PORTFOLIO • ENGAGEMENT • MARKET RESPECT We respect the market through the observance of its rules and its political, economical, social, technological and environmental context. “Be the reference in the engineering market. Deserve the natural choice of Clients.” We reach in a continuous manner the best indicators in order to fulfill our mission, guaranteeing the present and keeping in mind the future development. • TEAM SPIRIT

Citation preview

Page 1: pf_VF_inglês

PORTFOLIO

Page 2: pf_VF_inglês
Page 3: pf_VF_inglês

A400 – Projectistas e Consultores de Engenharia Civil Lda. is a company founded in August 1995, whose Object is to render technical services in the various aspects implicated in anengineering project, implemented by the Quality System according to the referential ISO 9001:2008.A400 is aware of the importance that Quality takes nowadays. Competitivity is getting each day stronger and, regarding the management of companies, it is necessary to introduce quality improvements as a way to produce goods and services that better suit the needs of clients.The company, after more than FIFTEEN years of activity, has developed its permanent board and its activity range. The company defends the engagement and continuous training of all the technical staff who together are A400.Presently, given the global economic framing and the saturation of the Portuguese Civil Engineering market, internationalization is crucial for the entrepreneurial sector.In order to “sail” through the storm, A400 has widened its scope of action for new market segments within the engineering

COMPANY’S PRESENTATION

branch, through the engagement in internationalizationprocesses, namely through international projects and participation in tenders. In 2010, A400 Angola (Angolan company where A400 has a stake) became a reality. The company’s headquarter is located in Luanda, with the permanent presence of the General Manager and the presence of technical staff when necessary. The relevance of this physical presence is determinant to allow the proximity to clients who develop their activity in Angolan territory.This new attitude is also reflected in the South American continent, namely in Brazil. The evolution and growth potential is a reality, with business opportunities and attractive projects.

Page 4: pf_VF_inglês

“Be the reference in the engineering market. Deserve the natural choice of Clients.”

VISION

MISSION

VALUES

Create value for the Client, offering innovative solutions reached through an organized and dynamic team, targeted at the Total Satisfaction of Clients and Partners.

• ENGAGEMENTWe ensure the quality of service, privilege a personalized relation with the client and create adequate solutions to each need.

• MARKET RESPECTWe respect the market through the observance of its rules and its political, economical, social, technological and environmental context.

• TEAM SPIRITWe promote teamwork, attention to detail, individual responsibility and initiative, trust, translated by mutual cooperation, engagement and participation.

• HUMAN COMPONENTWe focus on both personal and Professional development of our workers, capitalizing all the knowledge created in an important source of information and differentiation of all.

•PERFORMANCEWe reach in a continuous manner the best indicators in order to fulfill our mission, guaranteeing the present and keeping in mind the future development.

Page 5: pf_VF_inglês

MAIN INDICATORSVOLUME OF BUSINESS

Although the Volume of Business is continuous, the year of 2007 is a turning point due to the rise of new projects.

0,00€

0,50€

1,00€

1,50€

2,00€

2,50€

3,00€

3,50€

Milhares de Euros

A400 Angola

A400

1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010

thousand euros

Page 6: pf_VF_inglês

MAIN INDICATORSWORKERS

3 3 33

7

10 10

3

10

24

37 38

47 48

0

10

20

30

40

50

1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010

Page 7: pf_VF_inglês

Quality is one of the main paradigms in the management of companies. Consequently, the ISO9001:2008 certification was, from the beginning, understood as a fundamental instrumentto control work processes, to look for continuous improvement and to promote clients growing satisfaction, always looking for the development and satisfaction of the collaborators.The policy of quality assumed by A400 assumes the policy of Quality in the following commitments:

• Clients, Taken as partners, by systematically trying to satisfy and predict their needs and expectations as well as to establish relations on the basis of a permanent cooperation;•People, by promoting at all levels their engagement, development and responsibility, by stimulating individual creativity and team work, guaranteeing the most adequate workconditions and proper qualifications;• Suppliers, by trying to establish, when adequate, long time partnerships and to work continuously to create, maintain and improve synergies;• Continuous improvement of processes, by establishing competitive goals that stimulate the company to reach higher

QUALITY POLICY

performance levels, in a context of economic and environmentalefficiency.

