Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
PHASE 1 4 UNITS 30,000 - 60,000 SQ FT
BRAND NEW HIGH TECH /PRODUCTION UNITS
TO LET - AVAILABLE Q4 2019
SPARK OPPORTUNITY
PHASE 1 UNDER CONSTRUCTION
PHASE 2 DESIGN & BUILD
UNITS 3-5 SPECULATIVELY DEVELOPED WITH PRACTICAL COMPLETION DUE Q4 2019.
UNITS AVAILABLE ON A BUILD TO SUIT BASIS RANGING FROM 30,000 SQ FT TO 290,000 SQ FT.
Indicative Image
Indicative Image
Indicative Image
TACHBROOK ROAD
HA
RRISON
WA
Y
SPARTA
N C
LOSE
JUNO DRIVE
35m
45m
50m
35m
40m
35m
UNIT 3
WAREHOUSE
GROUND FLOOR OFFICE
FIRST FLOOR OFFICE
TOTAL
4 DOCK LEVEL DOORS
2 LEVEL ACCESS DOORS
94 CAR PARKING SPACES
54,000 SQ FT
3,000 SQ FT
3,000 SQ FT
60,000 SQ FT
UNIT 4
1 DOCK LEVEL DOOR
2 LEVEL ACCESS DOORS
52 CAR PARKING SPACES
WAREHOUSE
GROUND FLOOR OFFICE
FIRST FLOOR OFFICE
TOTAL
27,000 SQ FT
1,500 SQ FT
1,500 SQ FT
30,000 SQ FT
UNIT 5
2 DOCK LEVEL DOORS
2 LEVEL ACCESS DOORS
59 CAR PARKING SPACES
WAREHOUSE
GROUND FLOOR OFFICE
FIRST FLOOR OFFICE
TOTAL
36,000 SQ FT
2,000 SQ FT
2,000 SQ FT
40,000 SQ FT
PHASE 1UNDERCONSTRUCTION
ADDITIONAL OFFICE ACCOMMODATION CAN BE INSTALLED TO EACH UNIT AS REQUIRED.
4 DOCK LEVEL
2 LEVEL ACCESS
2 DOCK LEVEL
1 LEVEL ACCESS
1 DOCK LEVEL 1 LEVEL
ACCESS
1 LEVEL ACCESS
1 LEVEL ACCESS
UNIT 3 60,000 SQ FT
PHASE 2
UNIT 4 30,000 SQ FT
UNIT 5 40,000 SQ FT
LET TO
ENTRANCE(SPARTAN CLOSE)
MAIN ENTRANCE(TACHBROOK ROAD)
ENTRANCE(JUNO DRIVE)
10MEAVESHEIGHT
BREEAM RATING VERY GOOD
50 KN/M2 FLOOR LOADING
BESPOKE TENANTFIT OUT
35-45MYARDDEPTH
UP TO 11MVA OF POWER
SPARK NOW
77%OF THE LOCAL POPULATION ARE OF WORKING AGE
90%OF THE UK IS ACCESSIBLE BY HGV WITHIN 5 HOURS
LOCAL OCCUPIERS INCLUDE:
spapark.co.uk
May 2019These particulars are believed to be correct at the date of publication, but their accuracy is in no way guaranteed, neither do they form part of any contract. All areas are approximate.
MELISSA WASE-ROGERS07921 [email protected]
WILLIAM ABBOTT07827 [email protected]
RICHARD LUDLOW07836 [email protected]
MYLES WILCOX-SMITH07880 [email protected]
THOMAS BROMWICH07718 [email protected]
ANDREW COSNETT07973 [email protected]
SPARK AT SPA PARK
A DEVELOPMENT BY; FOR FURTHER INFORMATION, PLANS AND SPECIFICATIONS;
SAT NAV: CV31 3HH
J15
J14
STRA
TFO
RD
RO
AD
MYTON ROAD
H A R BURY LANE
TAC
HB
RO
OK
RO
AD
QUEENSW
A Y
TACH
BR
OO
K PK
DR
M 4 0
WA
RW
ICK
BY
PASS
WARWICK PARKWAY
WARWICKLEAMINGTON
SPA
A46
A425
A425
A425
A425
A452
A452
A4189
M54
A454
A444
A423
A422
A442
A456
A435
A46
A46 A14
A5
A45
A45
M42
M42
M42
M40
M69
M45
M1
M1
M6
M5
M5
M6
M6
M6 TOLL2
2
34
1
8
6
6
6
5
5
9
10
19
18
21
17
12
13
1514
11a
10a
4a 3a
7a
BIRMINGHAM
REDDITCH
SOLIHULLRUGBY
LEAMINGTON SPA
BIRMINGHAM AIRPORT
COVENTRY
LONDON
Spa Park is well connected, close to the A46 and junctions 14 and 15 of the M40. Leamington Spa train station is less than one mile away.
Coventry & Warwickshire has a long established track record for engineering and advanced manufacturing industries, with well-developed supply chains and expertise in automotive, aerospace and energy generation technology.
DRIVE TIMES
AIRPORTSCOVENTRY
BIRMINGHAM INT
EAST MIDLANDS
LUTON
HEATHROW
PORTSAVONMOUTH
LONDON GATEWAY
LIVERPOOL
GRIMSBY
FELIXSTOWE
20MINS
35MINS
1HR
1HR 25MINS
1HR 25MINS
1HR 35MINS
2HRS 20MINS
2HRS 20MINS
2HRS 35MINS
3HRS