5/13/2017 Environmental Remediation of Dioxin Contamination at Danang Airport 1
BILATERAL COLLABORATION AND JOINT MANAGEMENT FOR THE ENVIRONMENTAL REMEDIATION OF DIOXIN CONTAMINATION AT DANANG AIRPORT
Dr. Andrew L. Sayers-Fay
•ht
tps:
//pic
ture
s.re
uter
s.com
/arc
hive
/VIE
TNA
M-W
AR-
AG
ENTO
RAN
GE-
GF1
0000
0666
45.h
tml
PROJECT HISTORY & OVERVIEWWAR LEGACYENVIRONMENTAL ASSESSMENT PRE-IMPLEMENTATION DESIGNREMEDIATION STRATEGY
5/13/2017 Environmental Remediation of Dioxin Contamination at Danang Airport 2
• Operation Ranch Hand (1962–1971), United States (U.S.) applies Agent Orange and other herbicides during U.S.-Vietnam War
• Operation Pacer Ivy (1972), U.S. re-drums/removes herbicides from Vietnam• Normalization of relations in 1995, joint scientific cooperation in earnest in
2007 via Joint Advisory Committee between USG and GVN (Office 33 and EPA/CDC serve as Co-Chairs)
FROM CONTENTION TO COLLABORATIONRESOLVING A WAR LEGACY ISSUE
PHO
TO: N
ew Y
ork
Tim
es
5/13/2017 Environmental Remediation of Dioxin Contamination at Danang Airport 3
5/13/2017 4
• Assessment (2009-2010) – Conducted with Office of
National Steering Committee on Overcoming Consequences of Toxic Chemicals Used by U.S. During the War in Vietnam (Office 33)
– Estimate of 73,000 cubic meters of contaminated soil and sediment
– Recommended In-Pile Thermal Desorption® (IPTD®) technology
• Design (2010-2013)– Conducted by A&E firm and
proprietary technology holder– Included treatability studies and
engineering designs of excavation and treatment structure
ENVIRONMENTAL ASSESSMENT & DESIGNUSAID, 2009-2013
PHO
TO: D
OD
• USAID manages three prime contractors
– Construction Management Contractor (CMC): responsible for day-to-day oversight, environmental compliance and health & safety compliance
– Dig & Haul Contractor: excavate & build structure
– IPTD® Contractor: thermal treatment
REMEDIATION OVERVIEWONE PILE, TWO PHASES
PHO
TO: T
etra
Tech
27/10/16 Environmental Remediation of Dioxin Contamination at Danang Airport 5
PROJECT CLEAN UP GOALS(parts per trillion, ppt)
– Soil = 1,000 ppt– Sediment = 150 ppt– Treatment = 150 ppt
GVN Counterpart = Ministry of National
Defense, Air Defense –Air Force Command
(ADAFC)
PROJECT IMPLEMENTATIONCONSTRUCTIONTREATMENTCONFIRMATIONCOMPLETION
5/13/2017 Environmental Remediation of Dioxin Contamination at Danang Airport 6
27/10/16 Environmental Remediation of Dioxin Contamination at Danang Airport 7
• Excavated, transported and placed approximately 45,000 contaminated cubic meters
• All excavations were verified through sampling of excavation floors and sidewalls by CMC and Vietnam Russia Tropical Centre (VRTC)
• Treatment = minimum of 335°C for up to 21 days
• Operational performance monitored by VRTC and Chemical Command (air, water, soil)
PHASE 1IPTD® THERMAL OPERATIONS
Mean Post-Treatment Dioxin Concentration was 8.9 parts-per-trillion (ppt) Toxic
Equivalent (TEQ)
PHO
TO: U
SAID
27/10/16 Environmental Remediation of Dioxin Contamination at Danang Airport 8
PHASE 1 – COMPLETIONCELEBRATON EVENT (MAY 2016)
• Treated Phase 1 land (approximately 5 hectares) returned by USAID to the Ministry of National Defense and onward to the Ministry of Transportation
• Treated soil officially accepted for beneficial reuse as clean backfill for Airport expansion projects necessary for the City of Danang to successfully host Asia-Pacific Economic Cooperation 2017
PROJECT UPDATE - PHASE 2CONSTRUCTIONTREATMENT SCHEDULEADDITIONAL VOLUME
27/10/16 Environmental Remediation of Dioxin Contamination at Danang Airport 9
27/10/16 10
• May 2017: Begin confirmatory sampling (2 months)
• May to September 2017: Construct landfill for additional volume
• July 2017: Cool treated soil & remove thermal system (2-3 months)
• October 2017: Empty structure and deconstruct liquid vapor treatment plant (2 months)
• December 2017: Dismantle structure & export hazardous waste (2 months)
• March 2018: Complete site restoration
• June 2018: Complete contractor demobilization
PHASE 2 – TREATMENT SCHEDULE
PHO
TO: U
SAID
CAPACITY BUILDINGSUMMARY OF COMPLETED AND PENDING ACTIVITIES
5/13/2017 Environmental Assessment of Dioxin Contamination at Bien Hoa Airbase 11
CAPACITY BUILDING ACTIVITIESU.S. STUDY TOUR OF DIOXIN PROJECTS/LABS• Purpose: To expose participants to
U.S. approach to hazardous waste management
– Meetings with USEPA headquarters and regions
– Active dioxin remediation project tours with project managers
– Laboratory tour
• Participants: 9 GVN environmental remediation managers and scientists from several sections of the Vietnamese Ministry of National Defense
5/13/2017 Environmental Remediation of Dioxin Contamination at Danang Airport 12
– How to design a good sampling program
– Sample collection and management in the field
– Data evaluation and understanding of laboratory quality
– Remediation strategy criteria, evaluation, and selection process
• Participants: 30 trainees largely from Ministries of National Defense and Natural Resources & Environment and provincial-level DONREs
CAPACITY BUILDING ACTIVITIESFOUR-PART TRAINING CERTIFICATE PROGRAM
5/13/2017 Environmental Remediation of Dioxin Contamination at Danang Airport 13
• Purpose: To improve the knowledge and skill set of Vietnam’s next generation of dioxin experts to design and implement environmental assessments/remediation activities, using Bien Hoa as a case study
PHO
TO: U
SAID
5/13/2017 14
PHUC MANH NGUYENMAURA PATTERSONANDREW SAYERS-FAYUSAID/VIETNAM
Environmental Remediation of Dioxin Contamination at Danang Airport