118
Gopal Bhatt 1 and Gary Shenk 2 1 Penn State, 2 USGS 11/28/2017 Phase 6 Chesapeake Bay Watershed Model – Final Calibration Modeling Workgroup Conference Call – November 2017

Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

Gopal Bhatt1 and Gary Shenk2

1 Penn State, 2 USGS

11/28/2017

Phase 6 Chesapeake Bay Watershed Model – Final Calibration

Modeling Workgroup Conference Call – November 2017

Page 2: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

Presentation outline

Review of final re-calibration State-basin summary of delivered loads

2

Page 3: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

Final re-calibration

A detailed presentation on the updates included in the final re-calibration was made in the October modeling workgroup quarterly meeting [1].

The updates include: Partnership review comments for both inputs and model. USGS-SPARROW Nitrogen land to water delivery variance factors

were excluded. Flow weighted observations were used. Chesapeake floodplain network (CFN) observations (not

regressions) were used for estimating stream loads. Organic scour processes were added.

The post auto-calibration phase included further refinements of the model performance, calibration of time-variable Conowingo infill, and parametrization of ungagedriver segments.

[1] https://www.chesapeakebay.net/channel_files/24721/20171017_-_bhatt_-_cbp_-_october_recalibraion_2.pdf 3

Page 4: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

Model performance across spatial scalesaverage annual loads at WRTDS sites

Page 5: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

NITROGENPHASE 5

30 ESTIMATOR sites(with regional factors)

51E3 1E4 1E5 1E6 1E7 1E8 1E9

1E3

1E4

1E

5

1E6

1E7

1

E8

1E9

NSE 0.994

Log NSE 0.981 Susquehanna at Conowingo, MD27086 sq. miles

NW Branch Anacostia River near Hyattsville, MD

52 sq. miles

Page 6: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

NITROGENPHASE 6

77 WRTDS sites

61E3 1E4 1E5 1E6 1E7 1E8 1E9

1E3

1E4

1E

5

1E6

1E7

1

E8

1E9

NSE 0.998

Log NSE 0.996

S F Quantico Creek near Independent Hill, VA

7.4 sq. miles

Susquehanna at Conowingo, MD27086 sq. miles

Page 7: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

PHOSPHORUSPHASE 5

71E3 1E4 1E5 1E6 1E7 1E8

1E3

1

E4

1E

5

1E6

1E7

1

E8

30 ESTIMATOR sites(with regional factors)

NSE 0.966

Log NSE 0.962

Page 8: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

PHOSPHORUSPHASE 6

81E3 1E4 1E5 1E6 1E7 1E8

1E3

1

E4

1E

5

1E6

1E7

1

E8

61 WRTDS sites

NSE 0.997

Log NSE 0.989

Page 9: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

SEDIMENTPHASE 5

9

1E4 1E5 1E6 1E7 1E8 1E9 1E10 1E11

30 ESTIMATOR basins

1E4

1E5

1E6

1

E7

1

E8

1

E9

1

E10

1

E11

NSE 0.323

Log NSE 0.732

Page 10: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

SEDIMENTPHASE 6

10

1E4 1E5 1E6 1E7 1E8 1E9 1E10 1E11

60 WRTDS basins

1E4

1E5

1E6

1

E7

1

E8

1

E9

1

E10

1

E11

NSE 0.987

Log NSE 0.990

Page 11: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

Model performance in resolving heterogeneityaverage annual per acre loads at WRTDS sites

Page 12: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

Review of geographic efficiencies

12

WRTDS and simulated per acre loads are compared.

Nash-Sutcliffe model efficiency was used to quantify the predictive power of the model across the watershed.

An efficiency of 1 would indicate a perfect match in loads for all river basins (where WRTDS estimates are available).

Page 13: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

Phase 5 – geographic efficiencies

13WRTDS Per Acre Load

Sim

ulat

ed P

er A

cre

Load

Higher NSE indicates better model performance.

Page 14: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

Phase 6 – geographic efficiencies

14WRTDS Per Acre Load

Sim

ulat

ed P

er A

cre

Load

Page 15: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

Summary of geographic efficiencies

Constituents Phase 5 Phase 6

Nitrate 0.8284 0.9547

Nitrogen 0.8704 0.9747

Phosphorus 0.6321 0.9565

Sediment -0.0770 0.9649

15

Higher NSE indicates better model performance.

Page 16: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

Temporal/seasonal model performancethe correlation of simulated and WRTDS monthly loads

Page 17: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

Correlation of monthly loads: total nitrogen

17Higher correlation coefficient indicates better model performance.

Page 18: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

Correlation of monthly loads: total phosphorus

18Higher correlation coefficient indicates better model performance.

Page 19: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

Correlation of monthly loads: sediment

19Higher correlation coefficient indicates better model performance.

Page 20: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

Model performance in loading estuarine modelaverage annual loads at RIM sites

Page 21: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

RIM loads: total nitrogen

assuming +/- 10% uncertainty in WRTDS estimates21

BASIN Phase 6 June Draft Phase 5SUSQ -06% -03% -01%POTO -04% -09% -22%JAME -03% -02% -07%RAPP -01% -07% -10%APPO -01% -07% -02%PAMU -01% 00% 06%MATT 04% 07% -06%PATU 04% 05% 19%CHOP -02% 08% -13%

Page 22: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

RIM loads: total phosphorus

assuming +/- 15% uncertainty in WRTDS estimates22

BASIN Phase 6 June Draft Phase 5SUSQ 01% 07% 10%POTO 01% -01% -14%JAME -01% 10% -25%RAPP -01% 06% 02%APPO 02% 13% 04%PAMU 03% 12% 07%MATT 01% -13% 04%PATU 00% 08% -18%CHOP -12% 13% 22%

