20
1 ©USM_ USM_REDAC_2007 REDAC_2007 ©USM_ USM_REDAC_2007 REDAC_2007 PENGURUSAN SUNGAI MAPAN Dari Perspektif Kejuruteraan Pengangkutan Endapan dan Keseimbangan Sungai Profesor Aminuddin Ab Ghani ©USM_ USM_REDAC_2007 REDAC_2007 Pengenalan Pengenalan ©USM_ USM_REDAC_2007 REDAC_2007 Sistem Sungai Semula Jadi Sistem Sungai Semula Jadi Zon Air Hulu Zon Pindah Zon Pemendapan Tiga Zon Sungai ©USM_ USM_REDAC_2007 REDAC_2007 Koridor Sungai Koridor Sungai ©USM_ USM_REDAC_2007 REDAC_2007 Zon Air Hulu Zon Air Hulu Buaya Sangkut, Sungai Endau

Permodelan Sungai

  • Upload
    ngonga

  • View
    244

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Permodelan Sungai

1

©©USM_USM_REDAC_2007REDAC_2007 ©©USM_USM_REDAC_2007REDAC_2007

PENGURUSAN SUNGAI MAPAN

Dari Perspektif KejuruteraanPengangkutan Endapan dan

Keseimbangan Sungai

Profesor Aminuddin Ab Ghani

©©USM_USM_REDAC_2007REDAC_2007

PengenalanPengenalan

©©USM_USM_REDAC_2007REDAC_2007

Sistem Sungai Semula JadiSistem Sungai Semula Jadi

Zon Air Hulu Zon Pindah Zon PemendapanTiga Zon Sungai

©©USM_USM_REDAC_2007REDAC_2007

Koridor SungaiKoridor Sungai

©©USM_USM_REDAC_2007REDAC_2007

Zon Air HuluZon Air Hulu

Buaya Sangkut, Sungai Endau

Page 2: Permodelan Sungai

2

©©USM_USM_REDAC_2007REDAC_2007

Zon Air HuluZon Air Hulu

Sungai Endau©©USM_USM_REDAC_2007REDAC_2007

Zon Air HuluZon Air Hulu

Taman Negara, Sungai Pahang

©©USM_USM_REDAC_2007REDAC_2007

Zon PindahZon Pindah

Sg Pahang, Temerloh©©USM_USM_REDAC_2007REDAC_2007

Zon PindahZon Pindah

Sungai Berliku

©©USM_USM_REDAC_2007REDAC_2007

Zon PindahZon Pindah

Sungai Perak, Kuala Kangsar©©USM_USM_REDAC_2007REDAC_2007

Zon PindahZon Pindah

Sungai Lurus

Page 3: Permodelan Sungai

3

©©USM_USM_REDAC_2007REDAC_2007

Jajaran Sungai Semula jadi

Lurus

Berliku

©©USM_USM_REDAC_2007REDAC_2007

Pelbagai Bentuk Keratan Rentas Sungai Berliku Semula jadi

©©USM_USM_REDAC_2007REDAC_2007

Zon PemendapanZon Pemendapan

Muara Sg Pahang, Pekan©©USM_USM_REDAC_2007REDAC_2007

Zon PemendapanZon Pemendapan

Kuala Muda

©©USM_USM_REDAC_2007REDAC_2007

Zon PemendapanZon Pemendapan

Kuala Mersing©©USM_USM_REDAC_2007REDAC_2007

Zon PemendapanZon Pemendapan

Pulau Tioman

Sg Endau, Jeti Tg Gemok

Page 4: Permodelan Sungai

4

©©USM_USM_REDAC_2007REDAC_2007

Zon PemendapanZon Pemendapan

Sg Bebar, Nenasi©©USM_USM_REDAC_2007REDAC_2007

Udang Galah: Sg Bebar, Nenasi

©©USM_USM_REDAC_2007REDAC_2007

Sungai Yang Masih Dalam Keadaan SemulajadiSungai Yang Masih Dalam Keadaan Semulajadi

Sungai Sedim, Kulim

Sungai Ulu Paip, Kulim

Sungai Kampar @ Kg Jahang,

Gopeng

Sungai Kulim, Kedah

©©USM_USM_REDAC_2007REDAC_2007

Nuki River (Kitakyushu City, Fukuoka Prefecture)

Before construction( October 1991 )

23 months after construction (July 1995)Sediment was deposited on which vegetation grew,

Creating a natural water space.

Contoh Pemulihan Sungai di Jepun Contoh Pemulihan Sungai di Jepun

Immediately after construction (August 1993)

©©USM_USM_REDAC_2007REDAC_2007

(a) Pembinaan Siap Pada 30 Januari 2003 (b) 4 Bulan Selepas Pembinaan

Aliran Rendah (22 Mei 2003)

Aliran Tinggi (19 Mei 2003)

Pembinaan Sungai Buatan Di Kampus Kejuruteraan USMPembinaan Sungai Buatan Di Kampus Kejuruteraan USM

