Colorado

GamboaGamboa

Gatun LakeGatun LakeGatún

Gatún

Peña Blanca

Peña Blanca

BohíoBohío

Buena Vista

Buena Vista

Mame

y

Mame

y

Juan GrandeJuan Grande

Chagres

Chagres

San PabloSan Pablo

Tabern

il l aTabern

il l a

GamboaGamboa

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Programmed

Current 21%

22%22%

Page 9: PIANC Workshop Innovation in Navigation Lock Design 15 16 10 2009... · PIANC Workshop Innovation in Navigation Lock Design The Panama Canal Expansion Program The Panama Canal Market

Atlantic EntranceDeepening & WideningAtlantic EntranceDeepening & Widening

Width: 225m (740´) ▶▶▶▶

Volume: 15.8 M m3

RFP Issued: February 27, 2009

Contract award: October 2, 2009

Contractor: Jan de Nul

Contract amount: $89 M

0+175 0+675 1+175 1+675 2+175 2+675 3+175 3+675 4+175 4+675 5+175 5+675 6+175 6+675 7+175

ELE

VA

TIO

N

140

- 40

- 10

20

50

80

110

140

- 40

- 10

20

50

80

110

Pacific Access Channel - Phase 427 M m3 of Dry Excavation

Tender Documents published on July 31, 2009

Pacific Access Channel - Phase 427 M m3 of Dry Excavation

Tender Documents published on July 31, 2009

PAC 4PAC 4

PAC 2PAC 2

PAC 3PAC 3

PAC 1PAC 1

PAC-2PAC-2

PAC-1PAC-1

PAC-3PAC-3PAC-4PAC-4

Borinquen DamBorinquen Dam

0% 10% 20% 30% 40% 50% 60% 70% 80% 90%100%

Programmed

Current 2%2%

2%2%• Site Visit: August 25, 2009

• Pre tender Meeting: August 26, 2009

• Submit Technical Proposal: August 31, 2009

• Bid Opening (Price): October 30, 2009

• Site Visit: August 25, 2009

• Pre tender Meeting: August 26, 2009

• Submit Technical Proposal: August 31, 2009

• Bid Opening (Price): October 30, 2009

Page 10: PIANC Workshop Innovation in Navigation Lock Design 15 16 10 2009... · PIANC Workshop Innovation in Navigation Lock Design The Panama Canal Expansion Program The Panama Canal Market

Miraflores Lake

Pacific Locks Access Channel

Clay Core

Rock

Borinquen DamBorinquen Dam

Third Set of Locks contract awardThird Set of Locks contract award

Page 11: PIANC Workshop Innovation in Navigation Lock Design 15 16 10 2009... · PIANC Workshop Innovation in Navigation Lock Design The Panama Canal Expansion Program The Panama Canal Market

Locks Design and ConstructionTimeline of the Contracting PlanLocks Design and ConstructionTimeline of the Contracting Plan

New Datefor Last Individual Meeting with the

Consor tia 16-JAN-09

AGO SEP OCT NOV DIC ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC ENE FEB MAR APR MAY JUN JUL AGO SEP

2007 2008 2009

Request For Qualifications

Issued27-AUG-07

Draft Issue of the Terms of Refer ence

21-DEC-07

Receipt of Qualifications15-NOV-07

Shor t List Selection14-DEC-07

Individual Meetings with the Consor tia29-JAN-08

Homologation of the Terms of Refer ence26-MAR-08

Final Terms of Refer ence

Issued18-APR-08

Designation of the Technical

Evaluation Board

14 months14 months

Preview Confer ence13-SEP-07

Receipt of Proposals3-MAR-09

Contr act Award

15 -JUL-09

Proposals evaluation advisorsidentified9-FEB-09

PrequalificationPrequalification

Per formance & Payment Bonds r eceived11-AUG-09

Consortium Members Designers Gate fabricators

C.A.N.A.L.

ACS Serv icios, Comunicaciones y Energía, S.L. – Leader Sener Ingeniería y S istemas

ACS Serv icios, Comunicaciones y Energía, S.L.

A cciona Infraestructuras, S.A. Haskoning Nederland BV

F omento de C onstrucciones y Contratas, S.A. Mott Macdonald Limited

Hochtief Construction AG Hochtief Consult

Constructoras ICA S.A. de C.V.

