28
© 2017 Petroliam Nasional Berhad (PETRONAS) 1 © 2017 PETROLIAM NASIONAL BERHAD (PETRONAS) All rights reserved. No part of this document may be reproduced, stored in a retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner. PETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN) Presented by Khairil Azwan B Khabri COE Upstream Gavin Halls COE Upstream

PETRONAS ROTATING EQUIPMENT ANALYTICS · PDF filePETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN) Presented by Khairil Azwan B Khabri

  • Upload
    ngothuy

  • View
    458

  • Download
    24

Embed Size (px)

Citation preview

Page 1: PETRONAS ROTATING EQUIPMENT ANALYTICS  · PDF filePETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN) Presented by Khairil Azwan B Khabri

© 2017 Petroliam Nasional Berhad (PETRONAS) 1

© 2017 PETROLIAM NASIONAL BERHAD (PETRONAS) All rights reserved. No part of this document may be reproduced, stored in a retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.

PETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN)

Presented by

Khairil Azwan B Khabri – COE Upstream

Gavin Halls – COE Upstream

Page 2: PETRONAS ROTATING EQUIPMENT ANALYTICS  · PDF filePETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN) Presented by Khairil Azwan B Khabri

© 2017 Petroliam Nasional Berhad (PETRONAS) 2

Company Overview

Petroleum Nasional Berhad (PETRONAS) is Malaysia’s fully integrated oil & gas multinational with proven capabilities in a broad spectrum of the petroleum chain value. Establish in August 17, 1974, PETRONAS vision is to be a Leading Oil and Gas Multinational of Choice PETRONAS mission statements are • We are a business entity • Petroleum is our core business • Our primary responsibility is to develop and add value to this

national resource • Our objective is to contribute to the well-being of the people

and the nation

Open

Page 3: PETRONAS ROTATING EQUIPMENT ANALYTICS  · PDF filePETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN) Presented by Khairil Azwan B Khabri

© 2017 Petroliam Nasional Berhad (PETRONAS) 3

PETRONAS Core Business

Open

Page 4: PETRONAS ROTATING EQUIPMENT ANALYTICS  · PDF filePETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN) Presented by Khairil Azwan B Khabri

© 2017 Petroliam Nasional Berhad (PETRONAS)

Initial Problem Statement

Over 130 pieces of gas turbine driven equipment

Numerous manufacturers

Centrifugal Gas Compressor

Generator

30+ Pieces of Super Critical Equipment – single duty high value

Numerous Reciprocating engines and pumps

OEM and 3rd Party solutions mean financial commitment would be considerable

Management directive to go digital

Open

Page 5: PETRONAS ROTATING EQUIPMENT ANALYTICS  · PDF filePETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN) Presented by Khairil Azwan B Khabri

© 2017 Petroliam Nasional Berhad (PETRONAS) 5

PETRONAS Maintenance & Engineering team looked at how to perform diagnostics

using unit data on one single unit cost effectively

May

2015

August

2015

Utilized Operation Data Management system

(ODMS) which is a data capture system using handheld data loggers

October

2015

Team compiled monthly

report using running data

and equipment vibration and

lube oil health status

December

2015

Team developed the process

flow and investigated ways to

improve the overall

monitoring system

When did all begin?

Open

Page 6: PETRONAS ROTATING EQUIPMENT ANALYTICS  · PDF filePETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN) Presented by Khairil Azwan B Khabri

© 2017 Petroliam Nasional Berhad (PETRONAS) 6

• Unable to run macro to bring data in

from spreadsheet automatically

• Poor data entry by operators

• Numerous errors in data capture

• Manual process to capture data

from ODMS

• Understand data

• Monitoring actual data

• Monthly report was produced

showing health of the unit

• Visualized data

• Captured a few issues

• Understand process flow

Open

Page 7: PETRONAS ROTATING EQUIPMENT ANALYTICS  · PDF filePETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN) Presented by Khairil Azwan B Khabri

© 2017 Petroliam Nasional Berhad (PETRONAS) 7

• Not to duplicate machinery HMI

• Not to duplicate the unit control system

• Powerful automatic analytical tools to identify issues before they become issues