©©USM_USM_REDAC_2007REDAC_2007

Semasa Banjir

Selepas Banjir

Banjir 1993 Banjir 1993 –– Sungai KerohSungai Keroh

Page 5: Permodelan Sungai

5

©©USM_USM_REDAC_2007REDAC_2007

Hakisan TebingHakisan Tebing

©©USM_USM_REDAC_2007REDAC_2007

Hakisan TebingHakisan Tebing

©©USM_USM_REDAC_2007REDAC_2007

Hulu Hilir

Pemendapan Dalam Sungai Pemendapan Dalam Sungai ––Sungai KerayongSungai Kerayong

©©USM_USM_REDAC_2007REDAC_2007

Di hulu Jambatan Manjoi (21-12-1997)Banjir 1997Banjir 1997

©©USM_USM_REDAC_2007REDAC_2007

Saluran Utama

Dataran Banjir

Hakisan di Saluran Utama dan Hakisan di Saluran Utama dan Dataran Banjir 1997 Dataran Banjir 1997 –– Sungai PariSungai Pari

©©USM_USM_REDAC_2007REDAC_2007

Keratan R entas @ 1 2 /1 1 /9 7

3 5 .0

3 5 .5

3 6 .0

3 6 .5

3 7 .0

3 7 .5

3 8 .0

3 8 .5

3 9 .0

-1 0 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3Le ba r [m ]

Ara

s [m

]

BLW L0 .2 Y o0 .6 Y o0 .8 Y o

Keratan Rentas @ 19/11/97

35.0

35.5

36.0

36.5

37.0

37.5

38.0

38.5

39.0

-1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23Lebar [m]

Ara

s [m

]

BLWL0.2Yo0.6Yo0.8Yo

Keratan Rentas @ 29/11/97

35

35.5

36

36.5

37

37.5

38

38.5

39

-1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23Lebar [m]

Ara

s [m

]

BLWL0.2Yo0.6Yo0.8Yo

Keratan Rentas @ 03/12/97

35

35.5

36

36.5

37

37.5

38

38.5

39

-1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23Lebar [m]

Ara

s [m

]

BLWL0.2Yo0.6Yo0.8Yo

Keratan Rentas Di Jambatan Manjoi

35

35.5

36

36.5

37

37.5

38

38.5

39

-2 3 8 13 18 23Jarak [m]

Ara

s [m

]

BL12Nov

WL12Nov

BL19Nov

WL19Nov

BL29Nov

WL29Nov

BL3Des

WL3Des

Hakisan dan Pemendapan Dalam Hakisan dan Pemendapan Dalam Saluran SungaiSaluran Sungai

Page 6: Permodelan Sungai

6

©©USM_USM_REDAC_2007REDAC_2007

100

105

110

115

120

125

130

135

140

3600 4100 4600 5100 5600 6100 6600 7100

Distance, meter

Ele

vatio

n, fe

et

Calibrated WL 1997 Flood Soffit Silibin Soffit Manjoi Design Bed BL graf

Permodelan Sungai Menggunakan Permodelan Sungai Menggunakan FLUVIALFLUVIAL--12 Banjir 12 Banjir 19971997, Sg Pari, Sg Pari

©©USM_USM_REDAC_2007REDAC_2007

Kerja Pembinaan Semula Sungai Pari Kerja Pembinaan Semula Sungai Pari Selepas Banjir November 1997Selepas Banjir November 1997

©©USM_USM_REDAC_2007REDAC_2007

Kawalan Hakisan Tebing

©©USM_USM_REDAC_2007REDAC_2007

Kawalan Hakisan Tebing

©©USM_USM_REDAC_2007REDAC_2007

Keseimbangan SungaiKeseimbangan Sungai

©©USM_USM_REDAC_2007REDAC_2007

Konsep Asas Konsep Asas Pengangkutan Pengangkutan

EndapanEndapan

Page 7: Permodelan Sungai

7

©©USM_USM_REDAC_2007REDAC_2007

BAHAN DASAR

BEBAN ENDAPAN

DASAR

BEBAN TERAMPAI

BEBAN HASIL HAKIS

JUMLAH BEBAN BAHAN DASAR

JUMLAHAN BEBAN

Ragam Pengangkutan Ragam Pengangkutan EndapanEndapan

©©USM_USM_REDAC_2007REDAC_2007

Ragam Pengangkutan Ragam Pengangkutan EndapanEndapan

©©USM_USM_REDAC_2007REDAC_2007

No Sediment Transport

Diagram ShieldsDiagram Shields(Featherstone & Nalluri 1993)(Featherstone & Nalluri 1993)

©©USM_USM_REDAC_2007REDAC_2007

Bentuk Bentuk DasarDasar

©©USM_USM_REDAC_2007REDAC_2007

Stesen SP7 Sg. Pari

0.00

10.00

20.00

30.00

40.00

50.00

60.00

70.00

80.00

90.00

100.00

0.01 0.10 1.00 10.00 100.00

Sampel 1 Sampel 2 Sampel 3 PurataSaiz Partikel (mm)