The Quality Management System is understood as a group of processes that interact and interconnect.The application of this methodology allows the determination of a framing from which it is possible to determine the system’s development through adequate indicators and/or metrics.Its determination and use are performed regularly with the goal of continuously improving the efficiency and efficacy of processes and consequently of the organization.

The Quality System implemented at A400 includes the design and rendering of engineering services, in the field of Consultancy, Projects and Management of Buildings (ProjectManagement and Work Site Supervision). These activities will be performed according to the requisites/specifications of clients, in order to correspond to their needs and expectations.

Page 8: pf_VF_inglês

CERTIFICATIONS

Page 9: pf_VF_inglês

The growth of companies is now facing the inertia in the market of Public Works, the rise of competitiveness and the need for a constant monitoring of technological developments.

In order to face and overstep these obstacles, A400 has developed a transversal innovation policy to accomplish modernization, internationalization, the development of skills and the acquisition of technologies in the field of project development.

The main strategic investments are related with:• Implementation of transversal information systems.• Modernization of the entire productive department.• Acquisition of state of the art equipment, drawing and modulation software.• Acquisition of diverse information systems in order to elevate the levels of organization and of interoperability inside and outside the company.• Implementation of innovative renewable energy systems as well as environmental and safety systems.

INOVATION• Adoption of new marketing strategies and of international promotion.

The several information systems adopted will allow the development of all the productive, administrative, commercial and other processes what will be reflected both in logistics and in the company’s competitiveness. These systems will serve to elevate the company’s efficiency in those dimensions as well as to allow the company to project all the know-how and to elevate the competitiveness through the reduction of energetic, environmental and safety related costs.

The adoption of new philosophies and marketing methodologies will be reflected in several functional areas and will introduce a significant improvement in processes and innovation. The innovation policy will allow A400 to develop vital competitiveness factors and to occupy an important place in the markets where it operates.

Page 10: pf_VF_inglês

• Design and development of Engineering Projects

- Project of Structures and Foundations;- Project of Water Supply, Drainage and Rain Water;- Project of Gas Supply;- Project of Thermal and Acoustic Installations;- Project of Fire Safety and Mechanical Installations;- Project of Electricity and Telecommunications;- Infrastructures;- Energy Certification;- Project of Road Infrastructures;- Coordination of projects’ execution, specifications and preparation of documents for tenders;- Measurements and cost estimations;- Analysis and comparison of proposals;- Technical Evaluations.

•Verification and certification of Engineering Projects

SERVICES

Page 11: pf_VF_inglês

A400 – Projectistas e Consultores de Engenharia Civil, Lda, constantly invests in training its human resources so these are able to perform a better work, targeted at the client’s satisfaction. From a team of 44 collaborators, we count 30 civil engineers.

Since 1995, A400 has developed near one thousand projects within the scope of action, assuming and solving from the very beginning challenges of technical and execution complexity.Next, there is a sum of some of our Works to show our work and experience in the field of Civil Engineering.

DESIGN AND DEVELOPMENT OF ENGINEERING PROJECTS

Page 12: pf_VF_inglês

INTRODUCTION

The quality of projects is a determinant factor of both quality and economy in construction.

The first element of guarantee is the choice, by the Work Owner, of an entity to design the project.

The Work Owner has the right to accompany and validate all the project phases of, with the goal of ensuring that expectations are fulfilled (regarding quality, safety, deadlines and costs).

The Work Owner can use own means or can choose capable entities. In any situation, it is desirable that they work together from the very beginning.

The depth of the verification should be established by the Work Owner.

