Pi Engineering Co., Inc.
1
Pi Engineering Co., Inc.
2
1. INTRODUCTION
2. ABOUT US
3. QUALITY POLICY
4. ORGANIZATION CHART
5. COMPLETED PROJECTS
6. WORK COMPLETION CERTIFICATES
7. CERTIFICATES
π
Pi Engineering Co., Inc.
3
1. INTRODUCTION
Pİ MÜHENDİSLİK İNŞAAT TAAHHÜT ve TİCARET A.Ş. Address Fahrettin Kerim Gökay Cd.
No:280, D:16 Erenköy / İstanbul
Telephone +90216 467 77 42 +90216 467 77 43 +90216 467 77 44
+90216 467 77 45 Fax +90216 467 77 46 Web www.pimuhendislik.com E‐mail [email protected]
PI CONTRACTING and TRADING W.L.L. Adrdess Thammam Bin Galib Street, No:403, Villa No:12
P.O. Box: 15874 Doha ‐ Katar
Telephone +974 4451 3577
+974 5536 6136 Fax +974 4451 3318 Web www.pimuhendislik.com E‐mail [email protected]
Pi Engineering Co., Inc.
4
2. ABOUT US Our company was established in 1970 under the name of "Polat İnşaat Bekir Polat" in Turkey and has been serving under the name of "Pi Mühendislik İnşaat Taahhüt ve Ticaret A.Ş." since 1980.
Till 1970’s our company has been awarded and successfully completed international industrial projects both for public and private sector companies in Turkey, Saudi Arabia, Qatar, Kuwait and Russia. Further to our success in industrial sector, our company has completed residental and commercial construction projects like apartments, holiday villages both for private sector and for our company’s property as well. And now we are willing to share our experience and continuous success with investors all around the world, through our selective and experienced technical and administrative staff. π
Pi Engineering Co., Inc.
5
3. QUALITY POLICY
• Becoming one of the major names in our field of operations
• Improving ourselves through following the latest improvements in the residential and industrial constructions
• Remembered with respect through the people and the companies we served and worked with
• Satisfy our customers
• Being sensitive to the environment and the public
• Provide a satisfying service to our costumers through online and succcessfully completion of their in line with the contract international standarts and regulations
Pi Engineering Co., Inc.
6
4. ORGANIZATION CHART π
BoardChairman
Chief Executive(General Manager)
Head Office Organization
Procurement & Chief Accountant Tender Preperation
ManagerGeneral CoordinatorOverseas Projects
General CoordinatorOverseas Projects
Project Manager
Finance & Admin. Manager
Construction ManagerHSE Manager QA/QC Manager Technical Manager
Finance & Admin. Manager
Business DevelopmentManager
Overseas Projects Organization
Pi Engineering Co., Inc.
7
5. COMPLETED PROJECTS
YEAR JOB DESCRIPTION2010‐2012 Construction of Civil and Structural of LDPE Plant of Qatar Petrochemical
Company, Qatar 2009‐2010 Engineering, Procurementand Construction of Local Maintenance Building
and three Operator Shelters for U&O of Saudi Kayan Plant, Saudi Arabia 2009‐2010 Construction of Warehouse Silo Building of Saudi Kayan Plant, SaudiArabia
2008‐2009 Construction of Civil and Structural of Raz Al‐Zawr Ma’aden Phosphoric Acid
Plant Project, Saudi Arabia 2007‐2008 Construction of Civil and Structural of Rabigh Refining and Petrochemical
Co., Saudi Arabia 2005‐2006 Construction of Eyüp Saya Road Underground Tunnel, Turkey
2003‐2005 Construction of Primary, Intermediate, High Schools, Kuwait
2000‐2000 Furnace Insulation Renovation Works of Tüpraş, Turkey
1998‐2000 Construction of Kindergarten, Primary School, High School and Sports Halls
for Istanbul "Türk Eğitim Vakfı", Turkey 1998‐1999 Construction of Business Center, Perimeter Walls, Gas Station, Turkey
1996‐1998 Construction of Pendik Sultanbeyli‐Dolayoba Highway with (2x3) lanes