Pera

tusT

elus

(%)

d90

d65

d10

d35

d50

d60

Taburan Saiz Bahan DasarTaburan Saiz Bahan Dasar

©©USM_USM_REDAC_2007REDAC_2007

Halaju Kritikal Halaju Kritikal

Page 8: Permodelan Sungai

8

©©USM_USM_REDAC_2007REDAC_2007

Pengangkutan Jumlahan Beban Bahan Dasar

0.04 < d50(mm) < 4.94

0.137 < d50(mm) < 1.71yo(m) < 1.0 m

0.19 < d50(mm) < 0.93

0.09 < d50(mm) < 2.78

0.785 < d50(mm) < 28.6

ψ < 10

3.17 < d50(mm) < 28.6

Ackers & White

Yang

Engelund & Hansen

Graf

Einstein

Einstein – Brown

Meyer-Peter-Muller

Shields

Persamaan

2.8

2.7

2.6

2.5

Rajah 2.29

2.4

2.3

1.56 < d50(mm) < 2.472.2Pengangkutan Beban Endapan Dasar

Julat DataRujukan PersamaanJenis Persamaan

Persamaan Pengangkutan Persamaan Pengangkutan Endapan SediadaEndapan Sediada

©©USM_USM_REDAC_2007REDAC_2007

Graf (1968)Graf (1968)

©©USM_USM_REDAC_2007REDAC_2007

Ackers Ackers –– White (1972)White (1972)

©©USM_USM_REDAC_2007REDAC_2007

©©USM_USM_REDAC_2007REDAC_2007

Yang Yang (1973)(1973)

©©USM_USM_REDAC_2007REDAC_2007

Page 9: Permodelan Sungai

9

©©USM_USM_REDAC_2007REDAC_2007 ©©USM_USM_REDAC_2007REDAC_2007

Pengkalan Data Pengkalan Data Endapan SungaiEndapan Sungai

©©USM_USM_REDAC_2007REDAC_2007

Pencerapan DataPencerapan Data

©©USM_USM_REDAC_2007REDAC_2007

(a)(a) Kadar Aliran :Kadar Aliran :

• Pencerapan kadar aliran dilakukan untuk enam lokasi pencerapan bagi membangunkan lengkung kadar aliran.

• Tatacara pencerapan kadar aliran dibuat berdasarkan Prosedur Hidrologi No. 15 “River Discharge Measurement by Current Meter” (JPS, 1976).

Meter Arus Swoffer 2100 Meter Arus Model Neyrflux Type 80

Pencerapan DataPencerapan Data

©©USM_USM_REDAC_2007REDAC_2007

SungaiSungai Kulim, SerdangKulim, Serdang

©©USM_USM_REDAC_2007REDAC_2007

(b) (b) Bahan Dasar :Bahan Dasar :

• Bahan dasar dicerap dititik yang sama untuk pencerapan beban endapan dasar. Sebanyak tujuh sampel dicerap bagi setiap keratan rentas.

• Lengkung taburan endapan (S-Curve) hasil analisis ayakan diberikan dalam Volume III Draf Laporan Akhir.

Pensampel Kaut Bahan Dasar Van Veen

Data

Pencerapan DataPencerapan Data

Page 10: Permodelan Sungai

10

©©USM_USM_REDAC_2007REDAC_2007

PURATA SAIZ BATU ADALAH 35.8mm

SungaiSungai Kulim, SerdangKulim, Serdang

©©USM_USM_REDAC_2007REDAC_2007

Sungai Muda,Sungai Muda, Kg. Sg DerhakaKg. Sg Derhaka

©©USM_USM_REDAC_2007REDAC_2007

(c) (c) Beban Endapan Dasar :Beban Endapan Dasar :

• Pensampel beban endapan dasar Helley-Smith yang mempunyai bukaan muncung 76 mm × 76 mm dan satu kurung sampel dengan mesh bersaiz 0.25 mm telah digunakan.

• Bagi setiap lokasi kajian, tujuh sampel dicerap pada jarak yang sama.

Aliran Rendah

Aliran Tinggi

Data

Pencerapan DataPencerapan Data

©©USM_USM_REDAC_2007REDAC_2007

Alat Helley-Smith diletakkan disetiap lokasi selama 10 minit

Sampel yang diperolehidimasukkan dalam bag plastik

dan dilabelkan

Sungai Kulim, SerdangSungai Kulim, Serdang

©©USM_USM_REDAC_2007REDAC_2007

Sungai Muda,Sungai Muda, Ladang VictoriaLadang Victoria

©©USM_USM_REDAC_2007REDAC_2007

(d) (d) Beban Endapan Terampai :Beban Endapan Terampai :

• Pensampel DH 48 atau DH 59 digunakan bagi mencerap data beban endapan terampai secara kaedah depth integrating (JPS, 1977).

• Sebanyak tiga sampel dicerap bagi setiap lokasi kajian.

• Nilai beban endapan terampai bagi keratan rentas dikira berdasarkan nilai purata sampel yang dicerap.

Aliran Rendah Aliran Tinggi

Data

Pencerapan DataPencerapan Data

Page 11: Permodelan Sungai

11

©©USM_USM_REDAC_2007REDAC_2007

Sungai Muda,Sungai Muda, Ladang VictoriaLadang Victoria

©©USM_USM_REDAC_2007REDAC_2007

(d) (d) Cerun Saluran :Cerun Saluran :

• Cerun saluran di setiap keratan rentas adalah berdasarkan cerun permukaan air dicerap menggunakan “Electronic Digital Measurement” (EDM).

• Nilai purata digunakan bagi tujuan analisa data endapan sungai.

(f) (f) Suhu Aliran :Suhu Aliran :

• Suhu aliran diukur dengan menggunakan meter ketumpatan.

• Suhu 30 oC digunakan dalam analisa data endapan sungai.