VERIFICATION AND CERTIFICATION OF ENGINEERING PROJECTS

As an alternative or even complement, the Work Owner can demonstrate interest in the verification of the project’s specific aspects, accompanied by reports, which can focus on thefollowing aspects:

• Program fulfilment;• Project instruction with all the elements necessary to its licensing;• Feasibility of the solutions at the constructive level;• Fitness between the several projects;• Level of rigour and detail;• Rigour of cost estimations (in order to minimize errors and omissions).

In case the Work Owner wants specific reports, they should be asked as soon as possible inorder not to collide with already approved project phases.

Page 13: pf_VF_inglês

QUALITY VERIFICATION LEVELSLevel 1 – Minimum Compliance Evaluation

Level 1 corresponds to the lower compliance level. It is used to check if the process is complete rather than the verification of compliance of the several elaborated documents.

• Global Verification- Check the instruction of the Project, the existence of all the elements and number of necessary copied to be approved by the competent entities.- Proceed with a generic verification to detect gross errors or omissions.- Check the material fulfilments of the program defined by the Work Owner.

• Verification of Drawings- Confront the drawings with the respective index.- Check the drawings’ coherence and organization.

- Check the sufficiency and suitability of the drawings with specifications of the project.- Check the coherence of drawings with the written pieces.

• Verification of Written Pieces- Check the coherence between the several written pieces regarding technical specifications.- Check the coherence of organization of the written pieces.- Check the sufficiency and suitability of the drawings with specifications of the project.- Confront the written pieces with the respective index

• Verification of Measurements- To check the existence of measurements and coherence with the type of work.

• Verification of Specifications- To check the existence of specifications and the coherence with the type of work.

Page 14: pf_VF_inglês

Level 2 – Verification of Quality

The verification of quality, at the phase of execution, should avoid putting at stake the global design of the project, once there is already the approval of official entities.

Unless there is the occurrence of a really unviable solution, there should only be the evaluation and reflection if the proposed solution is the most adequate in the face of theknown restrictions.

At the level 2, there is the inclusion of all the activities of the Level 1 and also:

• Verification of Drawings- Evaluate the sufficiency of the detail level.- Check the coherence of organization of drawings.- Check the location and implantation of the work.- Confirm the indications regarding materials.- Evaluate the project’s feasibility in the face of the existent restrictions and constructive phases.- Detect eventual errors in the drawings.- Reflect on the works general conception.- Check the compatibility of the defined solutions in each one of the specialties.

• Verification of Written Pieces- Check, in the Descriptive Memory, if there is the definition of all the materials to use in the work and all the restrictions.- Detect eventual errors in the written pieces.- Evaluate the compliance with regulations.- Check the need of some complimentary calculations in the most significant pieces.- Check the compatibility of the defined solutions in each of the specialty.

- Verification of information on the Services Affected by the work.

• Verification of Measurements- Verification of the fitness and sufficiency of the articulated in the Project.- Perform an analysis of the Measurements, checking for eventual omissions, and check the most significant articles within the habitual parameters.- Indicate the non foreseen articles in order to contemplate unforeseen situations.- Check if there are no duplication of articles, compared with other specialties.- Check the compatibility of the solutions defined in each of the specialties.- Check which are the most adequate and complete measurement criteria.- Check the compatibility of measurements and criteria with all the predicted works and methods.

• Cost Verification- Check numbering and the rigour of the several articles and compatibility with the same articles of the measurements.

• Verification of Specifications- Verification of the coherence of Specifications with the type of work, legislation, standards and specifications, etc.- Verification of the existence and sufficiency of the Special Technical Conditions for all the predicted works.- Check the compatibility of the solutions defined in each of the specialties.- Check the fitness of the technical clauses, taking into account the materials and constructive processes adopted.

Page 15: pf_VF_inglês

Level 3 – Guidance and Quality Validation

This is the most rigorous level. It is essential to check the absence of significant errors, regarding design, calculations and dimensioning, definition of shapes, details and thedefinition of constructive materials and processes.

