Photovoltaic Developers Perspective Photovoltaic and Storage Workshop ERCOT Aruna Ranaweera, Ph.D., P.E. OCI Solar Power. October 15, 2012. OCI Solar Power. ($00). Headquartered in San Antonio Utility scale solar power development throughout the US 400 MW Solar PPA with CPS Energy - PowerPoint PPT Presentation

Citation preview

Page 1: Photovoltaic Developers Perspective Photovoltaic and Storage Workshop ERCOT

1

Photovoltaic Developers PerspectivePhotovoltaic Developers Perspective

Photovoltaic and Storage WorkshopPhotovoltaic and Storage WorkshopERCOTERCOT

Aruna Ranaweera, Aruna Ranaweera, Ph.D., P.E.Ph.D., P.E.

OCI Solar PowerOCI Solar Power

October 15, 2012October 15, 2012

Page 2: Photovoltaic Developers Perspective Photovoltaic and Storage Workshop ERCOT

2

($00)

OCI Solar Power

Headquartered in San Antonio Utility scale solar power development throughout the US 400 MW Solar PPA with CPS Energy Consortium of companies to create 800+ solar industry jobs in San Antonio Stage I: 50 MW to be in service in 2013 Interconnection studies in progress with ERCOT and CPS Stages II to V from 2014 to 2016 Committed to the reliable operation of the electric power system

Page 3: Photovoltaic Developers Perspective Photovoltaic and Storage Workshop ERCOT

3

($00)

Integration of Solar Power

Studies to show that concerns are not just speculation And understand issues correctly to implement proper mitigations Location specific issues (related to POI) Issues due to the size of the plant Centralized mitigations and individual plant mitigations Solar power forecasting by each plant and centralized forecasting managed by

the Reliability Coordinator Other RTO practices Impact of new requirements on the competitiveness of solar power

Page 4: Photovoltaic Developers Perspective Photovoltaic and Storage Workshop ERCOT

4

($00)

Clear application instructions: Submit Resource Registration form before the Interconnection Application?

Interconnection queue update frequency Examples of other RTO practices:

MISO - Pre-queue workshops several times a year PJM, MISO, CAISO, ISO-NE, NYISO - Interconnection Queue posted on

the public website

Generation Interconnection Process Feedback

Page 5: Photovoltaic Developers Perspective Photovoltaic and Storage Workshop ERCOT

5

($00)

Other RTO practices: Interconnection Queue map posted on public website

Generation Interconnection Process Feedback

Page 6: Photovoltaic Developers Perspective Photovoltaic and Storage Workshop ERCOT

6

($00)

Other RTO practices: Interconnection Capacity map posted on public website

Generation Interconnection Process Feedback

Page 7: Photovoltaic Developers Perspective Photovoltaic and Storage Workshop ERCOT

7

($00)

Generation Interconnection Process Feedback

Maps available on the state website