PhotocopiesPhotocopies
Occasionally need uncontrolled Occasionally need uncontrolled
copiescopiesinduction?induction?
information for client?information for client?
Mark copy as uncontrolledMark copy as uncontrolled
Explain how in documentationExplain how in documentation
Occasionally need uncontrolled Occasionally need uncontrolled
copiescopiesinduction?induction?
information for client?information for client?
Mark copy as uncontrolledMark copy as uncontrolled
Explain how in documentationExplain how in documentation
Handwritten AmendmentsHandwritten Amendments
May be permittedMay be permitted
Explain how in documentationExplain how in documentation
Must be authorisedMust be authorised
All copies must be amended All copies must be amended
MinimiseMinimise
May be permittedMay be permitted
Explain how in documentationExplain how in documentation
Must be authorisedMust be authorised
All copies must be amended All copies must be amended
MinimiseMinimise
Control of RecordsControl of Records
Documented procedures, records of:Documented procedures, records of:testingtesting
equipment calibrationequipment calibration
internal auditsinternal audits
management reviewmanagement review
corrective, preventive actionscorrective, preventive actions
Documented procedures, records of:Documented procedures, records of:testingtesting
equipment calibrationequipment calibration
internal auditsinternal audits
management reviewmanagement review
corrective, preventive actionscorrective, preventive actions
Control of RecordsControl of Records
What was doneWhat was done
Who did itWho did it
Immediate recordingImmediate recording
PreservationPreservation
Alterations - no erasureAlterations - no erasure
What was doneWhat was done
Who did itWho did it
Immediate recordingImmediate recording
PreservationPreservation
Alterations - no erasureAlterations - no erasure
OutlineOutline
What is an internal audit ?What is an internal audit ?
Types of AuditsTypes of Audits
How to meet standard requirementsHow to meet standard requirements
Effective auditing Effective auditing
Preparing for an auditPreparing for an audit
Conducting an auditConducting an audit
What is an internal audit ?What is an internal audit ?
Types of AuditsTypes of Audits
How to meet standard requirementsHow to meet standard requirements
Effective auditing Effective auditing
Preparing for an auditPreparing for an audit
Conducting an auditConducting an audit
Internal Audits Required:Internal Audits Required:
By ISO 9000By ISO 9000clause 4.17clause 4.17
By ISO/IEC 17025By ISO/IEC 17025clause 4.13 (management requirements)clause 4.13 (management requirements)
By ISO 9000By ISO 9000clause 4.17clause 4.17
By ISO/IEC 17025By ISO/IEC 17025clause 4.13 (management requirements)clause 4.13 (management requirements)
What is an Internal Audit ?What is an Internal Audit ?
Systematic and independent examination of Systematic and independent examination of
the quality management system (QMS)the quality management system (QMS)
By someone within the organisationBy someone within the organisation
In addition to external auditsIn addition to external audits
Systematic and independent examination of Systematic and independent examination of
the quality management system (QMS)the quality management system (QMS)
By someone within the organisationBy someone within the organisation
In addition to external auditsIn addition to external audits
The Internal Audit ProcessThe Internal Audit Process
Scheduled AuditsScheduled Auditsprogramme managed by Quality Managerprogramme managed by Quality Manager
examine documents, results, processesexamine documents, results, processes
identify problemsidentify problems
improve improve
Unscheduled AuditsUnscheduled Auditsinvestigate probleminvestigate problem
improveimprove
Scheduled AuditsScheduled Auditsprogramme managed by Quality Managerprogramme managed by Quality Manager
examine documents, results, processesexamine documents, results, processes
identify problemsidentify problems
improve improve
Unscheduled AuditsUnscheduled Auditsinvestigate probleminvestigate problem
improveimprove
Why Internal Auditing ?Why Internal Auditing ?
Is QMS implemented exactly as intended ?Is QMS implemented exactly as intended ?
To investigate a problemTo investigate a problem
why did it occur ?why did it occur ?
how can it be resolved ?how can it be resolved ?
how can it be prevented in future ?how can it be prevented in future ?
Identify opportunities to improveIdentify opportunities to improve
Does the QMS meet requirements of standards ?Does the QMS meet requirements of standards ?
Is QMS implemented exactly as intended ?Is QMS implemented exactly as intended ?
