10
VTA’s BART Silicon Valley Phase II Extension Project

Phase II Extension Project · Completion The Phase II project is currently in the design, engineering and contract procurement development phase. It will be delivered through four

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Phase II Extension Project · Completion The Phase II project is currently in the design, engineering and contract procurement development phase. It will be delivered through four

VTA’s BART Silicon Valley Phase II Extension Project

Page 2: Phase II Extension Project · Completion The Phase II project is currently in the design, engineering and contract procurement development phase. It will be delivered through four

Pro

ject

Ove

rvie

w

VTA's BART Silicon Valley Phase II Extension Project is a six-mile, four-station extension of BART service from the recently opened Berryessa/North San José Station, built as part of VTA’s BART Phase I Extension, through downtown San José to the City of Santa Clara.

The Phase II Project is planned to include an approximately five-mile, 48 foot exterior diameter single-bore tunnel, three underground stations (28th Street/Little Portugal, Downtown San José, and Diridon), one at-grade station (Santa Clara), two mid-tunnel ventilation and egress facilities, and a maintenance and storage yard.

Similar to VTA’s BART Phase I, VTA is the funding agency and manages the overall delivery of the program while BART is the operator and maintainer of the system. VTA and BART are jointly committed to timely delivery of this Project. Both agencies are following two governing agreements executed by their respective agencies-a Comprehensive Agreement and Operations and Maintenance Agreement. All aspects of these agreements are managed through joint executive committees.

Additionally, an integrated VTA and BART team, the Rail System Organization (RSO) has been established and is responsible for development of project specific requirements defining the applicable BART, national, state and local industry standards.

VT

A &

BA

RT

P

artn

ersh

ipVTA’S BART SILICON VALLEY PHASE II EXTENSION PROJECT

1

Page 3: Phase II Extension Project · Completion The Phase II project is currently in the design, engineering and contract procurement development phase. It will be delivered through four

VTA’S BART SILICON VALLEY PHASE II EXTENSION PROJECTFr

amew

ork

to

C

om

ple

tio

n

The Phase II project is currently in the design, engineering and contract procurement development phase. It will be delivered through four main construction contracts: Systems, Tunnel & Trackwork, Stations, and Santa Clara Station & Newhall Yard. These contracts are planned to be a combination of design build and progressive design build. The procurement process will begin in Fall 2020 with Requests for Industry Feedback (RFIF), followed by Requests for Qualifications (RFQ) and Requests for Proposals (RFP) over the next two years. Early construction activities are planned to begin in 2022 with substantial construction completed by 2028, followed by systems testing, integration, and safety certification.

Framework to Completion

Legend

SubstantialCompletion

Systems

Tunnel &Trackwork

Newhall Yard &Santa Clara Station

Stations

BART System Testing/Rail Acceptance/

CPUC Certification

NTPRFIF RFQ RFPEngineering &Procurement

Final Design &Construction

2020 2021 2023 2025 2027 20292022 2024 2026 2028 2030

2

Page 4: Phase II Extension Project · Completion The Phase II project is currently in the design, engineering and contract procurement development phase. It will be delivered through four

533+00

833+87

868+10

701+13

DTS

JSC

LD

IRLP 602+92

BERR

S65G

S65H

638+25

641+21

667+59

672+93

853+74

864+31

S1S2

S1S2

2723

S87A

S87B

S87D

23

S85A

S85BS85C

S65D

27

S65C

S65A

S65E

S55F

23

S65B

S55DS55A

2723

S55B S55C

S85D

S87C

29

S83DS83A

2723

S83B S83C

S55G

S55JS55H

S55F

S55EEA

STVE

NT

WES

TVE

NT

736+38

555+81

556+81 556+81

637+25

641+21

668+59

673+93

795+16

799+08

795+16

799+08

833+87

837+92

858+76

864+31

834+87

551+87

553+87

543+96

537+00

543+96

537+00

S3

S1S2

MLP

TW

S

S1S2

S4

S37D

S37A

370+99

370+99

S37C

S37B362+90

362+90

255+05

255+26 S27D

S27C

S27A

S27B

261+00

261+00

156+29

156+29 S25G

S25C

S25F

S25B

160+64

160+30

S25H

S25D

175+40

175+40

S25A

S25E168+24

168+45

291+01

S29F

S29B

299+40

S29E

S29A308+86

304+55

S45DS45A

23

S45B S45C

529+00

522+13

529+00

522+13

2727

2723

221

23

221

27

CON

TRAC

T N

O.