“Electronic Digital Measurement”(EDM)

Meter Ketumpatan

Pencerapan DataPencerapan Data

©©USM_USM_REDAC_2007REDAC_2007

Ringkasan Data Bagi Sungai Pari @ ManjoiRingkasan Data Bagi Sungai Pari @ Manjoi

Perubahan Keratan Rentas Taburan Saiz Endapan Rintangan Aliran

PengkalanPengkalan DataData

©©USM_USM_REDAC_2007REDAC_2007

Pembangunan Pembangunan Persamaan Persamaan

Pengangkutan Pengangkutan Endapan SungaiEndapan Sungai

©©USM_USM_REDAC_2007REDAC_2007

(a)(a)Hubungan antara Hubungan antara kadar alirkadar alir dan dan jumlahanjumlahan beban beban endapanendapan

(b)(b)Hubungan parameter aliran dan parameter Hubungan parameter aliran dan parameter pengangkutanpengangkutan

(c)(c)Penilaian persamaan pengangkutan endapan yang Penilaian persamaan pengangkutan endapan yang lazim lazim digunakandigunakan

(d)(d)Permodelan Permodelan sungaisungai menggunakan menggunakan FluvialFluvial--1212..

Analisis DataAnalisis Data

©©USM_USM_REDAC_2007REDAC_2007

Hubungan antara Kadaralir Aliran dan Kadaralir Jumlahan Beban EnHubungan antara Kadaralir Aliran dan Kadaralir Jumlahan Beban Endapan (Tdapan (Tjj))

0.1

1

10

100

0.1 1 10 100Q (m 3 /s)

Sungai Pari @ Manjoi

Analisis VSo Vs Tj

Perbandingan Analisis

Analisis DataAnalisis Data

Page 12: Permodelan Sungai

12

©©USM_USM_REDAC_2007REDAC_2007

Hubungan Parameter Aliran (Hubungan Parameter Aliran (ψψ) dan Parameter Pengangukutan () dan Parameter Pengangukutan (φφ))

0.001

0.01

0.1

1

10

100

1000

0.001 0.01 0.1 1 10 100Parameter Pengangkutan, φ

Para

met

er A

liran

, ψ

Sg Pari @ Tmn Merdeka Sg Pari @ Manjoi Sg Pari @ BuntongSg Kinta Sg Raia @ Kg Tanjung Sg Raia @ Bt GajahSg Kampar @ KM 34 Sg Kerayong Sg KulimSg Langat @ Kajang Sg Langat @ Dengkil Sg Lui @ Kg LuiSg Semenyih @ Kg Sg Rinching Persamaan Graf (1968) Persamaan Modified Graf (4.4)

φ=0.5(ψ)-2.52

φ=10.39(ψ)-2.52

Analisis DataAnalisis Data

©©USM_USM_REDAC_2007REDAC_2007

Parameter Pengangkutan EndapanParameter Pengangkutan Endapan

Rintangan Aliran

Bentuk Keratan Rentas

Saiz Endapan

Pengangkutan

Pergerakan

Parameter Tak BerdimensiJenis Parameter

s

o*

s50o

50s VS,VU,

)1S(gdV,

RSd)1S(

ω−−

350s

vv

d)1S(g

VRC,C−

υω

ω⎟⎠⎞

⎜⎝⎛

υ−

= 50s

s

*503/1

2s

50grd,U,

Bd,)1S(gdD

o

2

yB,

AB

50

o

502

ss d

y,dR,

V)1S(gRS8 −

Analisis DataAnalisis Data

©©USM_USM_REDAC_2007REDAC_2007

Analisis RegresiAnalisis Regresi

φ

Cv

Tj

Pembolehubah Bersandar Pembolehubah Tak Bersandar

,dR,

yB,y,R,

U

50oo

*

υ

50

o50*

50os50 dy

,d

,U,dR,

yB,

)1s(gdV

υω

ω−

AB,

yB,

dR,

dy

,D,2

o5050

ogrψ

Analisis DataAnalisis Data

©©USM_USM_REDAC_2007REDAC_2007

0.01

0.10

1.00

10.00

100.00

1 10 100 1000 10000R/d50

T j

Sg. Pari @ Tmn Merdeka Sg. Pari @ Manjoi Sg. Pari @ BuntongSg. Kinta @ Ipoh Sg. Raia @ Kg. Tanjung Sg. Raia @ Batu Ga jahSg. Kampar @ KM 34 Sg. Kerayong Sg. Kulim

0.01

0.10

1.00

10.00

100.00

1 10 100 1000B/y0

Tj

Sg. Pari @ Tmn Merdeka Sg. Pari @ Manjoi Sg. Pari @ BuntongSg. Kinta @ Ipoh Sg. Raia @ Kg. Tanjung Sg. Raia @ Batu GajahSg. Kampar @ KM 34 Sg. Kerayong Sg. Kulim

0.01

0.10

1.00

10.00

100.00

1 10 100 1000 10000y0/d50

T j

Sg. Pari @ Tmn Merdeka Sg. Pari @ Manjoi Sg. Pari @ BuntongSg. Kinta @ Ipoh Sg. Raia @ Kg. Tanjung Sg. Raia @ Batu GajahSg. Kampar @ KM 34 Sg. Kerayong Sg. Kulim