A400 guides and validates all the projects under its responsibility since the beginning of the process and participates in the options that are assumed along the several and different phases, in a constant and permanent dialogue with the several elements of the Team of Designers and the Work Owner.

Level 3 comprises the activities defined in the level 1 and 2 and also:

- Analyse the calculations of the several specialties with the goal to detect errors, through samples or verification of pieces considered fundamental.- Check the existence of real and precise measuring criteria.- Check the scope of the technical clauses regarding all the type of materials and activities necessary to develop the Works.- Promote and perform periodical meetings with all the elements of the Designers Team, of all the specialties.- Elaborate reports with the main decisions and reasons.- Propose the approval of the work’s general design according to all the designers- Approve all the decisions in order to get a perfect fitness between the specialties.- Propose the approval of the final version of the General Project and of all the specialty projects.

Page 16: pf_VF_inglês
Page 17: pf_VF_inglês

Client: Centro Cerro Angola - Constr. Civ. e Ob. Públicas, LdaStatus: CONSTRUCTION PHASEArchitect: PLARQ-Estudos de Arquitectura e Urbanismo Lda.Area: 42.000 sq metersDescription: Development of specialty projects for residential buildings, commerce and services.Notes: Residential and Office building comprising 25 floors above the ground and 2 underground floors. Mixed metal structure with resistant cores in armed concrete.

KANHANGULO TOWERLUANDA - ANGOLA

Page 18: pf_VF_inglês

Client: LUDOMUS – Grupo José GuilhermeStatus: CONSTRUCTION PHASEArchitect: Miguel Saraiva & Associados - Arquitectura e Urbanismo, Lda.Area: 50.000 sq metersDescription: Development of specialty projects for residential buildings, commerce and services.Notes: Two residential and office towers comprising 25 floors and 8 underground floors. Mixed metal structure with resistant cores in armed concrete.

OCEAN TOWERSLUANDA - ANGOLA

Page 19: pf_VF_inglês

Client: Empreiteiros Casais S.A.Status: Finished (2003)Architect: Aires Mateus e Associados, Lda.Area: 35.000 sq metersDescription: Project of specialties of offices located at Parque das Nações.Notes: The offices present an innovative construction based in pre fabricated materials.

MAR ORIENTE OFFICESLISBOA - PORTUGAL

Page 20: pf_VF_inglês

Client: Acordo Óbidos - Empreendimentos Imobiliários, S.A.Status: CONSTRUCTION PHASEArchitects: SeveralDescription: Elaboration of the projects of structures, foundations, peripheral containment, hydraulic, electrical and mechanical infrastructures.Notes: Reference Tourism Project, located in Óbidos, using contemporary architecture as the central feature of its design strategy.

BOM SUCESSO DESIGN RESORTÓBIDOS - PORTUGAL

Page 21: pf_VF_inglês

Client: Marinha Palace Hotel Empreendimentos Turísticos, S.A.Status: Finished (2010)Architect: Anahory - Projectos de Arquitectura Design, Lda.Area: 36.000 sq metersDescription: Elaboration of the project of structures and foundations, peripheral containment, together with the construction company Bysteel. Mixed metal structure withresistant cores in armed concrete.

MARINHA PALACE HOTELLISBOA - PORTUGAL

Page 22: pf_VF_inglês

Client: Turilima-Empreendimentos Turísticos Vale Lima, S.A.Status: Finished (2008)Architect: Jorge AlbuquerqueArea: 20.000 sq metersDescription: Elaboration of the project of structures and foundations and peripheral containment. Mixed metal structure with resistant cores in armed concrete.Notes: Reference tourism facility with a unique infrastructure and architecture.