DES

CRIP

TIO

NCH

KBY

DAT

ERE

VAP

P

DRA

WN

BY

DES

IGN

ED B

Y

DW

G. C

HEC

K

ENG

. CH

ECK

PAG

E N

O.

DRA

WIN

G F

ILE

IDEN

TIFI

ER

SUIT

ABIL

ITY

DES

CRIP

TIO

N

REV.

SCAL

E AT

D S

IZE

SUIT

. CO

DE

SHEE

T N

O.

COO

RD. C

HEC

K

REVI

EWED

BY

APPR

OVE

D

MMO

TT

MA

CD

ON

ALD

WO

NG

EN

GIN

EE

RIN

G

MW

MA

ET

BART

SIL

ICO

N V

ALLE

Y PH

ASE

IIEX

TEN

SIO

N P

ROJE

CT

MATCH LINE SEE BELOW

MATCH LINE SEE ABOVE

C:\Users\Jamie Chan\Desktop\From Lydia\385606-MMW-PWIDE-XX-SK-TR-070502.dwg11/4/2019 10:19 AMJamie Chan

Systems

Delivery Method

Design-Furnish-Install (DFI)

VTA’S BART SILICON VALLEY PHASE II EXTENSION PROJECT

The scope of Contract Package 1 (CP1) delivers 27 key subsystems required for BARTpassenger operations. These systems fall into two categories: Guideway Systems and Facility Systems. Guideway Systems includes project-wide elements such as traction power, train control, communications, and emergency ventilation systems. Facility Systems includes systems in the passenger stations such as heating, ventilation and air conditioning (HVAC), plumbing, drainage, lighting, power and fire protection.

The Systems Contractor will be responsible for design, procurement, receipt and storage of owner-furnished materials, factory tests, installation, field tests and integration testing of all system elements.

Co

ntr

act

Pac

kag

e 1

868+10

701+13

DTSJ SCLDIRLP

602+92

S65H641+

21

864+31

S1

S2

S87D

S65D

S55D

S85D

29 S83D

S55JS55H

S55F

EASTVENT

WESTVENT

736+38

556+81

556+81

668+59

799+08

837+92

551+87

543+96 S3

WESTPORTAL

EASTPORTAL

825+00

574+00

S55B537+

00

S65B637+

25

S65E672+

93

S83B795+

16

S85B833+

87

S87B858+

76

MIGUELITA

CREEK (SILVERCREEK)

COYOTECREEK

MARKETST.

SAN PEDROST.

GUADALUPERIVER

LOS GATOSCREEK

THEALAM

EDA

S55A543+

96

S55E553+

87

S55F638+

25

S65A673+

93

S83A799+

08

S85A834+

87

S87A864+

31

BERRYESSA / NORTH 28TH STREET /LITTLE PORTUGAL

STATION (S60)

DOWNTOWNSAN JOSESTATION

(S70)

DIRIDON /ARENA STATION

(S80)

CITY OF SAN JOSECITY OF SANTA CLARA

HWY 101

28TH ST

STATE ROUTE 87

HWY 88023 27 23 27 23 27 23 2723

SANTA CLARASTATION (S90)

537+00

S55C

555+81

S55G

641+21

S65G

667+59

S65C

795+16

S83C

833+87

S85C

853+74

S87C

(CP1)

Project includes six miles of trackwork including crossovers and turnouts; a straight through track (S2) and an outbound track (S1) with approximately 10,200 feet through downtown San José elevated into a stacked configuration to serve the Downtown San José and Diridon Stations.