Tj Lawan R/d50

Tj Lawan B/yo

Tj Lawan yo/d50

Hubungkait Antara Tj Dengan Pembolehubah Tak Bersandar

Analisis DataAnalisis Data

©©USM_USM_REDAC_2007REDAC_2007

0.00001

0.0001

0.001

0.1 1.0 10.0U*/ω

Cv

Sg. Pari @ Tmn Merdeka Sg. Pari @ Manjoi Sg. Pari @ BuntongSg. Kinta @ Ipoh Sg. Raia @ Kg. Tanjung Sg. Raia @ Batu GajahSg. Kampar @ KM 34 Sg. Kerayong Sg. Kulim

0.00001

0.0001

0.001

1 10 100 1000B/y0

Cv

Sg. Pari @ Tmn Merdeka Sg. Pari @ Manjoi Sg. Pari @ BuntongSg. Kinta @ Ipoh Sg. Raia @ Kg. Tanjung Sg. Raia @ Batu GajahSg. Kampar @ KM 34 Sg. Kerayong Sg. Kulim

0.00001

0.0001

0.001

0.1 1.0 10.0 100.0V/(gd50(S-1)1/2

Cv

Sg. Pari @ Tmn Merdeka Sg. Pari @ Manjoi Sg. Pari @ BuntongSg. Kinta @ Ipoh Sg. Raia @ Kg. Tanjung Sg. Raia @ Batu GajahSg. Kampar @ KM 34 Sg. Kerayong Sg. Kulim

Cv Lawan R/d50

Cv Lawan V/gd50(S-1)1/2 Tj Lawan U*/ω

Hubungkait Antara Cv Dengan Pembolehubah Tak Bersandar

Analisis DataAnalisis Data

©©USM_USM_REDAC_2007REDAC_2007

0.001

0.01

0.1

1

10

0.1 1.0 10.0 100.0Ψ

Sg. Pari @ Tmn Merdeka Sg. Pari @ Manjoi Sg. Pari @ BuntongSg. Kinta @ Ipoh Sg. Raia @ Kg. Tanjung Sg. Raia @ Batu GajahSg. Kampar @ KM 34 Sg. Kerayong Sg. Kulim

0.001

0.01

0.1

1

10

1 10 100 1000 10000y0/d50

Φ

Sg. Pari @ Tmn Merdeka Sg. Pari @ Manjoi Sg. Pari @ BuntongSg. Kinta @ Ipoh Sg. Raia @ Kg. Tanjung Sg. Raia @ Batu GajahSg. Kampar @ KM 34 Sg. Kerayong Sg. Kulim

φ Lawan ψ

φ Lawan yo/d50

0.001

0.01

0.1

1

10

1 10 100 1000 10000R/d50

Sg. Pari @ Manjoi Sg. Pari @ Buntong Sg. Kinta @ IpohSg. Raia @ Kg. Tanjung Sg. Raia @ Batu Gajah Sg. Kampar @ KM 34Sg. Kerayong Sg. Kulim Sg. Pari @ Tmn Merdeka

φ Lawan R/d50

Hubungkait Antara ψ Dengan Pembolehubah Tak Bersandar

Analisis DataAnalisis Data

Page 13: Permodelan Sungai

13

©©USM_USM_REDAC_2007REDAC_2007

⎟⎟

⎜⎜

⎛ −⎟⎟⎠

⎞⎜⎜⎝

⎛⎟⎟⎠

⎞⎜⎜⎝

⎛= −

VRdSg

dRVSC s

sv

350

390.1

50

293.0

04 )1(10*811.1

ω

Analisis DataAnalisis Data390.1

50

293.0o4

dRVS

10811.1 ⎟⎟⎠

⎞⎜⎜⎝

⎛⎟⎠⎞

⎜⎝⎛

ω×=φ −

Atau

©©USM_USM_REDAC_2007REDAC_2007

0.01

0.1

1

10

100

1000

0.1 1 10 100 1000

Q ( m3/s )

T j

( kg/

s )

Data Endapan Sungai Malaysia Persamaaan 4.14

⎟⎟

⎜⎜

⎛ −⎟⎟⎠

⎞⎜⎜⎝

⎛⎟⎟⎠

⎞⎜⎜⎝

⎛= −

VRdSg

dRVSC s

sv

350

390.1

50

293.0

04 )1(10*811.1

ω

Lengkung Kadar EndapanLengkung Kadar Endapan

©©USM_USM_REDAC_2007REDAC_2007

Permodelan Permodelan SungaiSungai

©©USM_USM_REDAC_2007REDAC_2007

mula

data input

t = t + Δt

penghalaan air

penghalaan endapan

penyesuaian geometri saluran

tempohmasa telah diliputi?tidak

ya

tamat

Carta Aliran FLUVIALCarta Aliran FLUVIAL--1212

©©USM_USM_REDAC_2007REDAC_2007

JajaranSungai Pari

Keratan Rentas

Sungai Pari

PermodelanPermodelan SungaiSungai

©©USM_USM_REDAC_2007REDAC_2007

Ch. 3020 ( 21 Oktober 2002) Jambatan Manjoi, Ch. 3380 ( 21 Oktober 2002)

Taman Merdeka, Ch. 2475 ( 21 Oktober 2002)Alor Limpah Batu, Ch. 1220 ( 25 Julai 2001)

PermodelanPermodelan SungaiSungai

Page 14: Permodelan Sungai

14

©©USM_USM_REDAC_2007REDAC_2007

Jambatan Silibin, Ch. 4540 ( 21 Oktober 2002)

