5/13/2017 Environmental Remediation of Dioxin Contamination at Danang Airport 1 BILATERAL COLLABORATION AND JOINT MANAGEMENT FOR THE ENVIRONMENTAL REMEDIATION OF DIOXIN CONTAMINATION AT DANANG AIRPORT Dr. Andrew L. Sayers-Fay https://pictures.reuters.com/archive/VIETNAM-WAR-AGENTORANGE-GF10000066645.html

PESF 2017 BILATERAL COLLABORATION AND JOINT …pesforum.org/docs/2017/Presentations/Day_2/D2_Waste_02_Sayers-Fay.pdf · 13/05/2017  · pesf 2017 bilateral collaboration and joint

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PESF 2017 BILATERAL COLLABORATION AND JOINT …pesforum.org/docs/2017/Presentations/Day_2/D2_Waste_02_Sayers-Fay.pdf · 13/05/2017  · pesf 2017 bilateral collaboration and joint

5/13/2017 Environmental Remediation of Dioxin Contamination at Danang Airport 1

BILATERAL COLLABORATION AND JOINT MANAGEMENT FOR THE ENVIRONMENTAL REMEDIATION OF DIOXIN CONTAMINATION AT DANANG AIRPORT

Dr. Andrew L. Sayers-Fay

•ht

tps:

//pic

ture

s.re

uter

s.com

/arc

hive

/VIE

TNA

M-W

AR-

AG

ENTO

RAN

GE-

GF1

0000

0666

45.h

tml

Page 2: PESF 2017 BILATERAL COLLABORATION AND JOINT …pesforum.org/docs/2017/Presentations/Day_2/D2_Waste_02_Sayers-Fay.pdf · 13/05/2017  · pesf 2017 bilateral collaboration and joint

PROJECT HISTORY & OVERVIEWWAR LEGACYENVIRONMENTAL ASSESSMENT PRE-IMPLEMENTATION DESIGNREMEDIATION STRATEGY

5/13/2017 Environmental Remediation of Dioxin Contamination at Danang Airport 2

Page 3: PESF 2017 BILATERAL COLLABORATION AND JOINT …pesforum.org/docs/2017/Presentations/Day_2/D2_Waste_02_Sayers-Fay.pdf · 13/05/2017  · pesf 2017 bilateral collaboration and joint

• Operation Ranch Hand (1962–1971), United States (U.S.) applies Agent Orange and other herbicides during U.S.-Vietnam War

• Operation Pacer Ivy (1972), U.S. re-drums/removes herbicides from Vietnam• Normalization of relations in 1995, joint scientific cooperation in earnest in

2007 via Joint Advisory Committee between USG and GVN (Office 33 and EPA/CDC serve as Co-Chairs)

FROM CONTENTION TO COLLABORATIONRESOLVING A WAR LEGACY ISSUE

PHO

TO: N

ew Y

ork

Tim

es

5/13/2017 Environmental Remediation of Dioxin Contamination at Danang Airport 3

Page 4: PESF 2017 BILATERAL COLLABORATION AND JOINT …pesforum.org/docs/2017/Presentations/Day_2/D2_Waste_02_Sayers-Fay.pdf · 13/05/2017  · pesf 2017 bilateral collaboration and joint

5/13/2017 4

• Assessment (2009-2010) – Conducted with Office of

National Steering Committee on Overcoming Consequences of Toxic Chemicals Used by U.S. During the War in Vietnam (Office 33)

– Estimate of 73,000 cubic meters of contaminated soil and sediment

– Recommended In-Pile Thermal Desorption® (IPTD®) technology

• Design (2010-2013)– Conducted by A&E firm and

proprietary technology holder– Included treatability studies and

engineering designs of excavation and treatment structure

ENVIRONMENTAL ASSESSMENT & DESIGNUSAID, 2009-2013

PHO

TO: D

OD

Page 5: PESF 2017 BILATERAL COLLABORATION AND JOINT …pesforum.org/docs/2017/Presentations/Day_2/D2_Waste_02_Sayers-Fay.pdf · 13/05/2017  · pesf 2017 bilateral collaboration and joint

• USAID manages three prime contractors

– Construction Management Contractor (CMC): responsible for day-to-day oversight, environmental compliance and health & safety compliance

– Dig & Haul Contractor: excavate & build structure

– IPTD® Contractor: thermal treatment

REMEDIATION OVERVIEWONE PILE, TWO PHASES

PHO

TO: T

etra

Tech

27/10/16 Environmental Remediation of Dioxin Contamination at Danang Airport 5

PROJECT CLEAN UP GOALS(parts per trillion, ppt)

– Soil = 1,000 ppt– Sediment = 150 ppt– Treatment = 150 ppt

GVN Counterpart = Ministry of National

Defense, Air Defense –Air Force Command

(ADAFC)

Page 6: PESF 2017 BILATERAL COLLABORATION AND JOINT …pesforum.org/docs/2017/Presentations/Day_2/D2_Waste_02_Sayers-Fay.pdf · 13/05/2017  · pesf 2017 bilateral collaboration and joint

PROJECT IMPLEMENTATIONCONSTRUCTIONTREATMENTCONFIRMATIONCOMPLETION

5/13/2017 Environmental Remediation of Dioxin Contamination at Danang Airport 6

Page 7: PESF 2017 BILATERAL COLLABORATION AND JOINT …pesforum.org/docs/2017/Presentations/Day_2/D2_Waste_02_Sayers-Fay.pdf · 13/05/2017  · pesf 2017 bilateral collaboration and joint

