2
Permanent USFS Visitor Center (Lake Isabella) Site Selection Survey This printable survey is designed to gather input from the Isabella Lake community in regard to site selection of a permanent USFS visitor center in Lake Isabella. As a community member, your feedback is very valuable to our decision-making process. Please take a few minutes to share your thoughts and return via postal mail. The address is included at the end of the survey. This form must postmarked no later than 11:59 p.m. on July 9, 2020 Submissions received with postmarks after that time will not be considered. Thank you for your candid feedback! Isabella Dam Safety Modification Project U.S. Army Corps of Engineers Sacramento District Permanent USFS Visitor Center (Lake Isabella) Site Selection Survey Q1 Do you feel that a new, permanent visitor center is needed in Lake Isabella? Q2 What are the top three (3) services of the former or interim visitor center (Lake Isabella) that you found/find most useful? Q3 Based on the map below, what is your preferred area for the permanent visitor center in Lake Isabella? Area 1 (Red) - the area that sits immediately downstream of the Auxiliary Dam, bordered by SR178 and Ponderosa Dr. Area 2 (Green) - the northernmost area that sits between SR178 and the Auxiliary Dam shoreline Area 3 (Blue) - the area southeast of SR178 and north of the town-proper (near other local and county services) Area 4 (Yellow) - the southernmost area that runs parallel to SR178 and is intersected by Lake Isabella Blvd. Other (Please specify) Yes No Unsure

Permanent USFS Visitor Center (Lake Isabella) Site

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Permanent USFS Visitor Center (Lake Isabella) Site Selection Survey

This printable survey is designed to gather input from the Isabella Lake community in regard to site selection of a permanent USFS visitor center in Lake Isabella. As a community member, your feedback is

very valuable to our decision-making process. Please take a few minutes to share your thoughts and return via postal mail. The address is included at the end of the survey.

This form must postmarked no later than 11:59 p.m. on July 9, 2020Submissions received with postmarks after that time will not be considered.

Thank you for your candid feedback!

Isabella Dam Safety Modification ProjectU.S. Army Corps of Engineers Sacramento District

Permanent USFS Visitor Center (Lake Isabella) Site Selection Survey

Q1 Do you feel that a new, permanent visitor center is needed in Lake Isabella?

Q2 What are the top three (3) services of the former or interim visitor center (Lake Isabella) that you found/find most useful?

Q3 Based on the map below, what is your preferred area for the permanent visitor center in Lake Isabella?

Area 1 (Red) - the area that sits immediately downstream of the Auxiliary Dam, bordered by SR178 and Ponderosa Dr.

Area 2 (Green) - the northernmost area that sits between SR178 and the Auxiliary Dam shoreline

Area 3 (Blue) - the area southeast of SR178 and north of the town-proper (near other local and county services)

Area 4 (Yellow) - the southernmost area that runs parallel to SR178 and is intersected by Lake Isabella Blvd.

Other (Please specify)

Yes No Unsure

l2pa9rdb
Rectangle

Permanent USFS Visitor Center (Lake Isabella) Site Selection Survey

Q4 What are your general comments or concerns about this permanent visitor center?

Please provide at least one form of contact information. Only one submission per person.

Name *

Address *

Email Address

* Required Fields

Mail completed form to:

U.S. Army Corps of Engineers Sacramento District

1325 J Street, Planning Division Sacramento, CA 95814

l2pa9rdb
Rectangle
l2pa9rdb
Underline
l2pa9rdb
Underline