• Simple visuals whilst providing as much relevant information to the engineer as possible

• Trends and graphs take human process power to look for issue

• Automated alert system

• Email

• Ability to review historical data

• Not limited to Major Rotating Equipment

• Support other disciplines

• Electrical health

• Pumps

• Vessels

• Ability to evolve system

• Visuals

• Algorithms

• Integrate with other systems

ADD Value to PETRONAS

Basic Design Brief

Open

Page 8: PETRONAS ROTATING EQUIPMENT ANALYTICS  · PDF filePETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN) Presented by Khairil Azwan B Khabri

© 2017 Petroliam Nasional Berhad (PETRONAS)

Page 9: PETRONAS ROTATING EQUIPMENT ANALYTICS  · PDF filePETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN) Presented by Khairil Azwan B Khabri

© 2017 Petroliam Nasional Berhad (PETRONAS) 9

Lessons Learnt and Limitations

Understanding the need for

management of a system

Excel not ideal as very processor heavy: constant

No automatic email

notifications

Very manual to

understand alerts

Difficult to

integrate into other

PETRONAS

systems

Open

Page 10: PETRONAS ROTATING EQUIPMENT ANALYTICS  · PDF filePETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN) Presented by Khairil Azwan B Khabri

© 2017 Petroliam Nasional Berhad (PETRONAS) 10

System Solution Architecture

Workflows

&

Integration

Smart

Visualization

Informed

Decisions

Applications

Data

Management

Data

Sources

Monitoring & Surveillance Analysis & Predictive Action & Optimization

Real Time

Historians

Business Process

Automation Engine Analysis & Predictive

Engines Optimization

Engines

1

2

3

4

5

6

PI System

Open

Page 11: PETRONAS ROTATING EQUIPMENT ANALYTICS  · PDF filePETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN) Presented by Khairil Azwan B Khabri

© 2017 Petroliam Nasional Berhad (PETRONAS) 11

Design Brief for next step November 2016

Clear aim on the system to be developed with element

of People, process & Technology

Visuals should be meaningful

System does the hard work and complex thinking

processes

Link with other PETRONAS software solutions

Human to make final decision

Open

Page 12: PETRONAS ROTATING EQUIPMENT ANALYTICS  · PDF filePETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN) Presented by Khairil Azwan B Khabri

© 2017 Petroliam Nasional Berhad (PETRONAS) 12

No algorithm

embedded to the

systems

Very manual to

understand alerts

Dashboard

Excel not ideal as

very processor

heavy: constant

Difficult to

integrate into

other PETRONAS

systems

No automatic

email

notifications

PI Data Archive

PI System

Access

PI AF Notifications

Asset Analytics PI Coresight

How do OSIsoft help PROTEAN

Open

Page 13: PETRONAS ROTATING EQUIPMENT ANALYTICS  · PDF filePETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN) Presented by Khairil Azwan B Khabri

© 2017 Petroliam Nasional Berhad (PETRONAS) 13

Early development of PROTEAN

Developed system for 2 critical

gas turbine driven compressor

units

Automatic e-mail notifications of

issues proved difficult and

unreliable. Email notification of

unit shutdown successful

Data points analyzed based on

criticality of data point

Data dump when unit shuts

down to aid RCFA : CSV file on

shared drive

Analytic page simple but

effective

Utilized PETRONAS PI System

for data collection and

algorithms. Utilized PI Coresight

for visuals 01 02

03 04

05 06

Open

Page 14: PETRONAS ROTATING EQUIPMENT ANALYTICS  · PDF filePETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN) Presented by Khairil Azwan B Khabri

© 2017 Petroliam Nasional Berhad (PETRONAS) 14

Developed PROTEAN in PI System Environment

Open

Page 15: PETRONAS ROTATING EQUIPMENT ANALYTICS  · PDF filePETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN) Presented by Khairil Azwan B Khabri

© 2017 Petroliam Nasional Berhad (PETRONAS) 15

Did it Work?

