11
Peta Luas Produk dan Luas Lantai Produksi

Peta Luas Produk dan Luas Lantai Produksi

  • Upload
    boyce

  • View
    65

  • Download
    0

Embed Size (px)

DESCRIPTION

Peta Luas Produk dan Luas Lantai Produksi. Multi-Column Process Chart. Similar content Visually cleaner Compares processes side-by-side. Multi-Column Example. Process Chart. Used for just one part Record everything that happens to the part from material arrival to shipping - PowerPoint PPT Presentation

Citation preview

Page 1: Peta Luas Produk dan Luas Lantai Produksi

Peta Luas Produk dan Luas Lantai Produksi

Page 2: Peta Luas Produk dan Luas Lantai Produksi

Multi-Column Process Chart Similar content

Visually cleaner

Compares processes side-by-side

Page 3: Peta Luas Produk dan Luas Lantai Produksi

Multi-Column Example1 2 3

R

A

B

C

D

S Totals

No. Steps 7 9 9 25

Least Steps 5 5 5 15

Efficiency 60%

Part Numbers

Page 4: Peta Luas Produk dan Luas Lantai Produksi

Process Chart Used for just one part

Record everything that happens to the part from material arrival to shipping

Symbols are used to describe what happens

Page 5: Peta Luas Produk dan Luas Lantai Produksi

Process Chart Symbols Operation: an object is changed in its characteristics Transportation: an object is moved from one place to another Inspection: an object is examined with a standard as to quantity and quality Delay: the immediate performance of the next planned action does not take place Storage: an object is kept under control such that its withdrawal requires authorization

Page 6: Peta Luas Produk dan Luas Lantai Produksi

Process Chart Questions1. Can I eliminate this step?2. Can I automate this step?3. Can I combine this step with another?4. Can I reduce the travel distance?5. Can I move workstations closer?6. Can I justify production aids to increase

effectiveness?7. How much does this part cost to

produce?

Page 7: Peta Luas Produk dan Luas Lantai Produksi

Total Plant Flow Flow Diagrams

Show the path traveled by each part from receiving to fabrication to assembly and finally to shipping

Problems such as cross traffic, backtracking, and travel distance should be visible

Page 8: Peta Luas Produk dan Luas Lantai Produksi

Total Plant Flow Cross Traffic

Cross traffic occurs where flow lines cross

Proper placement of equipment, services, and departments will eliminate cross traffic

Congestion and safety considerations are results of cross traffic

Page 9: Peta Luas Produk dan Luas Lantai Produksi

Total Plant Flow Backtracking

Material movement reversing flow Backtracking costs three times as

much as correct material flow Distance Traveled

Distance costs money to travel Facility layout is the key to reducing

travel distances

Page 10: Peta Luas Produk dan Luas Lantai Produksi

Goals

Analyze the flow to better plant layout Promote efficiency, effectiveness, and

cost reduction Eliminate as many steps as possible Combine steps Rearrange equipment as appropriate

Page 11: Peta Luas Produk dan Luas Lantai Produksi

Questions and Comment