Tokong Buddha, Ch. 4160 ( 21 Oktober 2002)Ch. 3600 ( 21 Oktober 2002)

Kuala Sungai Pari ( 22 Julai 2001 )

PermodelanPermodelan SungaiSungai

©©USM_USM_REDAC_2007REDAC_2007

Data Profil Data Profil Paras AirParas Air

Data Profil Data Profil Paras AirParas Air

Perbezaan Paras Air Sungai Pari

34.00

35.00

36.00

37.00

38.00

39.00

2000 2500 3000 3500 4000 4500 5000Keratan Rentas, m

Para

s, m

P. Air 7/10/2002 (35.00 Cumecs) P. Air 8/10/2002 (34.70 Cumecs)P. Air 9/10/2002 (47.80 Cumecs) P. Air 10/10/2002 (14.15 Cumecs)P. Air 21/10/2002 (7.05 Cumecs)

Paras Air Cerapan Sungai PariParas Air Cerapan

PermodelanPermodelan SungaiSungai

©©USM_USM_REDAC_2007REDAC_2007

Data Data Aliran SungaiAliran Sungai

Puncak Hidrograf Tahun 2000 Sungai Pari

0

20

40

60

80

100

120

2390 2400 2410 2420 2430 2440 2450Masa, jam

Kada

ralir

, m3 /s

PermodelanPermodelan SungaiSungai

©©USM_USM_REDAC_2007REDAC_2007

Taburan Purata Saiz Endapan Bahan

Dasar Untuk Sungai Pari

0.00

10.00

20.00

30.0040.00

50.00

60.0070.00

80.00

90.00

100.00

0.01 0.10 1.00 10.00 100.00

Saiz Partikel, mm

Pera

tus

Telu

s, %

Cerapan Dasar Hil ir Cerapan Dasar Hulu

d50 = 2.50 mm

d50 = 1.80 mm

Data Data Bahan DasarBahan Dasar Data Bahan TebingData Bahan Tebing

Lengkung Kadar EndapanLengkung Kadar Endapan

0.00

0.05

0.10

0.15

0.20

0.25

0.00 10.00 20.00 30.00 40.00 50.00Masa (jam)

Out

put E

ndap

an, Q

s (m

3 /s)

PermodelanPermodelan SungaiSungai

©©USM_USM_REDAC_2007REDAC_2007

Penyelakuan FluvialPenyelakuan Fluvial--1212

PermodelanPermodelan SungaiSungaiPerbandingan Paras Dasar dan Air FL-14/12 Sungai Pari Pada

Puncak Hidrograf Tahun 2000

32.00

34.00

36.00

38.00

40.00

42.00

1000 1500 2000 2500 3000 3500 4000 4500 5000Keratan Rentas, m

Para

s, m

Paras Dasar Simulasi FL12 Paras Air Simulasi FL12 Paras Dasar Mula Paras Cerapan

©©USM_USM_REDAC_2007REDAC_2007

PermodelanPermodelan SungaiSungaiJambatan Manjoi, Sungai Pari

34.0035.00

36.0037.00

38.0039.00

40.00

0.00 10.00 20.00 30.00 40.00 50.00Jarak Dari Tebing Kiri, m

Para

s, m

P. Dasar Awal P. Dasar Simulasi FL-12

CH 4160, Sungai Pari

33.0034.0035.0036.0037.0038.0039.0040.00

0.00 10.00 20.00 30.00 40.00 50.00Jarak Dari Tebing Kiri, m

Para

s, m

Paras Dasar Awal Paras Dasar Simulasi FL-12

Ch. 3380

Ch. 4160

Page 15: Permodelan Sungai

15

©©USM_USM_REDAC_2007REDAC_2007

Projek Tebatan Projek Tebatan Banjir Sg. Muda, Banjir Sg. Muda,

KedahKedah

©©USM_USM_REDAC_2007REDAC_2007

©©USM_USM_REDAC_2007REDAC_2007

Kawasan Banjir 1998Kawasan Banjir 1998

©©USM_USM_REDAC_2007REDAC_2007

Kawasan Banjir 2003Kawasan Banjir 2003

©©USM_USM_REDAC_2007REDAC_2007

Kawasan Banjir Kuala Ketil Kawasan Banjir Kuala Ketil Oktober 2003Oktober 2003

©©USM_USM_REDAC_2007REDAC_2007

Aliran Sungai Muda,Aliran Sungai Muda,Ladang VictoriaLadang Victoria

0

200

400

600

800

1000

1200

1400

1600

1800

2000

2200

6 24 42 60 78 90 108 126 144 162 180

Masa (jam)

Kad

ar a

lir (m

3 /s)

50-year ARI (Q=1768 cumec)

100-year ARI (Q=2001 cumec)

Flood 2003 (Qmax=1340 cumec)

Page 16: Permodelan Sungai

16

©©USM_USM_REDAC_2007REDAC_2007

-6

-4

-2

0

2

4

6

8

10

12

-200 -150 -100 -50 0 50Distance (m)

Ele

vatio

n (m

)

Predicted Bed Level (Design: ARI-50) Predicted Water Level (Design: ARI-50)Predicted Bed Level (Design: ARI-100) Predicted Water Level (Design: ARI-100)Predicted Bed Level (JPZ: ARI-50) Predicted Water Level (JPZ: ARI-50)Predicted Bed Level (JPZ: ARI-100) Predicted Water Level (JPZ: ARI-100)Existing Bed Level