• Yes • System alerted

to numerous

concerns over a

2 month period

• Email

notifications

worked

• Visuals worked

well

• PROTEAN

Dashboard

Open

Page 16: PETRONAS ROTATING EQUIPMENT ANALYTICS  · PDF filePETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN) Presented by Khairil Azwan B Khabri

© 2017 Petroliam Nasional Berhad (PETRONAS) 16

During development and implementation May 2017

Increase number of units

covered and ISO 14224

system classification

Multiple data point

comparisons Increase

number of units

covered

Understanding of

PI AF structure

and power

Better email notifications. More

information to recipient. Utilized Event

Frame process

Create templates for algorithm.

Reduce processor and server

loading.

Not all algorithms are required

on all data points

Open

Page 17: PETRONAS ROTATING EQUIPMENT ANALYTICS  · PDF filePETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN) Presented by Khairil Azwan B Khabri

© 2017 Petroliam Nasional Berhad (PETRONAS) 17

Current Look and Feel

Open

Page 18: PETRONAS ROTATING EQUIPMENT ANALYTICS  · PDF filePETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN) Presented by Khairil Azwan B Khabri

© 2017 Petroliam Nasional Berhad (PETRONAS) 18

PROTEAN as tools in PETRONAS Integrated Operation (IO)

Unit

Review

data and

confirm

issue

Algorithms

runAnalysis output Concerns

Issue initial action or

recommendation to

respective

stakeholders

Critical Trends

shown on IO

Raise SAP

notification

Recommendations will show

Issue

Criticality

Possible solutions

Rectification

carried outConfirmed by data

Monthly Report

Platform Central ICBM Department Regional

Automatic data

from PI

Validation of data

E-mail alert to

relevant parties

Concerns

Improvement in

algorithms

Closing the circle… system improvements

Automatic Process

Closing the circle… system improvements

Initial actions

carried out

Notification

received

Platform

ICBM

Engineer SME

ICBM

Engineer Operations

Maintenance

ICBM

Manager

Plan for

rectification

EIC

If rectification is

required

Human to Human

communicationAutomatic processReporting

Automatic Process

Unit

Automatic data

from PI

Algorithms

run

Validation of data

Analysis output

Critical Trends

shown on IO

E-mail alert to

relevant parties

Concerns

Open

Page 19: PETRONAS ROTATING EQUIPMENT ANALYTICS  · PDF filePETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN) Presented by Khairil Azwan B Khabri

© 2017 Petroliam Nasional Berhad (PETRONAS) 19

No of unit in December 2016

PROTEAN in demand !

No of unit in April 2017 No of unit in October 2017

Open

Page 20: PETRONAS ROTATING EQUIPMENT ANALYTICS  · PDF filePETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN) Presented by Khairil Azwan B Khabri

© 2017 Petroliam Nasional Berhad (PETRONAS) 20

Next Development

• CMMS, PETRONAS Asset Management, online drawings and other

system integrations

• Further Supercritical and C1 units to be incorporated – 100 + units

by 2019

• Research more complex algorithms and OSIsoft PI System add-on

• Ability for individuals to run reports on equipment and compare

between regions

• Technical Condition Index (TCI) for systems and unit for easy

visualization of equipment health

• Develop fault tree to assist engineers with investigation and

diagnosis of alerts

• Develop risk based maintenance philosophy (condition based) and

move away from fixed periodic maintenance schedules

Next Development

Open

Page 21: PETRONAS ROTATING EQUIPMENT ANALYTICS  · PDF filePETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN) Presented by Khairil Azwan B Khabri

© 2017 Petroliam Nasional Berhad (PETRONAS) 21

Summary as of Q3 2017

Evolution rather than

revolution

PROTEAN is

developing very

well and meeting

expectations

270 man hours

each unit to

replicate due to

template system

Low cost and

high return on

investment

predicted

PROTEAN future

upgrades will be

based on benefit

to user

Open

Page 22: PETRONAS ROTATING EQUIPMENT ANALYTICS  · PDF filePETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN) Presented by Khairil Azwan B Khabri

© 2017 Petroliam Nasional Berhad (PETRONAS) 22

The Future

Analysis tools

Pattern

recognition

Baseline scoring

Future data -

prediction

Spare part

optimization

Open

Page 23: PETRONAS ROTATING EQUIPMENT ANALYTICS  · PDF filePETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN) Presented by Khairil Azwan B Khabri

© 2017 Petroliam Nasional Berhad (PETRONAS) 23

Final Thoughts

Why pay the OEM for Remote

Monitoring and Diagnostics

(RM&D) when the OEM is

receiving all the data for R&D?