Atlántico-Pacífico de Panamá

Bouy gues Travaux Publics – Leader

AECOM – Leader A LSTOM Hy dro Energia Brasil

Bilfinger Berger

VINCI C onstruction Grands Projets

Construcoes e Comercio C amargo Correa S.A.

Construtora A ndrade Gutierrez S.A.

Construtora Q ueiroz Galvao S.A.

A LSTOM Hy dro Energia Brasil

BARDELLA Ind. Mecánicas

Bechtel, Taisei, Mitsubishi

Corporation

Bechtel Internacional, Inc. – Leader

Bechtel Internacional, Inc. –Leader

Wuchang Shipyard Taisei Corporation

Mitsubishi Corporation

Grupo Unidos por el Canal

Sacy r Vallehermoso S.A. – Leader Montgomery Watson Harza (MWH) –Leader

Heerema Fabrication GroupImpregilo S.p.A.

Jan de Nul n.v. IV -Groep

Constructora Urbana, S.A . Tetra Tech

Prequalified ConsortiaPrequalified Consortia

Page 12: PIANC Workshop Innovation in Navigation Lock Design 15 16 10 2009... · PIANC Workshop Innovation in Navigation Lock Design The Panama Canal Expansion Program The Panama Canal Market

Consortium Members Designers Gate fabricators

C.A.N.A.L.

ACS Serv icios, Comunicaciones y Energía, S.L. – Leader Sener Ingeniería y S istemas

ACS Serv icios, Comunicaciones y Energía, S.L.

A cciona Infraestructuras, S.A. Haskoning Nederland BV

F omento de C onstrucciones y Contratas, S.A. Mott Macdonald Limited

Hochtief Construction AG Hochtief Consult

Constructoras ICA S.A. de C.V.

Bechtel, Taisei, Mitsubishi

Corporation

Bechtel Internacional, Inc. – Leader

Bechtel Internacional, Inc. –Leader

Wuchang Shipyard Taisei Corporation

Mitsubishi Corporation

Grupo Unidos por el Canal

Sacy r Vallehermoso S.A. – Leader Montgomery Watson Harza (MWH) –Leader

Heerema Fabrication GroupImpregilo S.p.A.

Jan de Nul n.v. IV -Groep

Constructora Urbana, S.A . Tetra Tech

Consortia that submitted proposals on March 3, 2009Consortia that submitted proposals on March 3, 2009

Atlántico-Pacífico de Panamá

Bouy gues Travaux Publics – Leader

AECOM – LeaderA LSTOM Hy dro Energia Brasil

Bilfinger Berger

VINCI C onstruction Grands Projets

Construcoes e Comercio C amargo Correa S.A.

Construtora A ndrade Gutierrez S.A.

Construtora Q ueiroz Galvao S.A.

A LSTOM Hy dro Energia Brasil

BARDELLA Ind. Mecánicas

Bechtel Mitsubishi TaiseiBechtel Mitsubishi Taisei CANALCANAL GUPCGUPC

Locks Design and Construction Bidding ProcessLocks Design and Construction Bidding ProcessOpening of Price Envelopes - July 8, 2009 Opening of Price Envelopes - July 8, 2009

Page 13: PIANC Workshop Innovation in Navigation Lock Design 15 16 10 2009... · PIANC Workshop Innovation in Navigation Lock Design The Panama Canal Expansion Program The Panama Canal Market

New Locks featuresNew Locks features

Page 14: PIANC Workshop Innovation in Navigation Lock Design 15 16 10 2009... · PIANC Workshop Innovation in Navigation Lock Design The Panama Canal Expansion Program The Panama Canal Market

Main functions and objectives Third Set of Locks Main functions and objectives Third Set of Locks

• Larger locks for post-panamax vessels

• Throughput minimize F-E times

• Safe smooth filling and emptying lock chambers

• Environmental preserve Gatun Lake as source of fresh water for human consumption

• High reliability third lane locks

• Water efficient

• Benefit/Cost analysis alternatives

• Life cycle cost optimization

• Durable infrastructure

• Larger locks for post-panamax vessels

• Throughput minimize F-E times

• Safe smooth filling and emptying lock chambers

• Environmental preserve Gatun Lake as source of fresh water for human consumption

• High reliability third lane locks

• Water efficient

• Benefit/Cost analysis alternatives

• Life cycle cost optimization

• Durable infrastructure

Project concept and execution of Third Set of Locks projectProject concept and execution of Third Set of Locks project