AXIS VIANA HOTELVIANA DO CASTELO - PORTUGAL

Page 23: pf_VF_inglês

Client: RIOPART – Consultoria, Investimentos e Participações, S.A.Architect: João Brandão Margarida Gomes, Architects Lda.Description: Elaboration of the projects of structures and foundations, peripheral containment, hydraulic, electrical and mechanical infra structures and also road infrastructures.Notes: Reference tourism facility, located in Sintra, using contemporary architecture as a central line of its design strategy.

SINTRA GOLF & COUNTRY CLUBSINTRA - PORTUGAL

Page 24: pf_VF_inglês

Client: Hautevile Imobiliária, Lda.Status: CONSTRUCTION PHASEArchitect: Sequeira - Architects Associados, Lda.Area: 30.000 sq metersDescription: Elaboration of the projects of structures and foundations, peripheral containment, hydraulic, electrical and mechanical infra structures and also road infrastructures.

VILLA PARKLUANDA- ANGOLA

Page 25: pf_VF_inglês

Client: Monte Santos Imobiliária SAStatus: PROJECT PHASEArchitect: João Brandão Margarida Gomes, Architects Lda.Area: 90.000 sq metersDescription: Elaboration of the projects of structures and foundations, peripheral containment, hydraulic, electrical and mechanical infra structures of a residential, commercial and tourism complex located in Sintra, comprising the elaboration of all specialties.

MONTE SANTOS COUNTRY CLUBSINTRA - PORTUGAL

Page 26: pf_VF_inglês

Client: Leogest - Investimentos Financeiros E Imobiliários, Lda.Status: Finished (2007)Architect: Atelier RP - Arquitectura Interiores e Design Unipessoal Lda.Description: Licensing and execution projects of all specialties.Notes: Residential complex comprised by 13 collective buildings for commerce and residences and by 30 single family residences.

QUINTA DE FORBESVILA NOVA DE GAIA – PORTUGAL

Page 27: pf_VF_inglês

Client: 4 Partes – Empreendimentos Imobiliários, S.A.Status: Finished (2004)Architect: António BarbosaDescription: Execution Project of structures and foundations.

4 PARTES TOWNHOUSEPORTO – PORTUGAL

Page 28: pf_VF_inglês

Client: Dra. Maria José FernandesStatus: Finished (2009)Architect: João Brandão Margarida Gomes, Architects Lda.Description: Elaboration of the specialties projects for the construction of a single family residence.

NAFARROS TOWNHOUSESINTRA - PORTUGAL

Page 29: pf_VF_inglês

Client: Câmara Municipal de BragançaStatus: Finished (2006)Architect: Filipe Oliveira DiasArea: 8.000 sq metersDescription: Elaboration of the projects of structures, foundations, peripheral containment and hydraulic infra structures.Notes: Integrated in the urban centre of Bragança, the building presents a complex structural solution together with the evolving area.

BRAGANÇA THEATREBRAGANÇA – PORTUGAL

Page 30: pf_VF_inglês

Client: Câmara Municipal de Vila RealStatus: Finished (2005)Architect: Filipe Oliveira DiasArea: 7.500 sq metersDescription: Elaboration of the project of structures, foundations, peripheral containment and hydraulic infra structures.Notes: Located in a park near the river, this theater introduced a new dynamic to the city, turning into a cultural reference at national level.

VILA REAL THEATREVILA REAL – PORTUGAL

Page 31: pf_VF_inglês

Client: Amorim Imobiliária S.G.P.S., S.A.Status: Finished (2004)Architect: Jorge AlbuquerqueArea: 20.000 sq metersDescription: Remodeling of the casino with the elaboration of projects of structures and foundations.

FIGUEIRA DA FOZ CASINOFIGUEIRA DA FOZ – PORTUGAL

Page 32: pf_VF_inglês

Client: VHM - Coordenação e Gestão de Projectos S.A.Status: Finished (2006)Architect: Cannatà & Fernandes Architects Lda.Area: 8000 sq metersDescription: Project of structures and foundations.