27/10/16 Environmental Remediation of Dioxin Contamination at Danang Airport 7

• Excavated, transported and placed approximately 45,000 contaminated cubic meters

• All excavations were verified through sampling of excavation floors and sidewalls by CMC and Vietnam Russia Tropical Centre (VRTC)

• Treatment = minimum of 335°C for up to 21 days

• Operational performance monitored by VRTC and Chemical Command (air, water, soil)

PHASE 1IPTD® THERMAL OPERATIONS

Mean Post-Treatment Dioxin Concentration was 8.9 parts-per-trillion (ppt) Toxic

Equivalent (TEQ)

Page 8: PESF 2017 BILATERAL COLLABORATION AND JOINT …pesforum.org/docs/2017/Presentations/Day_2/D2_Waste_02_Sayers-Fay.pdf · 13/05/2017  · pesf 2017 bilateral collaboration and joint

PHO

TO: U

SAID

27/10/16 Environmental Remediation of Dioxin Contamination at Danang Airport 8

PHASE 1 – COMPLETIONCELEBRATON EVENT (MAY 2016)

• Treated Phase 1 land (approximately 5 hectares) returned by USAID to the Ministry of National Defense and onward to the Ministry of Transportation

• Treated soil officially accepted for beneficial reuse as clean backfill for Airport expansion projects necessary for the City of Danang to successfully host Asia-Pacific Economic Cooperation 2017

Page 9: PESF 2017 BILATERAL COLLABORATION AND JOINT …pesforum.org/docs/2017/Presentations/Day_2/D2_Waste_02_Sayers-Fay.pdf · 13/05/2017  · pesf 2017 bilateral collaboration and joint

PROJECT UPDATE - PHASE 2CONSTRUCTIONTREATMENT SCHEDULEADDITIONAL VOLUME

27/10/16 Environmental Remediation of Dioxin Contamination at Danang Airport 9

Page 10: PESF 2017 BILATERAL COLLABORATION AND JOINT …pesforum.org/docs/2017/Presentations/Day_2/D2_Waste_02_Sayers-Fay.pdf · 13/05/2017  · pesf 2017 bilateral collaboration and joint

27/10/16 10

• May 2017: Begin confirmatory sampling (2 months)

• May to September 2017: Construct landfill for additional volume

• July 2017: Cool treated soil & remove thermal system (2-3 months)

• October 2017: Empty structure and deconstruct liquid vapor treatment plant (2 months)

• December 2017: Dismantle structure & export hazardous waste (2 months)

• March 2018: Complete site restoration

• June 2018: Complete contractor demobilization

PHASE 2 – TREATMENT SCHEDULE

PHO

TO: U

SAID

Page 11: PESF 2017 BILATERAL COLLABORATION AND JOINT …pesforum.org/docs/2017/Presentations/Day_2/D2_Waste_02_Sayers-Fay.pdf · 13/05/2017  · pesf 2017 bilateral collaboration and joint

CAPACITY BUILDINGSUMMARY OF COMPLETED AND PENDING ACTIVITIES

5/13/2017 Environmental Assessment of Dioxin Contamination at Bien Hoa Airbase 11

Page 12: PESF 2017 BILATERAL COLLABORATION AND JOINT …pesforum.org/docs/2017/Presentations/Day_2/D2_Waste_02_Sayers-Fay.pdf · 13/05/2017  · pesf 2017 bilateral collaboration and joint

CAPACITY BUILDING ACTIVITIESU.S. STUDY TOUR OF DIOXIN PROJECTS/LABS• Purpose: To expose participants to

U.S. approach to hazardous waste management

– Meetings with USEPA headquarters and regions

– Active dioxin remediation project tours with project managers

– Laboratory tour

• Participants: 9 GVN environmental remediation managers and scientists from several sections of the Vietnamese Ministry of National Defense

5/13/2017 Environmental Remediation of Dioxin Contamination at Danang Airport 12

Page 13: PESF 2017 BILATERAL COLLABORATION AND JOINT …pesforum.org/docs/2017/Presentations/Day_2/D2_Waste_02_Sayers-Fay.pdf · 13/05/2017  · pesf 2017 bilateral collaboration and joint

– How to design a good sampling program

– Sample collection and management in the field

– Data evaluation and understanding of laboratory quality

– Remediation strategy criteria, evaluation, and selection process

• Participants: 30 trainees largely from Ministries of National Defense and Natural Resources & Environment and provincial-level DONREs

CAPACITY BUILDING ACTIVITIESFOUR-PART TRAINING CERTIFICATE PROGRAM

5/13/2017 Environmental Remediation of Dioxin Contamination at Danang Airport 13

• Purpose: To improve the knowledge and skill set of Vietnam’s next generation of dioxin experts to design and implement environmental assessments/remediation activities, using Bien Hoa as a case study

Page 14: PESF 2017 BILATERAL COLLABORATION AND JOINT …pesforum.org/docs/2017/Presentations/Day_2/D2_Waste_02_Sayers-Fay.pdf · 13/05/2017  · pesf 2017 bilateral collaboration and joint

PHO

TO: U

SAID

5/13/2017 14

PHUC MANH NGUYENMAURA PATTERSONANDREW SAYERS-FAYUSAID/VIETNAM

Environmental Remediation of Dioxin Contamination at Danang Airport