0

2

4

6

8

10

12

-200 -150 -100 -50 0 50Distance (m)

Ele

vatio

n (m

)

Predicted Bed Level (Design: ARI-50) Predicted Water Level (Design: ARI-50)Predicted Bed Level (Design: ARI-100) Predicted Water Level (Design: ARI-100)Predicted Bed Level (JPZ: ARI-50) Predicted Water Level (JPZ: ARI-50)Predicted Bed Level (JPZ: ARI-100) Predicted Water Level (JPZ: ARI-100)Existing Bed Level

(a)Ch. 39.50 (M8-Ladang

Victoria Bridge)

(b) Ch 31.60 (Kuari Kg

Pantai Perai )

Perubahan Keratan RentasPerubahan Keratan Rentas

©©USM_USM_REDAC_2007REDAC_2007

CH 21.90

CH 23.00

-6

-4

-2

0

2

4

6

8

10

-400 -350 -300 -250 -200 -150 -100 -50 0 50 100Distance (m)

Ele

vatio

n (m

)

Predicted Bed Level (Design: ARI-50) Predicted Water Level (Design: ARI-50)Predicted Bed Level (Design: ARI-100) Predicted Water Level (Design: ARI-100)Predicted Bed Level (JPZ: ARI-50) Predicted Water Level (JPZ: ARI-50)Predicted Bed Level (JPZ: ARI-100) Predicted Water Level (JPZ: ARI-100)Existing Bed Level

(d) Ch. 23.00 (Kg Lahar Tiang)

-8

-6

-4

-2

0

2

4

6

8

10

-200 -150 -100 -50 0 50Distance (m)

Ele

vatio

n (m

)

Predicted Bed Level (Design: ARI-50) Predicted Water Level (Design: ARI-50)Predicted Bed Level (Design: ARI-100) Predicted Water Level (Design: ARI-100)Predicted Bed Level (JPZ: ARI-50) Predicted Water Level (JPZ: ARI-50)Predicted Bed Level (JPZ: ARI-100) Predicted Water Level (JPZ: ARI-100)Existing Bed Level

(e) Ch. 21.90 (M17-Kg Lahar Tiang)

©©USM_USM_REDAC_2007REDAC_2007

KG. BUMBUNG LIMA

PEKULA

KG. JAWA

KG. BUKITLALANG

Merdeka Bridge

PLUS Highway

-20

-15

-10

-5

0

5

10

-200 -150 -100 -50 0 50Distance (m)

Ele

vatio

n (m

)

Predicted Bed Level (Design: ARI-50) Predicted Water Level (Design: ARI-50)Predicted Bed Level (Design: ARI-100) Predicted Water Level (Design: ARI-100)Predicted Bed Level (JPZ: ARI-50) Predicted Water Level (JPZ: ARI-50)Predicted Bed Level (JPZ: ARI-100) Predicted Water Level (JPZ: ARI-100)Existing Bed Level

CH 13.1 CH 15.4

-14

-12-10-8-6

-4-202

468

-200 -150 -100 -50 0 50Distance (m)

Ele

vatio

n (m

)

Predicted Bed Level (Design: ARI-50) Predicted Water Level (Design: ARI-50)Predicted Bed Level (Design: ARI-100) Predicted Water Level (Design: ARI-100)Predicted Bed Level (JPZ: ARI-50) Predicted Water Level (JPZ: ARI-50)Predicted Bed Level (JPZ: ARI-100) Predicted Water Level (JPZ: ARI-100)Existing Bed Level

Ch. 13.10 (Bumbong Lima)Ch. 15.40 (Bumbong Lima)

©©USM_USM_REDAC_2007REDAC_2007

Pemetaan Risiko Pemetaan Risiko BanjirBanjir

©©USM_USM_REDAC_2007REDAC_2007

Mud

a B

arra

ge

Mer

deka

B

ridg

e

Exp

ress

way

Bri

dge

Rai

lway

Bri

dge B

ridg

e

Pipe

Bri

dge

Profil Banjir 2003, Sg. Muda Profil Banjir 2003, Sg. Muda (Q=1340m(Q=1340m33/s)/s)

©©USM_USM_REDAC_2007REDAC_2007

n = 0.03

Paras Air Paras Air MaksimumMaksimum di CH 41.2 di CH 41.2 (Ladang Victoria)(Ladang Victoria)

Page 17: Permodelan Sungai

17

©©USM_USM_REDAC_2007REDAC_2007

n = 0.03

Paras Air Maksimum di Ch 25.2 Paras Air Maksimum di Ch 25.2 (Pinang(Pinang Tunggal)Tunggal)

©©USM_USM_REDAC_2007REDAC_2007

n = 0.03

Paras Air Maksimum di CH 14.0 Paras Air Maksimum di CH 14.0 (Bumbung(Bumbung Lima)Lima)

©©USM_USM_REDAC_2007REDAC_2007

Kawasan Ditenggelami Air bagi GunatanahSekarang (Q=220.0 m3/s)

Sungai PariSungai Pari

©©USM_USM_REDAC_2007REDAC_2007

Kawasan Ditenggelami Air bagi Gunatanah2020 (Q=343.0 m3/s)