To investigate a problemTo investigate a problem
why did it occur ?why did it occur ?
how can it be resolved ?how can it be resolved ?
how can it be prevented in future ?how can it be prevented in future ?
Identify opportunities to improveIdentify opportunities to improve
Does the QMS meet requirements of standards ?Does the QMS meet requirements of standards ?
Types of Internal Audits Types of Internal Audits
HorizontalHorizontalall departmentsall departments audited against audited against oneone element of element of
standard or procedurestandard or procedure
VerticalVerticalone departmentone department audited against audited against allall element of standard or procedureelement of standard or procedure
HorizontalHorizontalall departmentsall departments audited against audited against oneone element of element of
standard or procedurestandard or procedure
VerticalVerticalone departmentone department audited against audited against allall element of standard or procedureelement of standard or procedure
Standard Requirements:ISO 9001 and 17025
Standard Requirements:ISO 9001 and 17025
Audit programAudit program
Documented procedures Documented procedures
Auditors independent of activityAuditors independent of activity
Audit results documented and reported to managementAudit results documented and reported to management
Prompt action after problems identifiedPrompt action after problems identified
Follow up activities Follow up activities
Audit programAudit program
Documented procedures Documented procedures
Auditors independent of activityAuditors independent of activity
Audit results documented and reported to managementAudit results documented and reported to management
Prompt action after problems identifiedPrompt action after problems identified
Follow up activities Follow up activities
Management’s ResponsibilityManagement’s Responsibility
Define internal auditing policyDefine internal auditing policy
Assign responsibility of internal audit programAssign responsibility of internal audit programQuality ManagerQuality Manager
Must be advised of internal audit outcomesMust be advised of internal audit outcomesdiscussed at management reviewdiscussed at management review
Define internal auditing policyDefine internal auditing policy
Assign responsibility of internal audit programAssign responsibility of internal audit programQuality ManagerQuality Manager
Must be advised of internal audit outcomesMust be advised of internal audit outcomesdiscussed at management reviewdiscussed at management review
Quality Manager’s Responsibility
Quality Manager’s Responsibility
Establish & maintain internal audit system Establish & maintain internal audit system
Develop scheduleDevelop schedule
Coordinate auditsCoordinate audits
Manage corrective action systemManage corrective action system
Advise management audit outcomesAdvise management audit outcomes
Establish & maintain internal audit system Establish & maintain internal audit system
Develop scheduleDevelop schedule
Coordinate auditsCoordinate audits
Manage corrective action systemManage corrective action system
Advise management audit outcomesAdvise management audit outcomes
Who Audits ?Who Audits ?
Trained & qualified auditors Trained & qualified auditors
Quality Manager selects and trains internal auditorsQuality Manager selects and trains internal auditorsobserver on Quality Manager’s auditsobserver on Quality Manager’s audits
fist audit under supervision of qualified auditorfist audit under supervision of qualified auditor
Independent of the activity to be auditedIndependent of the activity to be audited
Trained & qualified auditors Trained & qualified auditors
Quality Manager selects and trains internal auditorsQuality Manager selects and trains internal auditorsobserver on Quality Manager’s auditsobserver on Quality Manager’s audits
fist audit under supervision of qualified auditorfist audit under supervision of qualified auditor
Independent of the activity to be auditedIndependent of the activity to be audited
Audit ScheduleAudit Schedule
AnnualAnnual
Address all elements of the quality systemAddress all elements of the quality systemnot all departmentsnot all departments
Frequency ?Frequency ?critical areascritical areas
AnnualAnnual
Address all elements of the quality systemAddress all elements of the quality systemnot all departmentsnot all departments
Frequency ?Frequency ?critical areascritical areas
Documents used in Internal Auditing
Documents used in Internal Auditing
ChecklistsChecklists
Corrective action request formsCorrective action request forms
Audit report formsAudit report forms
ChecklistsChecklists
Corrective action request formsCorrective action request forms
Audit report formsAudit report forms
Documenting the Audit Program (1)
Documenting the Audit Program (1)
Quality ManualQuality Manual
quality policy on internal auditing quality policy on internal auditing
responsibility for internal auditsresponsibility for internal audits
Quality ManualQuality Manual
quality policy on internal auditing quality policy on internal auditing
responsibility for internal auditsresponsibility for internal audits
Documenting the Audit Program (2)
Documenting the Audit Program (2)
Internal audit procedure(s)Internal audit procedure(s)
selection and training of auditorsselection and training of auditors
scheduling auditsscheduling audits
responsibilities of auditorsresponsibilities of auditors
preparation, conducting and reporting on auditspreparation, conducting and reporting on audits
identifying, resolving and following up corrective actionsidentifying, resolving and following up corrective actions
