4
PHYSICAL STORAGE HUB

PHYSICAL STORAGE HUB · Reference period Min. price Max. price LD1 LD2 LD3 100 90 80 70 60 110 0 50 40 30 20 10 ... In case that unit price on Pricing day does not reach over minimum

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PHYSICAL STORAGE HUB · Reference period Min. price Max. price LD1 LD2 LD3 100 90 80 70 60 110 0 50 40 30 20 10 ... In case that unit price on Pricing day does not reach over minimum

PHYSICALSTORAGE HUB

Page 2: PHYSICAL STORAGE HUB · Reference period Min. price Max. price LD1 LD2 LD3 100 90 80 70 60 110 0 50 40 30 20 10 ... In case that unit price on Pricing day does not reach over minimum

Owned and operated by POZAGAS

22 years in operation

Depleted gas fields with current total storage capacity:

WGV 6 947 GWh (655 mcm) IFR 72.66 GWh/d (6.85 mcm/d) WFR 72.66 GWh/d (6.85 mcm/d)

Available storage capacity: 3,552 GWh (335 mcm).

Physical storage hub – connected to 3 independent pipeline systems

Entry/Exit Points: Virtual Trading Point Austria (Gas Connect Austria - Market Area Manager)

Transmission Network SK (Eustream - domestic point)

Distribution Network SK (SPP-distribúcia)

POZAGAS SERVICESGas storage and associated services

Selection of connected pipeline systems (gas markets) OBA allocation regime Fuel gas included in storage price Customer focused approach Storage of gas with any customs status Transfer of gas within the storage Transfer of gas between connected storages in Slovakia Intra-day re-nominations (2 hrs. lead-time) Additional flexibility services (extra IFR/WFR on top of

maximum rights, combination of E/E points, etc.) Transportation to VTP Austria (MAB/WAG) integrated in

storage product

Bundled Unbundled Short-term Long-term Secondary trading

support

KEY:

E/E: Entry – Exit (Handing Over-Acceptance) PointI/W: Injection/WithdrawalOBA: Operational Balancing AccountWGV: Working Gas VolumeIFR: Injection Flow RateWFR: Withdrawal Flow RateVTP: Virtual Trading Point

LÁB 4SPP

DISTRIBÚCIA

VTPAUSTRIA

EUSTREAM

Note: schematic picture only, for more details please check also terms and conditions of adjacent networks operators.

Firm Interruptible Seasonal Flexible (multicycling)

Page 3: PHYSICAL STORAGE HUB · Reference period Min. price Max. price LD1 LD2 LD3 100 90 80 70 60 110 0 50 40 30 20 10 ... In case that unit price on Pricing day does not reach over minimum

STANDARD 110 Firm capacity/flexible product Combination of all E/E points 110 days effective I/W Structured delivery profile Fixed pricing/Indexed pricing

PRODUCT PORTFOLIO

B.U.I.L.D.

CONVENTIONAL CONVENTIONAL

BASIC 120B.U.I.L.D.

PREMIUM 90STANDARD 110

% of Working Gas Volume

Reference period

Min. price

Max. price

LD1 LD2 LD3

10090807060

110

0

5040302010

10 20 30 40 50 60 70 80 90 100

% o

f max

. inj

ectio

n Fl

ow R

ate

EUR/

MW

h

PL1 for C1

H1 for C1

PL2 for C2

H2 for C2

PL3 for C3

H3 for C3

PMIN

BASIC 120 – B.U.I.L.D. Firm capacity/flexible product Combination of all E/E points 120 days effective I/W Flat delivery profile Indexed pricing

Allocation of capacity prior to beginning of storage year Storage price indexed to Net Connect Germany (NCG) Applicant bidding for floor, cap and discount/premium to

seasonal spread Summer/Winter spread in Reference period determines

the price Nomination of pricing days by POZAGAS instead of averaging

spreads Price reference made to established reporting agency B.U.I.L.D. your storage portfolio with POZAGAS!

PREMIUM 90 Firm capacity/flexible product Combination of all E/E points 90 days effective I/W Structured delivery profile Fixed pricing

POZAGAS can nominate up to 3 Pricing days during Reference period. Customer does not have to hedge his positions in line with POZAGAS Pricing days, he can use his knowledge of market to gain the upsides. In case that unit price on Pricing day does not reach over minimum price, minimum price for that Pricing day applies.

A

A

U

UA

Min. price Minimum price that Applicant shall bid in tender

Max. price Maximum price that Applicant shall bid in tender

A Coefficient that Applicant shall bid in tender

LDi Pricing day

Ci Portion of capacity dedicated to the Pricing day

Hi Hedging of Customer’s position on gas market

U Potential upside for Customer

PLi Partial Unit Price at given Pricing day

INNOVATIVE

B. BENEFICIAL for customer from market-based storage product

U. UNIqUE the only storage solution of its kind in the region

I. INNOVATIVE innovative pricing methodology approach 

L. LEADING leading concept of indexed pricing on storage market

D. DEVELOPING basis for further storage portfolio development

Page 4: PHYSICAL STORAGE HUB · Reference period Min. price Max. price LD1 LD2 LD3 100 90 80 70 60 110 0 50 40 30 20 10 ... In case that unit price on Pricing day does not reach over minimum

Why our Storage

Book & store Use our products to create your storage portfolio in the region

Our market based pricing provides fair value for your storage

Fixed pricing/off-line auctions

Indexed pricing linked to seasonal spread

Use our connectivity Access three independent pipeline systems directly

Reach gas markets in Austria, Slovakia and Czech Republic

Utilize price arbitrage opportunities between gas hubs

Add-on with unbundled services Use title transfers within the storage/between connected storages in Slovakia

Utilize extra Day-ahead/Within-Day injection and withdrawal rates on top of your maximum rights for higher flexibility

Additional short-term flexibility

POZAGAS a.s.Malé námestie 1, 901 01 Malacky, SlovakiaTel.: +421 34 772 [email protected]