The OEM should be paying the

operator for the data… business

model change?

Open

Page 24: PETRONAS ROTATING EQUIPMENT ANALYTICS  · PDF filePETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN) Presented by Khairil Azwan B Khabri

© 2017 Petroliam Nasional Berhad (PETRONAS) 24

THE FUN PART IS WE DESIGNED A FANTASTIC LOGO!!!!

Symbolizes the rotating

element Symbolizes the machinery

heartbeat

Trident for

Predictive

Diagnostic

Prognostic

Open

Page 25: PETRONAS ROTATING EQUIPMENT ANALYTICS  · PDF filePETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN) Presented by Khairil Azwan B Khabri

© 2017 Petroliam Nasional Berhad (PETRONAS) 25

Khairil Azwan Bin Khabri

[email protected]

Head Reliability Management

Operational Excellence

Center of Excellence

PETRONAS Carigali

Gavin Warren Halls [email protected]

Rotating Machinery Specialist

Operational Excellence

Center of Excellence

PETRONAS Carigali

25

Nazrul Hsyraf M Mokhtar [email protected]

PI Specialist

Group Technical Data

Project Delivery and Technology

PETRONAS

Open

Page 26: PETRONAS ROTATING EQUIPMENT ANALYTICS  · PDF filePETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN) Presented by Khairil Azwan B Khabri

EMEA USERS CONFERENCE 2017 LONDON #OSISOFTUC ©2017 OSIsoft, LLC

26

Questions

Please wait for the

microphone before asking

your questions

Please remember to…

Complete the Online Survey

for this session

State your

name & company

Page 27: PETRONAS ROTATING EQUIPMENT ANALYTICS  · PDF filePETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN) Presented by Khairil Azwan B Khabri

© 2017 Petroliam Nasional Berhad (PETRONAS) 27

M Nazori B Janor

Anuar Ismail

M Shahrizal B Jasmani

Shaharuddin Hamid Mustapha

Abayazi B Zainul Zaidah Zainal

Nazrul Hsyraf B M Mokhtar

Azlan B Ayub

Marina Syazlin M Saidi

Erma Fathin Aqera

Syazwani Mohd Ali

Nur Sharafina Md Abidin Shah

Nisa Balqis Masnoor

M Shafek A Aziz

Muhammad Hafizi Mat Saat

A Halim B A Gani

Saharudin B M Rejab

Josiah Tay Guang Wei

Madzalan B Nawi

Siti Zainah Mapak

Nabilah Nur Amanina Abdul Rahim

Shairine Manlosa

Hew Pei Chin

Nor Affendi B Jemidi

Rahmat Nur Adi Wijaya

Khairul Anwar B M Nor

M Faizal B Mohamed

M Hafiz B Husin

Megat Nazri B Hanifah

Muqrim Dzubairy B Shahaimi

M Muslim B Jusoh

Sharizan Ramli

Idris Ibrahim

Musreen Azwan Mustafa

Arif Ibrahim

Khairul Rijal

Gavin Warren Halls

M Farid B M Ismail M Zaha Mira B M Idrus

A Ghaffar Dawam

Hairil Helmy Hamzah

M Fadzly B M Khalil

Sultan Maideen Noorul Amen

Chen Kah Seong

Open

Page 28: PETRONAS ROTATING EQUIPMENT ANALYTICS  · PDF filePETRONAS ROTATING EQUIPMENT ANALYTICS (PROTEAN) Presented by Khairil Azwan B Khabri

© 2017 Petroliam Nasional Berhad (PETRONAS) 28

Thank You

Open