reporting audit results to managementreporting audit results to management
Internal audit procedure(s)Internal audit procedure(s)
selection and training of auditorsselection and training of auditors
scheduling auditsscheduling audits
responsibilities of auditorsresponsibilities of auditors
preparation, conducting and reporting on auditspreparation, conducting and reporting on audits
identifying, resolving and following up corrective actionsidentifying, resolving and following up corrective actions
reporting audit results to managementreporting audit results to management
Effective Auditing (1)Effective Auditing (1)
Gather evidence about compliance with Gather evidence about compliance with
quality system or standardquality system or standard
Gather evidence about compliance with Gather evidence about compliance with
quality system or standardquality system or standard
Effective Auditing (2)Effective Auditing (2)
Gather information about:Gather information about:process, operating proceduresprocess, operating procedures
staff, equipment, test methodsstaff, equipment, test methods
environment, handling of samplesenvironment, handling of samples
quality control, verification activitiesquality control, verification activities
recording and reporting practices.recording and reporting practices.
Compare with documented system Compare with documented system
Identify breakdown in system or departure from proceduresIdentify breakdown in system or departure from procedures
Gather information about:Gather information about:process, operating proceduresprocess, operating procedures
staff, equipment, test methodsstaff, equipment, test methods
environment, handling of samplesenvironment, handling of samples
quality control, verification activitiesquality control, verification activities
recording and reporting practices.recording and reporting practices.
Compare with documented system Compare with documented system
Identify breakdown in system or departure from proceduresIdentify breakdown in system or departure from procedures
What to AuditWhat to Audit Systems auditSystems audit
adherence to documented proceduresadherence to documented procedures
Technical auditTechnical auditTechnical correctnessTechnical correctness
adherence to documented procedures/test methodsadherence to documented procedures/test methods
auditor must have technical knowledge of testauditor must have technical knowledge of test
CombinationCombinationvertical auditvertical audit
Systems auditSystems auditadherence to documented proceduresadherence to documented procedures
Technical auditTechnical auditTechnical correctnessTechnical correctness
adherence to documented procedures/test methodsadherence to documented procedures/test methods
auditor must have technical knowledge of testauditor must have technical knowledge of test
CombinationCombinationvertical auditvertical audit
What to Audit - Technical AuditWhat to Audit - Technical Audit StaffStaff
MethodsMethods
EquipmentEquipment
Testing EnvironmentTesting Environment
Samples and Test ItemsSamples and Test Items
Quality ControlQuality Control
ComputersComputers
Records and ReportsRecords and Reports
StaffStaff
MethodsMethods
EquipmentEquipment
Testing EnvironmentTesting Environment
Samples and Test ItemsSamples and Test Items
Quality ControlQuality Control
ComputersComputers
Records and ReportsRecords and Reports
Audit PreparationAudit Preparation Quality Manager determinesQuality Manager determines
audit teamaudit teamlead auditorlead auditor
audit detailsaudit detailsscope of auditscope of audit
time, date, durationtime, date, duration
Contact auditeeContact auditeedate, time, type & durationdate, time, type & duration
Quality Manager determinesQuality Manager determinesaudit teamaudit team
lead auditorlead auditor
audit detailsaudit detailsscope of auditscope of audit
time, date, durationtime, date, duration
Contact auditeeContact auditeedate, time, type & durationdate, time, type & duration
1. Audit Plan1. Audit Plan
4. Gather Evidence 4. Gather Evidence
3. Opening Meeting3. Opening Meeting
5. Record Results5. Record Results
2. Develop Checklists2. Develop Checklists
6. Closing Meeting6. Closing Meeting
7. Audit Report7. Audit Report
Conducting the Audit
Conducting the Audit
Conducting the Audit
Conducting the Audit
1. Audit Plan1. Audit Plan
Objectives & scopeObjectives & scope
Collect documentsCollect documents
standard, procedure, work instructions, formsstandard, procedure, work instructions, forms
desk top reviewdesk top review
HistoryHistory
Objectives & scopeObjectives & scope
Collect documentsCollect documents
standard, procedure, work instructions, formsstandard, procedure, work instructions, forms
desk top reviewdesk top review
HistoryHistory
2. Developing Checklists2. Developing Checklists
GuidelinesGuidelines
Review documentsReview documentsidentify important aspects of the activityidentify important aspects of the activity
list in logical orderlist in logical order
set of questionsset of questions
GuidelinesGuidelines
Review documentsReview documentsidentify important aspects of the activityidentify important aspects of the activity
list in logical orderlist in logical order
set of questionsset of questions
P-AD-0012 3.5 Audit Follow-up Activities P-AD-0012 3.5 Audit Follow-up Activities It may be necessary for a follow-up audit to be performed to verify the
effectiveness of any corrective action carried out. Corrective action, and
subsequent follow-up audits, should be completed within a time period
agreed to by the auditee, in consultation with the auditor.