3

Page 5: Phase II Extension Project · Completion The Phase II project is currently in the design, engineering and contract procurement development phase. It will be delivered through four

Co

ntr

act

Pac

kag

e 2

Tunnel and Trackwork

VTA’S BART SILICON VALLEY PHASE II EXTENSION PROJECT

Contract Package 2 (CP 2) includes a 5-mile long single bore tunnel, extending from the terminus south of the recently opened Berryessa/North San José Station, through downtown San José along Santa Clara St, to the planned Newhall Maintenance Facility in the City of Santa Clara. The tunnel will be approximately 43 feet internal diameter which will accommodate two BART trainways and will allow for the station platforms for Downtown San José and Diridon Stations to be constructed within the tunnel. The contract will include procurement of the Tunnel Boring Machine, utility relocations, portal enabling works and permanent structures, manufacturing and installation of the precast tunnel lining, construction of internal tunnel structures, construction of several ancillary ventilation/egress facilities, support of excavation of the 28th Street/Little Portugal Station and track installation.

Source: Herrenknecht

Delivery Method

Progressive Design-Build

(CP2)

4

Page 6: Phase II Extension Project · Completion The Phase II project is currently in the design, engineering and contract procurement development phase. It will be delivered through four

Co

ntr

act

Pac

kag

e 3

Newhall Yard Maintenance Facility, Santa Clara Station and Parking GarageContract Package 3 (CP 3) includes the Newhall Yard Maintenance Facility, yard track and contact rail, auxiliary buildings, civil site restoration and demobilization, and the full construction of the at-grade Santa Clara Station along with a 500-space parking garage and required transit access facilities. The yard and maintenance facilities will be designed in accordance with specifications and requirements developed by the VTA/BART Rail System Organization. The Santa Clara Station is a typical at-grade station, like many other BART stations (e.g.: Warm Springs and Millbrae).

VTA’S BART SILICON VALLEY PHASE II EXTENSION PROJECT

Delivery Method

Design-Build (DB)

(CP3)

Newhall Maintenance Facility

SANTA CLARA CALTRAIN STATION

NEWHALL MAINTENANCE FACILITYNORMAN Y. MINETA SAN JOSÉINTERNATIONALAIRPORT

AVAYA STADIUM

BBRROOKKAAWWRROOAADD

1

Norman Y. Mineta San José International Airport

Newhall Maintenance Facility

Santa Clara Caltrain Station

Santa Clara BART Station

Newhall Maintenance Facility

SANTA CLARA CALTRAIN STATION

NEWHALL MAINTENANCE FACILITYNORMAN Y. MINETA SAN JOSÉINTERNATIONALAIRPORT

AVAYA STADIUM

BBRROOKKAAWWRROOAADD

1

Norman Y. Mineta San José International Airport

Newhall Maintenance Facility

Santa Clara Caltrain Station

Santa Clara BART Station

5

Page 7: Phase II Extension Project · Completion The Phase II project is currently in the design, engineering and contract procurement development phase. It will be delivered through four

Co

ntr

act

Pac

kag

e 4

VTA’S BART SILICON VALLEY PHASE II EXTENSION PROJECT

Stations

Delivery Method

Design-Build (DB)

(CP4)

Contract Package 4 (CP 4) includes three underground stations: 28th Street/ Little Portugal, Downtown San Jose (DTSJ), and Diridon along with their associated headhouse, ancillary facilities, and street-level improvements. Transit-oriented development is planned for all stations.

Scope elements generally include: Site demolition utility relocations as required; ground improvement; excavation and support of excavation (SOE); waterproofing; placement of structural concrete; heating, ventilation and air-conditioning (HVAC); mechanical, electrical, and plumbing (MEP); conveyance systems; ventilation and egress shafts, utility connections, civil site restoration; architecture and landscaping.

The design-build project elements specific to each station includes:

• 28th Street/Little Portugal Station: Street-level entrance portal with adjacent community plaza, 1,200 car parking facility and street improvements;

• Downtown San Jose Station: Two street-level entrance portals and station ventilation shafts with underground adits connecting to tunnel.

• Diridon Station: Street-level entrance portal with adjacent pedestrian plaza; headhouse and station ventilation shafts with underground adits connecting to tunnel.