Page 23: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

RIM loads: sediment

assuming +/- 15% uncertainty in WRTDS estimates23

BASIN Phase 6 June Draft Phase 5SUSQ 07% -11% 01%POTO 03% -29% -45%JAME 01% -13% -58%RAPP 00% 26% -29%APPO 14% 36% 75%PAMU 02% 40% 10%MATT -01% 90% 57%PATU 12% 53% 22%CHOP 03% 171% 71%

Page 24: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

State-basin loads:

Review of Phase 5 and Phase 6 state-basin loads delivery to the Bay (1991-2000) –

24

Page 25: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

NITROGENCalibration

25Average annual delivery for 1991-2000

Page 26: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

Phase 5: Nitrogen – MD Potomac

26

Page 27: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

27

Phase 6: Nitrogen – MD Potomac

Page 28: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

PHOSPHORUSCalibration

28Average annual delivery for 1991-2000

Page 29: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

29

Phase 5: Phosphorus – MD Potomac

Page 30: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

30

Phase 6: Phosphorus – MD Potomac

Page 31: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

Summary and Conclusions

Phase 6 Watershed Model was re-calibrated to incorporate final partnership inputs and review comments. The model performed quite well for several key

performance evaluation metrics. The corresponding state-basin summary of loads were

shown.Work is needed to document several aspects of model

development, calibration, and its application.

Calibration related information, such as calibration figures, comparison with WRTDS loads, are available at ftp://ftp.chesapeakebay.net/Modeling/Phase6/Phase_6_201710/Watershed_Model/

31

Page 32: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

Appendices

32

Page 33: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

NITRATEPHASE 5

16 ESTIMATOR basins

331E3 1E4 1E5 1E6 1E7 1E8 1E9

1E3

1E4

1E

5

1

E6

1E7

1E8

1E

9

NSE 0.900

Log NSE 0.965

Page 34: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

NITRATEJUNE DRAFT

77 WRTDS Stations

341E3 1E4 1E5 1E6 1E7 1E8 1E9

1E3

1E4

1E

5

1

E6

1E7

1E8

1E

9

NSE 0.994

Log NSE 0.971

Page 35: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

NITRATEPHASE 6

77 WRTDS Stations

351E3 1E4 1E5 1E6 1E7 1E8 1E9

1E3

1E4

1E

5

1

E6

1E7

1E8

1E

9

NSE 0.996

Log NSE 0.992

Page 36: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

DISSOLVED PHOSPHATEPHASE 5

361E2 1E3 1E4 1E5 1E6 1E7 1E8

1E2

1E

3

1E4

1

E5

1E6

1

E7

1E8

61 WRTDS Stations

NSE -3.195

Log NSE 0.540

Page 37: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

JUNE DRAFT

37

61 WRTDS Stations

DISSOLVED PHOSPHATE

1E2 1E3 1E4 1E5 1E6 1E7 1E8

1E2

1E

3

1E4

1

E5

1E6

1

E7

1E8

NSE 0.892

Log NSE 0.974

Page 38: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

PHASE 6

38

61 WRTDS Stations

DISSOLVED PHOSPHATE

1E2 1E3 1E4 1E5 1E6 1E7 1E8

1E2

1E

3

1E4

1

E5

1E6

1

E7

1E8

NSE 0.871

Log NSE 0.981

Page 39: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

Monthly loads: nitrate

39

Page 40: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

Monthly loads: dissolved phosphate

40

Page 41: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

State – basin loads: Nitrogen (1991-2000)

Page 42: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

42

Page 43: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

43

Page 44: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

44

Page 45: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

45

Page 46: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

46

Page 47: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

47

Page 48: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

48

Page 49: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

49

Page 50: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

50

Page 51: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

51

Page 52: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

52

Page 53: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

53

Page 54: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

54

Page 55: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

55

Page 56: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

56

Page 57: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

57

Page 58: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

58

Page 59: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

59

Page 60: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

60

Page 61: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

61

Page 62: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

62

Page 63: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

63

Page 64: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

64

Page 65: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

65

Page 66: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

66

Page 67: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

67

Page 68: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

68

Page 69: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

69

Page 70: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

70

Page 71: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

71

Page 72: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

72

Page 73: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

73

Page 74: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

74

Page 75: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

75

Page 76: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

76

Page 77: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

77

Page 78: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

78

Page 79: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

79

Page 80: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

State – basin loads: Phosphorus (1991-2000)

Page 81: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

81

Page 82: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

82

Page 83: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

83

Page 84: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

84

Page 85: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

85

Page 86: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

86

Page 87: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

87

Page 88: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

88

Page 89: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

89

Page 90: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

90

Page 91: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

91

Page 92: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

92

Page 93: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

93

Page 94: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

94

Page 95: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

95

Page 96: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

96

Page 97: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

97

Page 98: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

98

Page 99: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

99

Page 100: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

100

Page 101: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

101

Page 102: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

102

Page 103: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

103

Page 104: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

104

Page 105: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

105

Page 106: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

106

Page 107: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

107

Page 108: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

108

Page 109: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

109

Page 110: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

110

Page 111: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

111

Page 112: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

112

Page 113: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

113

Page 114: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

114

Page 115: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

115

Page 116: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

116

Page 117: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

117

Page 118: Phase 6 Chesapeake Bay Watershed Model Final Calibration - BHATT - MWCC...Gopal Bhatt1 and Gary Shenk2. 1 . Penn State, 2 . USGS. 11/28/2017. Phase 6 Chesapeake Bay Watershed Model

118