The Quality Manager should schedule the follow-up audit and enter
details on the Audit Schedule and the Audit Status Log.
It may be necessary for a follow-up audit to be performed to verify the
effectiveness of any corrective action carried out. Corrective action, and
subsequent follow-up audits, should be completed within a time period
agreed to by the auditee, in consultation with the auditor.
The Quality Manager should schedule the follow-up audit and enter
details on the Audit Schedule and the Audit Status Log.
AUDIT CHECKLIST (Reference P-AD-0012) Audit Number: 1 Page1 of1
Reference(clause/procedure)
Question/Requirement Observations Compliance(Y/N)
P-AD-0012 Internal Audits – Follow-up Activities
3.5 When are follow up audits performed ?Why ?
CHECK – are follow-up audits performed ?CHECK – are time periods specified
Where ?In conjunction with auditor ?
CHECK - are follow-ups completed by thespecified time period
Who schedules follow-up audits ?How?
CHECK - are details entered on the: Audit Schedule ?Audit Status Log ?
Document Control:CHECK – are all forms and documents reviewed:
Correct version ?Authorised ?Stored correctly ?
* A = acceptable, NA = not acceptable, NI = needs improvement
3. Opening Meeting 3. Opening Meeting Who ?Who ?
auditor/audit teamauditor/audit team
auditeeauditee
any staff from area to be audited that may be interviewed any staff from area to be audited that may be interviewed
What ?What ? ScopeScope
expected durationexpected duration
Who ?Who ? auditor/audit teamauditor/audit team
auditeeauditee
any staff from area to be audited that may be interviewed any staff from area to be audited that may be interviewed
What ?What ? ScopeScope
expected durationexpected duration
4.1 Gather Evidence about Compliance
4.1 Gather Evidence about Compliance
InterviewsInterviewsask questions about system and its implementationask questions about system and its implementation
who, what, when, how, where, why ?who, what, when, how, where, why ?
other questionsother questionsdirect direct
hypothetical hypothetical
clarifyingclarifying
InterviewsInterviewsask questions about system and its implementationask questions about system and its implementation
who, what, when, how, where, why ?who, what, when, how, where, why ?
other questionsother questionsdirect direct
hypothetical hypothetical
clarifyingclarifying
4.2 Gather Evidence about Compliance4.2 Gather Evidence about Compliance Examine documents Examine documents
procedures, work instructions, forms, quality manualprocedures, work instructions, forms, quality manual
copies controlled ?copies controlled ?
available ?available ?
correct issue status ?correct issue status ?
used in manner intended ?used in manner intended ?
Quality RecordsQuality Records stored correctly ?stored correctly ?
used as objective evidence used as objective evidence
many formsmany forms
Examine documents Examine documents procedures, work instructions, forms, quality manualprocedures, work instructions, forms, quality manual
copies controlled ?copies controlled ?
available ?available ?
correct issue status ?correct issue status ?
used in manner intended ?used in manner intended ?