• Conceptual design

• Numerical and physical F-E models

• Performance based contract specifications

• Design and build contract

• Technical evaluation of proposals

• Selection based on best value

• Final design by Contractor

• Requires optimization of F-E system numerical model and validation physical model

• Commissioning F-E performance

• Conceptual design

• Numerical and physical F-E models

• Performance based contract specifications

• Design and build contract

• Technical evaluation of proposals

• Selection based on best value

• Final design by Contractor

• Requires optimization of F-E system numerical model and validation physical model

• Commissioning F-E performance

Page 15: PIANC Workshop Innovation in Navigation Lock Design 15 16 10 2009... · PIANC Workshop Innovation in Navigation Lock Design The Panama Canal Expansion Program The Panama Canal Market

Atlantic & Pacific Post Panamax Locks(40 M m3 of dry excavation)Atlantic & Pacific Post Panamax Locks(40 M m3 of dry excavation)

PacificPacific

AtlanticAtlantic

Lock Chamber

Length: 427 m

Width: 55 m

Depth: 18.3 m

Vessel size

LOA: 366 m

Beam: 49 m

Draft: 15.2 m

Dimensions of Locks and VesselsDimensions of Locks and Vessels

294.1 m (965’)

294.1 m (965’)

33.5 m (110’)33.5 m (110’)

32.3 m (106’)32.3 m (106’)

304.8 m (1,000’)

304.8 m (1,000’)

12.8 m (42’)

366 m (1,200’)

366 m (1,200’)

55 m (180’)55 m (180’)

49 m (160’)49 m (160’)

427 m (1,400’)

427 m (1,400’)

18.3 m (60’)

12.4 m(39.5’)

12.4 m(39.5’)

15.2 m(50’)

15.2 m(50’)

Existing Locks Max Vessel size:Existing Locks Max Vessel size: 4,400 TEU’s4,400 TEU’s

New Locks Max Vessel size:New Locks Max Vessel size: 12,600 TEU’s12,600 TEU’s

New Locks

New Locks

Existing Locks

Existing Locks

Page 16: PIANC Workshop Innovation in Navigation Lock Design 15 16 10 2009... · PIANC Workshop Innovation in Navigation Lock Design The Panama Canal Expansion Program The Panama Canal Market

GUPC Locks Design – Pacific LocksGUPC Locks Design – Pacific Locks

Post-Panamax Locks Operation GUPC’s Proposal Post-Panamax Locks Operation GUPC’s Proposal

With the water saving basinsthe new locks will use 7% less water than the existing locks

With the water saving basinsthe new locks will use 7% less water than the existing locks

Existing LocksExisting LocksNew LocksNew Locks

Water Utilization

Water Utilization

WSB 1WSB 2WSB 3

Page 17: PIANC Workshop Innovation in Navigation Lock Design 15 16 10 2009... · PIANC Workshop Innovation in Navigation Lock Design The Panama Canal Expansion Program The Panama Canal Market

Hydraulic Filling and Emptying SystemUpper Chamber and water IntakesHydraulic Filling and Emptying SystemUpper Chamber and water Intakes

GUPC Tender Design Meets or Exceeds ACP’s Performance RequirementsGUPC Tender Design Meets or Exceeds ACP’s Performance Requirements

• Filling and Emptying System times – improved throughput

• Chamber Hawser Forces

• Permeable Approach Structure

• Approach Channel Current Velocities

• Culvert water flow velocities

• Water Saving percentage

• Filling and Emptying System times – improved throughput

• Chamber Hawser Forces

• Permeable Approach Structure

• Approach Channel Current Velocities

• Culvert water flow velocities

• Water Saving percentage

Page 18: PIANC Workshop Innovation in Navigation Lock Design 15 16 10 2009... · PIANC Workshop Innovation in Navigation Lock Design The Panama Canal Expansion Program The Panama Canal Market

Peak Surface longitudinal VelocityMixing 14 min after with permeable approach wallPeak Surface longitudinal VelocityMixing 14 min after with permeable approach wall

F-E system final design next stepsF-E system final design next steps

• Contractor to optimize numerical model runs and finalize F-E system design

• Validate F-E system with contractor’s physical model prior to construction of F-E system