OVAR ARTS CENTEROVAR – PORTUGAL

Page 33: pf_VF_inglês

Client: Trofa Saúde SGPS S.A.Status: Finished (2010)Architect: Ricardo Sousa OliveiraArea: 14.000 sq metersDescription: Project of structures and foundations in armed concrete.

BRAGA PRIVATE HOSPITALBRAGA - PORTUGAL

Page 34: pf_VF_inglês

Client: Ideal Tower, Sgps, S.A.Status: CONSTRUCTION PHASEArchitect: PLARQ - Estudos de Arquitectura e Urbanismo Lda.Area: 30.000 sq metersDescription: Project of Structures and Foundations and Hydraulic Installations.

COIMBRA PRIVATE HOSPITALCOIMBRA - PORTUGAL

Page 35: pf_VF_inglês

Client: Jocilma - Indústria de Móveis, S.A.Status: Finished (2005)Architect: MR ArchitectsArea: 14.000 sq metersDescription: Elaboration of the projects of structures, foundations, peripheral containment, hydraulic infra-structures, electrical and mechanical of an industrial unity of furniture making.

JOCILMA INDUSTRIAL BUILDINGPAREDES – PORTUGAL

Page 36: pf_VF_inglês

Client: DST- Domingos da Silva Teixeira S.A.Status: Finished (2008)Architect: Júlio Quirino & Paulo Viana ArchitectsArea: 30.000 sq metersDescription: Project of structures and foundations, hydraulic installations, gas supply, fire safety, HVAC, thermal project, acoustic project (regulation check) and outside arrangements.

MOVIFLOR MEDIA MARKTALFRAGIDE – PORTUGAL

Page 37: pf_VF_inglês

Client: DST - Domingos da Silva Teixeira S.A.Status: Finished (2008)Architect: Victor MogadouroArea: 6000 sq metersDescription: Licensing and execution project of all the specialties.

VILA PRAIA DE ÂNCORA SWIMMING-POOLVILA PRAIA DE ÂNCORA – PORTUGAL

Page 38: pf_VF_inglês

Client: CÂMARA MUNICIPAL DE MATOSINHOSStatus: Finished (2005)Architect: -Area: -Description: Project of structures and foundations, peripheral containment, hydraulic, electrical and mechanical installations.

SENHORA DA HORA SWIMMING-POOLMATOSINHOS - PORTUGAL

Page 39: pf_VF_inglês

Client: Câmara Municipal de MatosinhosStatus: Finished (2009)Architect: Telmo CastroArea: 5.000 sq metersDescription: Elaboration and development of the specialties projects.

GUIFÕES SWIMMING-POOLMATOSINHOS – PORTUGAL

Page 40: pf_VF_inglês

Client: Irmandade Nª. Sra. da Consolação e Santos PassosStatus: Finished (2008)Architect: Pitágoras - Arquitectura e Engenharia Integradas, Lda.Area: 10.000 sq metersDescription: Elaboration of the project of structures and foundations.

NOSSA SENHORA DA CONCEIÇÃO SCHOOLGUIMARÃES – PORTUGAL

Page 41: pf_VF_inglês

Client: Câmara Municipal de MatosinhosStatus: CONSTRUCTION PHASEArchitect: Telmo CastroDescription: Licensing and execution project of all specialties.

PADRÃO DA LÉGUA SCHOOLMATOSINHOS - PORTUGAL

Page 42: pf_VF_inglês

Client: FUTURLAGOS - Entidade Emp. Municipal p/ o Desenv. EEMStatus: CONSTRUCTION PHASEArchitect: João Brandão Margarida Gomes, Architects Lda.Area: 1000 placesDescription: Elaboration of the specialties projects for the construction of the Parking Lots of the river front and the Park Anel Verde/ City Park.

ANEL VERDE CAR PARKFARO - PORTUGAL

Page 43: pf_VF_inglês

Client: Town Hall of Cabeceiras de BastoStatus: Finished (1999)Architect: -Area: 68 linear metersDescription: Project of structures and foundations in armed concrete.