Quality RecordsQuality Records stored correctly ?stored correctly ?
used as objective evidence used as objective evidence
many formsmany forms
4.3 Gather Evidence about Compliance4.3 Gather Evidence about Compliance Observe activitiesObserve activities
what is said or written may not reflect practicewhat is said or written may not reflect practice““show me”show me”
Examine facilitiesExamine facilitiesas travel through laboratory/officesas travel through laboratory/officesexamine:examine:
equipmentequipmentstandard of housekeepingstandard of housekeepingsize and layout of working areasize and layout of working areaenvironment eg. temperature in labenvironment eg. temperature in lab
Observe activitiesObserve activitieswhat is said or written may not reflect practicewhat is said or written may not reflect practice““show me”show me”
Examine facilitiesExamine facilitiesas travel through laboratory/officesas travel through laboratory/officesexamine:examine:
equipmentequipmentstandard of housekeepingstandard of housekeepingsize and layout of working areasize and layout of working areaenvironment eg. temperature in labenvironment eg. temperature in lab
5. Recording Results5. Recording Results
Record on checklistsRecord on checklistsactivities which do not adhere to quality activities which do not adhere to quality
systemsystem
may be classifiedmay be classifiedmajor non-conformancemajor non-conformance
minor non-conformanceminor non-conformance
areas for improvementareas for improvement
Record on checklistsRecord on checklistsactivities which do not adhere to quality activities which do not adhere to quality
systemsystem
may be classifiedmay be classifiedmajor non-conformancemajor non-conformance
minor non-conformanceminor non-conformance
areas for improvementareas for improvement
6. Closing Meeting(s)6. Closing Meeting(s)
Audit team meetingAudit team meetingdiscuss audit resultsdiscuss audit results
Closing meetingClosing meetingdiscuss corrective actionsdiscuss corrective actions
determine resolution datesdetermine resolution dates
Identify corrective actionsIdentify corrective actionsuse corrective action formsuse corrective action forms
Audit team meetingAudit team meetingdiscuss audit resultsdiscuss audit results
Closing meetingClosing meetingdiscuss corrective actionsdiscuss corrective actions
determine resolution datesdetermine resolution dates
Identify corrective actionsIdentify corrective actionsuse corrective action formsuse corrective action forms
7. Audit Report7. Audit Report
Audit detailsAudit details Summary of findingsSummary of findings
corrective actionscorrective actionsnumberednumberedobjective evidenceobjective evidencereference the documentreference the document
observationsobservations
Distribute Distribute
Audit detailsAudit details Summary of findingsSummary of findings
corrective actionscorrective actionsnumberednumberedobjective evidenceobjective evidencereference the documentreference the document
observationsobservations
Distribute Distribute
OutlineOutline
What is a corrective action ?What is a corrective action ?
What is a preventive action ?What is a preventive action ?
Corrective and preventive action Corrective and preventive action
programprogram
Corrective and preventive action processCorrective and preventive action process
What is a corrective action ?What is a corrective action ?
What is a preventive action ?What is a preventive action ?
Corrective and preventive action Corrective and preventive action
programprogram
Corrective and preventive action processCorrective and preventive action process
Corrective & Preventive Action Required:
Corrective & Preventive Action Required:
By ISO 9000By ISO 9000clause 4.14clause 4.14
By ISO/IEC 17025By ISO/IEC 17025clause 4.10 corrective actionclause 4.10 corrective actionclause 4.11 preventive actionclause 4.11 preventive action
By ISO 9000By ISO 9000clause 4.14clause 4.14
By ISO/IEC 17025By ISO/IEC 17025clause 4.10 corrective actionclause 4.10 corrective actionclause 4.11 preventive actionclause 4.11 preventive action
Corrective ActionCorrective Action
An action taken to correct a problemAn action taken to correct a problem
incorrect result incorrect result
departure from proceduredeparture from procedure
An action taken to correct a problemAn action taken to correct a problem
incorrect result incorrect result
departure from proceduredeparture from procedure
Preventive ActionPreventive Action
A A proactiveproactive process to identify process to identifyimprovement opportunitiesimprovement opportunities
potential sources of non-conformancepotential sources of non-conformance
A A proactiveproactive process to identify process to identifyimprovement opportunitiesimprovement opportunities
potential sources of non-conformancepotential sources of non-conformance