including all Infrastructure Works, for Istanbul Municipality, Turkey 1996‐1998 Refractory Works of Aleksin Keramsit Plant, Russia
1996‐2003 Construction of Beykoz Acarkent Villa, Turkey
1996‐1997 Soil Improvement between Pendik‐Pendik Shipyard for Istanbul
Municipality, Turkey 1994‐1994 Refractory Works of Ünye Çimento Fabrikası, Turkey
1994‐1995 Equipment Assembly Plant in Permanent Annealing Line Works for Ereğli
Demir Çelik A.Ş., Turkey1993‐1995 Construction of Yenibosna and Şişli Solid Waste Conveyance Stations and
Administrative Office of Istanbul Municipality, Turkey 1992‐1993 Refractory Works of Bolu Çimento Fabrikası, Turkey
1992‐1992 Construction of Section 4, Plant of TEKEL at Nevşehir, Turkey
1990‐1992 Construction of Alcholic Beaverage Plant of TEKEL at Nevşehir, including
Treatment Plant, Staff Houses, Social Facilities and Swimming Pools, Turkey 1988‐1990 Construction of 390 Villas, Infrastructure, Treatment Plant, Road, Pier,
Water and Energy Lines for Ayvalık Intaland Site, Turkey
Pi Engineering Co., Inc.
8
1988‐1989 Construction of 413 Villas, Infrastructure and Social Facilities at Bodrum for the Staff of State Planning Organization, Turkey
1987‐1987 Construction of Two Warehouses for Bandırma Bağfaş Fertilizer Plant, Turkey
1987‐1987 Construction of the Entire Factory, Administration Building, Roads Infrastructure and Social Facilities for Çebitaş Demir Çelik A.Ş., Turkey
1987‐1989 Construction of 68 houses and social facilities for Avcılar Alan Construction Cooperative, Turkey
1986‐1987 Road, Canal and Culvert Wors for Özamaç Construction Cooperative, Ankara, Turkey
1986‐1987 Construction of Municipal Shopping Centre and Social Facilities for İller Bankası‐Zonguldak, Turkey
1985‐1986 Construction and Erection of Fresh Water Supply System for the 18. Bölge Osmanlı Grubu, Köy Hizmetleri, Turkey
1985‐1986 Refractory Works of İzmir Demir Çelik A.Ş, Turkey
1985‐1985 Construction and Erection of the 120 meters High Stack and Connection Ditches for Karabük Demir Çelik Tesisleri, Turkey
1984‐1985 Construction, Erection and Refractory Works of 120 meters High 2 Stacks for Çayırhan Termik Santrali of Turkiye Elektrik Kurumu, Turkey
1984‐1984 Construction and Erection of Coolers, Revolving Furnace Calcinatory Cyclones, Pre Heater Refractory Materials and Warehouses for Batı Anadolu Çimento Fabrikası‐İzmir, Turkey
1983‐1984 High Heat‐Resistant Concrete and Refractory Lining Works for Kromsan‐Krom Bileşikleri Fabrikası, İstanbul
1983‐1984 Refractory Works of Riyadh Cement Plant, Saudi Arabia
1983‐1985 Construction of Tank Foundation for Storage Facilities of Etibank Hopa Plant, Turkey
1983‐1983 Steel, Artificial Profile, Equipment, Tank, Conveyor Belt Manufacturing for Mersin Kromsan‐Krom Bileşikleri Tesisleri, Turkey
1983‐1984 Construction and Erection of Transformer, Staff Houses Lines and Social Facilities for Bozcaada‐Gökçeada Plants of Türkiye Elektrik Kurumu, Turkey
1982‐1983 Refractory Works of Sakufa Cement Plant, Saudi Arabia
1982‐1984 Construction and Erection of Transformer and Type H+E Staff Houses atNiğde‐Aksaray for Türkiye Elektrik Kurumu, Turkey
1982‐1983 Construction of the Infrastructure of Chloride Alkali Plant of Aliağa‐Petkim Kompleksi, Construction of F‐401 Incinerator stack for Acrino Litryl Plant, Turkey
1981‐1982 Construction and Erection of Smoke Conveyance and Pyrite Roasting Furnaces for Etibank Murgul Asit Fabrikası, Turkey
1981‐1983 Construction and Erection of Revolving Furnace Cooler and Tank Foundations of Çimentaş Çimento Fabrikası, Turkey
1981‐1981 Lime Furnaces and Refractory Works of Mersin Soda Sanayi, Turkey
Pi Engineering Co., Inc.