• Final F-E system acceptance with commissioning and take over performance tests

• Contractor to optimize numerical model runs and finalize F-E system design

• Validate F-E system with contractor’s physical model prior to construction of F-E system

• Final F-E system acceptance with commissioning and take over performance tests

Page 19: PIANC Workshop Innovation in Navigation Lock Design 15 16 10 2009... · PIANC Workshop Innovation in Navigation Lock Design The Panama Canal Expansion Program The Panama Canal Market

Program ManagementProgram Management

The $2.3 billion financing package will cover a portion of the $5.25 billion total cost of the project and will be allocated as follows: The $2.3 billion financing package will cover a portion of the $5.25 billion total cost of the project and will be allocated as follows:

Administration Secured Financing for Expansion Program – December 9 , 2008

Administration Secured Financing for Expansion Program – December 9 , 2008

FINANCING: European Investment Bank (EIB) $ 500 M

Japan Bank for International Cooperation (JBIC) $ 80 0 M

Inter-American Development Bank (IDB) $ 400 M

International Finance Corporation (IFC) $ 300 M

Corporación Andina de Fomento (CAF) $ 300 M

Subtotal: $2,300 M

ACP: $ 2,950 M

Total: $ 5,250 M

The negotiated financing structure includes favorable provisions for the ACP including a 20-year amortizing period with a 10-year grace period.

The negotiated financing structure includes favorable provisions for the ACP including a 20-year amortizing period with a 10-year grace period.

Page 20: PIANC Workshop Innovation in Navigation Lock Design 15 16 10 2009... · PIANC Workshop Innovation in Navigation Lock Design The Panama Canal Expansion Program The Panama Canal Market

Administration Program Management Integrated SystemAdministration Program Management Integrated System

Main Modules

Management Dashboard

Primavera P6

Project Accounting (Oracle PA)

Primavera Contract Manager (Document Control)

Risk Analysis (Primavera Pert Master and @Risk)

Cost Estimates (Heavy Bid and Timberline Estimating)

Main Modules

Management Dashboard

Primavera P6

Project Accounting (Oracle PA)

Primavera Contract Manager (Document Control)

Risk Analysis (Primavera Pert Master and @Risk)

Cost Estimates (Heavy Bid and Timberline Estimating)

Administration Environmental and Social Monitoring and ControlAdministration Environmental and Social Monitoring and Control

Environmental Impact Assessment

Ecological Compensation paid to ANAM

Wildlife Rescue Plan

Archeological Rescue

Paleontological Resources Studies

Reforestation

Air and Water Quality Monitoring

Noise and vibrations monitoring

Meetings with communities according to project advance

Report and inspection by independent consultant

Inspections by ANAM

Environmental Impact Assessment

Ecological Compensation paid to ANAM

Wildlife Rescue Plan

Archeological Rescue

Paleontological Resources Studies

Reforestation

Air and Water Quality Monitoring

Noise and vibrations monitoring

Meetings with communities according to project advance

Report and inspection by independent consultant

Inspections by ANAM

Page 21: PIANC Workshop Innovation in Navigation Lock Design 15 16 10 2009... · PIANC Workshop Innovation in Navigation Lock Design The Panama Canal Expansion Program The Panama Canal Market

Lock

s

Activity

Excavation Contract 1

Deepening and Widening of Gatun Lake

Deepening of Culebra Cut

Dredging of the Atlantic Entrance

Dredging of the Pacific Entrance

06 2007 2008 2009 2010 2011 2012 2013 2014

Increase Operating Level of Gatún Lake

Expanded Canal Begins Operations

Design & Build Post-Panamax Locks

4T 1T 2T 3T 4T 1T 2T 3T 4T 1T 2T 3T 4T 1T 2T 3T 4T 1T 2T 3T 4T 1T 2T 3T 4T 1T 2T 3T 4T 1T 2T 3T 4T

%Progress

Acce

ss C

hann

elD

redg

ing

* Baseline from December 31, 2006 including contingency.

Bidding and Contracting ExecutionSpecifications and Design

Baseline* Baseline Baseline

Beginning of operationsContingency against baseline

Specifications and Procurement

Excavation Contract 2

Excavation Contract 3

Excavation Contract 4 and Dams

Summary Schedule of Main Projects with Baseline and Contingencyas of July 31, 2009*

92%

79%

27%

2%

26%

11%

1%

41%

<1%

<1%

100%