N Market Street

E Santa Clara Street

Downtown San José Station Characteristics

2

Artist Rendering of Downtown San José from TOCs Strategy Study (Looking northeast along Market St and Santa Clara St)

2

6

Page 8: Phase II Extension Project · Completion The Phase II project is currently in the design, engineering and contract procurement development phase. It will be delivered through four

VTA’S BART SILICON VALLEY PHASE II EXTENSION PROJECTO

ther

Co

nsi

der

atio

ns Project Requirements, Standards & Design Criteria

Project requirements, design criteria, and standards will be developed for each contract. These will be prepared and approved by VTA and BART, provided at the time of solicitation.

Owner Controlled Insurance Program (OCIP)

This Project will be insured through Owner Controlled Insurance Program (OCIP) also referred to as a “wrap-up”. This type of a program is project specific. The sponsor of the insurance program will be the Santa Clara Valley Transportation Authority (VTA). Enrolled Participants will generally include all contractors and subcontractors of every tier involved with on-site project construction.

Project Labor Agreement (PLA)

It is recognized that on projects with multiple contractors and bargaining units on the job site at the same time over an extended period of time, the potential for work disruption is substantial unless there is a shared overriding commitment to maintain continuity of work. As such, VTA is finalizing the execution of a Project Labor Agreement (PLA) with contractors and subcontractors of all tiers from Santa Clara and San Benito Counties Building & Construction Trades Council and its affiliated local Unions. The PLA will apply to VTA contracts of $2 million and above as will all work on same site as with contracts over $2 million. The PLA is not intended to replace, interfere with, abrogate, diminish or modify existing local or national collective bargaining agreements in effect during the duration of the Project.

Geotechnical Investigations

VTA has a robust general understanding of subsurface conditions along the project alignment, based on several hundred exploratory borings drilled over the past twenty years including recent significant efforts on characterization of the Silver Creek Fault which crosses the alignment. Investigations have continued through the last few years with a Geotechnical Data Report and Geotechnical Baseline Report to be provided to proposers at time of solicitation.

Utility Investigations

Through the course of the last twenty years, over one thousand potholes and gravity line utility investigations have been performed identifying actual locations of critical utilities and flow line elevations to inform designs and development of an extensive database of as-built utility date.

Right of Way

The Right-of-Way (ROW) acquisition process for the project is underway with identification and characterization of required fee takes and easements substantially complete; approximately 80 acquisitions have been determined. VTA already owns two major sites required for the project: the Newhall Yard (site for future Newhall Yard and Santa Clara Station) and the VTA Block in Downtown San José.

Third Party Agreements

Twenty-one third-party agreements and permits have been identified for delivery of this project. This includes public agencies, transit and transportation agencies, regulatory agencies, and private utility owners. Development of agreements are underway with those identified as critical, close to being executed. VTA is actively working and meeting with each of the third parties regarding these agreements.

7

Page 9: Phase II Extension Project · Completion The Phase II project is currently in the design, engineering and contract procurement development phase. It will be delivered through four

VTA’S BART SILICON VALLEY PHASE II EXTENSION PROJECTFu

nd

ing

Str

ateg

y

In order to make the Phase II project a reality, a diverse funding strategy has been identified for this project with varied revenue streams to support it. Voters have approved multiple local sales tax measures, showing their support for bringing BART service into Santa Clara County.

Integrity of the Procurement Process

As a public agency, VTA is required and committed to conducting a fair and open competitive procurement process. To ensure integrity is preserved, interested parties are advised that all questions pertaining to contractual matters for this project be directed solely to Mary Talentinow, Contracts Manager, via e-mail at [email protected]

For any general project inquiries or community relations related questions, please contact Gretchen Baisa, via e-mail at [email protected]

Register to become a vendor with VTA, receive information about upcoming solicitations and more. Visit: https://www.vta.org/business-center

Learn more about VTA’s BART Silicon Valley Phase II Project at https://www.vta.org/projects/bart-sv/phase-ii

Questions? Email: [email protected] | Phone: (408) 321-2300

Co

nta

ct U

s

Federal - FTA Expedited Project Delivery Grant (25%)

State - Transit and Intercity Rail Capital Program (TIRCP) Grant

State - Traffic Congestion Relief Program (TCRP) Grant

Transit Oriented Development (P3)

2000 Measure A Sales Tax

2016 Measure B Sales Tax

Regional Measure 3

$1,714

$750

$161

$75

$1,954

$1,831

$375

$6.86 BillionIn millions Total project funding