9
1980‐1980 Construction and Erection of Tank Conveyor and Refractory Works of Mersin Şişe Cam Kromsan Tesisleri, Turkey
1980‐1980 Construction of 3 Lime Furnaces of Mersin Soda Sanayi, Turkey
1980‐1980 Construction and Erection of Naphta Crushing Furnaces for Aliağa Petkim Petro‐Kimya Tesisleri, Turkey
1979‐1980 Construction of Reinforced Concrete Stack Brick Cladding, Insulation and Revision for Türkiye Selüloz ve Kağıt Fabrikaları, Turkey
1979‐1979 Erection of Naptha Crushing Furnaces and Gun‐Out Units of İzmir İpraş Rafineri, Turkey
1978‐1979 Construction and Erection of Tempering Furnaces, Heat Treatment Furnace with Moving Bottom, Vacuum Degassing Unit and Stacks for Asil Çelik, Turkey
1978‐1979 Refractory Works of Çanakkale Çimento Fabrikası, Turkey
1978‐1978 Construction and Erection of Half‐Cycle Kiln and Stack for Etibank KayseriÇinkur Tesisleri, Turkey
1977‐1977 Construction of 2 Electric Furnace and 3 Annealing for Özköseoğlu Tesisleri, Turkey
1977‐1977 Erection of Oil and Slat Bath Furnaces for Adapazarı Zirai Donatım Kurumu and Erection of Drying Unit at Başak Traktör, Turkey
1976‐1976 Construction and Erection of Kiln, Pre‐Heater, Cooling System and Silos for Darıca Çimento Fabrikası, Turkey
1976‐1976 Construction and Erection of Arc Furnaces, Crucibles and Refractory Works of Etibank Elazığ Ferro Krom Tesisleri, Turkey
1975‐1975 Construction and Erection of Melting Furnace for Phosphate for EtibankMardin Mazıdağı Tesisleri, Turkey
1974‐1975 Construction of Road Passages and Refractory Works of Mersin Çimsa Çimento Sanayi, Turkey
1974‐1974 Construction and Erection of 2 Lime Furnaces of Mersin Soda Sanayi, Turkey
1972‐1974 Construction and Erection of 2 High Kiln, 65 meters Long Brick Stack, 108 meter High 2 Coke Units, Reinforced Concrete Stack, İskenderun Demir Çelik Sanayi, Turkey
1971‐1971 Construction and Erection of Limestone Furnace, Tank Foundations andAutoclave of Türk Ytong Sanayi (Turkish Hollow Block Industries), Turkey
Pi Engineering Co., Inc.
10
6. WORK COMPLETION CERTIFICATES
Pi Engineering Co., Inc.
11
Pi Engineering Co., Inc.
12
Pi Engineering Co., Inc.
13
Pi Engineering Co., Inc.
14
Pi Engineering Co., Inc.
15
Pi Engineering Co., Inc.
16
Pi Engineering Co., Inc.
17
Pi Engineering Co., Inc.
18
Pi Engineering Co., Inc.
19
Pi Engineering Co., Inc.
20
Pi Engineering Co., Inc.
21
Pi Engineering Co., Inc.
22
Pi Engineering Co., Inc.
23
Pi Engineering Co., Inc.
24
Pi Engineering Co., Inc.
25
Pi Engineering Co., Inc.
26
Pi Engineering Co., Inc.
27
Pi Engineering Co., Inc.
28
Pi Engineering Co., Inc.
29
Pi Engineering Co., Inc.
30
Pi Engineering Co., Inc.
31
Pi Engineering Co., Inc.
32
Pi Engineering Co., Inc.
33
Pi Engineering Co., Inc.
34
7. CERTIFICATES
Pi Engineering Co., Inc.
35