Sungai PariSungai Pari

©©USM_USM_REDAC_2007REDAC_2007

Bekas Lombong Sebagai Kolam TahananBekas Lombong Sebagai Kolam Tahanan

©©USM_USM_REDAC_2007REDAC_2007

Keseimbangan SungaiKeseimbangan Sungai

Page 18: Permodelan Sungai

18

©©USM_USM_REDAC_2007REDAC_2007

Zorkeflee Abu Hasan (MSc, 1998)

Evaluation of Scour and Deposition in Malaysian Rivers Undergoing Training Works: Case Studies of Pari and Kerayong Rivers

Nasehir Khan E. M Yahaya (MSc, 1999)

Development of Total Bed Material Transport Rating Curves for Rivers in Malaysia: Case Studies of Pari River and Kerayong River and Kulim River

Pelajar Pengajian SiswazahPelajar Pengajian Siswazah

©©USM_USM_REDAC_2007REDAC_2007

Noor Azman Ibrahim (MSc, 2002 )

Sediment Load Measurement In Malaysian Rivers –Case Studies of Pari, Kinta and Perak Rivers

Ahmad Darus (MSc, 2002)

Conservation and Restoration of Urban Rivers: Case Studies of Raia River and Pari River

Pelajar Pengajian SiswazahPelajar Pengajian Siswazah

©©USM_USM_REDAC_2007REDAC_2007

Sharifah Abdullah (MSc, 2002 )

Simulation of River Bed Changes Due To Sand Mining Operation At Muda River

Ahmad Bakri Abdul Ghaffar (MSc, 2003 )

Factors Affecting Values of Manning's Flow Resistance Coefficient

Pelajar Pengajian SiswazahPelajar Pengajian Siswazah

©©USM_USM_REDAC_2007REDAC_2007

Abd Jalil Hassan (MSc, 2005)

River and Floodplain Modelling for the Development of Flood Risk Map: A Case Study of Sg. Selangor

Chang Chun Kiat (MSc, 2006)

Sediment Transport in Sungai Kulim, Kedah

Pelajar Pengajian SiswazahPelajar Pengajian Siswazah

©©USM_USM_REDAC_2007REDAC_2007

Junaidah Ariffin (PhD, 2004)

Development of Sediment Transport Models for Selected Rivers in Malaysia Using Regression Analysis and Artificial Neural Network

Shanker Kumar a/l Sinnakaundan(PhD, 2003)

Sediment Transport Modeling and Flood Risk Mapping in Geographic Information System

Pelajar Pengajian SiswazahPelajar Pengajian Siswazah

©©USM_USM_REDAC_2007REDAC_2007

Rabie A A Hussein (Calon PhD)

Floodplain Inundation Modelling using an Integrated GIS with Radar and Optical Remote Sensing

Pelajar Pengajian SiswazahPelajar Pengajian Siswazah

Page 19: Permodelan Sungai

19

©©USM_USM_REDAC_2007REDAC_2007

Flood Risk Mapping for Pari River Incorporating Sediment Transport (2003)Journal of Environmental Modelling & Software, Vol. 18, No. 2, pp. 119-130

Sediment Transport Equation Assessment for Selected Rivers in Malaysia (2005)International Journal of River Basin Management, IAHR, Vol. 3, No. 3, pp. 203-208

List of PublicationsList of Publications

Multiple Linear Regression Model for Total Bed Material Load Prediction (2006)Journal of Hydraulic Engineering, ASCE, Vol. 132, No. 5, pp. 521-528

©©USM_USM_REDAC_2007REDAC_2007

Revised Equations for Manning’s Coefficient for Sand-Bed Rivers (2007)International Journal of River Basin Management, IAHR, Vol. 5, No. 4, pp. 329-346

List of PublicationsList of Publications

Case Study: Flood Mitigation of the Muda River, Malaysia (In Press)Journal of Hydraulic Engineering, ASCE.

Sediment Transport Modeling for Kulim River - A Case Study (Under Review).Journal of Hydro-Environment Research, IAHR

©©USM_USM_REDAC_2007REDAC_2007

PenghargaanPenghargaan

©©USM_USM_REDAC_2007REDAC_2007

Naib CanselorUniversiti Sains Malaysia

Timbalan NaibCanselor USMPenyelidikan & Inovasi

©©USM_USM_REDAC_2007REDAC_2007

Hj Ab Ghani Mat

Hajjah Rahmah Ariffin

Pn Salbiah Abd Hamid

Hafizuddin Aminuddin

Farzana Aminuddin©©USM_USM_REDAC_2007REDAC_2007

Profesor Nor Azazi Zakaria

Prof. Madya Rozi Abdullah

Prof. Madya Lariyah Mohd Sidek

Prof. Madya Mohd Nordin Adlan

Prof. Madya Ahmad Shukri Yahaya

Dr Dini Ramya Hassan Basri

Page 20: Permodelan Sungai

20

©©USM_USM_REDAC_2007REDAC_2007

Semua KakitanganPusat PengajianKejuruteraan Awam

Semua Kakitangan PusatPenyelidikan KejuruteraanSungai dan Saliran Bandar

©©USM_USM_REDAC_2007REDAC_2007

Jabatan Pengairan dan Saliran

Kementerian Sains, Teknologi & Inovasi

©©USM_USM_REDAC_2007REDAC_2007

SekianSekianTerima KasihTerima Kasih